MEG Summary. T. Mori for MEG Collaboration. February 9, 2005. The MEG C ollaboration. Spokespersons : T.Mori, A.Baldini Technical Coordinator : S.Ritt Detectors : Beam line:PSIP.-R.Kettle COBRA:KEK/TokyoW.Ootani Drift Chamber:PSIJ.Egger - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/1.jpg)
MEG Summary
February 9, 2005
T. Mori for MEG Collaboration
![Page 2: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/2.jpg)
Spokespersons: T.Mori, A.BaldiniTechnical Coordinator: S.Ritt
Detectors:• Beam line: PSI P.-R.Kettle• COBRA: KEK/Tokyo W.Ootani • Drift Chamber: PSI J.Egger• Timing Counter: Genova/Pavia/Roma G. Cecchet• Photon Detector: Tokyo/Pisa/KEK S.Mihara• Trigger: Pisa M.Grassi• DAQ/Elec.: PSI S.Ritt• Offline: C.Gatto/S.Yamada/F.Cei
The MEG Collaboration
![Page 3: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/3.jpg)
Highlights in developments sine July 2004
Beam line Separator, BTS in construction
COBRA Fringing field problem ~solved
LXe Beam test w/ new PMTs, waveform digitizers, and wire alpha sourcesDetector cryostat in construction
![Page 4: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/4.jpg)
![Page 5: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/5.jpg)
5
Absolute time of LXe55 M
eV
high gainnormal gain
110 psec 103 psec
110 - 64 - 61 = 65 = 56 + 33 psec
LYSO targetIntrinsic from LR analysis depth
![Page 6: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/6.jpg)
Background and Sensitivity
Jan 2004 Jan 2005Gamma Energy (%) 4.5-5.0*e+ Timing (nsec) 0.1*Gamma Timing <0.23* ~0.15**Gamma Position (mm) 4.5-9.0*Gamma acceptance >0.4*Muon rate (108/sec) 0.2-0.3 0.25-0.35Running Time (107sec) 4.0Accidental Rate (10-14) 2.3-3.5 1.9-3.0# Accidental Events 0.6 0.690% CL Limit (10-13) 1.2-1.7 0.9-1.4
* Measured **w/ new PMTs
More detailed calculation necessary
![Page 7: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/7.jpg)
Schedule
![Page 8: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/8.jpg)
Changes (~delays) in schedule
Beam line BTS construction
LXe Detector cryostat constructionPMT delivery
new problem arising -- solution foreseen
DC Troubles with cathode foil production
![Page 9: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/9.jpg)
Noise from Zener diode
![Page 10: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/10.jpg)
2005 2006J F M A M J J A S O N D J F M A
Beam Time Shutdown MEG MEG Shutdown
COBRATests
P
F
Field
MapBeam
Line
BTS
Test
Commiss.
Part 2Tgt Full Test
Drift
Chamber
Proto
Inst
Full
InstallationTiming
Counter
BG
TestTstInst
Full
Installation
LPT PMT testing + calibration
Full
Calorimeter
Cryogenics
Installation
Assembly +
TestTest
Trigger
Inst Inst
DAQDC
Electr.
Inst Inst
![Page 11: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/11.jpg)
Manpower
![Page 12: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/12.jpg)
Mostly in healthy situation
except:
beam line + targetMonte Carlo
![Page 13: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/13.jpg)
Budget
![Page 14: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/14.jpg)
We now have enough money for PMTs!
a new budget for construction in Japan ~400 PMTsadditional budget for ~110 PMTs in Italy
Then new problems arising…
LXe for last 300literselectronicsLXe calibration equipment proton beam?
PSI
![Page 15: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/15.jpg)
1982 !!
PREVIOUS e EXPERIMENT
![Page 16: MEG Summary](https://reader035.vdocuments.site/reader035/viewer/2022081506/56814449550346895db0e681/html5/thumbnails/16.jpg)
NOW: GLAST SPACE EXPERIMENTCRYSTAL CALORIMETER CALIBRATION
It is the old VDG of the Crystal Ball experiment ! !they have some problems: old device, max. VDG p-energy is 400 KeVout of resonance: -rate reduced by factor 5000
180 cm target-pipe