BUILDINGS ARE “MISSION CRITICAL”
AND ESPC IS KEY
Kathleen McGintyVice President, Global Government RelationsJohnson Controls
![Page 2: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/2.jpg)
• An Energy Revolution
• Money Proves the Point
• A Megatrend Supercharges the Change
• “Bricks and Mortar” Isn’t Good Enough Anymore
• ESPC is key … but your old ESPC won’t do…
![Page 3: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/3.jpg)
TALKING ABOUT A REVOLUTION…
Shale plus a Housing Bust plus a Stimulus Package plus China
• Net natural gas importer (arrow) Net natural gas exporter
• 80-fold increase in installed solar capacity
• 300 percent increase in installed wind
• 90 percent drop in battery costs
• US GDP up 25%; Total energy use up just 6.6%
*BCSE 2020 Energy Factbook
![Page 4: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/4.jpg)
2019 Global Energy Efficiency Indicator Survey
• 75% investing in efficiency, renewables, smart buildings (16% jump)
• 87% investing in resilience (19% jump)
• 71% investing in building controls; over half in enterprise BMS
• 69% investing to cut fossil fuel use
• 63% investing to get off the grid
FOLLOW THE MONEY
![Page 5: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/5.jpg)
Decarbonization Electrification Efficiency Digitalization
From Berkeley Britain Beijing
THE MEGATREND SUPERCHARGING THE CHANGE
![Page 6: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/6.jpg)
WASHINGTON• Statewide decarb
targets• Energy code
incentivizes decarb• Mandatory bldg. perf.
standardSEATTLE• Proposed ban on
new gas infrastructure
CALIFORNIA• Reduce bldg.
emissions 40% by 2030
• 60% RPS by 2030, 100% RPS by 2050
• Bldg Decarb Coalition: specific bans for furnaces in res, com
SAN JOSE, BERKELEY, +++• Bans on gas in new
constructionSAN FRANSISCO• Climate plan
specifically targets electrification
SMUD• Significant
electrification incentive for customers
SCE• Specific space/water
heating electrification targets
LOS ANGELES• “Green New Deal”
expected to set electrification targets
ALL NORTHEAST STATES• Statewide decarb
targets• Significant utility
incentives for ccHPMASSACHUSETTS• Energy code
incentivizes decarb/ccHP
CAMBRIDGE, BROOKLINE• Bans on gas in new
constructionBOSTON• Climate plan
specifically targets electrification
RHODE ISLAND• Heating sector
transformation EONEW YORK• Specific IOU
requirements for ccHP
• Specific R&D for electrification
NEW YORK CITY• Bldg. perf. standard
is emissions-basedNEW JERSEY• Energy Master Plan
specifies electrification
WASHINGTON, DC• Mandatory bldg. perf.
standard• CNCA/BEI city w/
elec. program assessment
MAINE• Specific requirement
for ccHP deploymentVERMONT• Energy code
incentivizes ccHP
COLORADO• Statewide decarb
targets• Admin. developing
electrification plan• Xcel: 100% clean
energy by 2050DENVER• Climate plan
specifically targets electrification
BOULDER• Possible code
proposal to mandate heat pumps
MINNESOTA• Statewide decarb
targets• Specific R&D for
ccHP• Xcel: 100% clean
energy by 2050
Electrification Policy/Initiative
State to Watch (decarb targets)
BUILDING ELECTRIFICATION MOVEMENT AT THE STATE AND LOCAL LEVEL
![Page 7: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/7.jpg)
EFFICIENCY & DIGITALIZATION ARE A MUST
![Page 8: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/8.jpg)
• Conserving Cash
• Saving the Planet
• Training the Troops
• Securing the Country
• Curing People
FROM “BRICKS AND MORTAR” TO “MISSION CRITICAL”
![Page 9: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/9.jpg)
HUMBER HOSPITAL
![Page 10: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/10.jpg)
STANFORD UNIVERSITY CENTRAL ENERGY FACILITY
![Page 11: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/11.jpg)
USMC RECRUIT DEPOT PARRIS ISLAND
![Page 12: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/12.jpg)
KWAJALEIN 1 ESPC SOLAR ARRAY
![Page 13: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/13.jpg)
LEADING REASONS INVESTMENTS NOT MADE
• Lack of Technical Expertise to Evaluate
• Lack of Capital
• Insufficient Payback / ROI
ESPC IS KEY…
![Page 14: McGinty - NAESCO...Title Microsoft PowerPoint - McGinty Author Nina Kogan Created Date 3/13/2020 9:57:59 AM](https://reader036.vdocuments.site/reader036/viewer/2022062609/60fa25c79072a738a61a8c8e/html5/thumbnails/14.jpg)
• System Level Efficiency
• Fully Integrated Supply and Demand
• “SMART” Systems
• EaaS
• “Performance”
BUT YOUR OLD ESPC WON'T DO…