McDonalds PROJECT LOCATION LEGEND PROJECT LOCATION NOTIFICATION CONTACTS NO. TITLE INDEX TO DRAWINGS SHEET SANITARY SEWER PLAN AND PROFILE COVER SHEET C1.1 - C2.2 C3.1 CONSTRUCTION NOTES TREES TO BE REMOVED NOT IN CONTRACT OF BARBED WIRE FENCE W/ 3 STRANDS SOIL TYPE FENCE SOIL BOUNDARY LINE PVC IRRIGATION SLEEVE SPOT ELEVATION CONCRETE PAVING SILT FENCE & TYPE CONCRETE SIDEWALKS EXISTING CLEANOUT DRAIN INLET CATCH BASIN D.O.T. STD. 1033D FIRE HYDRANT WATER VALVE SAN. SEWER W/ MANHOLE DOMESTIC WATER IRRIGATION MAIN FIRE PROTECTION MAIN GAS LINE WATER LINE STORM DRAIN UNDERGROUND FIBER OPTIC UNDERGROUND TELEPHONE UNDERGROUND ELECTRICAL HIGH VOLTAGE LINE DESCRIPTION LIGHT POLE OVERHEAD POWER POWER POLE CONTOUR LINE PROPERTY LINE NEW 1. CONTRACTOR WILL BE WORKING IN TEMPORARY CONSTRUCTION EASEMENTS, PERMANENT EASEMENTS, AND COUNTY RIGHT-OF-WAYS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEARING AND GRUBBING OF EASEMENTS AND REMOVAL OF ALL DEBRIS INCLUDING STUMPS, BLAST ROCK, ETC. NO BURIAL OF CLEARED MATERIALS WILL BE ALLOWED. 2. CONTRACTOR SHALL REMOVE ALL DEBRIS AND HAVE SOIL EROSION CONTROL MEASURES IN PLACE BEFORE CONSTRUCTIONS BEGINS. 3. CONTRACTOR TO NOTIFY UTILITY PROTECTION AGENCY 72 HOURS PRIOR TO START OF WORK. PHONE 811. ALL UTILITY COMPANIES WHICH HAVE FACILITIES IN THE CONSTRUCTION AREA (TELEPHONE, ELECTRIC, ETC.) SHALL BE CONTACTED BY THE CONTRACTOR PRIOR TO THE BEGINNING OF CONSTRUCTION. 4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT ANY DISRUPTIONS OF UTILITY SERVICE. ANY UTILITIES DAMAGED MUST BE REPAIRED THE SAME DAY, UNLESS WRITTEN PERMISSION FROM UTILITY OWNER IS GIVEN. 5. EXISTING UTILITY LINES SHOWN ARE APPROXIMATE LOCATIONS ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS FROM THE DESIGN LOCATION SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. DAMAGE TO EXISTING UTILITY LINES RESULTING FROM THE CONTRACTOR'S ACTIONS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. HE SHALL, AT HIS OWN EXPENSE, REPLACE OR REPAIR THE UTILITIES TO THEIR ORIGINAL CONDITION AND QUALITY, AS APPROVED BY THE CLIENT AND REPRESENTATIVE OF THE APPROPRIATE UTILITY COMPANY. SHOULD THE DAMAGED UTILITY LINE REQUIRE REPAIR BY THE RESPECTIVE UTILITY COMPANY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING ALL COSTS ASSOCIATED WITH THE REPAIR INCLUING FINES AND ASSESSMENTS IMPOSED BY UTILITY COMPANY. CONTRACTOR SHALL NOTIFY ELECTRIC POWER PROVIDER 5 BUSINESS DAYS IN ADVANCE OF WORK ADJACENT TO POWER POLES. COORDINATE WITH UTILITY PROVIDER TO REMOVE OR RELOCATE UTILITY MAINS AND POLES AND PAY ALL ASSOCIATED COSTS. 6. WHEN CONSTRUCTION INVOLVES THE REMOVAL OF FENCE, POLES, MAILBOXES, SIGNS, SIDEWALKS, DRIVEWAYS, DRIVEWAY CULVERTS, TEMPORARY OR FIXED STRUCTURES, THE CONTRACTOR, AT HIS EXPENSE, SHALL PROVIDE FOR TEMPORARY ACCESS SERVICE OR CONTAINMENT TO THE AFFECTED PROPERTY. HE SHALL REPLACE SUCH ITEMS WITH SIMILAR OR BETTER MATERIALS AS SOON AS PRACTICAL, OR AS DIRECTED BY THE ENGINEER AND ALL SIGNAGE, ALL UTILITY COMPANIES WHICH HAVE FACILITIES IN THE CONSTRUCTION AREA (TELEPHONE, ELECTRIC, ETC.) SHALL BE CONTACTED BY THE CONTRACTOR PRIOR TO THE BEGINNING OF CONSTRUCTION. 7. PEDESTRIAN AND LOCAL VEHICULAR TRAFFIC SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. SAFETY DEVICES AND FLAGMEN SHALL BE PROVIDED BY THE CONTRACTOR, AT HIS EXPENSE. IF IT SHOULD BE NECESSARY, WRITTEN PERMISSION TO CLOSE THE CONSTRUCTION AREA TO TRAFFIC MUST BE OBTAINED FROM THE APPROPRIATE GOVERNMENT AGENCY PRIOR TO ANY STREET CLOSING. ALL CONSTRUCTION SIGNAGE, LIGHTED BARRIERS, ETC. SHALL BE INSTALLED PRIOR TO BEGINNING CONSTRUCTION. 8. ALL CONSTRUCTION STAKING SHALL BE BY THE CONTRACTOR, AT HIS EXPENSE. STAKING OF EASEMENT AND CLEARING LIMITS AND NEW CONSTRUCTION SHALL BE PERFORMED BY PROFESSIONAL SURVEYOR LICENSED IN GEORGIA. 9. ALL PROPERTY LINES ARE BASED ON DATA PROVIDED BY FIELD SURVEY DATA. 10. CONTRACTOR SHALL MAINTAIN FIELD "AS-BUILT" DRAWINGS AND SHALL MEASURE AND SHOW LOCATION OF ALL MANHOLES, GRAVITY MAINS, RIM/INVERT ELEVATIONS, ETC. 11. CONTRACTOR SHALL MATCH EXISTING LAWN AND GRASS TYPES WHEN REPAIRING DISTURBED AREAS. 12. ALL CROSS DRAINS AND DRIVEWAY CULVERTS MUST REMAIN OPEN AT ALL TIMES. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO DRAINS AND CULVERTS. 13. CONTRACTOR SHALL PERFORM CONSTRUCTION IN A MANNER THAT WILL ALLOW VEHICULAR ACCESS TO EACH HOME OR BUSINESS DURING CONSTRUCTION. 14. ALL EROSION AND SEDIMENTATION CONTROL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE AS INDICATED ON THE PLANS AND AS DIRECTED BY THE ENGINEER. 15. A MINIMUM OF 10' OF HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN WATER & SEWER MAINS. A MINIMUM OF 18" VERTICAL SEPARATION SHALL BE MAINTAINED AT ALL CROSSINGS OF WATER & SEWER MAINS. 16. THE CONTRACTOR SHALL FURNISH MATERIALS AND MAKE THE CONNECTION TO ALL EXISTING PIPE LINES. 17. THE CONTRACTOR SHALL BEAR ALL COST OF WATER USED FOR FLUSHING AND TESTING REQUIRED BY THE SPECIFICATIONS. PROVISIONS TO PURCHASE SAID WATER FROM A SUPPLIER APPROVED OF BY THE ENGINEER. 18. ALL REQUIRED FITTINGS ARE NOT NECESSARILY SHOWN ON THESE DRAWINGS. CONTRACTOR SHALL FURNISH AND SUPPLY ALL FITTINGS NECESSARY TO CONSTRUCT GRAVITY SEWER MAIN. 19. BEFORE CONSTRUCTION BEGINS, THE CONTRACTOR SHALL PROVIDE THE OWNER AND ENGINEER THE CONTACT INFORMATION OF A PERSON WHO WILL BE AVAILABLE 24 HOURS A DAY TO CONTACT IN CASE OF EMERGENCY. 20. CONTRACTOR TO SAW-CUT EXISTING ASPHALT TO PROVIDE NEAT EDGE FOR PATCHING ON ALL STREETS (SEE DETAIL CLASS 'A' UTILITY PATCH DETAIL) 21. ALL CONSTRUCTION MATERIALS, METHODS AND INSTALLATION SHALL BE IN ACCORDANCE WITH MACON WATER AUTHORITY STANDARDS AND SPECIFICATIONS. 22. CONTRACTOR SHALL NOTIFY MWA CHIEF INSPECTOR, JOEL HERNDON, 478-464-5639, A MINIMUM OF 72 HOURS PRIOR TO BEGINNING CONSTRUCTION. UTILITY CONTACTS C2.1 BENCHMARK INFORMATION PROJECT QUANTITIES 8" PVC SEWER (SDR 26): 269 L.F. JACK & BORE 16" CASING: 240 L.F. # OF MANHOLES: 3 EACH. VERTICAL FEET OF MANHOLE CONSTRUCTION 28.5 V.F. CONTRACTOR TO COORDINATE WITH GDOT I-16/I-75 INTERCHANGE PROJECT CONTROL CP004 - REBAR I-16 CONST 830+79.69, 55.59' RT NORTHING: N: 1035726.9020 EASTING: E: 2462558.5530 ELEV.: 320.36 8" SANITARY SEWER RELOCATION 230 NORTH AVENUE FOR THE MACON WATER AUTHORITY OCTOBER 12, 2020 Engineer Don L. Carter, P.E. Carter Engineering Group. 6310 Peake Road, Suite 200 Macon, GA 31210 Office: 478-219-2600 Email: [email protected] Gas Electricity Telephone/Cable Cheryl Treadway, Account Executive, New Business Development AGL Resources (Local Office) 5472 New Forsyth Rd, Macon, GA 31210 Local Office: (478) 476-2230 Cell: 404-391-3142 Email: [email protected] Georgia Power 960 Key Street Macon, GA 31204 Office: 888-655-5888 Melgenia (Mel) Redd, Manager, OSP-Planning & Design Engineering AT&T 1630 Eisenhower Parkway-Room 260 Macon, GA 31206 Phone: 478-788-1040 Email: [email protected] Owner and 24-Hour Contact Water and Sewer Joel Herndon, Chief Inspector Macon Water Authority Phone: 478-464-5639 Email: [email protected] EROSION CONTROL NOTES EROSION CONTROL DETAILS SANITARY SEWER DETAILS THIS PROJECT CONSISTS OF RELOCATING APPROXIMATELY 269 L.F. OF 8" SANITARY SEWER DIRECTLY ADJACENT TO 230 NORTH AVENUE. PROJECT NARRATIVE LEVEL II CERTIFIED DESIGN PROFESSIONAL # 2061 ISSUED: 11/2/2017 EXPIRES: 11/2/2020 537 Hemlock Street Macon, GA 31202 Joel Herndon, Chief Inspector Macon Water Authority Phone: 478-464-5639 Email: [email protected] 537 Hemlock Street Macon, GA 31202

Upload: others

Post on 25-Apr-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: McDonalds - Macon Water

McDonalds

PROJECT LOCATION

LEGEND

PROJECT LOCATION

NOTIFICATION CONTACTS

NO. TITLE

INDEX TO DRAWINGS

SHEET

SANITARY SEWER PLAN AND PROFILE

COVER SHEET

C1.1

-

C2.2

C3.1

CONSTRUCTION NOTES

TREES TO BE REMOVED

NOT IN CONTRACT

OF BARBED WIRE

FENCE W/ 3 STRANDS

SOIL TYPE

FENCE

SOIL BOUNDARY LINE

PVC IRRIGATION SLEEVE

SPOT ELEVATION

CONCRETE PAVING

SILT FENCE & TYPE

CONCRETE SIDEWALKS

EXISTING

CLEANOUT

DRAIN INLET

CATCH BASIN

D.O.T. STD. 1033D

FIRE HYDRANT

WATER VALVE

SAN. SEWER W/ MANHOLE

DOMESTIC WATER

IRRIGATION MAIN

FIRE PROTECTION MAIN

GAS LINE

WATER LINE

STORM DRAIN

UNDERGROUND FIBER OPTIC

UNDERGROUND TELEPHONE

UNDERGROUND ELECTRICAL

HIGH VOLTAGE LINE

DESCRIPTION

LIGHT POLE

OVERHEAD POWER

POWER POLE

CONTOUR LINE

PROPERTY LINE

NEW

1. CONTRACTOR WILL BE WORKING IN TEMPORARY CONSTRUCTION EASEMENTS, PERMANENT EASEMENTS, AND

COUNTY RIGHT-OF-WAYS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEARING AND GRUBBING OF EASEMENTS AND

REMOVAL OF ALL DEBRIS INCLUDING STUMPS, BLAST ROCK, ETC. NO BURIAL OF CLEARED MATERIALS WILL BE

ALLOWED.

2. CONTRACTOR SHALL REMOVE ALL DEBRIS AND HAVE SOIL EROSION CONTROL MEASURES IN PLACE BEFORE

CONSTRUCTIONS BEGINS.

3. CONTRACTOR TO NOTIFY UTILITY PROTECTION AGENCY 72 HOURS PRIOR TO START OF WORK. PHONE 811. ALL

UTILITY COMPANIES WHICH HAVE FACILITIES IN THE CONSTRUCTION AREA (TELEPHONE, ELECTRIC, ETC.) SHALL BE

CONTACTED BY THE CONTRACTOR PRIOR TO THE BEGINNING OF CONSTRUCTION.

4. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT ANY DISRUPTIONS OF UTILITY SERVICE.

ANY UTILITIES DAMAGED MUST BE REPAIRED THE SAME DAY, UNLESS WRITTEN PERMISSION FROM UTILITY OWNER IS

GIVEN.

5. EXISTING UTILITY LINES SHOWN ARE APPROXIMATE LOCATIONS ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. ANY DEVIATIONS FROM THE DESIGN LOCATION

SHALL BE REPORTED TO THE ENGINEER PRIOR TO CONSTRUCTION. DAMAGE TO EXISTING UTILITY LINES RESULTING

FROM THE CONTRACTOR'S ACTIONS SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. HE SHALL, AT HIS OWN

EXPENSE, REPLACE OR REPAIR THE UTILITIES TO THEIR ORIGINAL CONDITION AND QUALITY, AS APPROVED BY THE

CLIENT AND REPRESENTATIVE OF THE APPROPRIATE UTILITY COMPANY. SHOULD THE DAMAGED UTILITY LINE REQUIRE

REPAIR BY THE RESPECTIVE UTILITY COMPANY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING ALL COSTS

ASSOCIATED WITH THE REPAIR INCLUING FINES AND ASSESSMENTS IMPOSED BY UTILITY COMPANY. CONTRACTOR SHALL

NOTIFY ELECTRIC POWER PROVIDER 5 BUSINESS DAYS IN ADVANCE OF WORK ADJACENT TO POWER POLES.

COORDINATE WITH UTILITY PROVIDER TO REMOVE OR RELOCATE UTILITY MAINS AND POLES AND PAY ALL ASSOCIATED

COSTS.

6. WHEN CONSTRUCTION INVOLVES THE REMOVAL OF FENCE, POLES, MAILBOXES, SIGNS, SIDEWALKS, DRIVEWAYS,

DRIVEWAY CULVERTS, TEMPORARY OR FIXED STRUCTURES, THE CONTRACTOR, AT HIS EXPENSE, SHALL PROVIDE FOR

TEMPORARY ACCESS SERVICE OR CONTAINMENT TO THE AFFECTED PROPERTY. HE SHALL REPLACE SUCH ITEMS WITH

SIMILAR OR BETTER MATERIALS AS SOON AS PRACTICAL, OR AS DIRECTED BY THE ENGINEER AND ALL SIGNAGE, ALL

UTILITY COMPANIES WHICH HAVE FACILITIES IN THE CONSTRUCTION AREA (TELEPHONE, ELECTRIC, ETC.) SHALL BE

CONTACTED BY THE CONTRACTOR PRIOR TO THE BEGINNING OF CONSTRUCTION.

7. PEDESTRIAN AND LOCAL VEHICULAR TRAFFIC SHALL BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION. SAFETY

DEVICES AND FLAGMEN SHALL BE PROVIDED BY THE CONTRACTOR, AT HIS EXPENSE. IF IT SHOULD BE NECESSARY,

WRITTEN PERMISSION TO CLOSE THE CONSTRUCTION AREA TO TRAFFIC MUST BE OBTAINED FROM THE APPROPRIATE

GOVERNMENT AGENCY PRIOR TO ANY STREET CLOSING. ALL CONSTRUCTION SIGNAGE, LIGHTED BARRIERS, ETC. SHALL

BE INSTALLED PRIOR TO BEGINNING CONSTRUCTION.

8. ALL CONSTRUCTION STAKING SHALL BE BY THE CONTRACTOR, AT HIS EXPENSE. STAKING OF EASEMENT AND

CLEARING LIMITS AND NEW CONSTRUCTION SHALL BE PERFORMED BY PROFESSIONAL SURVEYOR LICENSED IN GEORGIA.

9. ALL PROPERTY LINES ARE BASED ON DATA PROVIDED BY FIELD SURVEY DATA.

10. CONTRACTOR SHALL MAINTAIN FIELD "AS-BUILT" DRAWINGS AND SHALL MEASURE AND SHOW LOCATION OF ALL

MANHOLES, GRAVITY MAINS, RIM/INVERT ELEVATIONS, ETC.

11. CONTRACTOR SHALL MATCH EXISTING LAWN AND GRASS TYPES WHEN REPAIRING DISTURBED AREAS.

12. ALL CROSS DRAINS AND DRIVEWAY CULVERTS MUST REMAIN OPEN AT ALL TIMES. CONTRACTOR SHALL BE

RESPONSIBLE FOR ANY DAMAGE TO DRAINS AND CULVERTS.

13. CONTRACTOR SHALL PERFORM CONSTRUCTION IN A MANNER THAT WILL ALLOW VEHICULAR ACCESS TO EACH HOME

OR BUSINESS DURING CONSTRUCTION.

14. ALL EROSION AND SEDIMENTATION CONTROL SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE AS

INDICATED ON THE PLANS AND AS DIRECTED BY THE ENGINEER.

15. A MINIMUM OF 10' OF HORIZONTAL SEPARATION SHALL BE MAINTAINED BETWEEN WATER & SEWER MAINS. A

MINIMUM OF 18" VERTICAL SEPARATION SHALL BE MAINTAINED AT ALL CROSSINGS OF WATER & SEWER MAINS.

16. THE CONTRACTOR SHALL FURNISH MATERIALS AND MAKE THE CONNECTION TO ALL EXISTING PIPE LINES.

17. THE CONTRACTOR SHALL BEAR ALL COST OF WATER USED FOR FLUSHING AND TESTING REQUIRED BY THE

SPECIFICATIONS. PROVISIONS TO PURCHASE SAID WATER FROM A SUPPLIER APPROVED OF BY THE ENGINEER.

18. ALL REQUIRED FITTINGS ARE NOT NECESSARILY SHOWN ON THESE DRAWINGS. CONTRACTOR SHALL FURNISH AND

SUPPLY ALL FITTINGS NECESSARY TO CONSTRUCT GRAVITY SEWER MAIN.

19. BEFORE CONSTRUCTION BEGINS, THE CONTRACTOR SHALL PROVIDE THE OWNER AND ENGINEER THE CONTACT

INFORMATION OF A PERSON WHO WILL BE AVAILABLE 24 HOURS A DAY TO CONTACT IN CASE OF EMERGENCY.

20. CONTRACTOR TO SAW-CUT EXISTING ASPHALT TO PROVIDE NEAT EDGE FOR PATCHING ON ALL STREETS (SEE

DETAIL CLASS 'A' UTILITY PATCH DETAIL)

21. ALL CONSTRUCTION MATERIALS, METHODS AND INSTALLATION SHALL BE IN ACCORDANCE WITH MACON WATER

AUTHORITY STANDARDS AND SPECIFICATIONS.

22. CONTRACTOR SHALL NOTIFY MWA CHIEF INSPECTOR, JOEL HERNDON, 478-464-5639, A MINIMUM OF 72 HOURS

PRIOR TO BEGINNING CONSTRUCTION.

UTILITY CONTACTS

C2.1

BENCHMARK INFORMATIONPROJECT QUANTITIES

8" PVC SEWER (SDR 26): 269 L.F.

JACK & BORE 16" CASING: 240 L.F.

# OF MANHOLES: 3 EACH.

VERTICAL FEET OF MANHOLE CONSTRUCTION 28.5 V.F.

CONTRACTOR TO COORDINATE WITH GDOT

I-16/I-75 INTERCHANGE PROJECT CONTROL

CP004 - REBAR I-16 CONST ℄ 830+79.69, 55.59' RT

NORTHING: N: 1035726.9020

EASTING: E: 2462558.5530

ELEV.: 320.36

8" SANITARY SEWER RELOCATION

230 NORTH AVENUE

FOR THE

MACON WATER AUTHORITY

OCTOBER 12, 2020

Engineer Don L. Carter, P.E.

Carter Engineering Group.

6310 Peake Road, Suite 200

Macon, GA 31210

Office: 478-219-2600

Email: [email protected]

Gas

Electricity

Telephone/Cable

Cheryl Treadway, Account Executive, New Business

Development

AGL Resources (Local Office)

5472 New Forsyth Rd, Macon, GA 31210

Local Office: (478) 476-2230

Cell: 404-391-3142

Email: [email protected]

Georgia Power

960 Key Street

Macon, GA 31204

Office: 888-655-5888

Melgenia (Mel) Redd, Manager, OSP-Planning & Design

Engineering

AT&T

1630 Eisenhower Parkway-Room 260

Macon, GA 31206

Phone: 478-788-1040

Email: [email protected]

Owner and

24-Hour

Contact

Water and Sewer

Joel Herndon, Chief Inspector

Macon Water Authority

Phone: 478-464-5639

Email: [email protected]

EROSION CONTROL NOTES

EROSION CONTROL DETAILS

SANITARY SEWER DETAILS

THIS PROJECT CONSISTS OF RELOCATING APPROXIMATELY 269 L.F. OF 8" SANITARY SEWER

DIRECTLY ADJACENT TO 230 NORTH AVENUE.

PROJECT NARRATIVE

LEVEL II CERTIFIED

DESIGN PROFESSIONAL # 2061

ISSUED: 11/2/2017 EXPIRES: 11/2/2020

537 Hemlock Street

Macon, GA 31202

Joel Herndon, Chief Inspector

Macon Water Authority

Phone: 478-464-5639

Email: [email protected]

537 Hemlock Street

Macon, GA 31202

AutoCAD SHX Text
N.I.C.
AutoCAD SHX Text
HyB
AutoCAD SHX Text
OHP
AutoCAD SHX Text
450
AutoCAD SHX Text
FOC
AutoCAD SHX Text
HVL
AutoCAD SHX Text
W
AutoCAD SHX Text
SAN
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
DW
AutoCAD SHX Text
IRR
AutoCAD SHX Text
FM
AutoCAD SHX Text
W
AutoCAD SHX Text
450
AutoCAD SHX Text
Sd1-C
AutoCAD SHX Text
537 HEMLOCK STREET
AutoCAD SHX Text
M0175.044 Cover.dwg
AutoCAD SHX Text
Macon Water Authority
AutoCAD SHX Text
(478) 464-5635 * Fax (478) 738-3864
AutoCAD SHX Text
Macon, GA 31202-0108
AutoCAD SHX Text
MAGNETIC
Page 2: McDonalds - Macon Water

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

823

306.6

9

MH

S

S

S

S

SS

S

S

MH

SS

S

SS

S

S

S

S

SS

MH

S

S

MH

MH

SS

S

S

SS

MH

S

S

MH

S

S

MH

MH

MH

S

S

FH

42"

15"

15"

36"

18"

36"

36"

15"

15"

15"

15"

18"

15"15"

15"

18"

18"

18"

18"

15"

15"

15"

15"

15"

18"

18"

18"

15"

18"

15"

15"

18"

18"

18"

18"

18"

18"

18"

18"

24"

24"

24"

24"

18"

42"

15"

15"

18"

CURVE KC11000

(ORANGE)4' BARRIER FEN

CE

(ORANGE)4' BARRIER FEN

CE

TOP OF BANK / WRESTED VEGETATION

EXIST. R/W

EXIST. R/W

EXIST. R/WEXIST. R/W

EXIS

T. R/W

EXIST. R/W

LP

LP

LP

L.L. 58L.L. 57

L.L. 55

L.L. 58

96

117

118

REQ'

D. R/W

REQ'D. R/W

REQ'D. R/W

REQ'D. R/WREQ'

D. R/W

F

F

F

F

F

FF

C

C

CC

C

C

C

C

CC

C

C

FF

FF F F

C

CC

CC C

CC

CC

CC

C

C

C

F F F

FF

FF

F

F

18"

36"

REH

INC.

COUNDRIE

S,

18"

S-29

U-02

REH

INC.

COUNDRIE

S,

S-31

S-30

U-01V-01

V-11

10'

X10'

18"U-04

U-05

S-3318"

DETENTION POND

WATER QUALITY

PROPOSED

#4

DETENTION POND

WATER QUALITY

PROPOSED

#4

S 28°10'04.6" E

RAMP-K

SPRING STREET

I-16 WB

I-16 EB

RAMP-H

E 2462829.0648

N 1035554.9623

PC 179

+98.02

BEGI

N RA

MP H

PT 138

+94.42

S 28°10'04.6" E

S 40°11'03.7" E

625+00

135+00

140+00

PT 628

+52.58

PC 634

+66.65

PT 144+47.

60

N 40°10'51.9"

E

S 27°52'48.2" E

170+00

630+00

PC 31+

13.00

25+00

RAMP CDWSTA.163+75.23

BEGIN BRIDGE NO 7

U.S.23 & 129/S.R.19 & 49SPRING ST.

PC 175+36.52

RAMP F

S 35°08'21.5" W

165+00

150+00

S 50°34'48.0" W

PT 148+10.78

PC 148+85.55

PT 149+5

8.87

140+00

PC 140

+00.00

145+00

RAMP-I

PT 166+44.21

CURV

E 52

STA.166+09.98

END BRIDGE 7

STA.627+54.29

END BR NO 8

CURVE

KC 60

STA.625+30.29

BEGIN BR. NO 8

CURVE KC 27

+33.43

18'

CURV

E KC62

CURVE KC 7

CURVE KC38

RAMP-I

W(B)

8"

18"

C.I.

18" C.I.

8" CLAY

18" C.I.

18" C.I.

18" C.I.

48" F.L. 281.0

RIM 295.07

SMH

18" C.I.

18" OUT 293.0

18" IN 295.2

RIM 307.38

SMH

10" CLAY

10" OUT 287.9

RIM 295.02

SMH

10"

MET.

12" M

ET. (A

AT

UR)

16" M

ET.

8" MET.

SVCSS

12" OUT 283.0

12" IN 283.1

RIM 310.23

SMH (AATFI)

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

LP

FH

18" OUT 300.0

18" IN 300.0

SMH

18" OUT 302.7

18" IN 302.9

8" IN 303.3

SMH

18" OUT 295.7

18" IN 295.7

RIM 307.44

SMH (AATUR)

(AA

TU

R)

18" P

VC

SS(C)

SS(C)

18" PVC

10" CLAY

(FIL

LE

D

WIT

H F

LO

WA

BL

E FIL

L)

(FIL

LE

D

WIT

H F

LO

WA

BL

E FIL

L)

FL

OW

AB

LE FIL

L)

(FIL

LE

D

WIT

H

16" MET. (AATUR)(FILLED WITH FLOWABLE FILL)

16" M

ET.

16"

D.I.

(450

L.F.)

24" S

TE

EL

CA

SIN

G

W(C)6"

D.I.

16" D.I.

12" M

ET. (A

AT

UR) (F

ILL

ED

WIT

H F

LO

WA

BL

E FIL

L)

(FILLED WITH FLOWABLE FILL)

16" UNK TYPE (AATUR)

16" D.I.

]

[

10" CLAY

10" OUT 287.710" IN 287.7RIM 295.46SMH

INSTALLED BY JACK AND BOREINSIDE 16" DIA STEEL CASING, 0.250 WT;247 L.F. 8" SANITARY SEWER @ 1.00%

;22 L.F. 8" SANITARY SEWER @ 7.23%

STA 27+91 SPRING STREET

RAMP 'K'

SPRING STREET

EXISTING 36" STORM DRAIN

EXISTING

15" STORM

DRAIN

EXISTING

AT&T DUCT

BANK

EXISTING

16" WATER

MAIN

NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR VERIFYING

ALL UTILITY CROSSING LOCATIONS AND

ELEVATIONS INCLUDING ANY UTILITY NOT SHOWN

ON THE PLANS.

2. CONTRACTOR TO VERIFY ALL INVERTS.

290

300

310

320

330

340

290

300

310

320

330

340

0+00 1+00 2+00 2+69

INV. OUT=310.03 8"

INV. OUT=310.13 8"

INV. IN=310.13 8"

BASE UNIT I.D. = 48"

RIM=318.40

SPRING STREET

STATION 28+78

PROPOSED DHMH-3

INV. OUT=306.47 8"

INV. IN=308.47 8"

BASE UNIT I.D. = 48"

RIM=317.00

SPRING STREET

STATION 28+56

PROPOSED SSMH-2

BA

SE U

NIT I.

D.

= 4

8"

RIM

=311.6

0

SP

RIN

G S

TR

EE

T

ST

ATIO

N 27+6

5

PR

OP

OS

ED D

HM

H 1

INV. IN

=30

4.0

0 8"

INV. IN

=30

2.0

5 18

"

INV.

OU

T=

30

2.0

5 18

"

311.5

8

312.3

3

313.3

4

313.2

2

315.5

7

316.5

5

316.9

3

V 1"=10'

H 1'=50'SCALE:

REVISION DATES

DRAWING No.

DATETIME$$$

$USER$

$PRF$

$$PENTABLE$$

$DGN$ SHEET NO.PROJECT NUMBER

$R

EF01$

$R

EF02$

$R

EF03$

$R

EF04$

$R

EF05$

TOTAL SHEETS

Design File and Plot Substitution information

TIME$$$

$R

EF06$

$R

EF07$

$R

EF08$

$R

EF09$

$R

EF10$

$R

EF11$

$R

EF12$

$R

EF13$

$R

EF14$

$R

EF15$

GPLN

50 100 200

SCALE IN FEET

0

NHIM0-0016-01(131), 0012701

SEE

DW

G.

NO. 13-008

MATC

H LI

NE ST

A.93+50

SEE D

WG.NO. 13-008

MATCH LINE STA.142+00

SEE D

WG.NO. 13-010

MATCH LINE STA.184+00

PL

EASEMENT FOR CONSTR

EASEMENT FOR CONSTR OF SLOPES

EASEMENT FOR CONSTR OF DRIVES

CONSTRUCTION LIMITS

& MAINTENANCE OF SLOPES

C F

REQUIRED R/W LINE

PROPERTY AND EXISTING R/W LINE

LIMIT OF ACCESS

BEGIN LIMIT OF ACCESS................BLA

END LIMIT OF ACCESS.............ELA

REQ'D. R/W AND LIMIT OF ACCESS

STATE

GA

SEE

DW

G.

NO. 13-008

MAT

CH LI

NE ST

A.624+00

SEE DWG.1

3-018

MATCH L

INE S

TA.23+

00

1

(478) 464-5620 FAX (478) 750-2007

Macon, GA 31202-0108

P.O. Box 108 - 790 Second St.

PLAN AND PROFILE

230 NORTH AVENUE

8 INCH SANITARY SEWER REPLACEMENT

C1.1

E = 2462590.20

N = 1036333.17

65' RT

SPRING STREET

STATION 27+65

PROPOSED DHMH 1

E = 2462454.71

N = 1036539.89

165' LT

SPRING STREET

STATION 28+56

PROPOSED SSMH-2

E = 2462464.17

N = 1036559.29

168' LT

SPRING STREET

STATION 28+78

PROPOSED DHMH-3

@ 7.23%

8" SANITARY SEWER

;22 L.F.

INSTALLED BY JACK & BORE

STEEL CASING, 0.250 WT

INSIDE 240 L.F. 16" DIA

SEWER @ 1.00%

;247 L.F. 8" SANITARY

BORE PIT

15' x 30'

RECEIVING PIT

10' x 10'

FILL W/ FLOWABLE FILL

AND ;246 L.F. 8" SANITARY SEWER MAIN

2 -EXISTING SANITARY SEWER MANHOLES (SEE DETAIL)

ABANDON IN PLACE

McDONALDS KRISPY KREME

EM

OR

Y HIG

HW

AY

RESTAURANT

McDONALDS

LATERAL SERVING

SANITARY SEWER

RECONNECT EXISTING

RELOCATE AND

CONTRACTOR TO

RESTAURANT

McDONALDS

LATERAL SERVING

SANITARY SEWER

RECONNECT EXISTING

RELOCATE AND

CONTRACTOR TO

MWA GIS MH #66114

EXIST SSMH

Page 3: McDonalds - Macon Water

Plotted:9/29/2020 04:07:32 PM By:Joe Wood Paper Size:None_user_media Device Name:None Style:CS 253 Plot.ctb Scale:1:80

P:\M0175 - MACON WATER AUTHORITY - 1300\M0175.044 230 North Avenue 18 Inch Sanitary Sewer Replacement\CADD\M0175.044 Details.dwg, C3.2 EROSION NOTES, Last Save:Sep 29,2020 4:07:17pm By:jwood

DRAWING TITLE:

DRAWING NUMBER:

M0175.044 Details.dwg

PROJECT NUMBER: DATE:

DRAWN BY: CHECKED BY:

M0175.044

GRAPHIC SCALE:

CADD DLC

10/12/2020

SCALE:

8" SANITARY SEWER

RELOCATION - 230

NORTH AVENUE

MACON-BIBB COUNTY, GEORGIA

PROJECT:CLIENT:

MACON WATER

AUTHORITY

THIS DRAWING IS AN INSTRUMENT OF SERVICE AND SHALL REMAIN THE PROPERTY OF

THE ENGINEER, AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY

WITHOUT THE CONSENT OF THE ENGINEER. THIS DRAWING SHALL NOT BE SCALED.

© COPYRIGHT 2019 CARTER ENGINEERING GROUP, LLC.

DATE DESCRIPTION

RELEASE DATES:

REV #

STAMP:

LEVEL II CERTIFIED

DESIGN PROFESSIONAL # 2061

ISSUED: 11/2/2017 EXPIRES: 11/2/2020

NOTE: PERMANENT VEGETATION INDICATED ABOVE IS REQUIRED FOR ALL DISTURBED AREAS OF THE SITE EXCEPT:

2 - SPORTS FIELDS WHICH ARE TO BE PERMANENTLY SEEDED WITH PRINCESS-77 BERMUDA 80 LBS./ACRE (SEE SPECS.)

1 - AREAS TO BE SODDED

POLYACRYLAMIDE - PM

CONTRACTOR SHALL INCORPORATE USE OF POLYACRYLAMIDE WITH ALL TEMPORARY AND PERMANENT GRASSING FOR AREAS THAT

HAVE NOT BEEN STABILIZED WITH TEMPORARY OR PERMANENT COVER WITHIN 7 DAYS OF INITIAL DISTURBANCE.

ANIONIC PAM APPLICATION SHALL COMPLY WITH ALL FEDERAL, STATE AND LOCAL LAWS, RULES, OR REGULATIONS GOVERNING

ANIONIC PAM. THE OPERATOR IS RESPONSIBLE FOR SECURING REQUIRED PERMITS.

USERS OF ANIONIC PAM SHALL OBTAIN AND FOLLOW ALL MATERIAL SAFETY DATA SHEET REQUIREMENTS AND MANUFACTURER'S

RECOMMENDATIONS.

LIME: APPLY AGRICULTURAL LIME AT A RATE OF ONE TO TWO TONS PER ACRE AS RECOMMENDED BY SOIL TESTS.

3 - WOOD CELLULOSE MULCH OR WOOD PULP FIBER: 500 LBS PER ACRE

3 - WOOD CELLULOSE MULCH OR WOOD PULP FIBER: 500 LBS PER ACRE

FERTILIZER: APPLY 6-12-12 FERTILIZER AT A RATE OF 1500 LBS PER ACRE.

MULCHING RATES: FOR PERMANENT VEGETATION

PERMANENT VEGETATION/ MULCHING - DS3

MULCHING RATES: FOR TEMPORARY VEGETATION

FERTILIZER: APPLY 10-10-10 FERTILIZER AT A RATE OF 500 LBS PER ACRE.

LIME: APPLY AGRICULTURAL LIME AT A RATE OF ONE TON PER ACRE.

40 LB.

2 - DRY HAY: 2.5 TONS PER ACRE

1 - DRY STRAW: 2 TONS PER ACRE

1 - DRY STRAW: 2 TONS PER ACRE

2 - DRY HAY: 2.5 TONS PER ACRE

ANNUAL RYEGRASS

DECEMBER UNHULLED BERMUDA 40 LB.

RATE/ACRE

SOUTHERN PIEDMONT VEGETATIVE COVERS

40 LB.UNHULLED BERMUDA40 LB.

ANNUAL RYEGRASS

FEBRUARY

40 LB.

40 LB.

40 LB.

40 LB.

40 LB.

40 LB.

40 LB.

40 LB.

40 LB.

ANNUAL RYEGRASS

ANNUAL RYEGRASS

ANNUAL RYEGRASS

BROWN TOP MILLET

ANNUAL RYEGRASS

OCTOBER

NOVEMBER

JULY

AUGUST

SEPTEMBER

BROWN TOP MILLET

ANNUAL RYEGRASS

BROWN TOP MILLET

BROWN TOP MILLETMAY

JUNE

MARCH

APRIL

UNHULLED BERMUDA

UNHULLED BERMUDA

40 LB.

40 LB.

HULLED BERMUDA

HULLED BERMUDA

HULLED BERMUDA

HULLED BERMUDA

40 LB.

40 LB.

40 LB.

40 LB.

RATE/ACRE

40 LB.

TEMP

ANNUAL RYEGRASS

TEMPORARY SEEDMONTH

JANUARY

(LANDSCAPES/SHOULDERS)

UNHULLED BERMUDA

PERMANENT SEED

40 LB.

PERM.

SERICEA LESPEDEZA

& WEEPING LOVEGRASS

75 LB.

4 LB.

SERICEA LESPEDEZA

& WEEPING LOVEGRASS

SERICEA LESPEDEZA

& WEEPING LOVEGRASS

SERICEA LESPEDEZA

& WEEPING LOVEGRASS

SERICEA LESPEDEZA

& WEEPING LOVEGRASS

75 LB.

4 LB.

75 LB.

4 LB.

75 LB.

4 LB.

75 LB.

4 LB.

PERMANENT SEED

STEEPER)

(SLOPES 2:1 AND

RATE/ACRE

PERM.

UNHULLED BERMUDA

HULLED BERMUDA

HULLED BERMUDA

40 LB.

40 LB.

40 LB.

TEMPORARY VEGETATION/ MULCHING - DS2

0.04-0.08

0.10-0.15

0.05-0.080.06-0.2

0.6-6.0

6.0-20

SANDY CLAY LOAM, SANDY LOAM, SANDY CLAY

SANDY CLAY LOAM, SANDY LOAM

LOAMY SAND

23-60

8-23

0-8

(inches)

SURFACE

VuC,VuDVAUCLUSE

PERMEABILITY

(in./hr.)

AVAIL. WATER

(in./in. of soil)

CAPACITY

SYMBOLNAME

DEPTH FROM

USDA TEXTURE

SOIL DATA

EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS.

THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT

SHOWN ON THE APPROVED PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM

THE PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION

CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ANY

DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE

DESIGN PROFESSIONAL IMMEDIATELY.

EARTHWORK OPERATIONS IN THE VICINITY OF STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO

AVOID ENCROACHMENT INTO THE BUFFER AREAS.

TYPE "NS" SILT FENCE SHALL BE PLACED AT THE TOE OF ALL DIRT STOCK PILE AREAS.

INLET SEDIMENT PROTECTION MEASURES SHALL BE INSTALLED ON ALL STORM STRUCTURES AS THEY ARE

CONSTRUCTED. SEE PLAN VIEW FOR SPECIFIC TYPE AND SEPARATE DETAILS FOR ADDITIONAL INFORMATION

ON TYPE OF INLET PROTECTION SPECIFIED.

SEDIMENT SHALL NOT BE WASHED INTO INLETS. IT SHALL BE REMOVED FROM THE SEDIMENT TRAPS AND

DISPOSED AND STABILIZED SO IT WILL NOT ENTER THE INLETS.

ALL GRADED AREAS SHALL BE APPLIED WITH VEGETATIVE COVER AS SOON AS FINAL GRADE IS ACHIEVED.

INTERMEDIATE PHASE EROSION CONTROL NOTES:

THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER

IS ESTABLISHED. SEDIMENT SHALL BE CLEANED OUT OF THE SILT FENCE WHEN IT REACHES THE HALF WAY

POINT ON THE RISER.

ALL ROADWAY SHOULDERS SHALL BE APPLIED WITH VEGETATIVE COVER AS SOON AS FINAL GRADE IS

ACHIEVED BEHIND CURBS.

UPON COMPLETION OF THE PROJECT AND RECEIPT OF CERTIFICATE OF OCCUPANCY, THE CONTRACTOR

SHALL REMOVE ALL TEMPORARY EROSION CONTROL MEASURES (SILT FENCING, MULCH BARRIERS,

TEMPORARY PIPING AND STRUCTURES, CONSTRUCTION EXIT PADS, TEMPORARY SEDIMENT TRAPS, ETC.)

AND DISPOSE OF THEM UNLESS OTHERWISE NOTED ON PLANS.

FINAL PHASE EROSION CONTROL NOTES:

THE CONTRACTOR SHALL OBSERVE THE PROJECT SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR

SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND AREA STRIPPED OF ITS

NATURAL COVER IS EXPOSED ONLY IN MANAGEABLE QUANTITIES.

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION AND

SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING

ACTIVITIES.

IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION ENTRANCE/EXITS, ALL PERIMETER EROSION

CONTROL AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED AS SHOWN ON THE CLEARING

PHASE EROSION CONTROL PLAN.

TYPE "NS" SILT FENCE SHOULD BE INSTALLED AT THE PERIMETER OF THE DISTURBED AREA AS SHOWN ON

THE PLAN. THE SILT FENCE SHOULD BE PLACED IN ACCORDANCE WITH THE MANUAL FOR EROSION CONTROL

IN GEORGIA, TABLE 6-20.2. THE SILT FENCE SHOULD BE KEPT ERECT AT ALL TIMES AND REPAIRED WHEN

REQUESTED BY THE SITE INSPECTOR OR THE PROJECT DESIGN PROFESSIONAL OF RECORD. SILT SHOULD

BE REMOVED WHEN ACCUMULATION REACHES ½ HEIGHT OF THE BARRIER. THE PERIMETER SILT FENCE

SHOULD BE INSPECTED DAILY FOR ANY FAILURES. ANY FAILURES OF SAID FENCING SHOULD BE REPAIRED

IMMEDIATELY.

AFTER INSTALLATION OF INITIAL EROSION CONTROL MEASURES THE SITE CONTRACTOR SHALL SCHEDULE AN

INSPECTION BY THE PROJECT DESIGN PROFESSIONAL. NO OTHER CONSTRUCTION ACTIVITY SHALL OCCUR

UNTIL THE PROJECT DESIGN PROFESSIONAL APPROVES THE INSTALLATION OF SAID EROSION CONTROL

MEASURES. IF UNFORESEEN CONDITIONS EXIST IN THE FIELD THAT WARRANT ADDITIONAL EROSION

CONTROL MEASURES, THE CONTRACTOR MUST CONSTRUCT ANY ADDITIONAL EROSION CONTROL DEVICES

DEEMED NECESSARY BY THE SITE INSPECTION.

NO BURN PITS SHALL BE PERMITTED ON THE CONSTRUCTION SITE WITHOUT WRITTEN PERMISSION BY THE

OWNER AND THE GOVERNING AUTHORITIES. IF BURNING IS NOT PERMITTED, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR REMOVING FROM THE SITE ALL WASTE MATERIALS AND MATERIALS FROM CLEARING AND

GRUBBING OPERATIONS.

NO GRADING SHALL TAKE PLACE UNTIL SILT BARRIER INSTALLATION AND SEDIMENT PONDS ARE

CONSTRUCTED AS SHOWN ON THE INITIAL PHASE EROSION CONTROL PLAN.

NO BURY PITS SHALL BE PERMITTED ON SITE.

INITIAL PHASE EROSION CONTROL NOTES: REMEDIATION OF PETROLEUM SPILLS AND LEAKS

- LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE CLEARLY

POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE PERSONNEL.

- ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE REPORTED AS

REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS.

- MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL STORAGE

AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO, BROOMS, DUSTPANS,

MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST AND PROPERLY LABELED PLASTIC AND

METAL WASTE CONTAINERS.

- SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND ADJUSTED AS

NECESSARY TO PREVENT FUTURE SPILLS.

- FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE SPILL WILL BE CLEANED UP

AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED.

- FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER), THE NATIONAL

RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT 1-800-426-2675.

- FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) WILL BE CONTACTED

WITHIN 24 HOURS AT 1-800-426-2675.

- FOR SPILLS GREATER THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE GEORGIA EPD WILL BE

CONTACTED WITHIN 24 HOURS.

- THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF MORE THAN

1320 GALLONS OF PETROLEUM IS STORED ONSITE (THIS INCLUDES CAPACITIES OF EQUIPMENT) OR IF ANY

ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660 GALLONS. THE CONTRACTOR WILL NEED A

SPILL PREVENTION CONTAINMENT AND COUNTERMEASURES PLAN PREPARED BY THAT LICENSED

PROFESSIONAL.

ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL, STATE,

AND/OR FEDERAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. THE JOB SITE

SUPERINTENDENT, WHO WILL ALSO BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED,

WILL INSTRUCT SITE PERSONNEL IN THESE PRACTICES. MATERIAL SAFETY DATA SHEETS (MSDS'S) FOR

EACH SUBSTANCE WITH HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE WILL BE OBTAINED AND

USED FOR THE PROPER MANAGEMENT OF POTENTIAL WASTES THAT MAY RESULT FROM THESE PRODUCTS.

AN MSDS WILL BE POSTED IN THE IMMEDIATE AREA WHERE SUCH PRODUCT IS STORED AND/OR USED AND

ANOTHER COPY OF EACH MSDS WILL BE MAINTAINED IN THE ESPCP FILE AT THE JOB SITE CONSTRUCTION

TRAILER OFFICE. EACH EMPLOYEE WHO MUST HANDLE A SUBSTANCE WITH HAZARDOUS PROPERTIES WILL

BE INSTRUCTED ON THE USE OF MSDS SHEETS AND THE SPECIFIC INFORMATION IN THE APPLICABLE MSDS

FOR THE PRODUCT HE/SHE IS USING, PARTICULARLY REGARDING SPILL CONTROL TECHNIQUES.

WASTE DISPOSAL, SANITARY SEWER, AND/OR SEPTIC TANK REGULATIONS

THE CONTRACTOR WILL IMPLEMENT THE SPILL PREVENTION CONTROL AND COUNTERMEASURES (SPCC)

PLAN FOUND WITHIN THIS ESPCP AND WILL TRAIN ALL PERSONNEL IN THE PROPER CLEANUP AND HANDLING

OF SPILLED MATERIALS. NO SPILLED HAZARDOUS MATERIALS OR HAZARDOUS WASTES WILL BE ALLOWED

TO COME IN CONTACT WITH STORM WATER DISCHARGES. IF SUCH OCCURS, THE STORM WATER DISCHARGE

WILL BE CONTAINED ONSITE UNTIL APPROPRIATE MEASURES IN COMPLIANCE WITH STATE AND FEDERAL

REGULATIONS ARE TAKEN TO DISPOSE OF SUCH CONTAMINATED STORM WATER. IT SHALL BE THE

RESPONSIBILITY OF THE JOB SITE SUPERINTENDENT TO PROPERLY TRAIN ALL PERSONNEL IN THE USE OF

THE SPCC PLAN.

A MINIMUM OF ONE PORTABLE SANITARY UNIT WILL BE PROVIDED FOR EVERY TEN (10) WORKERS ON THE

SITE. ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF ONE TIME PER

WEEK BY A LICENSED PORTABLE FACILITY PROVIDER IN COMPLETE COMPLIANCE WITH LOCAL AND STATE

REGULATIONS.

ALL SANITARY WASTE UNITS WILL BE LOCATED IN AN AREA WHERE THE LIKELIHOOD OF THE UNIT

CONTRIBUTING TO STORM WATER DISCHARGE IS NEGLIGIBLE. ADDITIONAL CONTAINMENT BMP'S MUST BE

IMPLEMENTED, SUCH AS GRAVEL BAGS OR SPECIALLY DESIGNED PLASTIC SKID CONTAINERS AROUND THE

BASE, TO PREVENT WASTES FROM CONTRIBUTING TO STORM WATER DISCHARGES. THE LOCATION OF

SANITARY WASTE UNITS MUST BE IDENTIFIED ON THE EROSION CONTROL PLAN GRADING PHASE, BY THE

CONTRACTOR ONCE THE LOCATIONS HAVE BEEN DETERMINED.

SANITARY SEWER WILL BE PROVIDED BY MUNICIPAL AUTHORITY/SEPTIC SYSTEM AT THE COMPLETION OF

THIS PROJECT.

FERTILIZER/HERBICIDES - THESE PRODUCTS SHALL BE APPLIED AT RATES THAT DO NOT EXCEED THE

MANUFACTURER'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE CROP ESTABLISHMENT OR

IN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA. ANY STORAGE OF THESE

MATERIALS WILL BE UNDER ROOF IN SEALED CONTAINERS.

BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS SHALL BE BURIED OR DISPOSED OF

ONSITE. ALL SUCH MATERIAL WILL BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURES.

CONCRETE TRUCK WASHING - NO CONCRETE TRUCKS SHALL BE ALLOWED TO WASH OUT OR DISCHARGE

SURPLUS CONCRETE OR DRUM WASH WATER ONSITE. CONCRETE WASHDOWN OF TOOLS, CONCRETE MIXER

CHUTES, HOPPERS AND THE REAR OF VEHICLES SHALL BE CONTAINED IN A PIT OR TRENCH WITH NO

MATERIAL LEAVING THE SITE OR IMPACTING VEGETATED OR NON-DISTURBED AREAS. CONTRACTOR SHALL

DISPOSE OF MATERIAL BY BREAKING OF MATERIAL INTO SMALL AMOUNTS AND DISPOSING OF MATERIAL

OFF-SITE INTO A LANDFILL APPROVED TO ACCEPT SUCH WASTE.

PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS SHALL BE STORED IN TIGHTLY SEALED ORIGINAL CONTAINERS

WHEN NOT IN USE. EXCESS PRODUCT SHALL NOT BE DISCHARGED TO THE STORM WATER COLLECTION

SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS AND PRODUCT CONTAINERS SHALL

BE DISPOSED OF ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS.

PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS

SHALL BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ONSITE VEHICLE AND MACHINERY

DAILY INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT

MAINTENANCE AREAS SHALL BE LOCATED AWAY FROM STATE WATER, NATURAL DRAINS AND STORM WATER

DRAINAGE INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT

LINER TO PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS AND LUBRICANTS IS

PROHIBITED. PROPER DISPOSAL METHODS SHALL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND

DISPOSAL AS REQUIRED BY LOCAL AND STATE REGULATIONS.

PRACTICES TO REDUCE POLLUTANTS IN STORM WATER DISCHARGE

SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL NOT BE DISCHARGED TO WATERS OF THE

STATE OR BURIED ON SITE.

WASTE DISPOSAL CONTAINERS WILL BE PROVIDED BY CONTRACT HAULER FOR WASTE MATERIALS

GENERATED DURING CONSTRUCTION.

THE COMPLETED FACILITY WILL HAVE WASTE DUMPSTERS THAT WILL BE SERVICED BY A CONTRACT HAULER.

1.

2.

3.

4.

SANITARY WASTES

PRODUCT SPECIFIC PRACTICES

SOLID WASTE DISPOSAL:

SOIL CLEANUP AND CONTROL PRACTICES

CONTROL MEASURES

MAINTENANCE OF EROSION

OF TEMPORARY STRUCTURES

FINAL GRASSING & REMOVAL

TEMPORARY GRASSING

INSTALL SANITARY SEWER

5

7

6

3

CLEARING AND GRUBBING

SILT BARRIER INSTALLATION

DESCRIPTION

2

1

ITEM

21 43

WEEKS OF CONST.

THE INSTALLATION SOIL EROSION CONTROL MEASURES &

PRACTICES SHALL BE INSTALLED PRIOR TO OR CONCURRENT WITH

LAND-DISTURBING ACTIVITIES.

NOTE: STARTING & COMPLETION DATES ARE APPROXIMATE

AND NOT INTENDED TO BE CONTRACTUAL.

APPROX. STARTING DATE: DECEMBER 15, 2020

APPROX. COMPLETION DATE: JANUARY 15, 2021

CONSTRUCTION SCHEDULE

EROSION CONTROL

NOTES

C2.1

AS SHOWN

-ANY CONTEMPLATED DISTURBANCES SHALL FIRST BE BROUGHT TO THE ATTENTION OF THE MACON-BIBB

COUNTY DEPARTMENT OF PLANNING & DEVELOPMENT AND FORMAL APPROVAL SECURED PRIOR TO INITIATING

ACTIVITY WITHIN THE REQUIRED BUFFER AREAS.

-NO BUFFER ENCROACHMENTS OR BUFFER VARIANCES ARE NECESSARY FOR THIS PROJECT.

THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF EROSION

CONTROL MEASURES AND PRACTICES PRIOR TO LAND DISTURBING ACTIVITIES.

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE

APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.

ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABILIZED WITH

MULCH OR TEMPORARY SEEDING.

EROSION CONTROL NOTE:

MAINTENANCE STATEMENT:

14 DAY DISTURBANCE NOTE:

EROSION NOTES:

STATE WATERS BUFFER REQUIREMENTS:

PROJECT RECEIVING WATERS:

ADJACENT PROPERTIES:

FLOODPLAIN NOTE:

NO JURISDICTIONAL WETLANDS ARE LOCATED ON OR WITHIN 200 FEET OF THE PROJECT AREA.

STATE WATERS NOTE:

WETLANDS NOTE:

ALL STATE WATERS AND STATE WATERS BUFFERS LOCATED ON OR WITHIN 200 FEET OF THE PROJECT AREA

HAVE BEEN DELINEATED AND SHOWN ON THE CONSTRUCTION PLANS.

INITIAL PROJECT RECEIVING WATERS ARE THE CITY MUNICIPAL STORM SYSTEM THAT DISCHARGES INTO

THE OCMULGEE RIVER.

ADJACENT PROPERTIES ARE COMMERCIAL. NO ADVERSE IMPACTS TO ADJACENT PROPERTIES WILL

RESULT FROM DEVELOPMENT OF THIS PROJECT.

-ALL STATE WATERS BUFFERS AND UNDISTURBED BUFFERS SHALL BE FIELD LOCATED, STAKED AND FLAGGED

OR MARKED WITH "TENZAL" OR SIMILAR TYPE FENCING AND SHALL BE SUBMITTED TO THE COUNTY FOR

APPROVAL PRIOR TO GRADING.

-NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT UNDISTURBED STREAM

BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION OR WITHIN 25-FEET OF THE COASTAL

MARSHLAND BUFFER AS MEASURED FROM THE JURISDICTIONAL DETERMINATION LINE WITHOUT FIRST

ACQUIRING THE NECESSARY VARIANCES AND PERMITS.

-EXISTING VEGETATION SHALL BE PRESERVED WITHIN ALL BUFFER AREAS.

THE SUBJECT PARCEL IS DESIGNATED AS TAX PARCEL R071-0308, AND IS ZONED C-3.

SUBJECT PROPERTY DESIGNATED AS BEING IN ZONE X (AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL

CHANCE (500 YEAR FLOODPLAIN), PER FEMA FIRM MAP 13021C0132G, EFFECTIVE DATE JUNE 7, 2017.

CRITICAL AREAS ONSITE: POTENTIAL ONSITE EROSION AND SEDIMENT PROBLEMS INCLUDE FILL SLOPES

AND STORMWATER DISCHARGE FROM STORM SEWERS. SEDIMENT BARRIER SILT FENCING WILL BE

PLACED ALONG THE PERIMETER OF THE SITE AT CRITICAL LOCATIONS. BERMS, SWALES AND DIVERSION

DITCHES WILL BE EMPLOYED TO PREVENT RUNOFF FROM WASHING OVER SLOPES. RIP RAP STONE WILL

BE USED AT STORM DRAIN OUTLETS. CONSTRUCTION ACTIVITIES AT THIS SITE SHOULD HAVE NO

ADVERSE EFFECTS TO DOWNSTREAM PROPERTIES.

4.

3.

5.

PROPOSED PROJECT: THE PROPOSED PROJECT INCLUDES THE RELOCATION OF

APPROXIMATELY 269 L.F. OF 8 INCH SANITARY SEWER.

EXISTING LAND USE: COMMERCIAL

2.

1.

PROJECT ACREAGE: 0.1 ACRES

DISTURBED AREA: 0.1 ACRES

WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF THE STATE, EXCEPT AS AUTHORIZED BY A

SECTION 404 PERMIT.

7.

AMENDMENTS / REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP's WITH A

HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.

6.

OWNER/DEVELOPER:

24 HR CONTACT: MR. JOEL HERNDON

MACON WATER AUTHORITY

537 HEMLOCK STREET

MACON, GA 31202

OFFICE: 478-464-5639

EMAIL: [email protected]

EROSION & SEDIMENTATION, & POLLUTION CONTROL NOTES:

1.

13.

18.

19.

14.

11.

12.

6.

10.

8.

5.

4.

3.

SEDIMENT AND EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN

ACCORDANCE WITH THE PLANS AND SPECIFICATIONS, AND LOCAL AND STATE REQUIREMENTS AND

SPECIFICATIONS MUST MEET, AT A MINIMUM, GUIDELINES SET FORTH IN THE "MANUAL FOR EROSION

AND SEDIMENT CONTROL IN GEORGIA." FAILURE TO INSTALL, OPERATE, OR MAINTAIN ALL EROSION

CONTROL MEASURES CAN RESULT IN CONSTRUCTION BEING HALTED ON THE JOB UNTIL SUCH

MEASURES ARE CORRECTED.

EACH DAY WHEN ANY TYPE OF CONSTRUCTION ACTIVITY HAS TAKEN PLACE, CERTIFIED PERSONNEL SHALL

INSPECT (A) ALL AREAS WHERE PETROLEUM PRODUCTS ARE STORED, USED OR HANDLED AND (B) ALL

LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE.

IMMEDIATELY AFTER THE ESTABLISHMENT OF CONSTRUCTION ENTRANCES AND EXITS, ALL PERIMETER

EROSION CONTROL DEVICES AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO

ANY OTHER CONSTRUCTION. THE LOCATION OF CERTAIN EROSION CONTROL DEVICES MAY REQUIRE

ALTERING FROM THE LOCATIONS SHOWN ON THE DRAWING IF DRAINAGE PATTERNS DURING

CONSTRUCTION DIFFER FROM THE FINAL GRADING PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

ACCOMPLISH EROSION CONTROL FOR DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING

CONSTRUCTION. AT ALL TIMES, 67 CUBIC YARDS OF SEDIMENT STORAGE MUST BE AVAILABLE FOR EACH

ACRE OF DISTURBED LAND.

EACH DAY THERE IS A FAILURE TO PROPERLY INSTALL AND MAINTAIN ES&PC BMP's CONSTITUTES A

VIOLATION OF THE NPDES PERMIT. A VIOLATION OF THE TURBIDITY LIMITS FOR RECEIVING STREAMS

DEFINED BY THE NPDES PERMIT SHALL CONSTITUTE A SECOND VIOLATION OF THE PERMIT.

SEDIMENT BARRIERS SHALL MEET D.O.T. STANDARDS AND SPECIFICATIONS AND SHALL BE INSTALLED AS

DETAILED ON THE DRAWINGS.

ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE INSTALLED BY

CONTRACTOR IF DEEMED NECESSARY BY ON-SITE INSPECTION.

CONSTRUCT CONSTRUCTION EXITS AT LOCATIONS SHOWN ON THE EROSION CONTROL PLAN. EXIT SHALL

BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE FOLLOWING:

AGGREGATE SIZE: WILL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION ASTM

D448 SIZE #1 (1.5 TO 3.5 INCH STONE). STONE SHALL BE UNDERLAYED WITH GEOTEXTILE

FABRIC.

PAD WIDTH: AT AT MINIMUM, SHOULD EQUAL FULL WIDTH OF ALL POINTS OF VEHICULAR

EGRESS, BUT NOT LESS THAN 20 FEET WIDE AND 50 FEET LONG.

WASHING: WHEELS SHALL BE CLEANED TO REMOVE MUD PRIOR TO ENTRANCE ONTO PUBLIC

RIGHT-OF-WAY. WASHING SHALL BE PERFORMED ON AN AREA STABILIZED WITH CRUSHED

STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN.

MAINTENANCE: THE EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT

TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP

DRESSING WITH 1.5-3.5 INCH STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT

OF ANY STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED,

OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS OR INTO STORM DRAINS MUST BE

REMOVED IMMEDIATELY.

ESTABLISHMENT OF TEMPORARY AND PERMANENT VEGETATION FOR THIS PROJECT SHALL CONSIST OF

THE FOLLOWING: THE GROUND PREPARATION, SEEDING, MULCHING AND HYDROSEEDING OF ALL

DISTURBED AREAS IN THE PROJECT AREA IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. GROUND

PREPARATION SEEDING, MULCHING AND HYDROSEEDING METHODS SHALL CONFORM TO THE

SPECIFICATIONS.

PERMANENT CONTROL STRUCTURES SHALL BE MAINTAINED BY THE CONTRACTOR FOR A PERIOD OF 1

YEAR FOLLOWING ACCEPTANCE OF THE PROJECT.

TEMPORARY MEASURES SUCH AS SILT FENCING SHALL BE REMOVED AND DISPOSED OF BY THE

CONTRACTOR ONCE THE AREA DRAINING TO THE BMP HAS REACHED FINAL STABILIZATION. FINAL

STABILIZATION MEANS THAT ALL LAND-DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND THAT FOR

UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES, THE SOIL SURFACE IS

UNIFORMLY COVERED IN PERMANENT VEGETATION OR THAT EQUIVALENT PERMANENT STABILIZATION

MEASURES (SUCH AS RIP RAP, GABIONS, PERMANENT MULCHES, OR GEOTEXTILES) HAVE BEEN

EMPLOYED.

A COPY OF THE LDA PERMIT, APPROVED ES&PC PLAN, AND ALL REQUIRED NPDES DOCUMENTATION SHALL

BE PRESENT ON THE SITE UNTIL A NOTICE OF TERMINATION IS FILED.

A SITE INSPECTION SHALL BE CONDUCTED WITHIN 24 HOURS OF THE END OF ANY RAINFALL EVENT THAT

IS GREATER THAN OR EQUAL TO 0.5-IN., AND AT LEAST, EVERY SEVEN (7) DAYS. EACH DEVICE IS TO BE

MAINTAINED OF REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ON HALF THE CAPACITY OF THE

DEVICE. ADDITIONAL DEVICES MUST BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED.

MULCH, TEMPORARY VEGETATION, OR PERMANENT (PERENNIAL) VEGETATION SHALL BE COMPLETED ON

ALL EXPOSED AREAS BY THE 7TH DAY AFTER CONSTRUCTION ACTIVITIES TEMPORARILY OR

PERMANENTLY CEASE.

PERMANENT VEGETATION: SHALL BE USED ON AREAS THAT ARE AT FINAL GRADE OR ON AREAS

THAT WILL BE UNDISTURBED FOR MORE THAN SIX MONTHS. SEE GRASSING TABLE AND

MULCHING SCHEDULE.

TEMPORARY SEEDING: SHALL BE USED ON AREAS THAT WILL BE UNDISTURBED FOR LESS

THAN SIX MONTHS. SEE GRASSING TABLE.

MULCHING ALONE: MULCHING ALONE CAN BE USED ON ROUGH GRADED AREAS FOR UP TO SIX

MONTHS. IT SHALL BE APPLIED AT THE APPROPRIATE DEPTH, ANCHORED, AND MAINTAIN A

CONTINUOUS 90% COVER OR GREATER OF THE SOIL SURFACE. SEE MULCHING TABLE.

ANY DEFICIENCIES IDENTIFIED DURING THE INSPECTION OF BMP's SHALL BE CORRECTED WITHIN SEVEN

(7) DAYS OF THE INSPECTION.

EROSION CONTROL BLANKETS OR SODDING SHALL BE USED ON (1) ALL SLOPES STEEPER THAN 2 1/2:1

AND GREATER THAN OR EQUAL TO 10 FEET IN HEIGHT, (2) ALL CONCENTRATED FLOW AREAS, AND (3)

CUTS AND FILLS ADJACENT TO STATE WATERS. REFER TO DRAWINGS FOR AREAS REQUIRING THESE

MEASURES.

DIVERSION DITCHES, BERMS AND TEMPORARY DOWN DRAINS SHALL BE USED DURING GRADING

OPERATIONS TO PROVIDE SEDIMENT CONTROL FOR DISTURBED AREAS. THE CONTRACTOR SHALL

BE RESPONSIBLE FOR INSTALLATION OF THESE MEASURES DURING THE VARIOUS PHASES OF

GRADING. THESE MEASURES MAY OR MAY NOT BE INDICATED ON THE DRAWINGS.

--

20.

PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE LIMITS OF LAND DISTURBANCE SHALL BE

CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS.

THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED

FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE

THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS.

EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE

APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND

SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE

AS DIRECTED BY THE ON SITE INSPECTOR OR THE CIVIL ENGINEER.

NO STAGING AREAS, MATERIAL STORAGE, CONCRETE WASH OUT AREAS, OR DEBRIS BURN AND BURIAL

HOLES SHALL BE LOCATED WITHIN 300 FEET OF DESIGNATED TREE PROTECTION AREAS.

7.

2.

9.

CONTRACTOR SHALL MAINTAIN ON PROJECT SITE DIRECTIONS FOR NECESSARY ACTIONS SHOULD

ANY FUEL OR HAZARDOUS CHEMICAL SPILL OCCUR AT THE PROJECT SITE OR DURING

TRANSPORTATION OPERATIONS TO OR FROM THE PROJECT SITE.

CONTRACTOR SHALL EMPLOY APPROPRIATE MEASURES TO CONTROL DUST WITH THE UNDERSTANDING

WATER USE RESTRICTIONS COULD BE IMPOSED DURING SOME OR ALL PHASES OF CONSTRUCTION.

15.

16.

ALL B.M.P. DEVICES, PRACTICES, AND MATERIALS SHALL BE DESIGNED AND INSTALLED

TO WITHSTAND EFFECTS OF A MINIMUM 25-YEAR STORM EVENT.

SILT MATERIALS SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE HALF THE

HEIGHT OF SILT BARRIER.

17. PREPARATION OF ES&PC PLAN AND ACTIVITIES OF CONTRACTOR SHALL BE IN COMPLIANCE WITH WASTE

DISPOSAL, SANITARY SEWER, OR SEPTIC TANK REGULATIONS.

PAD THICKNESS: 6-INCH MINIMUM.

--

--

MR. JOEL HERNDON

MACON WATER AUTHORITY

537 HEMLOCK STREET

MACON, GA 31202

OFFICE: 478-464-5639

EMAIL: [email protected]

Page 4: McDonalds - Macon Water

Plotted:9/29/2020 04:07:55 PM By:Joe Wood Paper Size:None_user_media Device Name:None Style:CS 253 Plot.ctb Scale:1:80

P:\M0175 - MACON WATER AUTHORITY - 1300\M0175.044 230 North Avenue 18 Inch Sanitary Sewer Replacement\CADD\M0175.044 Details.dwg, C3.3 EROSION DETAILS, Last Save:Sep 29,2020 4:07:17pm By:jwood

DRAWING TITLE:

DRAWING NUMBER:

M0175.044 Details.dwg

PROJECT NUMBER: DATE:

DRAWN BY: CHECKED BY:

M0175.044

GRAPHIC SCALE:

CADD DLC

10/12/2020

SCALE:

8" SANITARY SEWER

RELOCATION - 230

NORTH AVENUE

MACON-BIBB COUNTY, GEORGIA

PROJECT:CLIENT:

MACON WATER

AUTHORITY

THIS DRAWING IS AN INSTRUMENT OF SERVICE AND SHALL REMAIN THE PROPERTY OF

THE ENGINEER, AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY

WITHOUT THE CONSENT OF THE ENGINEER. THIS DRAWING SHALL NOT BE SCALED.

© COPYRIGHT 2019 CARTER ENGINEERING GROUP, LLC.

DATE DESCRIPTION

RELEASE DATES:

REV #

STAMP:

LEVEL II CERTIFIED

DESIGN PROFESSIONAL # 2061

ISSUED: 11/2/2017 EXPIRES: 11/2/2020

EXIT DIAGRAM

ENTRANCE ELEVATION

SIDE VIEW

FRONT VIEW

EROSION CONTROL

DETAILS

C2.2

AS SHOWN

5.

STRUCTURAL PRACTICES

Ch

Co

Cr

Cr

Dc

Di

Dn1

Dn1

Dn2

Dn2

Fr

Ga

Gr

Lv

Rd

Re

Re

Rt

Sd1

Sd2

Sd3

Rt

Sk

Sd4

Gr

Co

Sd3

Sk

Sr

St

St

Su

Tc

Wt

Tr

Tp

Tc

Tp

Sr

CODE PRACTICE DETAIL DESCRIPTION

MAP

SYMBOL

Su

Spb

Spb

Cd

Ds1

Ds3

Ds4

Ss

Sb

Tac

Ds1

Ds3

Ds4

Sb

Tac

Ds2Ds2

Du Du

Ss

Cs

Bf

Cs

Fl-Co

Fl-Co

Bf

CODE PRACTICE DETAIL DESCRIPTION

MAP

SYMBOL

VEGETATIVE PRACTICES

STEEL FRAME AND SILT FENCE INSTALLATION

AutoCAD SHX Text
MULCHING MATERIALS: SELECT ONE OF THE FOLLOWING MATERIALS AND APPLY AT THE DEPTH INDICATED: 1. DRY STRAW OR HAY SHALL BE APPLIED AT A DEPTH OF 2 TO 4 INCHES PROVIDING COMPLETE SOIL COVERAGE. 2. CUTBACK ASPHALT (SLOW CURLING) SHALL BE APPLIED AT 1200 GALLONS PER ACRE APPLYING MULCH: WHEN MULCH IS USED WITH OUT SEEDING, MULCH SHALL BE APPLIED TO PROVIDE FULL COVERAGE OF THE EXPOSED AREA. 1. DRY STRAW OR HAY MULCH SHALL BE APPLIED UNIFORMLY BY HAND OR BY MECHANICAL EQUIPMENT. 2. CUTBACK ASPHALT SHALL BE APPLIED UNIFORMLY. CARE SHOULD BE TAKEN IN AREAS OF PEDESTRIAN TRAFFIC DUE TO PROBLEMS OF "TRACKING IN" OR DAMAGE TO SHOES, CLOTHING, ETC. ANCHORING MULCH: 1. STRAW OR HAY MULCH CAN BE PRESSED INTO THE SOIL WITH A DISK HARROW WITH THE DISK SET STRAIGHT OR WITH A SPECIAL "PACKER DISK". DISKS MAY BE SMOOTH OR SERRATED AND SHOULD BE 20 INCHES OR MORE IN DIAMETER AND 8 TO 12 INCHES APART. THE EDGES OF THE DISK SHOULD BE DULL ENOUGH NOT TO CUT THE MULCH BUT TO PRESS IT INTO THE SOIL LEAVING MULCH IN AN ERECT POSITION. STRAW OR HAY MULCH SHALL BE ANCHORED IMMEDIATELY AFTER APPLICATION. 2. STRAW OR HAY MULCH SPREAD WITH SPECIAL BLOWER-TYPE EQUIPMENT MAY BE ANCHORED WITH EMULSIFIED ASPHALT (GRADE AE-5 OR SS-1). THE ASPHALT EMULSION SHALL BE SPRAYED ONTO THE MULCH AS IT IS EJECTED FROM THE MACHINE. USE 100 GALLONS OF EMULSIFIED ASPHALT AND 100 GALLONS OF WATER PER TON OF MULCH. TACKIFIERS ON BINDERS CAN BE SUBSTITUTED FOR EMULSIFIED ASPHALT.
AutoCAD SHX Text
CONSTRUCTION SPECIFICATIONS 1. STRIPPING SHOULD BE CONFINED TO THE IMMEDIATE CONSTRUCTION AREA. A 4 TO 6 INCH STRIPPING DEPTH IS COMMON, BUT MAY VARY DEPENDING ON THE PARTICULAR SOIL. 2. IF pH VALUE IS LESS THAN 6.0. LIME SHALL BE APPLIES AND INCORPORATED WITH THE TOPSOIL TO ADJUST THE pH TO 6.5 OR HIGHER. TOPSOILS CONTAINING SOLUBLE SALTS GREATER THAN 500 PARTS PER MILLION SHALL NOT BE USED. 3. THE LOCATION OF TOPSOIL STOCKPILES SHOULD NOT OBSTRUCT NATURAL DRAINAGE OR CAUSE OFF-SITE ENVIRONMENTAL DAMAGE. 4. STOCKPILES SHALL BE CONTAINED BY SEDIMENT BARRIERS TO PREVENT SEDIMENTATION ON ADJACENT AREAS. STOCKPILES SHALL BE STABILIZED ON ACCORDANCE WITH SPECIFICATIONS FOR DS1, DS2, PM OR TB. SITE PREPARATION: 1. TOPSOILING: WHEN TOPSOILING, MAINTAIN NEEDED EROSION CONTROL PRACTICE SUCH AS DIVERSIONS, GRADE STABILIZATION STRUCTURES, BERMS, DIKES, LEVEL SPREADERS, WATERWAYS, SEDIMENT BASINS, ETC. 2. GRADING: GRADES ON THE AREAS TO BE TOP SOILED WHICH HAVE BEEN PREVIOUSLY ESTABLISHED SHALL BE MAINTAINED. 3. LIMING: SOIL TESTS SHOULD BE USED TO DETERMINE THE pH OF THE SOIL. WHERE THE pH OF THE SUBSOIL IS 5.0 OR LESS OR COMPOSED OF HEAVY CLAYS, AGRICULTURAL LIMESTONE SHALL BE SPREAD AT THE RATE OF 100 POUNDS PER 1,000 SQUARE FEET. LIME SHALL BE DISTRIBUTED UNIFORMLY OVER DESIGNATED AREAS AND WORKED INTO THE SOIL IN CONJUNCTION WITH TILLAGE OPERATIONS AS DESCRIBED IN THE FOLLOWING PROCEDURES. 4. BONDING: USE ONE OF THE FOLLOWING METHODS TO INSURE BONDING OF TOPSOIL: A. TILLING: AFTER THE AREAS TO BE TOPSOILED HAVE BEEN BROUGHT TO GRADE, AND IMMEDIATELY PRIOR TO DUMPING AND SPREADING THE TOPSOIL, THE SUB GRADE SHALL BE LOOSENED BY DISCING OR SCARIFYING TO A DEPTH OF AT LEAST 3 INCHES TO PERMIT BONDING OF THE TOPSOIL TO THE SUBSOIL. B. TRACKING: PASSING A BULLDOZER OVER THE ENTIRE SURFACE AREA OF THE SLOPE TO LEAVE HORIZONTAL DEPRESSIONS. 5. APPLYING TOPSOIL: A. TOPSOIL SHOULD BE HANDLED ONLY WHEN IT IS DRY ENOUGH TO WORK WITH WITHOUT DAMAGING SOIL STRUCTURE. B. A UNIFORM APPLICATION OF 6 INCHES (UNSETTLED) IS RECOMMENDED, BUT MAY BE ADJUSTED AT THE DISCRETION OF THE ENGINEER OR LANDSCAPE ARCHITECT.
AutoCAD SHX Text
Tp
AutoCAD SHX Text
DISTURBED AREA STABILIZATION (W/ MULCH ONLY)
AutoCAD SHX Text
TOPSOILING
AutoCAD SHX Text
Ds1
AutoCAD SHX Text
NOTES: : 1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS. 2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND CROWN FOR POSITIVE DRAINAGE. 3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE). AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE). 4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6". GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6". 5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'. 6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%.. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%.. 7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES. 8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE). 9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT SUITABLE FOR TRUCK TRAFFIC THAT FOR TRUCK TRAFFIC THAT REMOVE MUD AND DIRT. 10. MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT.
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
(IF NEEDED)
AutoCAD SHX Text
1
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
CONSTRUCTION EXIT
AutoCAD SHX Text
Co
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
30" MIN.
AutoCAD SHX Text
*
AutoCAD SHX Text
6"
AutoCAD SHX Text
2"
AutoCAD SHX Text
4' MAX. O.C.
AutoCAD SHX Text
FABRIC (WOVEN WIRE FENCE BACKING)
AutoCAD SHX Text
TRENCH
AutoCAD SHX Text
6"
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
30" MIN.
AutoCAD SHX Text
*
AutoCAD SHX Text
NOTES: : 1. USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION, USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN. 2. HEIGHT (*) IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION HEIGHT (*) IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION CONTROL PLAN.
AutoCAD SHX Text
2
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
SILT FENCE-TYPE SENSITIVE
AutoCAD SHX Text
Sd1-S
AutoCAD SHX Text
GABION
AutoCAD SHX Text
DIVERSION
AutoCAD SHX Text
CHECKDAM
AutoCAD SHX Text
Permanent structures installed to protect channels or waterways where otherwise the slope would be sufficient for the running water to form gullies.
AutoCAD SHX Text
A barrier to prevent sediment from leaving the construction site. It may be sandbags, bales of straw or hay, brush, logs and poles, gravel, or a silt fence.
AutoCAD SHX Text
A basin created by excavation or a dam across a waterway. The surface water runoff is temporarily stored allowing the bulk of the sediment to drop out.
AutoCAD SHX Text
An impounding area created by excavating around a storm drain drop inlet. The excavated area will be filled and stabilized on completion of construction activities.
AutoCAD SHX Text
A device or structure placed in front of a permanent stormwater detention pond outlet structure to serve as a temporary sediment filter.
AutoCAD SHX Text
A wall installed to stabilize cut and fill slopes where maximum permissible slopes are not obtainable. Each situation will require special design.
AutoCAD SHX Text
A permanent or temporary stone filter dam installed across small streams or drainageways.
AutoCAD SHX Text
A structure to convert concentrated flow of water into less erosive sheet flow. This should be constructed only on undisturbed soils.
AutoCAD SHX Text
A flexible conduit of heavy-duty fabric or other material designed to safely conduct surface runoff down a slope. This is temporary and inexpensive.
AutoCAD SHX Text
A travelway constructed as part of a construction plan including access roads, subdivision roads, parking areas and other on-site vehicle transportation routes.
AutoCAD SHX Text
A temporary channel constructed to convey flow around a construction site while a permanent structure is being constructed.
AutoCAD SHX Text
Rock filter baskets which are hand-placed into position forming soil stabilizing structures.
AutoCAD SHX Text
A temporary stone barrier constructed at storm drain inlets and pond outlets.
AutoCAD SHX Text
A paved chute, pipe, sectional conduit or similar material designed to safely conduct surface runoff down a slope.
AutoCAD SHX Text
An earth channel or dike located above, below, or across a slope to divert runoff. This may be a temporary or permanent structure.
AutoCAD SHX Text
A crushed stone pad located at the construction site exit to provide a place for removing mud from tires thereby protecting public streets.
AutoCAD SHX Text
Improving, constructing or stabilizing an open channel, existing stream, or ditch.
AutoCAD SHX Text
A small temporary barrier or dam constructed across a swale, drainage ditch or area of concentrated flow.
AutoCAD SHX Text
CHANNEL STABILIZATION
AutoCAD SHX Text
CONSTRUCTION EXIT
AutoCAD SHX Text
CONSTRUCTION ROAD STABILIZATION
AutoCAD SHX Text
STREAM DIVERSION CHANNEL
AutoCAD SHX Text
TEMPORARY DOWNDRAIN STRUCTURE
AutoCAD SHX Text
PERMANENT DOWNDRAIN STRUCTURE
AutoCAD SHX Text
FILTER RING
AutoCAD SHX Text
GRADE STABILIZATION STRUCTURE
AutoCAD SHX Text
LEVEL SPREADER
AutoCAD SHX Text
ROCK FILTER DAM
AutoCAD SHX Text
RETAINING WALL
AutoCAD SHX Text
RETRO FITTING
AutoCAD SHX Text
SEDIMENT BARRIER
AutoCAD SHX Text
INLET SEDIMENT TRAP
AutoCAD SHX Text
TEMPORARY SEDIMENT BASIN
AutoCAD SHX Text
(INDICATE TYPE)
AutoCAD SHX Text
A buoyant device that releases/drains water from the surface of sediment ponds, traps, or basins at a controlled rate of flow.
AutoCAD SHX Text
FLOATING SURFACE SKIMMER
AutoCAD SHX Text
A small temporary pond that drains a disturbed area so that sediment can settle out. The principle feature distinguishing a temporary sediment trap from a temporary sediment basin is the lack of a pipe or riser.
AutoCAD SHX Text
TEMPORARY SEDIMENT TRAP
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
A rough soil surface with horizontal depressions on a contour or slopes left in a roughened condition after grading.
AutoCAD SHX Text
A paved or short section of riprap channel at the outlet of a storm drain system preventing erosion from the concentrated runoff.
AutoCAD SHX Text
A temporary bridge or culvert-type structure protecting a stream or watercourse from damage by crossing construction equipment.
AutoCAD SHX Text
TEMPORARY STREAM CROSSING
AutoCAD SHX Text
STORMDRAIN OUTLET PROTECTION
AutoCAD SHX Text
SURFACE ROUGHENING
AutoCAD SHX Text
A floating or staked barrier installed within the water (it may also be referred to as a floating boom, silt barrier, or silt curtain).
AutoCAD SHX Text
TURBIDITY CURTAIN
AutoCAD SHX Text
Paved or vegetative water outlets for diversions, terraces, berms, dikes or similar structures.
AutoCAD SHX Text
VEGETATED WATERWAY OR STORMWATER CONVEYANCE CHANNEL
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
To protect desirable trees from injury during construction activity.
AutoCAD SHX Text
TREE PROTECTION
AutoCAD SHX Text
The practice of stripping off the more fertile soil, storing it, then spreading it over the disturbed area after completion of construction activities.
AutoCAD SHX Text
TOPSOILING
AutoCAD SHX Text
(SHOW STRIPING AND STORAGE AREAS)
AutoCAD SHX Text
(DENOTE TREE CENTERS)
AutoCAD SHX Text
Linear control device constructed as a diversion perpendicular to the direction of runoff to enhance dissipation and infiltration, while creating multiple sedimentation chambers with the employment of intermediate dikes.
AutoCAD SHX Text
SEEP BERM
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
A permanent vegetative cover using sods on highly erodable or critically eroded lands.
AutoCAD SHX Text
The use of readily available native plant materials to maintain and enhance streambanks, or to prevent, or restore and repair small streambank erosion problems.
AutoCAD SHX Text
A protective covering used to prevent erosion and establish temporary or permanent vegetation on steep slopes, shore lines, or channels.
AutoCAD SHX Text
Controlling surface and air movement of dust on construction site, roadways and similar sites.
AutoCAD SHX Text
Establishing a permanent vegetative cover such as trees, shrubs, vines, grasses, or legumes on disturbed areas.
AutoCAD SHX Text
Establishing a temporary vegetative cover with fast growing seedings on disturbed areas.
AutoCAD SHX Text
Establishing temporary protection for disturbed areas where seedlings may not have a suitable growing season to produce an erosion retarding cover.
AutoCAD SHX Text
DISTURBED AREA STABILIZATION (WITH MULCHING ONLY)
AutoCAD SHX Text
DISTURBED AREA STABILIZATION (WITH PERM SEEDING)
AutoCAD SHX Text
DISTURBED AREA STABILIZATION (SODDING)
AutoCAD SHX Text
DUST CONTROL ON DISTURBED AREAS
AutoCAD SHX Text
SLOPE STABILIZATION
AutoCAD SHX Text
STREAMBANK STABILIZATION (USING PERM VEGETATION)
AutoCAD SHX Text
TACKIFIERS AND BINDERS
AutoCAD SHX Text
DISTURBED AREA STABILIZATION (WITH TEMP SEEDING)
AutoCAD SHX Text
Substance used to anchor straw or hay mulch by causing the organic material to bind together.
AutoCAD SHX Text
COASTAL DUNE STABILIZATION (WITH VEGETATION)
AutoCAD SHX Text
BUFFER ZONE
AutoCAD SHX Text
Planting vegetation on dunes that are denuded, artificially constructed, or re-nourished.
AutoCAD SHX Text
Strip of undisturbed original vegetation, enhanced or restored existing vegetation or the reestablishment of vegetation surrounding an area of disturbance or bordering streams.
AutoCAD SHX Text
Substance formulated to assist in the solids/liquid separation of suspended particles in solution.
AutoCAD SHX Text
FLOCCULANTS AND COAGULANTS
AutoCAD SHX Text
(LABEL)
AutoCAD SHX Text
%%UNOTES
AutoCAD SHX Text
:
AutoCAD SHX Text
1. DESIGN IS FOR SLOPES NO GREATER THAN 5%%%
AutoCAD SHX Text
(NOT DESIGNED FOR CONCENTRATED FLOWS).
AutoCAD SHX Text
2. THE STEEL POSTS SUPPORTING THE SILT FENCE
AutoCAD SHX Text
MATERIAL SHOULD BE SPACED EVENLY AROUND
AutoCAD SHX Text
THE PERIMETER OF THE INLET (MAXIMUM OF 3'
AutoCAD SHX Text
APART).
AutoCAD SHX Text
3. THE STEEL POSTS SHOULD BE SECURELY DRIVEN
AutoCAD SHX Text
AT LEAST 18" DEEP.
AutoCAD SHX Text
4. THE FABRIC SHOULD BE ENTRENCHED AT LEAST
AutoCAD SHX Text
12" AND THEN BACKFILLED WITH CRUSHED STONE
AutoCAD SHX Text
OR COMPACTED SOIL.
AutoCAD SHX Text
3' MIN.
AutoCAD SHX Text
FABRIC WITH WIRE-BACKING SUPPORT
AutoCAD SHX Text
GATHER EXCESS AT CORNERS
AutoCAD SHX Text
WIRE-BACKING
AutoCAD SHX Text
*FABRIC ENTRENCHED AT
AutoCAD SHX Text
LEAST 12" AND BACKFILLED
AutoCAD SHX Text
WITH CRUSHED STONE OR
AutoCAD SHX Text
COMPACTED SOIL.
AutoCAD SHX Text
BURIED FABRIC
AutoCAD SHX Text
STAKE
AutoCAD SHX Text
CRUSHED STONE OR COMPACTED SOIL
AutoCAD SHX Text
12" MIN.
AutoCAD SHX Text
DROP INLET WITH GRATE
AutoCAD SHX Text
18" MIN.
AutoCAD SHX Text
1.5' MAX.
AutoCAD SHX Text
3' MAX.
AutoCAD SHX Text
3' MAX.
AutoCAD SHX Text
3
AutoCAD SHX Text
Sd2-F
AutoCAD SHX Text
FILTER FABRIC W/ SUPPORTING FRAME
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
INLET SEDIMENT TRAP
Page 5: McDonalds - Macon Water

Plotted:9/29/2020 04:08:22 PM By:Joe Wood Paper Size:None_user_media Device Name:None Style:CS 253 Plot.ctb Scale:1:80

P:\M0175 - MACON WATER AUTHORITY - 1300\M0175.044 230 North Avenue 18 Inch Sanitary Sewer Replacement\CADD\M0175.044 Details.dwg, C4.1 SANITARY SEWER DETAILS, Last Save:Sep 29,2020 4:07:17pm By:jwood

DRAWING TITLE:

DRAWING NUMBER:

M0175.044 Details.dwg

PROJECT NUMBER: DATE:

DRAWN BY: CHECKED BY:

M0175.044

GRAPHIC SCALE:

CADD DLC

10/12/2020

SCALE:

8" SANITARY SEWER

RELOCATION - 230

NORTH AVENUE

MACON-BIBB COUNTY, GEORGIA

PROJECT:CLIENT:

MACON WATER

AUTHORITY

THIS DRAWING IS AN INSTRUMENT OF SERVICE AND SHALL REMAIN THE PROPERTY OF

THE ENGINEER, AND SHALL NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY

WITHOUT THE CONSENT OF THE ENGINEER. THIS DRAWING SHALL NOT BE SCALED.

© COPYRIGHT 2019 CARTER ENGINEERING GROUP, LLC.

DATE DESCRIPTION

RELEASE DATES:

REV #

STAMP:

LEVEL II CERTIFIED

DESIGN PROFESSIONAL # 2061

ISSUED: 11/2/2017 EXPIRES: 11/2/2020

SECTIONPLAN

Metal Tape

Metal Tape

Curb line

Lateral (Typical)

Property Line

S

S

(Detectable Mylar)

Sew

er M

ain

Property Line

Road

3" Metal Tape (Detectable Mylar)

Install at a maximum of 36" deep

minimum of 24"

5'-0"

Sewer Main

Min.

Curb Line

5'-0"

Min.

Varies

Varies

3" Tape (Detectable Mylar)

3"Tape (Detectable Mylar)

SANITARY SEWER

DETAILS

C3.1

AS SHOWN

AutoCAD SHX Text
DETAIL AND INSTALLATION TO CONFORM
AutoCAD SHX Text
TO MACON WATER AUTHORITY
AutoCAD SHX Text
STANDARDS AND REGULATIONS
AutoCAD SHX Text
DETAIL AND INSTALLATION TO CONFORM
AutoCAD SHX Text
TO MACON WATER AUTHORITY
AutoCAD SHX Text
STANDARDS AND REGULATIONS
AutoCAD SHX Text
7
AutoCAD SHX Text
TO 95% ASTM D-698
AutoCAD SHX Text
6" LAYERS & COMPACTED
AutoCAD SHX Text
BACKFILL PLACED IN
AutoCAD SHX Text
HAND PLACED EARTH
AutoCAD SHX Text
O.D.
AutoCAD SHX Text
9"
AutoCAD SHX Text
9"
AutoCAD SHX Text
GRADE
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
O.D.
AutoCAD SHX Text
48" MIN.
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
(PIPE BEDDING)
AutoCAD SHX Text
GRANULAR FILL
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
#78 CRUSHED STONE
AutoCAD SHX Text
PVC SANITARY SEWER
AutoCAD SHX Text
BEDDING
AutoCAD SHX Text
COMPACT UPPER TWO FOOT
AutoCAD SHX Text
TO 98%%% ASTM D-698 AT ALL
AutoCAD SHX Text
AREAS INDICATED ON PROFILE
AutoCAD SHX Text
24"
AutoCAD SHX Text
DETECTION TAPE
AutoCAD SHX Text
36" MAX.
AutoCAD SHX Text
24" MIN.
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
5"
AutoCAD SHX Text
OF THE PROPER DIAMETER.
AutoCAD SHX Text
IN CORED OR PRECAST HOLE
AutoCAD SHX Text
TO MANHOLES BY RUBBER BOOT
AutoCAD SHX Text
NOTE: PVC & DIP SHALL BE CONNECTED
AutoCAD SHX Text
GROUT
AutoCAD SHX Text
NON-SHRINK
AutoCAD SHX Text
MIN.
AutoCAD SHX Text
WATERTIGHT
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
STRUCTURE
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
PIPE CLAMP
AutoCAD SHX Text
RUBBER BOOT
AutoCAD SHX Text
SEWER PIPE
AutoCAD SHX Text
MWA - RUBBER BOOT
AutoCAD SHX Text
MWA - METALLIC TAPE LOCATOR
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
MWA - DIRECTION OF FLOW IN A MANHOLE
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
18" TO 24"
AutoCAD SHX Text
0"
AutoCAD SHX Text
4'-0"
AutoCAD SHX Text
5"
AutoCAD SHX Text
0%%D TO 60%%D
AutoCAD SHX Text
18" TO 24"
AutoCAD SHX Text
6"
AutoCAD SHX Text
5'-0"
AutoCAD SHX Text
6"
AutoCAD SHX Text
60%%D TO 90%%D
AutoCAD SHX Text
X
AutoCAD SHX Text
X
AutoCAD SHX Text
M.H. DIA.
AutoCAD SHX Text
ANGLE "A"
AutoCAD SHX Text
R
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
MAIN
AutoCAD SHX Text
0%%D TO 45%%D
AutoCAD SHX Text
R
AutoCAD SHX Text
M.H. DIA.
AutoCAD SHX Text
C
AutoCAD SHX Text
= 1.5 x PIPE DIAMETER
AutoCAD SHX Text
MINIMUM L RADIUS (R) OF M.H. INVERT
AutoCAD SHX Text
%%U NOTE:
AutoCAD SHX Text
0"
AutoCAD SHX Text
4'-0"
AutoCAD SHX Text
0%%D TO 90%%D
AutoCAD SHX Text
8" TO 16"
AutoCAD SHX Text
"X"
AutoCAD SHX Text
MH. DIA.
AutoCAD SHX Text
ANGLE "A"
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
OF GOVERNING DIMENSIONS
AutoCAD SHX Text
STANDARD MANHOLE SCHEDULE
AutoCAD SHX Text
MINIMUM "T"
AutoCAD SHX Text
WALL THICKNESS
AutoCAD SHX Text
"T"
AutoCAD SHX Text
5"
AutoCAD SHX Text
%%UTYPICAL PLANS
AutoCAD SHX Text
8
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
EXISTING SURFACE
AutoCAD SHX Text
1' TO HAVE 100% COMPACTION
AutoCAD SHX Text
12"
AutoCAD SHX Text
12"
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
BACKFILL
AutoCAD SHX Text
TAMPED
AutoCAD SHX Text
TOP 2" OF PATCH TO BE REPLACED WITH SAME
AutoCAD SHX Text
MATERIAL AS EXISTING SURFACE. BITUMINOUS TACK
AutoCAD SHX Text
COAT OR PRIME APPLIED BEFORE PLACEMENT OF
AutoCAD SHX Text
ASPHALTIC TOP.
AutoCAD SHX Text
CLASS "A" PAVEMENT REPLACEMENT
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
8" CLASS "A" PORTLAND
AutoCAD SHX Text
CEMENT CONCRETE
AutoCAD SHX Text
FOR REPAIR OF UTILITY TRENCH
AutoCAD SHX Text
EDGES SAWED W/
AutoCAD SHX Text
CONCRETE SAW
AutoCAD SHX Text
REMAINDER TO HAVE
AutoCAD SHX Text
95% COMPACTION
AutoCAD SHX Text
10
AutoCAD SHX Text
CONCRETE PAVING
AutoCAD SHX Text
4" COMPACTED SUBGRADE PATCH
AutoCAD SHX Text
1/4 dv 10' O.C.
AutoCAD SHX Text
4"
AutoCAD SHX Text
dv
AutoCAD SHX Text
TYPICAL CONCRETE SIDEWALK PATCH
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
_" SAWED JOINT (FILL
AutoCAD SHX Text
WITH PLASTIC MATERIAL)
AutoCAD SHX Text
11
AutoCAD SHX Text
TYPE 2
AutoCAD SHX Text
TYPE 3
AutoCAD SHX Text
TYPE 4
AutoCAD SHX Text
TYPE 5
AutoCAD SHX Text
O.D. + 2'-0"
AutoCAD SHX Text
O.D. + 2'-0"
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
COMPACTED
AutoCAD SHX Text
4" MIN.
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
COMPACTED
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
0.5 O.D.
AutoCAD SHX Text
O.D.
AutoCAD SHX Text
PIPE O.D.
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
STONE
AutoCAD SHX Text
CRUSHED
AutoCAD SHX Text
O.D. + 2'-0"
AutoCAD SHX Text
0.25xO.D. MIN
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
O.D. + 2'-0"
AutoCAD SHX Text
CRUSHED
AutoCAD SHX Text
STONE
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
PIPE O.D.
AutoCAD SHX Text
O.D.
AutoCAD SHX Text
O.D.
AutoCAD SHX Text
O.D.
AutoCAD SHX Text
COMPACTED
AutoCAD SHX Text
EARTH HAUNCHING
AutoCAD SHX Text
MWA - PIPE BEDDING
AutoCAD SHX Text
AND HAUNCHING
AutoCAD SHX Text
12"
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
UP TO 24" DIA.
AutoCAD SHX Text
PRECAST CONCRETE MANHOLE
AutoCAD SHX Text
#57 CRUSHED STONE
AutoCAD SHX Text
ASTM 48,
AutoCAD SHX Text
5'-0"
AutoCAD SHX Text
6"
AutoCAD SHX Text
2'-0"MIN. 3'-0"MAX.
AutoCAD SHX Text
12:1 SLOPE
AutoCAD SHX Text
5"
AutoCAD SHX Text
6"
AutoCAD SHX Text
12"
AutoCAD SHX Text
1'-6"MIN. 5'0"MAX.
AutoCAD SHX Text
1'-0"MIN. 5'-0"MAX.
AutoCAD SHX Text
KOR-N-SEAL FLEXIBLE NEOPRENE BOOT OR
AutoCAD SHX Text
PIPE OPENING AS REQUIRED, USE DUKOR
AutoCAD SHX Text
PRECAST MANHOLE TO MEET ALL REQUIREMENTS OF
AutoCAD SHX Text
ASSEMBLE ACCORDING TO MANUFACTURER'S
AutoCAD SHX Text
SPEC. SS-S-00210, "RAM-NEK" OR APPROVED EQUAL-
AutoCAD SHX Text
PREFORMED PLASTIC GASKET WITH PRIMER, TO MEET FED.
AutoCAD SHX Text
BRICK COURSES FOR ADJUSTING TO GRADE (12" MAX.)
AutoCAD SHX Text
REINFORCING TO MEET ASTM
AutoCAD SHX Text
REGULAR MONOLITHIC BASE
AutoCAD SHX Text
CONCRETE INVERT PLACED IN FIELD OR
AutoCAD SHX Text
18" ABOVE GRAD., OR AS SHOWN ON PLANS
AutoCAD SHX Text
ASTM C-478 (LATEST)
AutoCAD SHX Text
RECOMMENDATIONS
AutoCAD SHX Text
APPROVED EQUAL
AutoCAD SHX Text
APPROVED EQUAL
AutoCAD SHX Text
A-185, 0.12in./ft.
AutoCAD SHX Text
1" MORTAR
AutoCAD SHX Text
TYPE 1 -STANDARD - USF-195
AutoCAD SHX Text
MANHOLE FRAME AND COVER
AutoCAD SHX Text
TYPE 2 -TRAFFIC - USF-604 OR EQUAL
AutoCAD SHX Text
TYPE 3 -WATERTIGHT - USF-S76BH
AutoCAD SHX Text
8"
AutoCAD SHX Text
8"
AutoCAD SHX Text
24" DIA.
AutoCAD SHX Text
CLASS 35 B
AutoCAD SHX Text
6
AutoCAD SHX Text
9
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
VARIES - SEE PROFILE
AutoCAD SHX Text
VARIES - SEE PROFILE
AutoCAD SHX Text
12
AutoCAD SHX Text
FILL REMAINING PIPE WITH
AutoCAD SHX Text
SECTION AND STRUCTURE
AutoCAD SHX Text
A MINIMUM OF THREE FEET
AutoCAD SHX Text
REMOVE MANHOLE FRAME AND COVER
AutoCAD SHX Text
#57 STONE OR
AutoCAD SHX Text
SELECT GRANULAR FILL
AutoCAD SHX Text
FLOWABLE FILL
AutoCAD SHX Text
SANITARY SEWER MANHOLE ABANDONMENT
AutoCAD SHX Text
UNLESS NOTED
AutoCAD SHX Text
OTHERWISE. COMPACT
AutoCAD SHX Text
BELOW FINISH GRADE
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
1
AutoCAD SHX Text
EXISTING MANHOLE TO REMAIN
AutoCAD SHX Text
REMAIN
AutoCAD SHX Text
CONNECTION TO
AutoCAD SHX Text
TO MANHOLE
AutoCAD SHX Text
PIPE TO
AutoCAD SHX Text
REMAIN
AutoCAD SHX Text
PIPE TO BE
AutoCAD SHX Text
ABANDONED
AutoCAD SHX Text
20"
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
PIPE STUB
AutoCAD SHX Text
DISCONNECTED PIPE
AutoCAD SHX Text
CONCRETE TO EXTEND A MINIMUM OF
AutoCAD SHX Text
TWO INCHES BEYOND MANHOLE TO
AutoCAD SHX Text
PIPE CONNECTION ALL AROUND.
AutoCAD SHX Text
READY MIX
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
3000 PSI IN 28 DAYS
AutoCAD SHX Text
EXISTING PIPE
AutoCAD SHX Text
PLUG
AutoCAD SHX Text
SANITARY SEWER PIPE ABANDONMENT AT A MANHOLE
AutoCAD SHX Text
(REMOVE EXISTING
AutoCAD SHX Text
PIPE AS DIRECTED
AutoCAD SHX Text
TWO FEET MINIMUM)
AutoCAD SHX Text
FILL REMAINING PIPE
AutoCAD SHX Text
WITH FLOWABLE FILL
AutoCAD SHX Text
AS DIRECTED
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
2
AutoCAD SHX Text
REMOVE ENTIRE CONE
AutoCAD SHX Text
TO 98%%% ASTM-D698.
AutoCAD SHX Text
SPREAD 6" TOPSOIL
AutoCAD SHX Text
AND PERMANENT GRASS
AutoCAD SHX Text
IN NON-PAVED AREAS
AutoCAD SHX Text
OTHERWISE TOP OUT WITH
AutoCAD SHX Text
CLASS A PAVEMENT
AutoCAD SHX Text
REPLACEMENT OR
AutoCAD SHX Text
CONCRETE PATCHING
AutoCAD SHX Text
TO MATCH ADJACENT
AutoCAD SHX Text
SURFACE.
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
PLUG
AutoCAD SHX Text
BREAK UP BOTTOM OF MANHOLE TO ALLOW FOR DRAINAGE
AutoCAD SHX Text
TAR COATED
AutoCAD SHX Text
CARRIER IN CASING
AutoCAD SHX Text
CROSS SECTION
AutoCAD SHX Text
HIGHWAY UTILITY CROSSING
AutoCAD SHX Text
CARRIER BELL
AutoCAD SHX Text
INSTRUCTIONS
AutoCAD SHX Text
MAX. SPACING
AutoCAD SHX Text
4'-0", SPACE PER
AutoCAD SHX Text
MANUFACTURER'S
AutoCAD SHX Text
CARRIER BARREL
AutoCAD SHX Text
MODEL PE
AutoCAD SHX Text
PLASTICICASING
AutoCAD SHX Text
PSI, HOUSTON, TX.
AutoCAD SHX Text
OR EQUAL
AutoCAD SHX Text
INSULATOR
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
STEEL CASING PIPE, COAL
AutoCAD SHX Text
4' MIN.
AutoCAD SHX Text
TOE
AutoCAD SHX Text
3' MIN.
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
LIMIT OF
AutoCAD SHX Text
OPEN CUT
AutoCAD SHX Text
(2' IF PAVED)
AutoCAD SHX Text
3' MIN.
AutoCAD SHX Text
PIT
AutoCAD SHX Text
4' MIN.
AutoCAD SHX Text
FACE OF
AutoCAD SHX Text
BORE PIT
AutoCAD SHX Text
CASING PIPE
AutoCAD SHX Text
(2' IF BULKHEADED)
AutoCAD SHX Text
Dv
AutoCAD SHX Text
Dh
AutoCAD SHX Text
10' MIN.
AutoCAD SHX Text
CARRIER PIPE
AutoCAD SHX Text
3' MIN.
AutoCAD SHX Text
4' MIN.
AutoCAD SHX Text
4' MIN.
AutoCAD SHX Text
2' MIN.
AutoCAD SHX Text
4' MIN.
AutoCAD SHX Text
PAVEMENT
AutoCAD SHX Text
BORED TUNNEL
AutoCAD SHX Text
LIMIT OF PAY ITEM
AutoCAD SHX Text
SIDEWALK
AutoCAD SHX Text
NOTE: Dh SHALL NOT BE
AutoCAD SHX Text
LESS THAN Dv
AutoCAD SHX Text
UNLESS BULKHEADED
AutoCAD SHX Text
TOE
AutoCAD SHX Text
NOTE: CONSTUCTION IN GDOT RIGHT-OF-WAY : CONSTUCTION IN GDOT RIGHT-OF-WAY SHALL CONFORM TO GDOT STD. SPECIFICATIONS
AutoCAD SHX Text
3