May 7, 2008

TPTF

Early Delivery SystemsStatus

Daryl Cote

Page 2: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

2TPTF4/1/2008 2

Agenda

• EDS SLA• EDS 2

– Release 3: State Estimator– Release 4: NOMCR

• EDS 3– Release 5: SCED– Release 6: LFC– Release 7: CRR

• EDS 4– Release 8: COMS– Release 9: DAM / RUC / SASM

• Go-live Procedure

Page 3: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

3TPTF4/1/2008 3

EDS SLA Metrics

Page 4: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

4TPTF4/1/2008 4

TSP - Request for Telemetry Status

Page 5: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

5TPTF4/1/2008 5

Load Status

Page 6: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

6TPTF4/1/2008 6

Next Steps

• ERCOT has communicated production ICCP server information to TSP and QSEs with Resources– ERCOT asked MPs to respond with completed AIEF

(Association Information Exchange Form) within 3 days of receipt

– ERCOT will coordinate with TSPs and QSEs with Resources to implement / test the new links

• Goal is to migrate TSPs and QSEs to new Servers by Mid-June

• Send follow up emails to QSEs for SI points and to confirm ownership of points TSPs indicated they do not own– Emails to go out Mid-May after TSPs respond (see slide 3)

Page 7: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

7TPTF4/1/2008 7

Alarm Configuration and Testing Status

• Market Facing Notifications and Alerts– Current Status:

• Business is reviewing list of alerts and notices

– Next Steps:• Obtain ERCOT Business approval • Submit to TPTF for review and approval• After ERCOT and TPTF approval MIS will submit to the appropriate

Nodal teams who will schedule implementation

• Control Room Alarms– Current Status:

• Business is reviewing list of alarms for category, priority and text

– Next Steps:• Implement and test Alarms with EMS 5 FAT testing. FAT is

scheduled to be completed by the end of June.

Page 8: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

8TPTF4/1/2008 8

Release 4 – NMMS / NOMCR

2007 2008Sep Oct Nov Dec Jan Feb

R4: NOMCR / Network Model verificationE2 R4NOMCR Checkout Network Model Verification

Onsite NMMS training and scripted scenario execution completed by: AEP, Rayburn, STEC, and College Station, AEN, CenterPoint, Garland, & CPS

Onsite training to occur week of 5/7 for: Brownsville, TNMP, TMPA, LCRA

Onsite training to occur week of 5/13 for: BEC, MVEC, Denton, Greenville

All MP to complete onsite training week of 5/19 BTU, MEC, Oncor

Concurrent user test conducted May 1st

28 MPs and 15 ERCOT users simultaneously used the system

Page 9: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

9TPTF4/1/2008 9

Release 5 - SCED

2007 2008

SCED R5.1 SCED R5.3: RT ICCP SCED R5.4: LMP Post

Sep Oct Nov Dec Jan Feb

SCED R5.2E3 R56-month LMP PostingRT ICCP

EDS 3 Release 5 Exit Criteria % Complete

Comments

Daily submissions of COP, TPO, and OS ~90% •Expect large payload support in August

SCED Inputs verified: HRL, LRL, SURAMP, SDRAMP, HDL, LDL; GTBD, ICCP

100%(90%)

Results from first pre-6.3 test provided to QSEsResults from second pre-6.3 test provided to QSEs

SCED Outputs verified: QSE’s ability to receive Resource Base Points and LMPs via ICCP

100%(90%)

Base Point and LMP calculation verified for Resources with Offer Curves or Output Schedules

100%(100%)

Reports 100%(100%)

LMPs verified for Reasonability and posted to MIS for Market Participant review 100%

(100%)

Legend: % in parentheses are from the 4/1 TPTF update

Page 10: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

10TPTF4/1/2008 10

Release 6 - LFC

2008Jan Feb Mar Apr May Jun

E3 R6 R6.1: RLC & ACE

EDS 3 Release 6.1 Criteria % Complete

Comments

ACE Performance Verification 100%(0%)

Approved by TPTF April 21, 2008

Completed Test Form Received back from MP 100%(80%)

Completed

RLC Validation Completed 100%(71%)

Completed

Emergency Base-Point Validation Completed 100%(33%)

Completed

EDS 3 Release 6.2 Criteria % Complete

Comments

Pre-Test & Test Times Scheduled 100% Dates have been set with all QSE organizations

Submit Units for Testing 74%

Provide Ramp Rate Curves and 5 Minute BPS 28%

Prove ability to receive Nodal Instructions 28%

Ability to receive Nodal & Zonal instruction Simultaneously 28%

Pre-Test Complete 28%

R6.2: QSE Testing R6.3: TST

Legend: % in parentheses are from the 4/1 TPTF update

Page 11: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

11TPTF4/1/2008 11

Release 6 – LFC Phase II Testing Status

LFC Phase II Testing Status

QSE SP Test Date Test Time Test Complete Test Date Test Time Test Complete

AEN - Austin Energy 24-Apr 1:00 PM 24-Apr 21-May 1:00 PMAEP - American Electric Power 1-Apr 9:00 AM 1-Apr 30-Apr 9:00 AM 30-AprAPX Group A 21-Apr 11:00 AM 21-Apr 1-May 9:00 AMAPX Group B 21-Apr 1:00 PM 21-Apr 8-May 9:00 AMAPX Group C 24-Apr 9:00 AM 24-Apr 15-May 9:00 AMBEC - Brazos Electric Coop 6-May 1:00 PM 22-May 1:00 PMBP Energy 20-May 1:00 PM 27-May 1:00 PMBTU - Bryan Texas Utilities 22-Apr 9:00 AM 22-Apr 7-May 9:00 AMCalpine Power Management 19-May 1:00 PM 28-May 9:00 AMConstellation Energy 6-May 9:00 AM 20-May 9:00 AMCoral Power 23-Apr 9:00 AM 23-Apr 14-May 1:00 PMCPS - City Public Services 13-May 1:00 PM 21-May 9:00 AMExelon 8-Apr 9:00 AM 8-Apr 28-Apr 1:00 PM 28-AprFPL 22-Apr 1:00 PM In Process 14-May 1:00 PMGarland Power and Light 20-Mar 9:00 AM 20-Mar 27-Mar 1:00 PM 27-MarLCRA - Lower Colorado River 3-Apr 1:00 PM 3-Apr 29-Apr 9:00 AM 29-AprLEC - Luminant Energy Company 23-Apr 1:00 PM 23-Apr 7-May 1:00 PMNRG 27-Mar 1:00 PM 27-Mar 1-Apr 1:00 PM 17-AprOXY - Occidental Power Svcs 3-Apr 9:00 AM 3-Apr 29-Apr 1:00 PM 29-AprReliant 14-May 9:00 AM 22-May 9:00 AMSTEC - South Texas Electric Coop 20-Mar 1:00 PM 20-Mar 26-Mar 9:00 AM 26-MarSuez Energy Marketing 18-Mar 1:00 PM 25-Mar 5-May 1:00 PM In ProcessTenaska Power Services Group 1 16-Apr 9:00 AM 16-Apr 30-Apr 9:00 AMTenaska Power Services Group 2 16-Apr 9:00 AM 16-Apr 29-May 9:00 AM

PreTest Test

The remaining schedule is very full, Mondays and Fridays being used to accommodate long running test, and make-ups.

Page 12: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

12TPTF4/1/2008 12

LFC 6.3 pre-Test

• Prior to R6.3 (total system test) the market desires an open loop test to validate SCED dispatch. Approach to accomplish this:– Performed open loop test on 4/28 from 10am-noon

• Results on following slides

– Performed open loop test on 5/5 from 4pm-9pm• Results on following slides

– Perform open loop test on 5/12 from 7am-9am

Page 13: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

13TPTF4/1/2008 13

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00

HE

%Nodal SE Convergence: 4-28

Began Contacting QSEs

Page 14: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

14TPTF4/1/2008 14

MW set to 15 & MVar at 30, spikes removed from graph (4/28)

-60

-40

-20

0

20

40

6:04:59 AM

6:19:59 AM

6:34:59 AM

6:49:59 AM

7:04:59 AM

7:19:59 AM

7:34:59 AM

7:49:59 AM

8:04:59 AM

8:17:13 AM

8:25:53 AM

8:36:41 AM

8:49:13 AM

9:00:53 AM

9:12:17 AM

9:24:19 AM

9:37:27 AM

9:51:29 AM

10:06:29 AM

10:17:37 AM

10:31:47 AM

10:44:11 AM

10:47:45 AM

10:52:19 AM

11:04:13 AM

11:15:37 AM

11:30:01 AM

11:43:03 AM

11:55:59 AM

12:10:59 PM

12:25:59 PM

12:40:59 PM

12:55:59 PM

1:10:59 PM

1:23:41 PM

1:38:43 PM

1:51:59 PM

2:06:59 PM

2:21:59 PM

2:36:59 PM

2:51:59 PM

3:06:59 PM

3:21:59 PM

3:36:59 PM

3:51:59 PM

4:06:59 PM

4:21:59 PM

Maximum MW mismatch at bus Maximum MVAR mismatch at bus

Page 15: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

15TPTF4/1/2008 15

Limits during test period 4-28, 10am - Noon

0

10000

20000

30000

40000

50000

60000

10:00 10:10 10:20 10:30 10:40 10:50 10:58 11:05 11:15 11:25 11:35 11:45 11:55

SCED Timestamp

MW

SUM_HEL

SUM_HSL

SUM_HASL

SUM_HDL

GTBD

SUM_LDL

SUM_LASL

SUM_LSL

SUM_LEL

Results look good minus the aggregated LEL limits (one resource had 6099 for the LEL)

Page 16: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

16TPTF4/1/2008 16

LMPs Vs GTBD (4/28)

30400

30500

30600

30700

30800

30900

31000

31100

31200

10:0

0

10:0

5

10:1

0

10:1

5

10:2

0

10:2

5

10:3

0

10:3

5

10:4

0

10:4

5

10:5

0

10:5

5

10:5

8

11:0

0

11:0

5

11:1

0

11:1

5

11:2

0

11:2

5

11:3

0

11:3

5

11:4

0

11:4

5

11:5

0

11:5

5

$44.50000

$45.00000

$45.50000

$46.00000

$46.50000

$47.00000

$47.50000

GTBD LMP

Aggregated offer curve had a flat point of a few 100 MWs Changes to amount of MW considered by SCED correctly moved LMPs

Uniform LMP result of no constraints in Nodal LMPs, for the most part, remained between min and max zonal MCPEs

Page 17: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

17TPTF4/1/2008 17

30%

40%

50%

60%

70%

80%

90%

100%

Hour Ending

Convergence

Nodal SE Convergence: 5-5

Began Contacting MPs

Page 18: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

18TPTF4/1/2008 18

-100

-50

0

50

100

150

3:1

4:2

1 P

M

3:1

7:4

9 P

M

3:2

0:1

1 P

M

3:2

7:5

5 P

M

3:3

0:4

9 P

M

3:3

7:4

3 P

M

3:4

8:0

9 P

M

3:5

5:4

1 P

M

4:1

0:1

9 P

M

4:2

2:3

7 P

M

4:3

7:3

9 P

M

4:4

6:0

9 P

M

4:5

7:1

7 P

M

5:0

2:4

1 P

M

5:1

0:0

7 P

M

5:1

4:3

1 P

M

5:2

1:1

3 P

M

5:2

4:1

3 P

M

5:3

2:0

1 P

M

5:4

3:2

9 P

M

5:5

8:2

9 P

M

6:1

3:2

9 P

M

6:2

8:2

9 P

M

6:4

3:2

9 P

M

6:5

8:2

9 P

M

7:1

3:2

9 P

M

7:2

8:2

9 P

M

7:4

3:2

9 P

M

7:5

8:2

9 P

M

8:1

3:2

9 P

M

8:2

8:2

9 P

M

8:4

3:2

9 P

M

8:5

8:2

9 P

M

9:1

3:2

9 P

M

9:2

8:2

9 P

M

9:4

3:2

9 P

M

9:5

8:2

9 P

M

10

:13

:29

PM

10

:28

:29

PM

10

:43

:29

PM

10

:58

:29

PM

11

:13

:29

PM

11

:28

:29

PM

Maximum MW mismatch at bus Maximum MVAR mismatch at bus

MW set to 15 & MVar at 30, spikes removed from graph (5/5)

Page 19: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

19TPTF4/1/2008 19

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

Sced Timestamp

MW

SUM_HEL

SUM_HSL

SUM_HASL

SUM_HDL

GTBD

SUM_LDL

SUM_LASL

SUM_LSL

SUM_LEL

Limits during test period 5-5, 4pm – 6pm

Limits Improved from first pre-test but a number of units continued to have questionable values

Page 20: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

20TPTF4/1/2008 20

Reference LMPs Vs GTBD (5/5)

Price remained flat from 1730-1750 while GTBD changed due to the generation that was changing over this period were price takers

Other nuances attributable to generation with no EOC, changes in OS, and telemetered limits MCPE for this period remained slightly lower than the Reference LMP

35,600

35,700

35,800

35,900

36,000

36,100

36,200

SCED Timestamp

$57.00000

$58.00000

$59.00000

$60.00000

$61.00000

$62.00000

$63.00000

$64.00000

$65.00000

$66.00000

GTBD REFERENCE_LMP

Page 21: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

21TPTF4/1/2008 21

LMP Graphics from 5/5

Page 22: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

22TPTF4/1/2008 22

Target Dates for 6.3 Tests

• Week of June 16th – 2 hour test– ERCOT desires to proceed with the 2hr test with/out CIM

– EDS plans to purge the resource data from MMS on May 15 and load it

with data from the Certified RARFs

• Week of July 7th – 8 hour test

• Week of July 28th – 48 hour test

Page 23: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

23TPTF4/1/2008 23

EDS 3 Release 7 - CRR

EDS 3 Release 7 Status % Complete Comments

Release 7.1 Connectivity and Submissions 100%(0%)

59 participants successfully completed UI testing (97% participation)

* completion of R7.1 qualifies MP for production cert

Release 7.2 Scripted Monthly Auction 100%(0%)

No Change

Release 7.3 unscripted Monthly Auction 100%(0%)

No Change

Release 7.4 Unscripted Annual Allocation/Auction

66%(0%)

9 participants successfully submitted PCRR nominations (82% participation)

46 participants successfully submitted bids (75% participation)

Jan 08 Feb 08 Mar 08 Apr 08 May 08Dec 07

CRR – R7.0 CRR – R7.1 CRR – R7.2 CRR – R7.3 CRR R7.4 CRR – R7.5 (TBD)

Jan 08 Feb 08 Mar 08 Apr 08 May 08Dec 07 Jan 08 Feb 08 Mar 08 Apr 08 May 08Dec 07

CRR – R7.0 CRR – R7.1 CRR – R7.2 CRR – R7.3 CRR – R7.5 (TBD)

R7.4 exit delayed 10 Business Days (to 5/16) due to issues clearing annual auction: Data and system environment / application tuning

Legend: % in parentheses are from the 4/1 TPTF update

Page 24: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

24TPTF4/1/2008 24

Release 8 – COMS Statements and Invoices Posted

Statements and Invoices posted to Readiness Center:

Standard Statements and Invoices

Mock CARD Invoices

Mock CRR Balancing Account Invoices

Mock DAM Late Fee Invoices

Mock DAM Settlement Statements and Invoices

Release 7.2 CRR Auction Invoices

MIS Certified Area:

DAM Statements and Invoices for Operating Days 4/18/08, 4/23/08, 4/25/08 and 4/30/08 (DAM awards only)

Release 7.3 CRR Auction Invoices

Page 25: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

25TPTF4/1/2008 25

Release 8 – continued

Reports, DDLs, XSDs and Reports posted to Readiness Center:

CMM Credit Standing to ERCOT Counterparty Report

CMM Total Potential Exposure Detail Report

EDW – PRDE Draft DDL

EDW – Settlements Draft DDL

EDW – PRDE Draft XSD

EDW – Settlements Draft XSD

COMS – Market Data Transparency Specifications

Verifiable Costs:

Received a large number of intent emails with resources specified

ERCOT will generate “temporary” Verifiable Costs for EDS testing based on resources provided in intent email

Page 26: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

26TPTF4/1/2008 26

Release 8 – Upcoming Activities

• Mock RTM Initial Settlement Invoices and RTM Late Fee Invoices with input data to Readiness Center.  (May 15, 2008)

• Mock RTM Settlement Statement in which there is no DAM for the Operating Day with input data to Readiness Center.   (May 15, 2008)

• CRR Auction Invoices – Release 7.4 Auction Results (2 business days after auction clears)

Page 27: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

27TPTF4/1/2008 27

EDS 4 Release 9.1

2008Jan Feb Mar Apr May Jun

E4 R9 R9.1: DAM/RUC Submission Testing R9.3: R9.4: DAM/ Adj Period, RT

R9.2: Outage Scheduler

Legend: % in parentheses are from the 2/22 TPTF update

EDS 4 Release 9.1 Exit Criteria % Complete

Comments

Sign-Up Testing Window Scheduled 94%(86%)

The following need to schedule test windows:Aquila, Clearview Electric, Glacial Energy, Kansas City Power and Light, National Power Company, Texpo Power, Urban Energy Source

MP8 - QSE Ability to Submit Transactions Via MIS

92%(86%)

MP9 – QSE Ability to Submit Web Service Transactions

100%(100%)

Of those who indicated desire to use Web Services

Page 28: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

28TPTF4/1/2008 28

EDS 4 Release 9.2

2008Jan Feb Mar Apr May Jun

E4 R9 R9.1: DAM/RUC Submission Testing R9.3: R9.4: DAM/ Adj Period, RT

R9.2: Outage Scheduler

Legend: % in parentheses are from the 4/1 TPTF update

EDS 4 Release 9.2 Exit Criteria % Complete

Comments

Test Window Scheduled 83%(0%)

The following need to schedule test windows:

QSEs: FPL, STEC, Scurry, Westar

TSPs: College Station, Denton, MVEC, MEC, Rayburn, STEC, TNMP

Completed Scripted Testing 0% Recurring Outages: target release 5/19

Grouped Outages through UI: target release 5/26

Opportunity outage: target release 6/2

Outage Notifications: target release to sandbox mid-June; EDS late June

Participate in Performance testing 0%

Participate in Dual Entry days (prior to 168hr test)

0%

Page 29: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

29TPTF4/1/2008 29

EDS 4 Release 9.3

2008Jan Feb Mar Apr May Jun

E4 R9 R9.1: DAM/RUC Submission Testing R9.3: R9.4: DAM/ Adj Period, RT

Page 30: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

30TPTF4/1/2008 30

Go-Live Procedure: TPTF Comments

• Guiding principals

– Reduce risk by limiting the number of moving parts leading up

to, during, and just after the Texas Nodal Market Implementation

Date (TNMID)

– Reduce risk by operating the systems as-if they are production

prior to operating under protocols

– Reduce risk by regression testing nodal systems

– Provide decision makers with a guideline for protocol section

21.12.5 Reinstatement of Zonal Protocol Provisions

Page 31: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

31TPTF4/1/2008 31

Go-Live Procedure: TPTF Comments

• New Resources coming on-line between the start of the 168-Hr test and the TNMID– New QSEs for resources coming on-line after the start of the 168

hour test but that are not associated with a QSE that is fully qualified that demonstrate that there is no feasible way to become qualified before the 168 hour test shall be allowed to qualify for zonal and/or nodal operation after the 168 hour test is completed

Page 32: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

32TPTF4/1/2008 32

Go-Live Procedure: TPTF Comments

• It is one thing to complete Nodal testing and another to complete qualification.  Qualification means that at an establish date of the Transition Plan each QSE will have completed required testing and have posted whatever required credit/collateral with ERCOT.  If required items are missing then digital certificate access to Nodal MIS will be suspended just before Go-Live.– If a QSE is currently active in Zonal and is transitioning to Nodal they

must complete Nodal testing and post any change in credit/collateral prior to establish date in the Transition Plan.

– If a QSE is not currently active in Zonal and expects to participate in the Nodal Market at Go-Live the QSE must complete Zonal qualification (posting collateral and/or completing any remaining zonal tests).  This is required because if for some reason ERCOT must fail back to Zonal after Go-Live all entities must be Zonal qualified.

– If a QSE is not currently active in Zonal and wishes to begin active participation some time after Go-Live the QSE may wait until ERCOT is ready to begin qualifying QSEs at an establish time after Go-Live (stabilization period).

Page 33: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

33TPTF4/1/2008 33

Go-Live Procedure: TPTF Comments

• Sempra Energy Solutions (SES) is troubled to learn that the latest version of the Go-Live Period contemplates a 7X24 parallel operation of both our zonal market systems and our nodal market systems prior to the TNMID.  This request, coming after the completion of the 168-Hour Test, imposes at least 90-days of burdensome and duplicative efforts on scheduling and operational resources, resources that have already, presumably, been certified by ERCOT Staff that all Market Readiness Criteria have been met.– SES offers three possible solutions;

• 1) shorten the parallel operation time period to the final week of November,

• 2) exempt QSEs from the parallel operation requirement if they have received certification that they have met the Market Readiness Criteria and schedule less than 1,000 MWs per hour, on average, or

• 3) a combination of items #1 and #2.

Page 34: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

34TPTF4/1/2008 34

Go-live Procedure: TPTF Comments

• Market Participants must also enforce a strict code change control procedure managing all aspects of their Texas nodal systems. Beginning thirty days prior to the TNMID, MPs shall notify make no upgrades to key systems such as Generation Management System (GMS) and Market Systems without written approval from ERCOT’s Nodal Executive Director of any changes it intends to make to its Generation Management System (GMS) and Market Systems. Such requests will be made available to all Market Participants. TPTF will determine if Market Participant’s code upgrades in aggregate are significant enough that regressive testing of all Market Participant’s systems must be made.

Page 35: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

35TPTF4/1/2008 35

Go-Live Procedure

• Use of Constant Frequency control– Suggested maximum use range from 1 to 24 hours

• ERCOT recommends no more than 12

Page 36: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

36TPTF4/1/2008 36

Go-Live Procedure: TPTF Comments

• What is the estimated “significant effort, unusual work hours and additional labor costs”

• What is the escalation procedure during this time should MPs observe issues relating to data and / or processing?

• How will the MP landscape be made aware beyond monitoring the MIS

• in regards to section 10.1 Guidelines for switching back to Zonal: How can ERCOT ensure Accuracy and Intent without the operation of SCED, RUC, DAM, etc. Given that we are migrating to a Financial market these operations are just as critical to the aforementioned systems. If not addressed and should this event occur the likelihood of multiple ADR’s becomes very real.

Page 37: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

37TPTF4/1/2008 37

Go-live Procedure: TPTF Comments

• The task on the bottom of page 5 listed as “ Entry of Ninety Day Outages into the nodal Outage Schedule by TSPs to Support December CRR Auction” with a target date of October 5, 2008 looks to be outside of protocols. In section 3.1 of the Nodal Protocols where the requirements for coordination activity for outages are specified; a 90 Day Outage is not defined. What is defined is an ERCOT approval timeline for outages that are submitted on a 90 day period.

• When will ERCOT Nodal system move from EDS to Production? What is the time period to verify MP source data such as MP Resource Registration data?

Page 38: May 7, 2008 TPTF Early Delivery Systems Status Daryl Cote

38TPTF4/1/2008 38

EDS Deliverables

EECP Go-Live 168Hr Test DST

Post for TPTF Comment

Apr 10 April 22 June 2 May 23

Comment Close Apr 25 May 2 June 11 May 30

TPTF Vote May 5 May 5 June 23 June 10

Legend: indicates completion