Materials & ConstructionChuck Gill VP Intergraph

2

1. Smart Materials

a) Portal, Mobile Scan (RFID,barcoding)

b) Customers (Technicas, IHI, Technip, CB&I)

2. Smart Construction

a) Advanced Work Packing (AWP Details)

b) Mobile

c) Customers (reliance, Bechtel, Fluor, Vale..)

d) Roadmap

3. EcoSys Update

a) Integration to SmartPlant Enterprise

b) Prototypes - 5D

c) More details

Agenda

Smart Materials

4

Simple is key

5

The feature

war is over.

6

7

Smart Materials Version 8 – new User Experience

• Work Process Driven• Easy understanding and learning

• Modern• Work with an attractive modern

application

• Efficient• Finish tasks quicker and use time

more effectivly

• Focused• Expediting

• Traffic

• Planning

8

Smart Materials Portal

Perfect collaboration• Save Money & Ensure Quality

• Be current with Supplier Information

• Commercial and technical information

• Complete Coverage

• Registration

• Quotation

• Logistic / Traffic

• Subcontract

• Onboard everybody

• Suppliers

• Subcontractors

• Freight Forwarders

• Construction Companies

• Modern Webbased application

• Easy to use for casual users

Technicas Reunidas Video

By allowing the suppliers access to the

data directly, we can improve the quality

of the data, and also gain transparency,

efficiency, and tracking of all information.

- Marcos Bauer, Technicas Reunidas

12

Sample of customer being online with the Portal

12

https://esupplier.mcdermott.com

http://spportal.rekayasa.co.id/smartplantmaterialsportal2013/client/ https://eportal.ch2m.com/SmartPlantMaterialsPortal2013/client/index.aspx

https://esupplier.ihi-ec.com/smartplantmaterialsportal2013/client/

13

Smart Materials Traffic/Logistic Portal

Perfect collaboration• Colaborate with

• Suppliers

• Freight Forwarders

• Stay current

• Preliminary Packing Lists

• Actual Release Notes and Packages

• Freight Forwarding Costs

• Know what‘s coming

• Up-To-Date Shipment information

• Make site ready for receiving

• Costs control

14

Smart Materials Business Intelligence Reporting is powerful on different devices

Visualize Business Value

• Out Of The Box

• Dozends of industry reports

• Visualize your data

• Mobile Enabled

• Zero footprint

• 100% HTML5

• SPMat‘s Business Value

• Progress

• Costs

• Supplier

• Ad-Hoc

15

Smart Materials Mobile Scan Barcoding/RFID – New release

Mobile Warehousing

• Seamless Integration

• The only seamless integrated

mobile solution for SmartMaterials

• Uses existing hardware

• Drive Savings

• Reduce manhours

• Eliminate waste

• Reduce lost material

• Key coverage

• Receiving

• Transfer

• Physical Counts

• Issue

• Modern App

• Android

• Browser usage possible

IHI Video

SP Construction

19

Advanced Work Package Planning (AWP)

• What is AWP?

• What is “Early Planning”?

• What is “Top Down Planning”?

• What is “Workface planning”?I’m confused

Forget all this.

Its just “Advanced Work Package planning”

Chevron, Exxon and Shell are requesting tools that

supports Advanced Work Package Planning.

20

Advanced Work Packaging

Subcontractor

EPC

21

NEW: SP Construction Mobile

22

SP Construction Testimonial - Reliance Integrated Structural and Piping

Field Construction

Planning

View IntegratedComposite

Models

3D Visualization

of Construction

Sequence

Construction Progressing

Enables Construction Planners to be much

more efficient

Bottom Line

23

Customers in the Americas

• Fluor

• Canada – North West Redwater in Production since September 2015 on Unit 10 and Unit 30

• Exxon impressed with SPC usage on NWR

• Other projects under consideration

• Bechtel

• Positioned for Production usage on Shell Franklin since 2015 but project now delayed to 2017

• Bechtel plans to retire in-house systems and replace with SPC

• Other target projects

• Waste Treatment Plant (WTP) – Hanford Site, Washington

• Uranium Processing Facility (UPF) – Oak Ridge, Tennessee

• Insight-WFP

• Owner - Valero

• Engineering – Burns & McDonnell

• Constructor – TBD – Probably

• Implementing SPC on Burns & McDonnell Infrastructure

• Production usage

24

Americas - Continued

• Vale

• In Production since 2014

• 3 Projects

• Potential project with Samaro (Vale and BHP) coming up

• NEW: Burns and McDonnell

• Targeting a Energy Transfer Partners – Revolution

Project for POC starting in September 2016

• Considering SPC in the Cloud

• Other projects under consideration

25

South Americas

CarajásSalviano Machado /

Customer Type Project / Area Short Description Status Projected Close

Date

Antofagasta

Minerals

O/O Oxido Encuentro Planning and control of the construction

phase

Ongoing Running until

October 2016

BHP O/O Spence Grow Option

(SGO)

Planning and project control for DPS and

Interim phases

Ongoing Running until

January 2017

BHP O/O Spence Grow Option

(SGO)

Planning and project control for Execution

Phase

Prospect July 2017

Codelco O/O Andina Traspaso Project Planning and control of underground

mining contruction project

Prospect September 2016

SNC Lavalin EPC Fundición Codelco

Teniente

Planning and 4D analysis for EPC Project Prospect September 2016

26

Customer in EMIA

• ITER

• Went live in May 2016

• Ramping up seats in 2016 and 2017

• Reliance

• In Production since 2014

• Using Handover from SPC to SPO

• Ansaldo

• In Production since 2014

• 6th October Open Cycle Power Plant in Cairo Egypt

• Two power plants in pipeline in Algeria

• Fluor TCO Project

• Started production usage in April 2016

27

Customers in Greater China

• China Nuclear Power Engineering (CGNEPC)

• COOEC

• Plan to use SPC for Petrobras P-70 and P-67

• SNPEC

• Nuclear

• CTCI

• Proof of Concept

28

Additional AWP Enhancements

Construction Check List

Systems Completions Integration (Punch Lists)

Civil Construction Planning from S3D

SPC 2017 and beyond – Scope Candidates

Component Animation by Purpose and Status

Weld Management, Tracking and Mapping

EcoSys Integration for 5D

SPE + ECOSYS EPC

Michael Buss, Sr. VP Business Development

30

What are the plans for

integrating

Ecosys EPC with

SmartPlant?

#1 Question from customers since

acquisition

31

FACILITATES 5D

& INTEGRATED

CONSTRUCTION EXECUTION

OPEN WEB APIs

REAL-TIME AND

ON-DEMAND EXCHANGE

CONFIGURABLE

YOUR PRIORITIES BENEFITSBUSINESSCLEAR BENEFITSBUSINESSCLEAR

32

RESULT OF

COLLABORATION WITH CUSTOMERS

33

Integration Scenarios: Engineering & Project Controls

Engineering progress &

productivity

Quantities, Progress

Engineering

3rd Party

Apps

Project Controls

34

Requisitions

Orders

Receipts

Actuals

Budgets

Materials progress &

cost

Engineering progress &

productivity

Integration Scenarios: Procurement & Project Controls

Project Controls

3rd Party

Apps

Materials Management

35

Construction progress

visibility & forecasting

Integration Scenarios: Construction & Project Controls

Quantities

Progress

Productivity

Earned Value

Costs

Material status & cost

Engineering progress &

productivity

Project Controls

3rd Party

Apps

Construction

36

SmartPlant-EcoSys Integration – Engineering, Procurement & Construction

Prototypes

38

SmartPlant Materials <> Ecosys

SmartPlant Materials

Ecosys EPC

39

COSTSCHEDULEMODEL

Design &

EngineeringConstructionProcurement

Project

Forecasts

Project

BudgetsFinance

Departmental

Budgets

AFEs

/Funding

$

!!

3D 4D 5D

40

5D Project Planning - Schedule

• Review progress status real-time during all project phases

• Engineering

• Procurement

• Construction

• Commissioning

• Review forecasted activities

• Visualize forecasted activities and identify issues early on, while they can still be corrected

• Eliminate silos between Engineering, Procurement, Construction and Commissioning

• Bring them all together in one environment, and visualize how a change in one phase impacts other phases

41

5D Project Planning – Schedule delays

• Identify impact of one activity delay

on other related activities

• Example: an equipment delivery delay

impacts not only that equipment

installation date, but also requires that

the structure that is in its path must also

have its installation delayed

42

5D Project Planning - Costs

• Review cost status and issues during

all project phases

• Engineering

• Procurement

• Construction

• Commissioning

• Review forecasted costs and cost

overruns

• Integrate data from various sources,

including timesheets, SmartPlant

design tools, procurement data

(SmartPlant Materials), construction

data (SPC), EcoSys, etc.