• Follow up from November 10th Board Workshop with SmithGroupJJR + Mijares-Mora
• Present recommendations for Master Plan Priorities & Funding Options
• Recommendations based on projected cost of $255 million for Phase I
• Board evaluation and final approval of recommendations by administration
Meeting Objectives
• 3 Phases over a ten-year period between 2016-2025– Phase I (A) $60 million for District-wide new construction
• $10 million in reserve from 2007 Bond proceeds
• $50 million issuance of new Revenue Bonds in 2016
– Phase I (B) $150 million General Obligation Bonds 2020/2021• Fort Bliss Campus construction
• District-wide projects to include renovation of facilities
– Phase I (C) $45 million Revenue Bonds in 2025• Debt capacity created by the payoff of 2007 Bonds
• Complete Phase I projects
Proposed Funding Structure of Phase I - $255 Million
VV MdP RGRG
GarageNW TM Total
New building size (Sq. Ft.) 100,000 40,000 50,000 30,000 19,000 12,000 251,000
New building cost $27.0 $10.8 $13.5 $3.4 $5.1 $3.2 $63.0
Soft costs 9.5 3.8 4.7 0.3 1.8 1.1 21.2
Subtotal $36.5 $14.6 $18.2 $3.7 $6.9 $4.3 $84.2
Other costs
IT $2.0
Wayfinding 1.2
Renovate Temple Mt. Sinai Bldg. (25,000 sq. ft.) 2.0
Total $89.4
• Using Smith GroupJJR+ Mijares-Mora Cost Estimates
• Version 1 of 3
5. All other new construction costs calculated at $270 per sq. ft.6. Renovation of Temple Mt. Sinai Building to be predominantly funded by sale
of Stanton properties7. District-wide fire alarm system and door locks projects to be funded by
Project Reserve Fund
1. All costs above in millions2. Soft costs for garage calculated at 9% of construction cost3. All other soft costs calculated at 35% of construction cost4. Garage new construction calculated at $114 per sq. ft.
Master Plan Phase I (A) Proposal – Version 1
VV MdP RGRG
GarageNW TM Total
New building size (Sq. Ft.) 77,778 30,741 38,519 30,000 0 0 177,038
New building cost $21.0 $8.3 $10.4 $3.4 $0.0 $0.0 $43.1
Soft costs 7.4 2.9 3.6 0.3 0.0 0.0 14.2
Subtotal $28.4 $11.2 $14.0 $3.7 $0.0 $0.0 $57.3
Other costs
IT $2.0
Wayfinding 1.2
Renovate Temple Mt. Sinai Bldg. (25,000 sq. ft.) 2.0
Total $62.5
• Using Smith GroupJJR+ Mijares-Mora Cost Estimates
• Version 2 of 3
5. All other new construction costs calculated at $270 per sq. ft.6. Renovation of Temple Mt. Sinai Building to be predominantly funded by sale
of Stanton properties7. District-wide fire alarm system and door locks projects to be funded by
Project Reserve Fund
1. All costs above in millions2. Soft costs for garage only calculated at 9% of construction cost3. All other soft costs calculated at 35% of construction cost4. Garage new construction calculated at $114 per sq. ft.
Master Plan Phase I (A) Proposal – Version 2
VV MdP RGRG
GarageNW TM Total
New building size (Sq. Ft.) 90,000 30,000 0 30,000 15,000 12,000 177,000
New building cost $24.3 $8.1 $0.0 $3.4 $4.1 $3.2 $43.1
Soft costs 8.5 2.8 0.0 0.3 1.4 1.1 14.1
Subtotal $32.8 $10.9 $0.0 $3.7 $5.5 $4.3 $57.2
Other costs
IT $2.0
Wayfinding 1.2
Renovate Temple Mt. Sinai Bldg. (25,000 sq. ft.) 2.0
Total $62.4
• Using Smith GroupJJR+ Mijares-Mora Cost Estimates
• Version 3of 3
5. All other new construction costs calculated at $270 per sq. ft.6. Renovation of Temple Mt. Sinai Building to be predominantly funded by sale
of Stanton properties7. District-wide fire alarm system and door locks projects to be funded by
Project Reserve Fund
1. All costs above in millions2. Soft costs for garage only calculated at 9% of construction cost3. All other soft costs calculated at 35% of construction cost4. Garage new construction calculated at $114 per sq. ft.
Master Plan Phase I (A) Proposal – Version 3 (Recommended)
The Best Place to Start
2016-2017 ProjectionsImpact on Tuition & General Use Fees
General Use Fee Increase Tuition & General Use Fee Increases
2015-16
$15 GUF
2016-17 Increase $5
$20 GUF
2016-17Increase $5
$20 GUF
2016-17Increase $5
$20 GUF
2016-17Increase $5
$20 GUF
Tuition & Fees increase/credit hour $1 $3 $5
% increase-Resident 5.05% 6.06% 8.08% 10.10%
% increase-Nonresident 2.98% 3.57% 4.76% 5.95%
Tuition increase/credit hour
% increase-Resident 1.19% 3.57% 5.95%
% increase-Nonresident 0.65% 1.96% 3.27%
Resident tuition & fees/credit hour $99 $104 $105 $107 $109
Nonresident tuition & fees/credit hour $168 $173 $174 $176 $178
Resident tuition & fees for 12 credit hours $1,188 $1,248 $1,260 $1,284 $1,308
Nonresident tuition & fees for 12 credit hours $2,016 $2,076 $2,088 $2,112 $2,136
The Best Place to Start
College DistrictTuition & Fees
In-District / Out-of-StateTotal per SCH
In-District / Out-of-StateTax Rate
Alamo $868 $4,329 $72 $361 0.1491500
Austin $1,020 $4,536 $85 $378 0.0942000
Collin $470 $1,658 $39 $138 0.0819600
Dallas $708 $2,088 $59 $174 0.1247750
Del Mar $1,181 $2,225 $98 $185 0.2480730
El Paso $1,188 $2,016 $99 $168 0.1281220
Houston $816 $1,878 $68 $157 0.1068900
Lone Star $806 $1,826 $67 $152 0.1081000
San Jacinto $734 $1,958 $61 $163 0.1856020
South Texas $1,362 $1,758 $114 $147 0.1850000
Tarrant $660 $2,460 $55 $205 0.1495000
Tuition & Fees/Tax Rate Comparisons Between Texas Public Community Colleges
Source: TACC Fall 2015 Tuition & Fees Survey
Total per SCH is the average tuition and fees per credit hour.
Tax impact $25.50