master plan for providing of water supply in …perpamsibanten.org/masterplan.pdf · master plan...

30
MASTER PLAN FOR PROVIDING MASTER PLAN FOR PROVIDING OF WATER SUPPLY IN BANTEN OF WATER SUPPLY IN BANTEN PROVINCE PROVINCE 2008 2008 - - 2023 2023 DPD PERPAMSI PROVINSI BANTEN DPD PERPAMSI PROVINSI BANTEN Jl Jl . . Kisamaun Kisamaun No. 204 No. 204 Tangerang Tangerang 15118 15118 Phone/Fax . 021 55794821 Phone/Fax . 021 55794821 2008 2008

Upload: ngothien

Post on 08-Mar-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

MASTER PLAN FOR PROVIDING MASTER PLAN FOR PROVIDING OF WATER SUPPLY IN BANTEN OF WATER SUPPLY IN BANTEN

PROVINCE PROVINCE 20082008--20232023

DPD PERPAMSI PROVINSI BANTENDPD PERPAMSI PROVINSI BANTENJlJl. . KisamaunKisamaun No. 204 No. 204 TangerangTangerang 1511815118

Phone/Fax . 021 55794821Phone/Fax . 021 5579482120082008

PREFACE

• Water Supply coverage in Banten Province still low only � ± 10%

• National Mid Term Development Goals (RPJMN) by 2009 :

� Urban : 66% � Rural : 30%

• Millenium Development Goals (MDG) by 2015 :� Uraban : 80% � Rural : 60%

• Providing water supply activities based on Governmentlal Regulation (PP) No.16/2005 Regarding of Developing of act preparing of water supply system (SPAM), which mention that act preparing water supply system is one of the government obligation.

WATER SUPPLY COVERAGE WATER SUPPLY COVERAGE (BY PIPING SYSTEM)(BY PIPING SYSTEM)

LoctionLoction%%--age coverageage coverage

RemarkRemarkPDAMPDAM Non PDAMNon PDAM TotalTotal

SerangSerang DistrictDistrict 4.944.94 -- 4.944.94

LebakLebak DistrictDistrict 5.815.81 -- 5.815.81

PandeglangPandeglang DistrictDistrict 4.484.48 -- 4.484.48

TangerangTangerang DistrictDistrict 5.055.05 5.385.38 10.4310.43

TangerangTangerang MunicipalityMunicipality 24.8724.87 0.160.16 25.0325.03Some supported by PDAM Some supported by PDAM TKR TKR TangerangTangerang District District (19.68%)(19.68%)

CilegonCilegon MunicipalityMunicipality16.5116.51 4.224.22 20.7420.74

Some supported by PDAM Some supported by PDAM SerangSerang District (11.34%)District (11.34%)

TotalTotal 8.668.66 2.142.14 10.7910.79

Kota Cilegon

KabupatenSerang

KabupatenTangerang

KotaTangerang

4.94 %

20.74 %

4.48 %5.81 %

10.43 %

25.03 %

KabupatenPandeglang

KabupatenLebak

• Common– To improve community accessibility to

water supply in Banten Province

• Special– To improve Quality, quantity and

continuity of water supply at existing area– To imporve standard of services at each

PDAMs within Banten based on national regulation.

– To develop integrated water supply system

– To develop tarrif system based on cross subsidy among customers.

– To develop integrated multy sector cooperation within related stakeholder in order to widening of coverage.

The Aims

CRITERIA

CRITERIA OF MASTER PLAN

Master Plan should be met with the Public Work Ministerial Decree fulfilled (Kepmen PU No.18/KMK/2007) :

– Future oriented

– Realistic– Flexsible

Approach on Master Plan Providing of Water Supply Arrangement

No. Grade of City Number of Popluation SPAM Location

1 Middle City 10.000 - 100.000

a. Middle City I 10.000 - 40.000 10 L/det. per 3 yearsSub urban in Serang, Lebak

dan Pandeglang districtsb. Middle City II 40.001 - 100.000 20 L/det. per 3 years

2 Big City 100.000 - 500.000 Per 5 years

Serang urban,Cilegon urban, Tangerang district urban

3 Metropolitan 500.000 - 1.000.000

4 City >1.000.000 Per 5 years Tangerang municipal

current conditions

CURRENT CONDITION OF WATER SUPPLY SYSTEMS

NoDistrics/

Municipalities

Water ResourcessName of WTPs Capacity

(lt/sec)River/Spring/Deep well Name of Resources

1 SerangDistrict

Sungai

Irigasi Pamarayan Barat Kenari 55

Sungai Banten Kroya 10

Sungai Cisirih Cinangka/Cisirih 10

Irigasi Pamarayan Barat

Kandayakan/ Keragilan 30

Irigasi Pamarayan Barat Ciruas 15

Irigasi Pamarayan Barat Tirtayasa 5

Sungai Ciwaka Linduk 10

Irigasi PamarayanTimur Carenang 5

Irigasi PamarayanTimur Cijeruk 15

NoDistrics/

Municipalities

Water ResourcessName of WTPs Capacity

(lt/sec)River/Spring/Deep well Name of Resources

1 SerangDistrict Mata air

Pelabuhan Bulan 11

Sukacai 40

Citaman 60

Cisaat 15

Cibuligir 2.5

Cilamojan 12Total (L/dtk) 313

CURRENT CONDITION OF WATER SUPPLY SYSTEMS

NoDistrics/

Municipalities

Water ResourcessName of WTPs Capacity

(lt/sec)River/Spring/Deep well Name of Resources

2 Pandeglang District

Mata air

Cikoromoy Cikoromoy 42

Karang tanjung Booster kadu merak 35

Ciwasiat 5

Cikupa 5

Paniis 50

Menes 5

Cileungsi 3

Sungai Cikeusik Cikoncang 2.5Total (L/dtk) 147.5

CURRENT CONDITION OF WATER SUPPLY SYSTEMS

NoDistrics/

Municipalities

Water ResourcessName of WTPs Capacity

(lt/sec)River/Spring/Deep well Name of Resources

3 KabupatenTangerang

Sungai

Cisadane Babakan 80

Cisadane Cikokol 1100

Cisadane Serpong 3000

Cidurian Solear 100

Cisadane Perumnas 120

Cidurian Kresek (IKK) 15

Cidurian Kronjo (IKK) 7.5

Irigasi (Cisadane) Mauk (IKK) 15

Irigasi (Cisadane) Rajeg (IKK) 25

Sumur Bor/dangkal Pasar Kemis 2.5

Total (L/dtk) 4562.5

CURRENT CONDITION OF WATER SUPPLY SYSTEMS

NoDistrics/

Municipalities

Water ResourcessName of WTPs Capacity

(lt/sec)River/Spring/Deep well Name of Resources

4 KabupatenLebak Sungai

Ciujung Rangkasbitung 170

Cilangkahan Malingping 20

Ciberang Sajira 10

Ciberang Cipanas 20Total (L/dtk) 120

5 Kota Tangerang Sungai Cisadane Mekarsari 370

Total (L/dtk) 370

CURRENT CONDITION OF WATER SUPPLY SYSTEMS

Map of Current Water Supply in Banten Province

Serang-Cilegon

Kota Serang KPS Serang-TNG

Kota Rangkas

Kota Pandeglang

IKK Labuan

Ciparen, Cipacul

Kota TNG

Bojongrenged

PROYEKSI

Population Projection, number of House Hold and Target Population Projection, number of House Hold and Target of Coverage based on the of Coverage based on the MDGsMDGs by 2015by 2015

Districts / Municipalities

Number of Population in

2015

Number of House Hold

Service Coverage

%-age of Service

Coverage

Kab. Pandeglang 1.430.780 357.677 213.015 60,00%

Kab. Lebak 1.474.452 368.613 235.862 64,00%

Kab. Tangerang 4.601.861 1.150.465 719.698 82,80%

Kab. Serang 2.430.256 607.565 390.107 64,80%

Kota Tangerang 2.013.608 503.402 402.722 80,00%

Kota Cilegon 467.285 116.821 93.457 80,00%

Total Banten Prov. 12.418.172 3.104.543 2.054.864 66,19%

WATER DEMANDWATER DEMAND

2004 201 0 201 5

K abupaten P andeglang 29,099,824 33,854,747 37,81 7,1 82

C onv ers ion to L iter per s ec ond 923 1 ,074 1 ,1 99

K abupaten L ebak 34,764,842 39,978,979 44,61 8,984

C onv ers ion to L iter per s ec ond 1 ,1 02 1 ,268 1 ,41 5

K abupaten T angerang 99,952,837 1 23,941 ,51 8 1 43,932,085

C onv ers ion to L iter per s ec ond 3,1 69 3,930 4,564

K abupaten S erang 57,282,578 66,1 32,826 76,059,1 69

C onv ers ion to L iter per s ec ond 1 ,81 6 2,097 2,41 2

K ota Tangerang 57,359,021 68,406,368 77,61 2,491

C onv ers ion to L iter per s ec ond 1 ,81 9 2,1 69 2,461

K ota C ilegon 1 3,246,340 1 5,845,272 1 8,01 1 ,049

C onv ers ion to L iter per s ec ond 420 502 571

Total (cubic meter per year) 291 ,705,442 348,1 59,71 0 398,050,960

C onv ers ion to L iter per s ec ond 9,250 1 1 ,040 1 2,622

L oc ationWater demand in c ubic meter per year

Water Demand and Water Suplly System Capacity Projection in Banten Province by

2007-2023

S. CIBERANG(DAM KARIAN)

Kapasitas : 279.000 m3

S. CISADANE

S. CIUJUNG

POTENSI SUMBER AIR BAKUPOTENSI SUMBER AIR BAKU

GAMBARAN ZONA PENYEDIAAN AIR MINUM DI PROVINSI BANTEN

MASTER PLAN STAGE OF MASTER PLAN STAGE OF IMPLEMENTATIONIMPLEMENTATION

Tahun

Description

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

Consolidation Acceleration Development

A. Development

1. DED Study

2. WTPsDevlopment

3. WTPs. Network Installation

4. Weir Development

5. Normalization of the reiver

6. Development of Dam

7. Optimation of spring

c. Merger

~ PDAM Pandeglang danPDAM Lebak

~ PDAM TKR dan PDAM TirtaBenteng

~ PDAM Kab. Serang danPDAM CilegonMandiri

b. HoldingCompany

a. Try out

8. Regionalisasi

DevelopmentAccelerationConsolidation

2023

2022

2021

2020

2019

2018

2017

2016

2015

2014

2013

2012

2011

2010

2009

2008Description

Year

TAHAPAN RENCANA TAHAPAN RENCANA MASTER PLANMASTER PLAN

�Water supply services is the government obligation to provide easy access to the people, this task based on the Governmental Regulation Decree (PP) No.16 year of 2005. So it need to be support by the stakeholder who related to the water supply services, both in central and local government.

�Wter supply services in Banten is very lack of services, in the othe hand there are some poteltial river which can be use for water supply services.

�The potenctial water resources need some supplort from stakeholder related to the water supply services in Banten Province, not only from governemnt side but also from private sector side,

�The master plan of providing of Water supply in Banten Province 2008-2023 is the tool to show of the situation of providing of water supply in Banten for the future. It contain the analitical situation and the aim tobe achieve in 2023.

�Regionalization is the best solution in providing of water supply system in BantenProvince.

CONCLUTION

• In order to achieve the masterplantarget need fully of support from stakeholder

• Inventorization of the river in Banten is have to be done in order to give the more information of water resources in Banten

• In order to implement the masterplanit need for socialization.

RECOMENDATION

Some inputs from Some inputs from RakerdaRakerda May 7May 7thth ‘2008‘2008(Annual meeting of DPD (Annual meeting of DPD PerpamsiPerpamsi BantenBanten))

•• Regionalization, is the main issue of the master Regionalization, is the main issue of the master plan, it could be implemented with the small scale plan, it could be implemented with the small scale of regionalization such as between two or three of of regionalization such as between two or three of PDAM within PDAM within BantenBanten..

•• Private sectors, in order to achieve the Private sectors, in order to achieve the MDG’sMDG’s it it doesn’t mean that the government and PDAM doesn’t mean that the government and PDAM obligation but need private sector participation obligation but need private sector participation trough Public Private Participation in Water supply trough Public Private Participation in Water supply System InfrastructureSystem Infrastructure

•• Water Resources, how to solve the problem in such Water Resources, how to solve the problem in such a way of the water resources crisis, the master plan a way of the water resources crisis, the master plan must be able to answer and find out the must be able to answer and find out the soultionssoultions..

TERIMA KASIHwww.perpamsibanten.org

[email protected]