A presentation about the approval process in Massachusetts for nitrogen-removing technologies. Presented by Claire Golden, environmental engineer with the Massachusetts Dept. of Environmental Protection, during a Buzzards Bay Coalition 2014 Decision Makers mini-workshop on nitrogen-reducing septic systems. Learn more at www.savebuzzardsbay.org/DecisionMakersTRANSCRIPT
MassDEP Approval Process for Nitrogen-Reducing I/As
Claire A. GoldenEnvironmental Engineer IVMassDEP/BRP
Buzzards Bay Coalition – March 5, 2014
SESSION OBJECTIVES & STRUCTURE
I/A Approval Process at MassDEPNitrogen-Reducing I/As and Conditions of ApprovalPath to General Use ApprovalOperation and MaintenanceUse of Shared Systems with I/As
Buzzards Bay Coalition – March 5, 2014
I/A APPROVAL PROCESS HISTORYTitle 5 - 1995 Code (Oct 1994)
Nitrogen loading limitations (440 gpd/building acre)Nitrogen Sensitive Areas
Zone II of PWSIWPA of PWS
Areas served by on-site wells and on-site septicLimitations apply primarily to new construction or increase in flow but may be required for upgrades also under Maximum Feasible ComplianceCode did not go into full effect (March 31, 1995) until some I/As for N-reduction were approved.RSF established as standard (550 gpd/ac).
Buzzards Bay Coalition – March 5, 2014
I/A APPROVAL PROCESS AT MassDEP
Established 4 Tiers of ApprovalRemedial Use ApprovalGeneral Use Approval Process
Piloting Use ApprovalProvisional Use ApprovalGeneral Use Approval
Approvals Design considerationsNitrogen-reductionPhosphorus-reduction
Buzzards Bay Coalition – March 5, 2014
Types of I/A Approval
Remedial Useupgrades onlyno increase in design flow
Piloting Usepermitted installation at up to 15 locations
Provisional Usepermitted installation at up to 50 locations
General Use
Buzzards Bay Coalition – March 5, 2014
NITROGEN-REDUCING I/As
General Use1 generic3 patented
Provisional Use9 patented
Piloting Use3 patented
Buzzards Bay Coalition – March 5, 2014
General Use Approval I/As
Recirculating Sand Filter (RSF)RUCKMicroFAST & NitriFAST
TECHNOLOGY FLOW (gpd)
RESTRICTION N-LOADING EFFLUENT N
RSF < 10,000 None 550 gpd/ac 25 mg/l
RUCK < 2,000 None 660 gpd/ac 19 mg/l
MicroFASTNitriFAST
< 2,000 < 2,000
ResidentialResidential
550 gpd/ac660 gpd/ac
25 mg/l19 mg/l
Buzzards Bay Coalition – March 5, 2014
Provisional Use Approval I/As
Advantex AX20 and AX100 (Advantex)Amphidrome Process (Amphidrome)Bioclere – 2 approvalsHighStrengthFAST, MicroFAST & NitriFAST (FAST)Modular FASTNitrexSeptiTechSingular 960 DNWaterloo Biofilter – 2 approvals (Waterloo)
Buzzards Bay Coalition – March 5, 2014
TECHNOLOGY FLOW (gpd)
RESTRICTION N-LOADING EFFLUENT N
Advantex < 2,000 < 2,000> 2,000
NoneNoneNone
550 gpd/ac660 gpd/ac550 gpd/ac
25 mg/l19 mg/l25 mg/l
Amphidrome < 2,000 < 2,000> 2,000
NoneNoneNone
550 gpd/ac660 gpd/ac550 gpd/ac
25 mg/l19 mg/l25 mg/l
Bioclere* < 2,000< 2,000 > 2,000
NoneResidential
None
550 gpd/ac660 gpd/ac550 gpd/ac
25 mg/l19 mg/l25 mg/l
FAST < 2,000> 2,000
NonresidentialNone
550 gpd/ac550 gpd/ac
25 mg/l25 mg/l
Modular FAST > 2,000 None 550 gpd/ac 25 mg/l
Prov. Use N-Removal I/As Chart
Buzzards Bay Coalition – March 5, 2014
TECHNOLOGY FLOW (gpd)
RESTRICTION N-LOADING EFFLUENT N
Nitrex < 2,000 < 2,000> 2,000
NoneResidential
None
550 gpd/ac660 gpd/ac550 gpd/ac
25 mg/l19 mg/l25 mg/l
SeptiTech < 2,000 < 2,000> 2,000
NoneNoneNone
550 gpd/ac660 gpd/ac550 gpd/ac
25 mg/l19 mg/l25 mg/l
Singular < 2,000< 2,000
NoneNone
550 gpd/ac660 gpd/ac
25 mg/l19 mg/l
Waterloo < 2,000 < 2,000> 2,000
NoneResidential
None
550 gpd/ac660 gpd/ac550 gpd/ac
25 mg/l19 mg/l25 mg/l
Prov. Use N-Removal I/As Chart (cont.)
Buzzards Bay Coalition – March 5, 2014
Piloting Use Approval I/As
BioBarrier Wastewater Treatment System (BioBarrier)Hydro-Kinetic Wastewater Treatment System (Hydro-Kinetic)RUCK CFT System (RUCK CFT)
Buzzards Bay Coalition – March 5, 2014
TECHNOLOGY FLOW (gpd)
RESTRICTION N-LOADING EFFLUENT N
BioBarrier < 2,000 < 2,000
NonresidentialResidential
550 gpd/ac660 gpd/ac
25 mg/l19 mg/l
Hydro-Kinetic < 600 < 600
NonresidentialResidential
550 gpd/ac660 gpd/ac
25 mg/l19 mg/l
RUCK CFT < 2,000 None 660 gpd/ac 19 mg/l
Piloting Use N-Removal I/As
Buzzards Bay Coalition – March 5, 2014
Path to General Use Approval
Piloting – up to 15 systems state-wideOperationsDataApply for Provisional Use Approval
Provisional – up to 50 systems state-wideOperationsDataApply for General Use Approval
General
OPERATION AND MAINTENANCE
Deed notificationOperations contractInspectionsSampling and reportingRelated electrical cost for operation of the I/A
Buzzards Bay Coalition – March 5, 2014
SHARED SYSTEM USE WITH I/As
Approval process for shared system must be completedPotential cost savingsPotential more consistent treatmentSystems are fully inspected every three years (inspection at time of transfer not required)
Buzzards Bay Coalition – March 5, 2014
Shared System Approvals
Shared components must be definedFinancial mechanisms put into place as needed
I/AsPump chambers
Establishment of ownership entityTrustsLLC
Easement for shared componentsDocuments provided in Title 5 regs
Buzzards Bay Coalition – March 5, 2014
Buzzards Bay Coalition – March 5, 2014
CONTACTS
Brett RoweMassDEP/BRP/SERO [email protected]
Claire A. GoldenMassDEP/[email protected]
Brian DudleyMassDEP/BRP/SEROCape [email protected]