MarTech LNG Small scale LNG infrastructure solutions Copenhagen 22.10 - 2013 Gunnar Helmen Key Account Manager

Upload: others

Post on 03-Feb-2021

10 views

Category:

Documents


0 download

TRANSCRIPT

  • MarTech LNG Small scale LNG infrastructure solutions

    Copenhagen 22.10 - 2013

    Gunnar Helmen

    Key Account Manager

  • Big scale LNG

    Gate terminal

    LNG vessel Hammerfest Sakhalin LNG

    Qatar gas 4

  • Risavika Havn

    Offshore supply base

    Increasing traffic in container port

    Node to Europa

    Skangass

    The Worlds most energy

    efficient & environmentally

    friendly LNG plant

  • The Small Scale LNG market, …this is what we do…

  • Onshore bunker station Bunkering by truck Loading arm Bunker vessel

    Maritime supply chain

    HUB (Risavika – Øra - Lysekil – Gävle)

    Coral Athelia Coral Energy

    LNG production LNG import

  • Kollsnes

    Gävle

    Lysekil

    Fredrikstad Skangass Risavika

    Karmøy

    Göteborg

    Nynäshamn

    Sköldvik

    Rotterdam

    Zeebrugge Isle of Grain

    Świnoujście

    Klaipéda

    Brunsbuttel

    SECA

    SE

    CA

    Production

    Existing Terminal (HUB)

    Planned terminal

    LargeTerminal

    NWE - Status

  • Bunkering PSV 2-3 trucks

  • Challenge; scale effect

    100 m3/ bunkering (3 h)

    130 m3/ bunkering (45 min)

    5000 m3/ bunkering (? min)

  • Lysekil terminal project

    • Capacity 15,600 m3

    • LNG carrier

    • Delivery Q4, 2012

    • Tank capacity 30 000 cbm

    • Operational as from Q2, 2014 • Bunker barge loading facility • Truck loading facilities

  • Lysekil LNG terminal - 2014

    • Lysekil terminal project

  • • Tank capacity 30 000 cbm

    • FID to be taken 2013

    Gävle LNG terminal - 2016

  • Fredrikstad LNG terminal - 2012

    6 500 cbm 9 x pressure vessels Truck loading & local gas grid Bunker pipe

  • LNG feeder vessels

  • LNG Carrier ”Coral Energy” - 2012

    • Capacity 15,600 m3

    • Dedicated LNG carrier

    • Ice class 1A

    • 155 meters long

  • Next step; Small LNG feeder with ability to make ship-to-ship bunker operations

    • 6500 cbm capacity • 100 meters long • Q4 - 2014

  • Bunker operations using tank trucks

    10/22/2013 www.skangass.no 19

    •1 or 2 trucks simultaneously •Supply rate; 50 – 100 cbm/ h

    Picture by Skangass

  • M/T Bit Viking

  • 1000 m3/h

    200 m3/h

    350 m3/h

    Truckdeliveries 50 m3/h

    Risavika, LNG bunker port

  • Fjord Line interim solution

    http://www.google.se/url?sa=i&rct=j&q=stavangerfjord+fjordline&source=images&cd=&cad=rja&docid=FgKdp1TZijpURM&tbnid=SDl92tPMzFErfM:&ved=0CAUQjRw&url=http://www.ta.no/nyheter/grenland/article6572632.ece&ei=BOWtUaHJB4SD4ASpk4H4Aw&psig=AFQjCNFE9ab5wVx7Pq3zzTzY6CzbhbaBJQ&ust=1370437213674268

  • Bunkering Stavanger

  • Tank you!

    [email protected] www/skangass.no