Mars Rover Term ProjectPhase 1 PDR

Date : Oct 25, 2010

Page 2: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Introduction Problem description

Design a simplified Mars Rover for a low-cost exploration to map a portion of the Martian surface and report on the presence of certain mineral deposits.

The system is composed of three separate elements: A mission control based on earth A rover base based on Mars Multiple, physically identical, rovers that will be

deployed to map the Martian surface and gather information on mineral deposits

Page 3: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Outline Mission Control package Rover Base package Rover package Comments, Questions, Issues

Page 4: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Mission control package

Page 5: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Mission Control package Context Diagram

Use case diagram

Page 6: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Mission Control package Upload mission plan

Page 7: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Mission Control package Receive consolidated report

Page 8: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Mission Control package Request on-site imagery

Page 9: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package

Page 10: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package Static class diagram

Page 11: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package Context diagram

Use case diagram

Page 12: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package Receive mission plan

Page 13: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package Process periodic rover reports

Page 14: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package Send consolidated report

Page 15: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover Base package Capture panoramic image

Page 16: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package

Page 17: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Static class diagram

Page 18: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Context diagram Use case diagram

Page 19: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Rover receive plan

Page 20: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Goto initial position

Page 21: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Traverse planned path

Page 22: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Execute mapping plan

Page 23: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Construct mineral map

Page 24: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Transmit report

Page 25: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Avoid obstacle

Page 26: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Rover package Execute fail-safe plan

Page 27: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Comments, Questions, Issues

Page 28: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Comments, Questions, Issues Comments

Assumptions Rover is aware of its own current location Rover has some memory indicator that triggers with

capacity reaches 80%

Page 29: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Comments, Questions, Issues Questions

Can there be sequence diagrams without a use case?

Page 30: Mars Rover Term Project Phase 1 PDR Date : Oct 25, 2010

Comments, Questions, Issues Issues

Papyrus does not preserve look after save and reopen