Marina Bay Sands Sky Park Cantilever
VC Cheong
![Page 2: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/2.jpg)
51 Marina Bay Sands Integrated Resort 2007 - 2010
![Page 3: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/3.jpg)
52
Esplanade
Marina Bay
Marina Bay Sands
Merlion
![Page 4: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/4.jpg)
53 Overall View
Skypark
Steel Roof Event Plaza
Crystal
Pavilion
Promenade - Retail
![Page 5: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/5.jpg)
54 Project Organization
Marina Bay Sands (MBS)
Moshe Safdie Associates (MSA) / Aedas
Arup
C&S/Traffic
Parson
Brinckerhoff
(MEP)
Arup
Facade
Arup
Acoustic
Arup Site
Supervision
Arup
Fire
Arup
Security
![Page 6: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/6.jpg)
55
Scope Demarcation Between Offices
Advanced Contracts (Singapore)
Conceptual & Schematic Design (Boston/New York/Hong Kong)
Design Development (Hong Kong/Singapore)
Tender Documentation (Hong Kong/Singapore)
Detailed Design (Hong Kong/Singapore)
Authority Submission (Singapore)
Construction Documentation (Hong Kong/Singapore)
Site Supervision (Singapore)
![Page 7: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/7.jpg)
56 Arup Offices
Hong Kong
Singapore
Sydney
London
Shenzhen
Manila
Melbourne
Brisbane
Boston
New York
New York
Singapore
Hong Kong
Sydney
London
Melbourne
Boston
Brisbane
Shenzhen
Manila
Newcastle
Newcastle
Involved for Skypark Design
![Page 8: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/8.jpg)
57 Project Communication Chart
Design and Construction Stage
Coordination
with MSA
Lead by AEDAS
• Museum Steelwork (schematic design)
• Risk and Security
• Podium Steel Roof
• Hotel Towers
• Foundation
Site Supervision
• Acoustic, Façade
and Fire
• Sky park
•Podium Concrete Structure
• Museum Steel works (detail design)
• Infrastructure
Arup HK in Singapore
• Project Management
• Podium coordination
• Geotechnical works
Coordination with MSA
Lead by AEDAS
• Traffic
ARUP
MELBOURNE
AEDAS EXECUTIVE
ARCHITECT
MSA CONCEPTUAL
ARCHITECT
MBS CLIENT
ARUP
HK/SHZ
ARUP
SINGAPORE
ARUP
Brisbane
ARUP
SYDNEY
ARUP
NEWCASTLE Dynamics Studies on
SkyPark Peer Review on
SkyPark Design
ARUP
LONDON
ARUP
NEW YORK
ARUP
BOSTON
•
••Podium
•Museum
![Page 9: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/9.jpg)
58
SkyPark Engineering Facts
Skypark length 340 m
Steelwork tonnage 7,700 tons (permanent) &
4,400 tons (temporary)
Cantilever length 65 m
Cantilever weight 3,500 tons
Lifting of cantilever structure 13 weeks
![Page 10: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/10.jpg)
59
Cantilever Structural Design Movement & Dynamics
Tight Construction Programme Lifting Methodology
MBS – SkyPark Cantilever
Design Challenges
![Page 11: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/11.jpg)
60 Design Challenges
Cantilever Structural Design
![Page 12: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/12.jpg)
61 Structural Layout at L56
65m Cantilever
MJ MJ MJ MJ
Truss Truss
Box Girder
4.6
5m
/ 6.1
5m
10m
Steel Frame with columns at 10mc/c columns at 10mc/c
Steel Frame with
4.6
5m
/ 6.1
5m
TOWER 1 TOWER 2 TOWER 3
![Page 13: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/13.jpg)
62 Cantilever Section – Design Evolution
SCHEME 1 --- SPACE TRUSS
CONSTRUCTED FROM I-SECTIONS
SCHEME 2 ---RAISED LANDSCAPE
DECK ALTERNATIVE
SCHEME 3 --- BOX GIRDERS WITH
CROSS BEAM
SCHEME 4 --- PT Box Girder (Final Scheme)
![Page 14: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/14.jpg)
63 Cantilever Section
Plan
Elev.
4m wide x 3.55m ~10m deep box girder
1.25m/ 1.75m
dp. transverse
plate girder at
4.2m c/c
175/ 225mm
thk.
composite
deck slab
4m wide x 3.55m ~10m deep box girder
Column
support
![Page 15: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/15.jpg)
64 Fabrication & Erection of Steel Frames
![Page 16: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/16.jpg)
65 Rendering of V & W Columns
![Page 17: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/17.jpg)
66 Design Challenges
Movement & Dynamics
![Page 18: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/18.jpg)
67 Movement Joint
Gravity : 150mm (Irreversible)
Wind: +/- 250mm (Reversible)
Seismic: +/- 600mm (Reversible)
Maximum Anticipated Movement
Sufficient “travelling
distance” during
seismic event
HOTEL
TOWER
![Page 19: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/19.jpg)
68 Movement Joints (Bearings)
![Page 20: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/20.jpg)
69
Bending of Cantilever with Tower Sway Torsional Mode
First Bending Mode Second Bending Mode
Purpose of Dynamic Studies
![Page 21: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/21.jpg)
70
4No 15T TMDs
(PRELIMINARY
SCHEME)
1No 5T TMD (Final
Scheme)
Tuned Mass Damper
![Page 22: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/22.jpg)
71 Tuned Mass Damper
5T Tuned
Mass
Damper
![Page 23: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/23.jpg)
72 Dynamic Studies – In situ Testing
![Page 24: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/24.jpg)
73
Almost 150 people
participated jumping test at
tip of the cantilever
2010.05.26
![Page 25: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/25.jpg)
74
![Page 26: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/26.jpg)
75 Key Findings
Measured Mode 1: Predicted Mode 1:
Predicted Mode 3: Measured Mode 3:
![Page 27: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/27.jpg)
76 76 Crowd Management
Viewing Platform
Maximum capacity of 600
people for general use.
Dancing activities are not
recommended
Outdoor Restaurant Terrace
Limit to 470 people for
general dancing with
restricted access to all viewing
platform
Indoor Restaurant
Limit to 345 people for
general dancing with
restricted access to all viewing
platform
![Page 28: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/28.jpg)
77 Design Challenges
Construction Methods
![Page 29: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/29.jpg)
78 Installation at L55/56/57 & Roofing
Assembly at Level 1
Heavy lifting to L55
![Page 30: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/30.jpg)
79 Lifting of Bridge Trusses
![Page 31: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/31.jpg)
80 Lifting of Bridge Trusses
![Page 32: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/32.jpg)
81 Bridge Trusses being slided into position
![Page 33: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/33.jpg)
82 Lifting of Bridge Trusses
![Page 34: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/34.jpg)
83 Lifting Gantries for Cantilever Backspan
![Page 35: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/35.jpg)
84 Lifting of Cantilever Backspan
![Page 36: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/36.jpg)
85 Lifting of Cantilever Backspan
![Page 37: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/37.jpg)
86 Lifting of Cantilever Backspan
![Page 38: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/38.jpg)
87 Lifting of Cantilever Segments
![Page 39: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/39.jpg)
88 Lifting of Cantilever Segments
![Page 40: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/40.jpg)
89 Lifting of Cantilever Segments
![Page 41: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/41.jpg)
90 Lifting of Cantilever Segments
![Page 42: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/42.jpg)
91 Lifting of Cantilever Segments
![Page 43: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/43.jpg)
92 Lifting of Cantilever Segments
![Page 44: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/44.jpg)
93
skypark
Overview of SkyPark
![Page 45: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/45.jpg)
94 Fabrication of Box Girders
![Page 46: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/46.jpg)
95 Backspan with 10m deep section
![Page 47: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/47.jpg)
96 Lifting - In Action
Segment 5 (24th December 2009)
![Page 48: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/48.jpg)
![Page 49: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/49.jpg)
![Page 50: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/50.jpg)
99 Design Challenges
Challenge Against Time
![Page 51: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/51.jpg)
100 Tight Construction Programme and Collaboration with Arup Offices
![Page 52: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/52.jpg)
101 101
What Values have been brought to Arup?
Successful Cross Regional Collaboration Irrespective of Cultural Differences
Skills and Experience Sharing among Offices and Staff
Created Good Bonding and Networking Between Offices/Staff
Enhanced Arup’s Reputation and Business Opportunities
Enriched Arup’s Portfolio of World-class Iconic Projects
![Page 53: Marina Bay Sands - Sky Park Cantilever](https://reader033.vdocuments.site/reader033/viewer/2022061215/54a117c0ac7959cc428b4593/html5/thumbnails/53.jpg)
102 Marina Bay Sands Integrated Resort 2007 - 2010
Thank You