OAL MANAGEMENTOAL MANAGEMENTYSTEM ATYSTEM AT
RAICHUR THERMAL POWER
STATION
: .GUIDE Mrs GAUTHAMI ALVA
: . .EVALUATOR PROF SUDHIR M
: .SPEAKER PRIYANKA R
-
8/14/2019 Management System At
3/23
-
8/14/2019 Management System At
4/23
INTRODUCTION
RaichurThermal Power Station (RTPS) is a project
sponsored by the Karnataka Power CorporationLimited . KPCL is a fully owned by the Government
of Karnataka.
Karnataka Power Corporation LTD exclusively for
power generation through hydel & thermal .
RaichurThermal Power Station is first of its kind in
Karnataka State.
-
8/14/2019 Management System At
5/23
OBJECTIVES
To generate the electricity & supply to the people
in the Karnataka State.
-
8/14/2019 Management System At
6/23
ESTABLISHMENT
Raichur Thermal Power Plant is situated atShaktinagar near Deosugur village of Raichur District(on Raichur Hyderbad Highway).
The Project to construct the Thermal Power Station was
finalized in 1978 after an MOU was signed betweenKarnataka Power Corpration Limited & the Karnataka
State Electricity Board. Tata Group Company wasappointed as the consultants for the project.
Aquired area of RTPS, is 536 acres for colony.1600 acresfor power station. 1000 acres for ash handling . 128
acres for Rehabilitation centre.
-
8/14/2019 Management System At
7/23
The Power station at present consists of seven
units each of 210 MW generationcapacities.Each unit generating 5 million units
per day .
-
8/14/2019 Management System At
8/23
Major Sources Of Coal Supply To Raichur
Thermal Power Plant Are:
M/s. Singareni Collieries Company Limited ,
Andhra Pradesh -550
KMs.M/s.Wstern Coalfields Limited ,Maharashtra -
660KMs.
M/s.Mahanadi Coal Fields Limited , Orissa - 1850KMsM/s.Karnataka EMTA Coal Mines Limited (KECML)
,Maharashtra - 660KMs.
Imported Coal from Indonesia, Thailand & China.
-
8/14/2019 Management System At
9/23
CHITTAPUR
KRISNA
RAICHUR
MCI
MADRAS
ARAKONAM
GUDUR
ANDRA PRADESH
RTPS
BYSHIP
WCL CUTTCK
BPARDM
SYIMMZ
SSCL
SAST1
PRPI
VISHAKAPATNAM
PENAKODA
BHUBANESWAR
BILASPUR
ORISSA
MCLTALCHER
-
8/14/2019 Management System At
10/23
The coal supplied is sampled using a
computerized system and sent to the laboratory
for testing. This ensures that a properly graded
coal is being used.
Coal Management System At
RTPS / Computerized Unit ControlSystem:
-
8/14/2019 Management System At
11/23
RAW MATERIALS
RTPS uses coal for generation of electricity.
Types of Coal Used
Raw Coal Washed coal
-
8/14/2019 Management System At
12/23
AVERAGE LANDED COST OF:
A) WASHED COAL 1728.91
B) RAW COAL 1103.08
THEREFORE, WASHING, HANDLING &
SERVICE CHARGES TO WASHERIES
(A - B)
625.83
ADD: 20% LOSS OF RAW COAL DUE TO
WASHING AT WASHERIES
220.62
ON THE TOTAL QUANTITY OF WASHED
COAL, THE FINANCIAL IMPLICATION IS
(Rs. In Crores)
271.21
TOTAL COST FOR THE COAL PROCURED DURING THE YEAR 2008-2009
-
8/14/2019 Management System At
13/23
Unloading of Coal at RTPS
-
8/14/2019 Management System At
14/23
-
8/14/2019 Management System At
15/23
Problems faced by KPCL inprocurement of coal
-
8/14/2019 Management System At
16/23
Actions initiated by KPCL:
To bring down the transit losss a liaison agent was
appointed.
KPCL entered into Fuel Supply agreement (FSA) with coal
companies during the year2000
.
-
8/14/2019 Management System At
17/23
KPCL initiative to own its coalmines block:
-
8/14/2019 Management System At
18/23
ISSUES
-
8/14/2019 Management System At
19/23
ENVIRONMENT MANAGEMENTGREENARY AT RTPS
-
8/14/2019 Management System At
20/23
AWARDS
2003-04 GOLD SHIELD & CERTIFICATE FOR OUTSTANDING
PERFORMANCE - 88.23% PLF
2002-03 GOLD SHIELD & CERTIFICATE FOR OUTSTANDINGPERFORMANCE -90.39% PLF
2000-01 and 2001-02 - CERTIFICATE & SILVER SHIELD FOR GOOD
-
8/14/2019 Management System At
21/23
-
8/14/2019 Management System At
22/23
CONCLUSION
-