Management Report and KPIs
Report to the Management Board on Q4 2014 Produced January and February 2015
KEY PERFORMANCE INDICATORS
Content – Request Submissions
Target – completed (including not accepted) – 70% 2014 Q4 – 66.3%
August Septemb
er October November December % on hold (excluding not accepted) 21.11% 21.45% 21.07% 20.92% 21.43%
Content – Projects 2014
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Content Mapping
Red
Green
CONTENT PROJECTS Content Content Mapping Mapping Green 12 70.59% 5 100.00% Red 5 29.41% 0 0.00%
Red projects • Pre-coordination roadmap and
expression library • Context value sets for situation content • Development of a Diagnostic Imaging
Reference Set • Alignment of SCT content with
procedure classifications • Pharmaceutical content international
value proposition
Content – Release Details (concepts/descriptions)
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Jan 2010
July 2010
Jan 2011
July 2011
Jan 2012
July 2012
Jan 2013
July 2013
Jan 2014
July 2014
Jan 2015
New descripIons added
New Concepts added
• July 2014 – descripIons added/changed represents the changes to the medical devices representaIon
0
5000
10000
15000
20000
25000
30000
35000
DescripIon changes
Concept changes
Customer Service - Freshdesk
Freshdesk went into use gradually beginning in April 2014, so Q2 numbers are not entirely accurate. New procedures were put into place in Feb. 2015 to improve response time. SLA levels vary (see bar chart) so they cannot be put on the line charts.
Education
80 39
4 21 56
15
121
80
33 18
31
4
E-Learning - Completed Unique Views Q3 Q4
0
5
10
15
20
Q3 Q4
Online Tutorials/Assessments
# Online Tutorials/Assessments Available
Human Resources
Q1 Q2 Q3 Q4
# Members 25 27 27 27
# Large Vendor Agreements
0 0 0 0
# New Salsa Licenses
51 25 30 39
# New Collab Agreements
0 0 2 0
Appropriate Representation at External Events
100% 100% 100% 100%
% Survey Results Showing Strong Product/Service Levels
71% (Member survey)*
n/a n/a 98% (Showcase survey)**
Stakeholder Management
*Member survey completed in Nov. 2013 but presented here as a baseline. “IHTSDO meets my overall service requirements” 13% strongly agree + 58% agree; “To what extent has our service delivery met your expectations?” average response score: 2.25, where 1-exceeds expectations, 2-meets expectations, 3-slightly below expectations, 4-does not meet expectations **Showcase survey: 56 respondents; 98% agreed or strongly agreed that it was a valuable use of their time, 84% said the Showcase met or exceeded their expectations.
Concepts per release 2014 2015 Added403,836 417,209 13,373
Release on time?Defects in release Opportunities 75,132,477
Defects* 40,364 Defect percentage 0.054%
January 2015 SNOMED CT International Edition
Yes, on 31 Dec. 2014
Technical - Delivery
RF2 Compliance All file columns present, in the correct order PASSAll columns contain the correct data types
Release type integrity Delta files are subsets of the Snapshot files PASSSnapshot component states are subsets of Fullcomponent statesNew Full release is same as previous Full release +new Delta
Concept/component integrity Each component possesses required components, and PASSnone added in error
Quality Assurance
*Language reference set member were erroneous; subsequently corrected
Technical - Applications & Architecture Customer Service
Tooling Issues logged in JIRA against Mapping, MLDS, Browser and Refset Mgmt Tools
Freshdesk Customer Support (internal and external stakeholders) Tickets Resolved On Time
Resolution First Contact Resolution
Average First Reponse Time
Average Response Time
Average Resolution Time
Q4 2014 67 67% 73% 5 hours 49 mins 4 hours 13 mins 2 days 16 hours Target 85% 75% 5 hours 4 hours 2 days
Technical - Applications & Architecture Infrastructure Uptime (%)
Oct 2014 Nov 2014 Dec 2014 IHTSDO Collabnet 100.00 99.99 99.99 IHTSDO Daily Build Browser 100.00 100.00 100.00 IHTSDO Freshdesk 99.97 IHTSDO JIRA 99.99 99.98 99.98 IHTSDO Lookup Service 100.00 IHTSDO Mapping Service 97.03 95.83 95.56 IHTSDO Release Service API 100.00 100.00 100.00 IHTSDO SALSA 99.99 99.95 99.84 IHTSDO SNOMED CT Browser 100.00 100.00 100.00 IHTSDO Web Site 100.00 99.94 100.00 SIRS 97.07 99.92 99.31 Average Uptime (%) 99.41 99.51 99.47
Target Uptime (%) 99.9
Technical - Applications & Architecture Online Service Usage Statistics
Sessions Avg. Session Duration
Bounce Rate
IHTSDO SNOMED CT Browser 14,273 00:01:13 85.87% IHTSDO Web Site (from Nov 1, 2014) 13,876 00:03:02 42.89% IHTSDO Mapping Tool 1,479 00:36:31 11.70% SNOMED In Action 1,296 00:00:52 49.38% SNOMED CT Documentation 942 00:00:48 84.08% IHTSOD Freshdesk Support Portal 602 00:02:00 47.18%
Technical - Applications & Architecture Project Success
Target Live Date
Actual Live Date
Variance Notes
IHTSDO SNOMED CT Browser
2014-10-01 2014-09-18 -13
IHTSDO Web Site 2014-10-27 2014-10-27 0 IHTSDO Mapping Tool 2014-07-25 2014-08-05 11 Member Licensing & Distribution Service (MLDS)
2014-12-01 2015-01-12 42 Delayed to align with new affiliate license
IHTSDO Refset Mgmt Tool 2014-12-19 2015-03-31 102 Multiple delivery points, rolled over into 2015 for directory functionality
Average Variance
28.4
Target Variance
0
Project Status
6 14
13
57 58
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Q3 Q4
Project Status
Green
Amber
Red
Number of projects declined in Q4 because some projects were combined. Red projects in Q4 include taking a step back to develop a strategy for refsets/subsets, mapping activities put on hold pending the completion of the ICD-10 maps, work on vaccines that require precursor activities, delays in getting a group of consultant editors, need to finish the SCT languages work, deferment of work on DITA, delays in the vendor guide, and supplier delays for the Refset Management tool.
UPDATES BY LINE OF BUSINESS
▪ Successful completion of content authoring for the Jan 2015 release ▪ Detailed planning for content development activities for 2015 ▪ Consultant Terminologist Program is progressing, with a successful
face-to-face group meeting and allocation of a group project ▪ Substance redesign - progressing on the alignment of content with
ChEBI and the development of molecular entity hierarchy ▪ LOINC – technology preview published ▪ Publication of medical devices release and GMDN map – planning
for required work in 2015 ▪ Publication of updated GP/FP subset and ICP-2 map ▪ Reviews of ICD-11 chapters, and subsequent content
enhancements – update on delivery of ICD-11 chapters ▪ Finalized the completion of the ICD-10 project to provide a complete
map
Content – 2014 Q4 Achievements
▪ Management and authoring of SIRS requests ▪ Management of feedback on LOINC technology preview ▪ Functioning work - initiate project ▪ Publication of updated GP/FP subsets and ICPC-2 map ▪ Preparation for publication of molecular entity hierarchy tech preview ▪ Use case review for pharmaceutical requirements for review by MF ▪ Development of E-learning syllabus (basic and advanced authoring) ▪ Consultant Terminologist program ▪ ICD-11 alignment – continuation of review and authoring new content
arising from review work ▪ Publishing candidate baseline of completed SCT to ICD-10 map ▪ Commencement of work with UKTC to review the SCT to ICD-10 map ▪ Complete requirements specification for key features of replacement
authoring tool
Content – 2015 Q1 Key Objectives
▪ Technology previews ▪ Molecular entity technology preview ▪ LOINC technology preview ▪ Substances technology preview ▪ Functioning technology preview
▪ LOINC content - first release of joint content ▪ Finalizing report on anatomy alignment with FMA, as part of the
contract with University of Washington ▪ Planning for future development of anatomy content based on the
report from University of Washington (continued next slide)
Content – 2015 Q2-Q4 Key Objectives
Content – 2015 Q2-Q4 Key Objectives (continued from previous slide)
▪ Management and authoring of SIRS requests ▪ Microbiology value set(s) ▪ Allergy content - enhancing
existing content ▪ Molecular entity ▪ Substances ▪ Pharmaceutical content ▪ Dentistry content ▪ Nursing diagnoses/procedures
content as agreed with ICN as part of collaboration agreement
▪ Development of editorial guidance for functioning content, and provision of new content ▪ Delivery and authoring of CMT
content as per agreed schedule with Kaiser Permanente ▪ Continuation of ICD-11 alignment
work ▪ Delivery of baseline release of
completed SNOMED CT to ICD-10 map
Items of content delivery for July 2015, also including Jan 2016 items:
▪ Potential disruption of authoring productivity due to development and delivery of new authoring tool ▪ Lack of clarity for the delivery of a clear process for escalation of
editorial issues available internally and externally will lead to uncertainty ▪ Potential lack of required skills within the authoring resource to
ensure the team can meet the challenging times ahead ▪ Lack of feedback on the alpha releases and technology previews
will lead to uncertainty of the ability to implement the solution
Content – 2015 Key Risks
▪ Customer Relations Roadmaps completed for all three regions ▪ Member Satisfaction survey issued ▪ Participation at national and regional conferences with positive
outcomes: ▪ National SCT event in Estonia ▪ HIMSS Middle East conference ▪ INFOLAC conference in Uruguay ▪ National SCT stakeholder engagement event in Malaysia ▪ Asia eHealth Information Network UHCICT conference in the
Philippines
Customer Relations – 2014 Q4 Achievements
▪ Member Satisfaction survey results received and summary results published ▪ Prospective Member pipeline updated and Impact Statements
developed ▪ “SCT in Action” redesign plan developed ▪ Finalize regional CRM Action Plans based on the regional
roadmaps
Customer Relations – 2015 Q1 Key Objectives
▪ Delivery against agreed regional CRM Action Plans ▪ Regional Staffing Models, Scope and Costing completed ▪ Regional Calendar of Meetings & Events established ▪ KPIs refined ▪ Work with LOB’s to simplify documentation for Members ▪ Development of Regional Marketing Plans
Customer Relations – 2015 Q2-Q4 Key Objectives
▪ The existing core delivery resources that are mainly centralized in Europe would not be scalable to support Members in Asia Pacific and Americas regions ▪ Insufficient resource capacity to scale up the engagement as
outlined in the vendor engagement strategy
Customer Relations – 2015 Key Risks
▪ Collaboration status and activities with all organizations as identified in Operation Plan 2014-15 ▪ Presentation at WHO-FIC annual meeting ▪ Started communicating to SDOs plans regarding antecedent
versions of SNOMED CT
Collaboration – 2014 Q4 Achievements
▪ Confirm 2015 work plan and communication activities with WHO and HL7 ▪ Formalize affiliate licensing arrangements with SDOs using
SNOMED CT in their products/materials e.g. DICOM, IEEE, HL7 ▪ Draft collaboration agreement with AMA with initial joint work
areas and seek approvals where required ▪ Sign off agreement and work plan with INSERM (Orphanet) ▪ Move forward the IHTSDO role in taking over the chair role with
JIC
Collaboration – 2015 Q1 Key Objectives
▪ Monitor delivery of agreed collaborative work plan within
individual LoB and also with partners ▪ KPI’s re-defined ▪ Service Level Targets Established. ▪ Define Regional requirements for collaboration support
Collaboration – 2015 Q2-Q4 Key Objectives
▪ Lack of access to clinical specialists for SNOMED CT/ICD-11 may delay progress of the work ▪ Dependence on potential and actual collaborating partners on
both establishing updated/new agreements and undertaking work
Collaboration – 2015 Key Risks
▪ Completion of main elements of Foundation course for E-Learning Reference Group ▪ Delivery of draft guidance document on terminology binding ▪ Delivery of a specification document updating SNOMED CT
compositional grammar ▪ Delivery of a draft specification document on expression
constraint language ▪ Delivery of a draft guidance document on analytics with
SNOMED CT ▪ Delivery of a draft document on options for exchanging
constrained post-coordinated expression ▪ Delivery of a draft report of a survey of requirements for wider
use of SNOMED CT in research and innovation activities
Education – 2014 Q4 Achievements
▪ Finalize preparation of course material for Foundation course ▪ Start first (small) and second (full) intakes to course ▪ Revise Foundation course material based on feedback from first
intake ▪ Plan and commence development of Implementation course ▪ Delivery of draft document on SNOMED CT query language
specification
Education – 2015 Q1 Key Objectives
▪ Assess completion of four intakes to Foundation course ▪ Complete preparation of course material for Implementation
course ▪ Start and complete first intake to Implementation course ▪ Manage content course delivery ▪ Draft document on template extensions to SNOMED CT query
language ▪ Delivery of updates to various SNOMED CT guidance
documents
Education – 2015 Q2-Q4 Key Objectives
▪ Disruption of key staff time by overhead of running courses for large numbers of students impacting other work
▪ Delay in delivery of presentation and assessment materials for implementation course ▪ Dependency of staff time on impact of feedback/issues from
Foundation course ▪ Dependency on external contractors with limited time
▪ Uncertainty about future demand for courses with cost of meeting potential demand or reputational risk of failing to meet demand
▪ Negative reactions to unsuccessful course completion – i.e. disputing assessment result
▪ Lack of available time from other teams to contribute to content course (and potential mapping course and refset course) development
▪ Implementation guidance documentation developments and updates delayed by priority focus on education
Education – 2015 Key Risks
▪ Successful running and completion of the Terminology Server RFP ▪ MVP development on Members Licensing & Distribution Service
(MLDS) completed in time for go live in early Jan 2015 ▪ Successful recruitment of three new team members to support
the tooling effort in 2015 ▪ Feedback & input from both Malaysia and Canada
Technical – App & Arch – 2014 Q4 Achievements
▪ Roll out of MLDS for IHTSDO in Jan. and Members in Feb. ▪ Approval and purchase of Terminology Server (TS) ▪ Integration of the IHTSDO SCT Browser to the TS ▪ Integration of WB exports to the TS so that current authoring is
being stored in the TS ▪ Minimum Viable Product (MVP) Translation Service beta for
members ▪ Batch Import integrated to the TS ▪ Refset Management Tool available for members, and integrated
with TS ▪ Publishing IT policies covering
▪ Data Protection ▪ Software Development Licensing, and ▪ Data Retention, Backup and Deletion.
Technical – App & Arch – 2015 Q1 Key Objectives
▪ IHTSDO content team will no longer need to rely on using the IHTSDO Workbench by end of Q4. This incorporates MVP’s of the following: ▪ template authoring ▪ batch authoring
▪ Migration away from Collabnet for both infrastructure and TeamForge well before the end of Q4. This includes: ▪ house cleaning of existing Collabnet content and users ▪ moving to JIRA to replace the current use of trackers ▪ moving to Confluence (current product of choice) for
technical documentation and project collaboration
Technical – App & Arch – 2015 Q2-Q4 Key Objectives
▪ On further investigation the Terminology Server is found to be less compliant than expected
▪ Tight development and delivery timelines without much room to maneuver
▪ Although improved since 2013, there is a continuing dependency on suppliers as fallback positions. There is a risk that this reliance can lead to the suppliers holding the organization to "ransom" in regards to costs and timings of deliverables.
▪ In the event of accessibility being denied to tools and applications for whatever reason this can lead to major reductions in productivity and impact the timing of releases.
Technical – App & Arch – 2015 Key Risks
▪ Release Management ▪ SNOMED CT Spanish Edition released to Members Oct 31 ▪ SNOMED CT International Edition released to Members Dec 31 ▪ LOINC Technology Preview co-released with Regenstrief in Oct
▪ SNOMED Factory/Process Development ▪ SNOMED CT release service used in the production of the Jan
2015 International Edition ▪ SNOMED CT release validation framework minimum viable
product completed and used in the validation of the Jan 2015 International Edition
▪ SNOMED Factory/End to End Service Development ▪ Initial planning for the Workbench Replacement Project
completed, resulting in funding approval
Technical – Delivery – 2014 Q4 Achievements
▪ Release Management ▪ Develop a product lifecycle management process, align the release
management portfolio with the content roadmap, and publish product maintenance schedules for SNOMED CT products in development, maintenance, and deprecation phases ▪ The related deliverable: the portfolio, along with current and planned
schedules and statuses, published on the Web by Mar 31 ▪ Workbench Replacement
▪ Demonstrate the end to end throughput of content, and deliver a minimum viable product (MVP) batch import service into production
▪ SNOMED CT Extended Logic Profile ▪ Understand and document the impact on Members. This will feed
into a roll-out plan, which will enable the delivery of pending content projects
Technical – Delivery – 2015 Q1 Key Objectives
▪ Release Management ▪ Achieve routine product lifecycle management ▪ Obtain buy-in for and introduce the use of the new product
development process, which will front-load decisions about content and software development requirements, and quality validation ▪ Leverage the new quality validation framework to improve quality
validation coverage across the entire product portfolio ▪ Begin partnering with NRCs to understand how extensions may
be managed and released using IHTSDO processes and tools
(continued next slide)
Technical – Delivery – 2015 Q2-Q4 Key Objectives
(continued from previous slide)
▪ Workbench Replacement ▪ Deliver a set of authoring services that are integrated from
request through publication. The aim is firstly to provide functionality to release content based on the current content roadmap, and secondly to improve the throughput of content by eliminating the inefficiencies inherent in the Workbench system. The focus in 2015 is on a minimum feature set (MVP), to be stabilized and enhanced during 2016.
Technical – Delivery – 2015 Q2-Q4 Key Objectives
▪ Risk to the quality of SNOMED CT releases: ▪ New staff are inexperienced in our domain ▪ Newly developed software tends to be unstable
▪ Risks to the Workbench Replacement Project ▪ Project timelines are ambitious ▪ There have already been delays due to the need for an
independent evaluation of the terminology server RFP ▪ Project personnel are 100% allocated. Additional projects or
tasks that would put timelines at risk ▪ An ambitious content release schedule for 2015 risks starving
the project team of SME input and testing resources
Technical – Delivery – 2015 Key Risks