manage the system operation. © irrigation association determine the system interval intervals...

30
Manage the System Operation

Upload: tracey-parks

Post on 04-Jan-2016

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

Manage the System

Operation

Page 2: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Determine the System Interval

• Intervals during peak and non-peak periods

• Scheduling with the checkbook method

Page 3: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Take Advantage of Off-Peak Pricing

• Electrical power rate structures

• Special electrical controls

• Modifications to design

Page 4: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Use Soil Moisture Sensors to Improve

Scheduling

• Simple measurements

• Soil based controls

Page 5: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook
Page 6: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Start and Stop the System

• Soil moisture trigger points

• Anticipating rain

Page 7: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

Appearance of clay, clay loam, and silty clay loam soils at various soilmoisture conditions.

Available Water Capacity 1.6-2.4 inches/foot

Percent Available: Currently available soil moisture as a percent of available water capacity.

In/ft. Depleted: Inches of water needed to refill a foot of soil to field capacity.

0-25 percent available 2.4-1.2 in/ft. depletedDry, soil aggregations separate easily, clods are hard to crumble with applied pressure.

(Not pictured)

25-50 percent available 1.8-0.8 in/ft. depletedSlightly moist, forms a weak ball, very few soil aggregations break away, no water stains, clods

flatten with applied pressure.

Page 8: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

OLD and NEW TOOLS

Page 9: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook
Page 10: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Scheduling Multiple Pivots

Pressure constraints

Page 11: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Computer Management

Page 12: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Implement Current Control Technology

Off-site sensing and control

(SCADA)

Telemetry (radio, cellular, etc.)

Page 13: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Page 14: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Page 15: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Uniformity Based on Infrared

Page 16: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Modify Soil Cultivation Practices to Reduce

Runoff

Call in number 1-888-450-5996, confirmation # 3268441.Call in number 1-888-450-5996, confirmation # 3268441.Call in number 1-888-450-5996, confirmation # 3268441.

Page 17: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

Dammer-Dikker

Page 18: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

Surface storage from crop residue

Page 19: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Blocking Off the Furrow

Page 20: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Page 21: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Let’s Go to Our Manuals and Look at Setting Irrigation

Intervals

Page 22: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Chapter 9Draw Up Plans and

Specs

Page 23: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Combine Manufacturer Plans with Local Details

Page 24: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

Plan view

© Irrigation Association

Page 25: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

Details

© Irrigation Association

Page 26: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Compile a Systems Specifications Manual

• Manufacturer specs

• Retention pond

• Well and/or screening

• Mainline

• Pump

Page 27: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Page 28: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Compile a System Operations Manual

• Pivot operation and maintenance

• Scheduling guidelines

• Application/depth vs. speed

• Winterization of the system

Page 29: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association

Let’s Go to Our Manuals -

Chapter 9

Page 30: Manage the System Operation. © Irrigation Association Determine the System Interval Intervals during peak and non-peak periods Scheduling with the checkbook

© Irrigation Association