makes it possible for customers to;

15
Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their production costs Release tied-up capital UFAB in Uddevalla and Shanghai

Upload: stone-kelley

Post on 31-Dec-2015

24 views

Category:

Documents


1 download

DESCRIPTION

UFAB in Uddevalla and Shanghai. Makes it possible for customers to;. Focus on their core activities. Expand through flexible production capacity. Reduce their production costs. Release tied-up capital. UFAB i Uddevalla och Shanghai. Develop – Manufacturing - Assembly - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Makes it possible for customers to;

Makes it possible for customers to;

Focus on their core activities

Expand through flexible production capacity

Reduce their production costs

Release tied-up capital

UFAB in Uddevalla and Shanghai

Page 2: Makes it possible for customers to;

UFAB i Uddevalla och Shanghai

• Develop – Manufacturing - Assembly

• High technical machines

• Turnover 2009; 11 MEUR

• Employees 2009; 40

• Quality First! – ISO 9001:2008

• 40 years experience – 1500 system

• Cost reduction – Lean

• Environmental - ISO 14001:2004

Page 3: Makes it possible for customers to;

Mattsson Wind

Page 4: Makes it possible for customers to;

Wind power

Trucks Medical

Offshore

Packaging

Page 5: Makes it possible for customers to;

Technique put in system

Page 6: Makes it possible for customers to;

Reference AssemblyQuality - National Oilwell Varco Norway AS • UFAB assemble and test complete units for offshore. Tests are made together with customer and delivery are made directly to oil platform.

Page 7: Makes it possible for customers to;

Complexity - Tetra Recart • UFAB assemble and test complete system with a capacity of 24 000 packages an hour. Order lead time are 21 weeks where 3 500 articles are manufactured, assembled and tested.

Reference Assembly

Page 8: Makes it possible for customers to;

Flexibility - Tetra Top • UFAB delivers complete customer specified modules in tact without any delays. Order lead time are 15 working days and the assembly and final testing takes 500 hours per module.

Reference Assembly

Page 9: Makes it possible for customers to;

Referenser MonteringFuture - WindEn • UFAB assemble wind turbines in the sizes 5,5 – 8 – 45 kw. These are used for private persons and farmyards and produces between 15 000 and 100 000 kw per year

Page 10: Makes it possible for customers to;

Volume - VGB • UFAB assemble and deliver 2000 snow chains to all big manufacturers of trucks and buses. Order lead time are between 1 and 5 days with 3000 different articles.

Reference Assembly

Page 11: Makes it possible for customers to;

Partnership - GE Healthcare • UFAB has during two years been participating in the prototype phase together with the customer. Serial production has started and forecasted annual volume are 600 units.

Reference Assembly

Page 12: Makes it possible for customers to;

Reference DevelopmentIdea to Reality - GreenClip • UFAB has for the customer developed an automatic labeling machine for high volume products. The assembly and installation at site has also been performed by UFAB.

Page 13: Makes it possible for customers to;

Reference DevelopmentMechanical development

• Ensure quality in development

• Easy to assemble

• Reduce manufacturing costs

• Assembly and test documentation

• Simulations

• ProEngineer, SolidWorks, AutoCAD, Framemaker

Automation

• Electrical development

• PLC programming

• Siemens S7, Rockwell, GE FANUC

• Simulations

• Profibus (Siemens) Devicenet (Rockwell)

Page 14: Makes it possible for customers to;

Future targets and commitments

Quality First in all steps of the process

20 MEUR in turnover 2011

Workshop to manufacture parts in China 2010

Achieve all Key indicators and customer satisfaction 2010

Lean – Increase cross functional team work 2010

Page 15: Makes it possible for customers to;

Summary

• System supplier with a Quality First approach• Lean – value stream mapping and 5s for cost reduction• 40 years experience - 1500 systems delivered• Developed supplier network and a workshop in China• Quality and Environmental certificate ISO 9001 and ISO 14001• Strong position with the Mattsson Group