major retrofits – reducing pollutant loading to comfort lake using iron filings d avid f ilipiak...

22
MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS DAVID FILIPIAK & JEREMY NIELSEN, SRF

Upload: desiree-rowson

Post on 28-Mar-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO

COMFORT LAKE USING IRON FILINGS

DAVID FILIPIAK & JEREMY NIELSEN, SRF

Page 2: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

PRESENTATION OUTLINE

• PROJECT OVERVIEW

• DESIGN GOALS/CONSIDERATIONS

• CONSTRUCTION/TECHNIQUES

• MONITORING RESULTS

• CONCLUSIONS/LESSONS LEARNED

Page 3: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

PROJECT OVERVIEW

Page 4: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

PROJECT OVERVIEWSITE PARAMETERS

64.9 ACRES OF EXISTING COMMERCIAL/RESIDENTIAL DRAINAGE AREA (60% IMPERVIOUS SURFACE)

36.5 ACRES OF PROJECT AREA (50% IMPERVIOUS SURFACE)

Page 5: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

DESIGN GOALS/CONSIDERATIONS

DESIGN GOALS/CONSTRAINTS

GOALSo MATCH PRE-DEVELOPMENT DISCHARGE RATESo NO NET INCREASE IN RUNOFF VOLUME (FROM PRE-DEVELOPMENT

CONDITIONS) FOR A 2-YEAR 24-HOUR STORMo NO NET INCREASE IN TOTAL PHOSPHOROUS LOADING

CONSTRAINTSo HIGH GROUND WATERo SHALLOW STORM SEWERo FLAT TOPOGRAPHY

Page 6: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

IRON FILING SAND ENHANCEMENT

ENHANCED DESIGN

ADDED IRON FILINGS SAND INTO THE FILTRATION BASIN DESIGN BIOENGINEERED SOIL PRIMARY FILTER MECHANISM/IRON FILING

SAND SECONDARY FILTER MECHANISM INCREASE THE DEPTH OF WATER THAT WILL PERMEATE THROUGH THE

FILTER MATERIAL BY 50%

Page 7: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

DESIGN

Page 8: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

DESIGN GOALS/CONSIDERATIONS

ENHANCED DESIGN CONSIDERATIONS

o STANDING WATER IN UPSTREAM PIPES – ADDED MECHANICAL VALVE TO DRAIN DOWN POND IN FALL

o VEGETATED BASIN DRAWN DOWN – MODIFIED SOIL TO HIGHER SAND CONTENT TO ASSIST DRAINAGE GIVEN ADDED WATER

o IRON FILING CONTENT – USED MECHANICAL MIXING FOR CONSISTENT MIX

Page 9: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

DESIGN GOALS/EXPECTATIONS

EXPECTED PERFORMANCE

DescriptionTotal Drainage Area/ Project

Area ac

% Total Impervious/

(Project Impervious)

TP Loadinglbs/yr

TP Removedlbs/yr TP Reduction, %

Existing Conditions 64.9 (36.5) 53.7% (40%) 54 5.2 9.6%

Proposed Conditions 64.9 (36.5) 59.8% (50%) 59.6 41.5 69.6%

Enhanced Conditions 64.9 (36.5) 59.8% (50%) 59.6 46.7 78.4%

Page 10: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUES

CHALLENGING SUBGRADE SOILS

Page 11: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUES

BURIED CONSTRUCTION DEBRIS

Page 12: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUES

FINE FILTER AGGREGATE

Page 13: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUESMIXING OF IRON ENHANCED SAND

Page 14: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUESMIXING OF IRON ENHANCED SAND

Page 15: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUES

PLACEMENT OF TILE/FILTER AGGREGATE

Page 16: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONSTRUCTION/TECHNIQUES

PLACEMENT OF IRON ENHANCED SAND

Page 17: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

FINAL PRODUCT – 1 YEAR LATER

PRETREATMENT BASINFILTRATION BASIN

Page 18: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

MONITORING/RESULTS

MONITORING LOCATIONS• INLET

• CONNECTION BETWEEN THE POND/FILTRATION BASIN

• TILE OUTFALL

• FIRST YEAR OF A 3 YEAR PROGRAM

Page 19: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

MONITORING/RESULTS

FIRST YEAR RESULTS • INCREASE ON CONCENTRATIONS AND LOADS OF TP, SRP AND TSS FROM THE

INLET OF THE IRON-ENHANCED INFILTRATION BASIN TO ITS OUTLET

• THE POND OPERATES WITHIN EXPECTED REMOVAL RATES

• SOME ORANGE WATER HAS BEEN DETECTED PERIODICALLY AT THE OUTLET, INDICATING POTENTIAL FERRIC HYDROXIDE COMING OUT FROM THE IRON FILLINGS

• INCREASES IN LOADING DECREASED WITH SIMILAR STORM EVENTS OVER THE COURSE OF THE YEAR

• ANY FINAL CONCLUSIONS ABOUT THE EFFECTIVENESS OF THE FILTRATION BASIN BASED ON THE FIRST YEAR MONITORING IS PREMATURE SINCE THESE SYSTEMS TYPICALLY REQUIRE AT LEAST A YEAR TO STABILIZE (VEGETATION/SOILS SETTLING) AND REACH STEADY STATE OPERATION

Page 20: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

CONCLUSIONS/LESSONS LEARNED

• IRON SYSTEMS NEED TO DRY OUT – CHALLENGING IN WET CONDITIONS OR IN POOR SOILS

• TAILWATER CONDITIONS FOR OUTLET COULD IMPACT PERFORMANCE

• DRYING OUT IRON MAY IMPACT VEGETATION OVER THE TILE SYSTEM (MAY IMPACT LONG-TERM VIABILITY OF VEGETATION)

• IT TAKES TIME TO SEE RESULTS WITH VEGETATED FACILITIES

Page 21: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

PROJECT PARTNERS

Page 22: MAJOR RETROFITS – REDUCING POLLUTANT LOADING TO COMFORT LAKE USING IRON FILINGS D AVID F ILIPIAK & J EREMY N IELSEN, SRF

QUESTIONS?

• DAVID FILIPIAK – [email protected]

• JEREMY NIELSEN – [email protected]