mail prep and entry steering committee meeting

11
® 1 Mail Prep and Entry Steering Committee Meeting May 14, 2013

Upload: carl

Post on 08-Jan-2016

28 views

Category:

Documents


1 download

DESCRIPTION

Mail Prep and Entry Steering Committee Meeting. May 14, 2013. Agenda. Welcome Deliverables/Updates since 04/11/13 Review Discussion Items Review Ideas in Benefit/Effort Matrix Decide Status of Open Ideas in Log Next Steps and Wrap Up. Mail Prep and Entry Ideas Log. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Mail Prep and Entry  Steering Committee Meeting

®

1

Mail Prep and Entry Steering Committee Meeting

May 14, 2013

Page 2: Mail Prep and Entry  Steering Committee Meeting

®

2

Agenda

Welcome Deliverables/Updates since 04/11/13 Review Discussion Items Review Ideas in Benefit/Effort Matrix Decide Status of Open Ideas in Log Next Steps and Wrap Up

Page 3: Mail Prep and Entry  Steering Committee Meeting

®

3

Mail Prep and Entry Ideas Log

75 ideas submitted to date• 29 ideas closed

Out of scope, withdrawn or re-assigned

• 11 ideas completed Postal Bulletin articles and DMM revisions announced

• 23 ideas remaining in Benefit/Effort matrix

• 12 ideas open needing Change/Improvement template submitted or idea withdrawn

Page 4: Mail Prep and Entry  Steering Committee Meeting

®

4

DMM Revisions

Federal Register

Proposed Rule

Federal Register

Final Rule

Postal Bulletin article

DMM revision effective

Eliminate QSGs 201b, 703, 705a-f, 707a

Removal of advanced mail prep and brief DMM section guides

NA NA 10/18/12

3/21/13

7/28/13

DSCF Eligibility

Enable DSCF price for 5D (FSS zone) pallet entry at FSS sites

NA NA 2/21/13 4/1/13

FAST FSS entry 7/1/13

3D/5D SCH vs. 3D/5D trays/handling units

Scheme trays must be made before making any 5-digit or 3-digit trays

NA NA 3/7/13 4/1/13

Page 5: Mail Prep and Entry  Steering Committee Meeting

®

5

Labeling List Release Cycle Utilizing the MOP to identify and organize improvement opportunitiesThe purpose of the work group is to utilize the Mail Optimization Matrix (MOP) to identify and organize improvement opportunities for all shapes of mail with collaboration from industry and USPS. Additionally, the goal is to identify changes that would create efficiencies, reduced costs, and improve cycle time around creation, processing and delivery of mail pieces.

The workgroup consists of three subgroups: flats, letters and parcels. Each group will develop multiple MOPs based on mail flows and mail sort levels.

WG 156

Primary Benefits:

•Create efficiencies: Identify opportunities to create efficiencies within mail flows by looking at preparation, drop locations, processing flows and MTE flows.

•Reduce costs: Identify ways to remove costs from the end-to-end mail flows for mailers, printers, and processors.

•Reduce cycle time: Identify opportunities to reduce and standardize cycle time by identifying non-value added steps within mail flows.

Primary Subgroups:

•Letters: Focus on mail flows of concern within letter mail, such as first class single piece commercial and 3-digit vs. SCF trays.

•Flats: Focus on mail flows of concern within flat mail, such as DSCF carrier route bundles and FSS bundles.

•Parcels: Focus on mail flows of concern within parcel mail, such as DNDC parcel drops.

Page 6: Mail Prep and Entry  Steering Committee Meeting

®

6

Subgroup Update – 24 oz PER

Evaluate increasing max PER weight to 24 oz for co-mail pools• Reviewed specification requirements for

AFSM 100 and FSS• Determination of more specific impacts to

each machine may require testing• USPS currently reviewing test potential

Page 7: Mail Prep and Entry  Steering Committee Meeting

®

7

Subgroup Update – FSS Bundle Prep

Explore changing the FSS bundle prep standard from optional to required• Recommendation of the subgroup is to

require FSS bundle prep• Impacts still under consideration

Container requirements

Small publications dropped at DDU

Page 8: Mail Prep and Entry  Steering Committee Meeting

®

8

Discussion Item

Allow Commingled BPM Auto Flats with Standard Mail Flats • Need to build business case

Include Periodicals?

• Will require DMM revision Mixed class comail

• Huge impact on PostalOne Mailing statements for each class

Page 9: Mail Prep and Entry  Steering Committee Meeting

®

9

Benefit/Effort Matrix

Item #6: Reduce time moving mail between bundle and piece sorts

Item #8: FCM 500 Piece Manifest Rule

Item #10: FCM Palletization Rules Confusing

Item #11: Non-automation Presort rules

Item #12: CSA Management Item #21: Eliminate CR prep for STD & PER Ltrs

Item #13: Allow Commingle/CoMail ofBPM and Standard Flats

Item #23: Origin Entry Separation

Item #22: FSS Prep Requirement Item #26: Bundle processing bottleneck and problems

Item #28: Increase 20 oz machinable weight limit

Item #36: Postage Statement Separations

Item #35 Single Piece Commercial Rate Item #44: Requirement to re-qualify mail

Item #42: Maintain Comail Benefits for FSS

Item #59: Current requirement of 100 unique addresses for NCOALink

Item #43: Cost Based Rates Study Item #61: ACS W Records are charged to customers

Item #60: IMB FC ACS / Non-Auto & SP Item #62: Carrier management of UAA mail and NIXIE information

Item #63: Eliminate CR bundles in FSS zones

Item #66: Presort verification for flats in DMUs

Item #74: Removal of Origin Sack Mail

High Priority Medium Priority Low Priority

Page 10: Mail Prep and Entry  Steering Committee Meeting

®

10

12 Open Items on Ideas Log

Item #3: Drop Shipments at Cross Dock Hubs

Item #4: DDU entry for non-FSS flats

Item #14: 5 digit/FSS Scheme pallets

Item #18: Carrier Route Prep in combined DDUs

Item #32: Pallet Minimums for Drop Ship

Item #33: Allow MADC/MAADC bundles

on MNDC pallets for flats

Item #38: Price vs. service level vs. time of day for different pts in USPS operations

Item #39: Narrow the focus of what defines a mailing

Item #40: Allow merging of classes when using same operation scheme

Item #41: Allow drop ship discounts at piece handing and bundle handling ops

Item #68: Streamline linking of new entry to payment process

Item #71: Conflict in DMM language regarding presentation of Mxd AADC trays

Page 11: Mail Prep and Entry  Steering Committee Meeting

®

11

Next Steps

Schedule Webinar date/time• June 13, 2013, 2pm - 3pm EST • July 11, 2013, 2pm – 3pm EST

Identify Topics to Discuss Next Face to Face Meeting

• August 27, 2013, 9am -12 noon EST Wrap up