mtac workgroup 115 flat mail prep & entry in fss environment november 18, 2009

30
MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

Upload: helen-norman

Post on 04-Jan-2016

221 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC Workgroup 115Flat Mail Prep & Entry

in FSS Environment

MTAC Workgroup 115Flat Mail Prep & Entry

in FSS Environment

November 18, 2009

Page 2: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

2

FSS Update

USPS / IDEAlliance Think Tank II

MTAC 115 in Review

FSS Mail Prep - Next Steps

Agenda

Page 3: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

®

FSS UpdateFSS Update

Rosa Fulton

Executive Director, FSS

Page 4: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

4

Flat Volume by Class FY 2009RPW

First Class Periodicals Standard Total Flats

2008 3,347,726 8,466,043 34,107,226 45,920,995

2009 2,834,331 7,838,032 28,888,753 39,561,116

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

35,000,000

40,000,000

45,000,000

50,000,000

Vo

lum

e / P

iece

s (0

00)

Class & Total Volume

FY 2009 Flat Volume Comparison by ClassOctober 1, 2009 - September 30, 2009

-15.3%

-15.3%

-7.4%

Flat volume decline FY 2009 -13.8%6.3 bil pieces

Flat volume decline FY 2009 -13.8%6.3 bil pieces

Page 5: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

5

20

25

30

35

40

45

50

55

60

2001 2002 2003 2004 2005 2006 2007 2008 2009Vol (Bil) 58.2 57.8 51.7 52.4 53.9 53.8 52.4 45.9 39.6

Flat Volume TrendRPW

Flat volume decline FY 2009 -13.8%Flat volume decline FY 2009 -13.8%

FY 2005 – FY 2009Flat volume decline 26%

14.3 billion fewer flats annually

FY 2005 – FY 2009Flat volume decline 26%

14.3 billion fewer flats annually

Page 6: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

6

Sequencing Operations

● Dulles – 4 FSS

● Columbus – 2 FSS

● Kansas City – 2 FSS

● Phoenix – 3 FSS

Operations & Installations

Installation of 14 FSS in progress

Page 7: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

7

FSS Operations – Ramp-up Status

FSS Site# FSSOn-line

# Delivery Units

On-line

# ZonesOn-line

Dulles P&DC 4 39 52

Columbus FSS Annex 2 24 36

Kansas City P&DC 2 18 44

Phoenix (West Valley) L&DC 3 8 27

Totals 11 89 159

Page 8: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

8

Installations – 14 FSS, 9 Sites

Area FSS Location Install Start% Complete

Install

CM CURSEEN-MORRIS DC P&DC 12-Sep-09 90%

NE NEW JERSEY NDC 12-Sep-09 95%

NE MID-ISLAND NY P&DC 26-Sep-09 65%

NE NEW JERSEY NDC 26-Sep-09 55%

NE NW BOSTON MA P&DC 10-Oct-09 45%

SE ORLANDO FL L&DC 10-Oct-09 20%

PA VAN NUYS CA FSS ANNEX 24-Oct-09 10%

SE SOUTH FLORIDA L&DC 24-Oct-09 10%

EA TRENTON NJ P&DC 7-Nov-09 5%

SE SOUTH FLORIDA L&DC 7-Nov-09 5%

GL INDIANAPOLIS IN MPA 21-Nov-09

NE MID-ISLAND NY P&DC 21-Nov-09

NE NW BOSTON MA P&DC 5-Dec-09

SEORLANDO FL L&DC 5-Dec-09

Install schedule of next 25 FSS in

progress

Page 9: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

9

FSS Redirection – New Deployment Plan

19 FSS planned for redirection

● Deploy fewer FSS in 10 sites

Two sites removed from original plan

12 new FSS sites

42 FSS sites versus 32

Page 10: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

10

Phase 1A (Redirect Sites) Space Planning

FSS Site # FSS

Linthicum MD IMF 1

Charlotte NC L&DC 1

Rochester NYL&DC 2

Philadelphia PA NDC 1

Philadelphia PA P&DC 2

Mid Island NY P&DC 1*

Westchester NY P&DC 1

Stamford CT P&DC 1

North Metro GA P&DC 2

Atlanta GA L&DC 2

North Houston TX P&DC 1

Minneapolis / Eagan P&DC 2

San Diego P&DC 2

* Mid-Island receiving 4th FSS

Page 11: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

®

USPS / IDEAllianceThink-Tank II

USPS / IDEAllianceThink-Tank II

Susan Hawes

Operational Requirements

Page 12: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

12

WG 115 collaborated with IDEAlliance, again!

● Met September 2, 2009

● Focus: Presort software programs and data files

● Participants this time included production and systems/software representatives

Provided context for Think-Tank II Participants

● Reviewed workgroup recommendations

Auto-ready pallet

Non-compensated bundles

Bundle heights 3”, 4”, or 6”

Think-Tank II Meeting

Page 13: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

13

Modeling Exercise

What would FSS pallets look like today?

● Volume and thickness of flats has changed since earlier modeling of bundles and pallets in 2007

● Pallet prep the same as 5-D/5-D schemes today

Test Plan included real “address lists” for destinating Dulles FSS site

● Using specific ZIP Codes processed on FSS

● Using real mailpiece characteristics and volumes

Page 14: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

14

Test plan included:

● Bundle and pallet counts● Current presort rules for comparison● ‘Artificial’ Labeling List data to use when identifying FSS schemes● Presort software that used LL to make up bundles and pallets● Specified bundle heights for each presort processing

Testing process was to:● Run presort for all 3-digits (201, 220-223, 226 and 227) ● Roll up data for non-FSS 5-digits using today’s rules● Prepare individual FSS sort plan pallets (1-4 5D ZIPs per sort plan)● Prepare multi FSS pallets based on each site

Presort FSS Test Plan

Page 15: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

15

FSS schemes:

● FSS sort plans mirror 5-digit and 5-digit scheme sort plans● Dulles currently has 49 FSS sort plans

19 sort plans with 1 5-digit ZIP Code 20 sort plans with 2 5-digit ZIP Codes 8 sort plans with 3 5-digit ZIP Codes 2 sort plans with 4 5-digit ZIP Codes

Test results:● Periodicals had few FSS sort plan pallets● Pallet counts remained same for PER and STD mailings● FSS scheme pallet (all sort plans at a site) has potential

Test Plan Results

Page 16: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

16

Test Plan Results

Test # Bundle height # Bundles Pallet Presort # Pallets Weight

Standard Mail

1   209,694   1,607 1,331

2   207,543   1,602 1,329

3 3 1,217 FSS 19 675

4 3 870 FSS Scheme 5 1,819

3 4 916 FSS 19 675

4 4 656 FSS Scheme 5 1,819

3 6 614 FSS 19 675

4 6 441 FSS Scheme 5 1,819

Periodicals Mail

1   105,460   443 1,310

2   105,375   442 1,311

3 3 - FSS 0  

4 3 142 FSS Scheme 1 781

3 4 - FSS 0  

4 4 70 FSS Scheme 1 797

3 6 - FSS 0  

4 6 68 FSS Scheme 1 666

Page 17: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

®

MTAC 115 in ReviewMTAC 115 in Review

Krista Finazzo

Postal Co-ChairJoe Schick

Industry Co-Chair

Page 18: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

18

Workgroup Focus – Issue Statement

Deployment Phase1 FSS● FSS program will impact:

Flats preparation How mail is presented and scheduled for entry

Continuous process - mail owner to USPS● Interdependencies of inputs and outputs through

entire process, concept to delivery Will drive standards/requirements for prep & entry Will play a major role in determining efficiency of

processing on FSS

Page 19: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

19

Desired Results

“Identify areas of impact to the USPS and customers associated with preparation and entry of flats in an FSS environment including the lowest combined cost model.”

Page 20: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

20

Workgroup Action Items

Workgroup 96 handed off four items to MTAC WG 115:● Bundle preparation● Containerization● Presort Parameters● Destination entry

Page 21: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

21

Workgroup Activities

Developed a prototype system “Automated Flats Processor” (AFP) to improve:

● Productivity of bundle processing

● Equipment space required to process daily volume

● Capability to accept multi-zone pallets

● Flats auto processing – induction to piece sorting

Page 22: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

22

Workgroup Activities

AFP key functions are:● Auto Depalletize Bundles – automatically unloads

bundles from pallets

● Distribute Bundles based on sort plans with OEL

readability – convey & prep bundles for processing

● Process Bundles – cut and remove bundle strapping

and load bundles into ACTs

● Make Dollies – produce sort plan based dollies

● Dispatch Dollies – full ACTs, produced for specific sort

plans, released for induct into flats sorting equipment

Page 23: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

23

Workgroup Activities

Bundle / Container testing:● Built on auto-ready pallet concept

● Evaluated – uniform bundle heights, compensation of bundles, containerization, and bundle securing methods

● Determined counter-stacked bundles of uniform height travel well through transportation / distribution system

Bundle securing methods tested:● Two cross-straps around length and girth● Shrinkwrap “bellyband” with a single-strap as alternative

to strap only

Page 24: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

24

Workgroup Activities

Discovered auto-ready pallet prep will allow bundles to flow directly to the bundle prep operation and bypass APPS processing

Evaluated potential pallet levels:● Pure FSS (single scheme)

● Pure FSS (multiple schemes)

● Combined FSS and non-FSS

Page 25: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

25

Workgroup Activities

Assessed impact of volume reduction● Volume reduction has required more ZIP Codes and

FSS sites than original plan● Some original sites receiving fewer machines● Volume reduction makes preparation of FSS single-

scheme pallets more difficult

Considered single preparation solution● Lowest end-to-end cost achieved with one bundle

preparation method Prep compatible with FSS and AFSM process

Page 26: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

26

Status of Action Items

Bundle● Optimal bundle height of 3”, 4”, 6”● Secured using two cross-straps

Container● Non-compensated bundles on compensated pallet● Content determined by FSS scheme & destination

Presort● Driven by FSS Label List and sort plan contents

Entry● Destination entry, at minimum, should not change

and may contract with optimized network

Page 27: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

27

Page 28: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

®

FSS Mail Preparation

Next Steps

FSS Mail Preparation

Next Steps

Krista Finazzo

Manager, Operational Requirements

Rosa Fulton

Executive Director, FSS

Page 29: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

29

FSS Flat Mail Prep – Next Steps

Propose new MTAC workgroup● Workgroup: “Implementing FSS Presort Parameters”● Align under the “Optimization of Mail Preparation

& Entry” focus area

Charter of new workgroup:● Develop and implement presort parameters to

support defined (optional) FSS prep ● Identify timing of software updates related to FSS

deployment● Communicate timing & FSS Label List

Page 30: MTAC Workgroup 115 Flat Mail Prep & Entry in FSS Environment November 18, 2009

MTAC 115 – November 18

, 2009

30

In closing