m m 0 3 8 h0 h 0 5 3 m m 0 5 3 h m m037 goldfields ... · h 0 5 3 m 0 1 m 05 m037 ravensthorpe g...
TRANSCRIPT
-
!
!
M024
H001
M004
H008
H052M017
M053
M013
M066
M001
M031
M014
H054H009
M015
M005
H053
M037
M059
M038
M021
M031
M037
H001
M005H008
M001
M037
M005
H009
M037
H009
H001
M031
M031
H001
H009
M031
M013
M024
M001
M014
H001
M021
H009
M021
M015
M001
M037
H001
M001
M031
M001H008
H008
M031
M037 H052 H052
H009
M031
H053
M001
M005
M037
Ravensthorpe
GREAT SOUTHERN
WHEATBELT GOLDFIELDS-ESPERANCE
Seal & Pavement Widths 2031Great SouthernLEGEND
12 on 12 (with 0.6 - 1m wide centerline)12 on 1211 on 11 (with 0.6 - 1m wide centerline)11 on 1110 on 12 (with 0.6 - 1m wide centerline)10 on 1210 on 10
9 on 119 on 98 on 108 on 87 on 9Dual CarriagewayGravel RoadRegional Boundary
µ AUTHOR: DOMAIN01\e81721DATE: 24-June-2017Coordinate System: GCS GDA 1994Datum: GDA 1994Units: Degree
0 13065 Kilometers DESCRIPTIONAnalysis looked at prior safety performance, future traffic volumes (2031) and current configuration. Where expectedsafety performance was worse than that desired for 2031 then seal was widened within existing pavement. If this newconfiguration still did not achieve the target KSI reduction, pavement was widened based on 2031 traffic projection. Through discussions with regions some configurations were altered, to ensure alignment with regional procedures without compromising on safety performance.NOTE:All roads require audible edge and audible centrelines.