1/5/2018 1 LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 2| PROJECT OVERVIEW LOR US 6-9.67 MATCHMAKER Rehabilitation of Erie Avenue (US-6) Lift Bridge over the Black River, City of Lorain, Lorain county Construction Project Number: 0002(18) Project Identification Number (PID): 92013 Estimated Construction Cost: $24,400,000

Upload: others

Post on 21-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

1

LOR-6-9.67 Prebid Meeting & Matchmaker

January 4, 2018

2 |

PROJECT OVERVIEW

LOR US 6-9.67 MATCHMAKER

Rehabilitation of Erie Avenue (US-6) Lift Bridge over the Black River, City of Lorain, Lorain county

Construction Project Number: 0002(18)

Project Identification Number (PID): 92013

Estimated Construction Cost: $24,400,000

Page 2: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

2

3 |

PROJECT OVERSITE

LOR US 6-9.67 MATCHMAKER

ODOT Project Team

Construction Field Engineer – James Wade, P.E.

Construction Area Engineer - Luke Wysocki, P.E.

District Construction Engineer – Mike Fair, P.E.

Design Project Manager - Shelley Pitcher, P.E.

Capital Programs Administrator – Bob Weaver, P.E.

4 |

PROJECT LOCATION

LOR US 6-9.67 MATCHMAKER

Page 3: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

3

5 |

PROJECT LOCATION

LOR US 6-9.67 MATCHMAKER

6 |

PROJECT DESCRIPTION

LOR US 6-9.67 MATCHMAKER

LOR 6 Bridge Rehabilitation

Superstructure steel strengthening & repairs

Wearing surface replacement

Mechanical & electrical replacement and/or

rehabilitation

Page 4: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

4

7 |

PROPOSED WORK

LOR US 6-9.67 MATCHMAKER

Superstructure

Girder, floorbeam & truss strengthening

Approach spans

Bascule span

Wearing surface replacement

Approach span

Sidewalk

Blasting & painting all structural steel

General repairs

Median

Curbs

Railing

8 |

PROPOSED WORK

LOR US 6-9.67 MATCHMAKER

Substructure

Concrete patching & repairs

Abutments

Piers

Masonry repairs

Pier buildings

Trunnion towers

Blasting & painting structural steel

Steel bents

Fender repairs

Page 5: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

5

9 |

PROPOSED WORK

LOR US 6-9.67 MATCHMAKER

Mechanical

Temporary operating system

Trunnion rehabilitation

Operating machinery replacement

Span lock machinery replacement

Tail lock machinery replacement

10 |

PROPOSED WORK

LOR US 6-9.67 MATCHMAKER

Electrical

Temporary operating system

Remote control operation

Motor Control Center (MCC)

replacement

Programmable Logic Controller (PLC)

replacement

Motor replacement

Span lock

Tail lock

Public Address (PA) system replacement

Miscellanous

Roadway lighting

HVAC replacement

Maintenance of Traffic

Page 6: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

6

11 |

PROJECT SCHEDULE

LOR US 6-9.67 MATCHMAKER

Sale Date: January 25, 2018

Award Date: February 5, 2018

Construction Start: April 2, 2018

Construction End: December 31, 2019

12 |

CONSTRUCTION WORK TYPES

LOR US 6-9.67 MATCHMAKER

Roadway Clearing & Grubbing (WT 01)

Incidental Grading (WT 06)Misc. Concrete (WT 38)

Erosion ControlErosion Control (WT 08)

Drainage (WT 35)Misc. Concrete (WT 38)

Landscaping (WT 46)

DrainageDrainage (WT 35)

PavementAggregate Bases (WT 09)Misc. Concrete (WT 38)

Traffic ControlMaintenance of Traffic (WT 39)

Pavement Markings (WT 45)

Structure RepairReinforcing Steel (WT 23)Structural Steel Painting (WT 26)

Expansion & Contraction Joints, Etc. (WT 27)Structure Repairs (WT 29)

Hydrodemolition (WT 30)Structural Steel Repairs (WT 31)

Highway Lighting (WT 43)Sealing of Concrete Surfaces (WT 57)

IncidentalsMaintenance of Traffic (WT 39)

Page 7: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

7

13 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

LOR US 6-9.67 MATCHMAKER

DBE GOAL - 10%

CONTAINS THE PROPOSAL NOTE 013-DISADVANTAGED

BUSINESS ENTERPRISE (DBE) UTILIZATION PLAN AND

GOOD FAITH EFFORTS UPDATED 07/21/2017.

ALL BIDDERS SHALL SUBMIT A DBE UTILIZATION PLAN AT

THE TIME OF BID.

14 |

DISADVANTAGED BUSINESS ENTERPRISE (DBE)

LOR US 6-9.67 MATCHMAKER

THE PLAN SHOULD SET FORTH SPECIFIC INFORMATION

DEMONSTRATING HOW BIDDER WILL ACHIEVE DBE GOAL.

IDENTIFY DBE CERTIFIED FIRMS:

http://www.dot.state.oh.us/Divisions/ODI/SDBE/Pages/DB

E-Directory.aspx

Page 8: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

8

15 |

WHERE TO FIND US

LOR US 6-9.67 MATCHMAKER

ODOT District 3

906 Clark Street

Ashland, Ohio 44805

419.281.0513

Howard Huebner

District Deputy Director

16 |

QUESTIONS

LOR US 6-9.67 MATCHMAKER

?

Page 9: LOR-6-9.67 Prebid Meeting & Matchmaker January 4, 2018 US-6.… · LOR US 6-9.67 MATCHMAKER Sale Date: January 25, 2018 Award Date: February 5, 2018 Construction Start: April 2, 2018

1/5/2018

9

17 |

MATCHMAKER IMMEDIATELYFOLLOWING

PREBID MEETING

LOR US 6-9.67 MATCHMAKER