fax: 434.395.2246 trs: 711 August 3, 2009 ADDENDUM 1 TO ALL BIDDERS: Reference Invitation for Bids: 214-10-JarmanRenovations Commodity: Jarman Auditorium Renovations Project Code: 214-16301 Dated: July 17, 2009 For Delivery To: Longwood University Materiel Management Office Farmville, Virginia 23909-1896 Bid Due: August 18, 2009 at 2:00 p.m. Local Time This Addendum 1 to the Invitation for Bids is being issued to publish Addendum No. 1 from the project architect, Little Diversified Architectural Consulting. Addendum consists of the following documents:
Narrative document: 4 pages
Sketches: 18 pages
• ADD-C-001 through ADD-C-003 • ADD-A-001 & ADD-A-002 • ADD-S-001 • ADD-M-001 through ADD-M-012
Full Size Drawings: 6 pages
• S104 • S301 • E501 • E502 • E503 • E504
All other general terms, conditions, and specifications shall remain the same. Please acknowledge receipt of this Addendum 1 on the Bid Form, DGS-30-220, when returning your bid package.
Very truly yours,
James E. Simpson, CPPB, VCO Director of Materiel Management
ADDENDUM NO. 1 LITTLE 24 July 2009 Jarman Auditorium Renovation Longwood University Farmville, Virginia BCOM Project ID No 214-16301-000
ADDENDUM No. 1 1 of 4
Little Diversified Architectural Consulting 4501 N. Fairfax Drive, Suite 120 Arlington, VA 22203 Phone: 703/908-4501 Fax: 703/908-4502 LITTLE Project No. 213-4546-00
NOTICE TO CONTRACTOR: Items revised on full-size drawings are each designated by a cloud line and a triangle surrounding the revision number corresponding to that addendum. Drawing items revised in the form of 8 ½” x 11” or 11” x 17” sheets will each receive sketch number designations with the prefix of the discipline whose drawing is being modified (example: ADD-A--#, ADD-S-#, ADD-M-#), with changes designated with cloud lines similar to those on full-size drawings. The list below may include items for which a written description alone is sufficient, with no corresponding revised drawings or specification pages attached to the addendum form. The following clarifications, amendments, additions, deletions, revisions and modifications are hereby made a part of the Contract Documents, and change the original documents only in the manner and to the extent stated below.
ADDENDUM NO. 1 Addendum No.1 consists of the following: Narrative document: 4 pages Sketches: 18
• ADD-C-001 through ADD-C-003
• ADD-A-001 & ADD-A-002
• ADD-S-001
• ADD-M-001 through ADD-M-012 Full Size Drawings: 6
• S104
• S301
• E501
• E502
• E503
• E504 Instructions to Bidders: Bidders are reminded that all pre-bid questions must be submitted in writing. The DGS-30-272 pre-bid questions form may be faxed to Little Diversified Architectural Consulting at 703 908 4502 or questions may be e-mailed to [email protected]. Pre-bid questions received prior to Wednesday August 5, 2009 will be addressed in an addendum to be issued on Friday August 7. No addenda will be issued after August 7, and no additional pre-bid questions can be addressed after that date.
ADDENDUM NO. 1 LITTLE 24 July 2009 Jarman Auditorium Renovation Longwood University Farmville, Virginia BCOM Project ID No 214-16301-000
ADDENDUM No. 1 2 of 4
Narrative of Modification:
1. Sheet C4.0 – Provide additive bid item to relocate existing sanitary line as indicated in sketch ADD-C-001.
2. Sheet C7.0 – Provide sanitary manhole detail for relocated sanitary line as indicated in sketch ADD-C-002.
3. New Sheet – Provide sanitary sewer profile for relocated sanitary line as indicated in sketch ADD-C-003.
4. Sheet A100 – Ground Floor Plan New: Location of new door 022 shifted below stage door on main level. See sketch ADD-A-002
5. Sheet A101 – Main Level New: Note added to floor plan.
6. Sheet S100 – Typical detail for roof mounted mechanical unit added, shown on sketch ADD-S-001.
7. Sheet S104 – Support beams for mechanical plenum boxes added.
8. Sheet S301 – Sect. 1: Exist. sanitary line shown outside of mech. annex. Sect. 2: Thickened slab beneath cooling tower Sect. 3: Increased lintel size and door opening height. Sect. 12: Duct opening west of exist. door opening added. Sect. 12: New door opening below exist. door opening. Sect. 12: Lintel size and bearing plate size increased.
9. Sheet M002 – Provide variable air volume diffusers for Lobby and Reception in lieu of
diffusers previously indicated. See sketch ADD-M-002 and ADD-M-004.
10. Sheet M003 – Provide accessory integral thermostats and wall mounting brackets for each hot water unit heater.
11. Sheet M003 – Revise the characteristics of the Steam-to-Hot Water Heat Exchanger to reflect a 10 psig inlet steam pressure, 1856 lbs/hr of steam, and a four pass configuration. Revise the Basis of Design to reflect a B&G SU10 3-2.
12. Sheet M003 and M302 – Provide duct mounted hot water coils as indicated on the Hot Water Coils Schedule. See sketch ADD-M-001 and ADD-M-004.
13. Sheets M301 and M302 – Provide wall mounted zone thermostats for each VAV zone.
14. Sheet M301 – Revise the ductwork in the crawl space to provide the necessary separation of penetrations through the existing structural wall. See sketch ADD-M-003.
15. Sheet M303 – Relocate CU-5 to a housekeeping pad on grade near the adjacent to the west exterior wall between column lines 5 and 6. See sketch ADD-M-006.
ADDENDUM NO. 1 LITTLE 24 July 2009 Jarman Auditorium Renovation Longwood University Farmville, Virginia BCOM Project ID No 214-16301-000
ADDENDUM No. 1 3 of 4
16. Sheet M303 – Relocate CU-6 to the roof of the mechanical annex adjacent to the existing east exterior wall between column lines 5 and 6. See sketch ADD-M-005.
17. Sheet M303 – Revise the stage return air duct and the penetration through the rear stage wall. See sketch ADD-M-007 and ADD-M-008.
18. Sheet M401 – Add 1-1/4” HWS and HWR pipes from the mechanical room to the duct mounted reheat coils associated with the Lobby. See sketch ADD-M-009.
19. Sheet M501 – Revise condenser water pipe routing between Mechanical Annex and Cooling Tower. See sketch ADD-M-010 and ADD-M-011.
20. Sheet M502 – Revise the return air connection to AHU-3. See sketch ADD-M-012.
21. Sheet M701 – Change the description of the chilled water control valve associated with each air handling unit from “Bypass Valve” to “3-Way Control Valve”.
22. Sheet M701 – Eliminate the normally closed 2-way control valve from the standby condenser water pump discharge piping.
23. Sheet M702 – Change the description of the hot water control valve associated with each air handling unit from “Bypass Valve” to “3-Way Control Valve”.
24. Sheet M702 – Provide a steam flow meter in the high pressure steam pipe between the gate valve and the inlet header of the steam pressure reducing station.
25. Sheet M702 – Eliminate the extraneous pump and duplicate tag marked “CP-1”.
26. Sheet M803 – Provide an additional ¼-inch pipe and ball valve from the inlet side of each pump suction strainer to the outlet side of the pressure gage to allow monitoring of the strainer pressure drop.
27. Sheet M803 – Revise the Chemical Shot Feeder to provide an additional union, pipe and valve connecting to the drain on the bottom of the Shot Feeder.
28. Sheet M803 – Eliminate the two-way control valve, one of the three-way control valves, and modify the piping to duplicate the Cooling Tower Piping flow path indicated on drawing M701.
29. Sheet P001 – Provide an Instantaneous Steam Water Heater selected for a “40°F-140°F” temperature rise rather than the “40°F-100°F” previously indicated.
30. Sheet P002 – Provide gate valves at the inlet and discharge of the steam control valve associated with the Steam Water Heater rather than the ball valves previously indicated.
31. Sheet P401 – Provide a ¾” make-up line with a shutoff ball valve to each of the two hydronic systems tapping into 1-1/2” line previously provided for the cooling tower make-up.
ADDENDUM NO. 1 LITTLE 24 July 2009 Jarman Auditorium Renovation Longwood University Farmville, Virginia BCOM Project ID No 214-16301-000
ADDENDUM No. 1 4 of 4
32. Sheet P702 - Provide a ¾” make-up line with a shutoff ball valve to each of the two hydronic systems tapping into 1-1/2” line previously provided for the cooling tower make-up.
33. Sheet E001 – Add Junction Box to Symbols List.
34. Sheet E403 - Relocate CU-5 to a housekeeping pad on grade near the adjacent to the west exterior wall between column lines 5 and 6.
35. Sheet E403 - Relocate CU-6 to the roof of the mechanical annex adjacent to the existing east exterior wall between column lines 5 and 6.
36. Sheets E501-E504 – Provide conduit to support installation of theatrical acoustical equipment (that will be installed under a separate contract). See new sheets E501-E504.
END OF ADDENDUM
DN
4 5 6
J
AUDITORIUM
102
11
102C
FEC
HEAD DETAIL: 4/A901JAMB DETAIL: 5/A901
OVER EXIST MECH ROOM, FILL EXIST 6" DIARETURN AIR HOLES WITH CONC, FINISH TOMATCH ADJACENT SLAB. SEE M201 & M302 FOREXTENT OF HOLES. ALL OTHER FLOOR VENTSAND COVERS ARE EXISTING TO REMAIN
1
w w w . l i t t l e o n l i n e . c o m
This drawing and the design shown are theproperty of Little Diversified ArchitecturalConsulting. The reproduction, copying orother use of this drawing without their writtenconsent is prohibited and any infringementwill be subject to legal action.T: 703.908.4501 F: 703.908.4502
4501 North Fairfax Drive Suite 120Arlington, VA 22203
PROJECT MANAGER
DESIGN TEAM
PRINCIPAL IN CHARGE
PROJECT NAME BCOM PROJECT ID NO.
ISSUE DATE
BETH BUFFINGTON
RICHARD NAAB
WILL NORTON
REFERENCE
SKETCH NUMBER
DESCRIPTION
ADDENDUM 1
214-16301-000Longwood UniversityFarmville, Virginia
Jarman Auditorium Renovation
07.24.2009
ADD-A-001
A102 - Main Floor Plan NewNote added to floor plan
RESTRM.
023
DRESSING RM.
022
022
023B
023A
012
011A
5' - 9" 9' - 6" 9' - 6"
MIN CLR
FEC
12' -
8"
1
w w w . l i t t l e o n l i n e . c o m
This drawing and the design shown are theproperty of Little Diversified ArchitecturalConsulting. The reproduction, copying orother use of this drawing without their writtenconsent is prohibited and any infringementwill be subject to legal action.T: 703.908.4501 F: 703.908.4502
4501 North Fairfax Drive Suite 120Arlington, VA 22203
PROJECT MANAGER
DESIGN TEAM
PRINCIPAL IN CHARGE
PROJECT NAME BCOM PROJECT ID NO.
ISSUE DATE
BETH BUFFINGTON
RICHARD NAAB
WILL NORTON
REFERENCE
SKETCH NUMBER
DESCRIPTION
ADDENDUM 1
214-16301-000Longwood UniversityFarmville, Virginia
Jarman Auditorium Renovation
07.24.2009
ADD-A-002
A101 - Ground Floor Plan Newlocation of new door 022 shiftedbelow stage door on main level
ROOF MOUNTED MECH.UNIT FRAMING
JOIST OR BEAM
MECH. UNIT CURB
C3X4.1 BLOCKING UNDERDECK AT SUPPORTS.EXTEND 1" MIN. BEYONDSUPPORT EA. SIDE ANDTACK WELD IN PLACE.
w w w . l i t t l e o n l i n e . c o m
This drawing and the design shown are theproperty of Little Diversified ArchitecturalConsulting. The reproduction, copying orother use of this drawing without their writtenconsent is prohibited and any infringementwill be subject to legal action.T: 703.908.4501 F: 703.908.4502
4501 North Fairfax Drive Suite 120Arlington, VA 22203
PROJECT MANAGER
DESIGN TEAM
PRINCIPAL IN CHARGEPROJECT NAME BCOM PROJECT ID NO.
ISSUE DATE
BETH BUFFINGTON
RICHARD NAAB
WILL NORTON
REFERENCE
SKETCH NUMBER
DESCRIPTION
ADDENDUM 1
214-16301-000Longwood UniversityFarmville, Virginia
Jarman Auditorium Renovation
07.24.09
ADD-S-001S100 - ROOF MOUNTEDMECHANICAL UNIT FRAMINGTYPICAL DETAIL ADDED
87654321.9
J
I
G
F
E
D
B
A
H
C
EXISTING 2'-5" X 1'-4 1/2"BRICK PILASTER (TYP.)
EXIS
T. TR
USS
EXIS
T. TR
USS
EXIS
T. TR
USS
EXIS
T. TR
USS
EXIST. 21 WF 62
EXIST. 21 WF 62
EXIST. 21 WF 62
EXIST. 21 WF 62
EXIST. 21 WF 62
EXIST. 21 WF 62
W8X15
W8X15
W8X18
W8X18
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
1'-6 1/2" 24'-0" 10'-1" 20'-0" 20'-0" 20'-0" 20'-0"
9S301S104
S104 S30111
W8X15
W8X15
W8X18
W8X18
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X18
W8X18
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
BOT. OF BM. ELEV. = TOP OF EXIST. TRUSS ELEV. (TYP.)
HSS 4X2X1/4HANGER (TYP.)
(TYP
.)
8'-3
1/2
"
8'-4
"8
SPA.
@ 8
'-3 1
/2" =
66'
-4"
8'-4
"
EXIST. 8 LB 13
EXIST. 8 LB 13
EXIST. 8 LB 13
EXIST. 8 LB 13
EXIST. 8 LB 13
EXIST. 8 LB 13
EXIST. 8 LB 13
W8X15
VERT. REINF. EA. SIDE OF EXIST. BRICKPILASTERS FROM LOW ROOF ELEV. TO FLYGALLERY ROOF (TYP. @ REAR STAGE WALL)
EXIST. PLATE GIRDERENCASED IN CONCRETELOCATED APPROX. 25'-7"BELOW TOP OF W21 BEAMS.
GRATING
GRATING
10'-1
1"12
'-9"
13'-0
"9'
-8"
13'-0
"12
'-9"
10'-1
1" W8X15
ROOF & CATWALK FRAMING PLANSCALE: 1/8" = 1'-0"
_
_
_
_
_
_
_
_
EXIST. C10 PURLINS (TYP.)
HSS6X6X5/16 (TYP.)
1'-0"
CENTERLINE BEAM SPLICE (TYP.)
W8X18
W8X18
W8X15
W8X15
W8X15
W8X15
HSS6X6X5/16 (TYP.)
3S301S102
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
EXIST. 12 WF 27
N
32'-9" 25'-11"
SUPPLY PLENUMBELOW (WT.=1800#)
RETURN PLENUMBELOW (WT.=1800#)W
8X21
W8X
21W
8X21
W8X
21
W8X
21
W8X
21
TOP OF NEW BEAM ELEV. =BOTTOM OF EXIST. 12 WF 27ELEV. (TYP.)
W8X
21
W8X
21
1
ENGINEERING PLC1010 Ednam Center, Suite 300
Charlottesville, VA 22903ph. (434) 245-5100fax (434) 245-5101
w w w . l i t t l e o n l i n e . c o m
T: 703.908.4501 F: 703.908.4502
4501 North Fairfax Drive Suite 120Arlington, VA 22203
PROJECT MANAGER
DRAWN BY
NO. REASON DATE
PRINCIPAL IN CHARGE
PROJECT TEAM
REVISIONS
PROJECT NAME
SHEET TITLE
PROJECT NO.
ISSUE DATE SHEET NUMBER
BCOM PROJECT ID NO.
SD Submission07-18-08
PD Submission12-16-08
214-16301-000
WD Submission06-02-09
S. KEITH RITTENHOUSECOMMON
WEAL TH OF
V I RGI N
IA
Lic. No.8946
PR
OF E S S I O N A L E N
G I NE
ER
7/17/09
Construction Documents07-17-09
Addendum #107-24-09
1
Longwood UniversityFarmville, VA
213.4546.00
07.17.09 S104
ROOF & CATWALKFRAMING PLAN
JarmanAuditoriumRenovation
GROUND LEVEL350' - 1"
J
8" CMU GROUTEDSOLID W/ #5 @ 8"ALT. EA. FACE
W10
1'-0
"
12'-8
" HIG
H P
OIN
T
3 - #5 LONG.
WR22 ROOF DECK
EXIST. SANITARYLINE (VERIFY ELEV.)
3'-0"
1'-0
"
3"
3" CLR.
1'-6"
3 - #5
2'-0"
(VERIFY)
2'-6"
TYPE R2 EXTENDED END
MATCH BOT. ELEV.OF EXIST. FTG.
3"
3"
_
12'-2
1/2
" LO
W P
OIN
T
FACE OFEXIST. BLDG.
1'-2"
11"
GROUT JOINT SOLID.
TOP OF SLAB ELEVATION = 349'-10"
SEE ARCH. FOR TOP OF WALL CONDTION
PL3/4X5X0'-10" ON 3/4" N.S.GROUT W/ (2) - 3/4" DIA. HEADEDANCHOR RODS (EMBED 6")
#5@8"
JOIST BEARING ELEVATION = 363'-5 3/8"
8" CMU GROUTEDSOLID W/ #5 @ 16"AT WALL CL
1
4
Auditorium Roof396' - 9"
CENTERLINEEXIST. TRUSS
10"
EXIST. ROOF
W8
6"
CENTERLINEHSS HANGER
4 1/
2"
3/16TYP.
HSS4X2X1/4
1'-0"CENTERLINE SPLICE(SEE BEAM SPLICEDETAIL ON S100)
AUDITORIUM ROOF
HSS6X6
3/4"X1/8"STEELGRATING
_3'-6"
S301 S30110
4" 4"
1'-9
"
3'-6
"
PIPE 2 STD.
HSS4X2X1/4X 0'-8"
2 - L2X2X3/16@ EA. HSS
6"
3/16 3
4"
PL3/8X3X0'-5" E.S. ATW8 LOCATIONS
EXIST. W21X73
2'-5" X 1'-4 1/2"BRICK PILASTER
3/4" DIA. HILTI HAS-E ROD INHIT HY 20 ADHESIVE W/SCREEN TUBE @ 2'-0" (TYP.)
HSS 8X6X3/8 (TYP.)
3/16TYP.
CONTIN.PL1/4X11 (TYP.)
STAGE LEVEL362' - 1"
5S301S102
SAW CUT AND REMOVE(SEE NOTE 1)
NOTES: 1. CONSTRUCT NEW 8" CMU WALL PRIOR TO CUTTING EXIST. JOIST SECTIONS TO BE REMOVED. 2. PROVIDE 3 COURSES OF FULLY BEDDED SOLID CMU BELOW EXIST. JOIST STEM BEARING ELEVATION.
.
#4@24" AT WALLCENTERLINE
NEW 8" CMU
MEZZ. LEVEL371'-0"
L3X3X3/8 CONT. W/ 5/8" DIA.HILTI HAS-E RODS IN HIT-HY20 ADHESIVE (EMBED. 6")
STAGE LEVEL362' - 1"
_
SEE NOTE 2
MEZZ. LEVEL371'-0"
_
PL5/16X4X1'-0"
2 - 3/4" DIA.THREADED STUDSWELDED TO HSS6X4(ERECTION STUDS)
4 - 3/4" DIA. BOLTS@ HSS6X4 SPLICE
3/16
HSS4X2 W/ BASEPL 3/8X4X0'-8" W/ 2SLOTTED HOLES
HSS6X6
3/16
5'-6"
1'-2
"
GRADE
12" CMUGROUTEDSOLID
#5@8" ALT.EA. FACE
_
ANNEX FLOOR
6 - #5#5 @ 12"FACE OF12" CMU
_
3" CLR.
3"
3"
3'-0
"
GROUT JOINTSOLID
BACKFILL BOTH SIDESSIMULTANEOUSLY. SEEFOUNDATION NOTE 4 ON S100
349'-10"
SEE ARCH. FOR TOPOF WALL CONDITION
2'-9" 2'-9"
#5@8" W/ STAND. HOOK8" CMU GROUTEDSOLID W/ #5 @ 16"AT WALL CL
#5@12" W/STAND. HOOK
#5@12" E.W.
COOLING TOWER CURB(SEE MECH. FOR UNITSIZE AND LOCATION)
1
6"6"
THICKEN SLABLOCALLY BENEATHCOOLING TOWER (SEEMECH. FOR LOCATION)
3"
3" CLR.
1'-0"1'-0"
STAGE LEVEL362' - 1"
T.O. LOW ROOF381' - 4"
EXIST. 12 WF 27
1'-4 1/2"
FACE OFPILASTER
FACE OFWALL
HSS W/ 1/2"CLOSUREPLATE EA. END
FIEL
D V
ERIF
Y
17'-1
1 5/
8"
W12X35
EXI
ST.
OPN
G.
12'-3
1/2
"
NE
W O
PN
G.
16'-1
0 3/
4"
EXIST. MASONRY
1'-0 1/2"4"
SHORE BEAMS & WALLABOVE AS NECESSARYPRIOR TO REMOVINGMASONRY
1
1
W10
W8
3/16TYP.
TYP.
CONTINUITY PL3/8 T&B, E.S.
SEE TYP. FRAMED BEAMCONNECTION (BOLTS SHALL BEPRETENSIONED ASTM A325-SC)
STAGE LEVEL362' - 1"
T.O. LOW ROOF381' - 4"
EXIST. DOOR OPNG.
6'-6"
(2) - W12X35
PL1X8X1'-2" ON3/4" N.S. GROUT
EXIST. 12 WF 27 EXIST. 12 WF 27
16'-1
0 3/
4"
SHIM AS REQ'D BTWN.EXIST BEAM AND NEWBEAM. WELD SHIMSTO BEAMS.
1'-4"
8"
8"X16"X1'-4 1/2"CONC. BOLSTER
C BRG.L(2) - 1/2" DIA. HILTIHAS ROD IN HIT HY150 MAX ADHESIVE,EMBED 2 1/4".
1
2'-8" 6"
1'-4" 8"DUCTOPNG.
1
EXIS
T. D
OO
R O
PNG
.
12'-3
1/2
"
NEW DOOR OPNG.
3'-6"
ALIGN WEST FACE OF NEWDOOR OPNG. W/ WEST FACE OFEXIST. DOOR OPNG. ABOVE.
1
(2) - 3/8" DIA. X 4"THREADED STUD INHILTI HIT HY 20ADHESIVE
C BRG.L
8"
2 - W8X24
1
3/16TYP.
PL3/4X8X1'-3" ON3/4" NON-SHRINKGROUT
ENGINEERING PLC1010 Ednam Center, Suite 300
Charlottesville, VA 22903ph. (434) 245-5100fax (434) 245-5101
w w w . l i t t l e o n l i n e . c o m
T: 703.908.4501 F: 703.908.4502
4501 North Fairfax Drive Suite 120Arlington, VA 22203
PROJECT MANAGER
DRAWN BY
NO. REASON DATE
PRINCIPAL IN CHARGE
PROJECT TEAM
REVISIONS
PROJECT NAME
SHEET TITLE
PROJECT NO.
ISSUE DATE SHEET NUMBER
BCOM PROJECT ID NO.
SD Submission07-18-08
PD Submission12-16-08
214-16301-000
WD Submission06-02-09
S. KEITH RITTENHOUSECOMMON
WEAL TH OF
V I RGI N
IA
Lic. No.8946
PR
OF E S S I O N A L E N
G I NE
ER
7/17/09
Construction Documents07-17-09
Addendum #107-24-09
1
Longwood UniversityFarmville, VA
213.4546.00
07.17.09 S301
SECTIONS
JarmanAuditoriumRenovation
SECTION 1/2" = 1'-0" S301S101
1
SECTION 3/4" = 1'-0" S301S104
9
DETAIL 3/4" = 1'-0" S301S104
11
SECTION 3/4" = 1'-0" S301S102
4
SECTION 3/4" = 1'-0" S301S102
7
SECTION 3/4" = 1'-0" S301S102
5
.
DETAIL 1 1/2" = 1'-0" S301S301
10
SECTION 1/2" = 1'-0" S301S101
2
SECTION 1/2" = 1'-0" S301S102
3
SECTION 3/4" = 1'-0" S301S102
6
SECTION 1/2" = 1'-0" S301S102
12