long term implementation of lean six sigma within organizations

45
Long Term Implementation of Lean Six Sigma within Organizations www.create-learning.com

Upload: michael-cardus

Post on 30-Oct-2014

6 views

Category:

Business


1 download

DESCRIPTION

www.create-learning.com Slides from a workshop and consultation program on creating an organizational culture that focuses of quality improvement.

TRANSCRIPT

Page 1: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Long Term Implementation of Lean Six Sigma within Organizations

Page 2: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Steps to Keep Lean Six Sigma Operational Within the Organization

Communication of the new process and results to the Senior Management and all staff within the company.

Capture Lessons LearnedMonitor Performance of the New ProcessRecognize, Reward and Celebrate both Success and Effort

Page 3: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 4: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Goals

Roles

Procedures

Interpersonal Relationships

Page 5: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Setting clear

goals.

Page 6: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

o small rather than large;o noticeable and important to the people on the team and

the team as a whole;o described in specific, concrete work (task) and behavioral

terms;o achievable within the practical context of the teams time

and work-days;o perceived by the people on the team and the team as a

whole as involving their “hard work”;o described as “the start of something” and not as “the end

of something”;o treated as involving new work task(s) and behavior(s)

rather than the absence or stopping of existing work task(s) and behavior(s).

Page 7: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Team Roles & Responsibilities

Many responsibilities need to be carried out and continued within the organization for Lean Six Sigma to be sustained. These tasks are divided among Team Members, Team Leader, Coach and Team Sponsor.

Page 8: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Team Member: People, appointed by the Sponsor and Team Leader, who share their knowledge, experience, and expertise while working to accomplish the team’s work. Team Leaders: People who orchestrate team activities, maintain team records, and serve as a communication link with the rest of the organization. Coaches: People with data-analysis and team-building skills who teach and support Team Leaders and Team Members in using selected tools and methods to help facilitate the team’s work. Sponsor: Individual managers who identify needed improvements, and review and support the work of teams.

Page 9: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Six Sigma Terminology

Team Members are usually called Green Belts Team Leaders are usually called Black Belts Coaches are usually called Master Black Belts Sponsors are usually called Champions Improvement teams are usually called DMAIC teams.

Page 10: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Roles and Accountabilities Flow ChartContact Mike at [email protected] call

+1.716.629.3678 … to discuss this workshop and consulting with your company and team.

Page 11: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 12: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Select and Define the Project

To improve a project’s chances for success, select a project that:Is important to the organization and its customers.Is not already undergoing major changes or being studied by

another group (unless the project is to study how to make the change).

Is relatively simple, with clearly defined starting and ending points. Even if you would rather target a large complex system – such as accounting – for most teams it is best to break it down to smaller components.

Completes a cycle once a day or so, rather than once a month or once a year. For example, collecting data on a process that produces outputs (products, reports, services) many times a day allows you to rapidly see what is actually happening and quickly figure out whether your solution actually improves things.

Page 13: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

After the

Project

Page 14: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Sponsor’s Responsibilities after the ProjectCelebrate the project’s conclusion. Hold a final project

review. Communicate the team’s results and ensure that any

changes made by the team are integrated into daily work methods in that area.

Monitor changes made by the team and implement changes the team in not authorized to make.

Review information collected during the project about systems issues or barriers encountered and address these barriers for the success of future projects.

Page 15: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Team Leader’s Responsibilities after the ProjectMake sure the project documentation is

complete and available for others in the organization.

See that the process owner receives the necessary documentation for ongoing monitoring of the solution.

Identify, document, and communicate lessons learned.

Page 16: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

The process owner’s job is to:Maintain the project’s gains.Monitor the processes and key

measures in his or her area of responsibility.

Page 17: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Leadership Team Reviews If there are several improvement efforts under way, the leadership team in the organization should meet periodically to track how the projects are progressing and what the results will be. These reviews allow the leadership team to:Continually assess the project mix with regard to organizational

priorities. Check synergies across projects.Manage the “pipeline” of projects.Reinforce a consistent message about the importance of the

projects for the organization.Gather lessons learned about factors contributing to success and

common problems across projects to improve how you improve.

Page 18: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

The input for leadership reviews is the data gathered across all efforts in order to assess patterns.

Page 19: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

o What percentages of teams provide adequate data to back up claims?

o Are the data displayed graphically so that the patterns are clear?o Are the conclusions drawn warranted by the data analysis?o What percentage of teams report problems getting access to data?o What percentages of teams try solutions out on a small scale

before going into full implementation? o What percentages of improvements “hold the gains” six months

after completion of the effort? One year after completion?o What percentages of teams have attendance problems at

meetings?o How often have the lessons learned been shared and adopted

across the enterprise?

Page 20: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 21: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

“If you have been trained to think in a certain way and are a member of a group that thinks the same way, how can you imagine changing to a new way of thinking?”- Edgar Schein

Page 22: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

3 Stages of Change Lewin/Schein

Stage 1 – becoming motivated to change (unfreezing)

Multiple forces established by past observational learning and cultural influences tend to maintain the current behavior. Change requires adding new forces of change or the removal of some of the existing factors that are at play in perpetuating the behavior.

• Denial• Scapegoating, passing the buck, dodging• Maneuvering & Bargaining

Page 23: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Stage 2 – change what needs to be changed (unfrozen and moving to a new state)

Once there is sufficient dissatisfaction with the current conditions and a real desire to make some change exists, it is necessary to identify exactly what needs to be changed, if not already articulated in the first stage.

• Words take on new and expanded meaning• A concept is interpreted within a broader context• There is an adjustment in the scale used in evaluating new input relative to what had previously been learned and accepted as factual.

Page 24: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Stage 3 - making the change permanent (refreezing)

Refreezing is the final stage where the action becomes habitual. This requires behavior that is consistent with other behaviors and the values and beliefs held by the individual.

• Develop a new self-concept and identity• Establishing the new behavior in interpersonal relationships.

Page 25: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Roles and Accountabilities Flow ChartContact Mike at [email protected] call

+1.716.629.3678 … to discuss this workshop and consulting with your company and team.

Page 26: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

10 Pitfalls to Avoid in Creating Lean Six Sigma Teams

Page 27: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

1. Failure of the Sponsor/Champion to be involved in each step of the team’s work.

o Sponsors/Champions must recognize the pre-work necessary to enhance the team’s chances of success.

o They must be skilled at Project Management keeping the team on track through the team’s weekly meetings and updates. Strategic Interventions removing roadblocks and providing resources. Management of Team Dynamics & Team Members

Page 28: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 29: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

2. Failure to Write it Downo What gets written down gets done. o Teams and leaders that develop a written plan for work

that is to take place between meetings are far more likely to complete the work and achieve Project Charter Milestones than those that don’t.

o Teams must keep detailed, documented, and reviewable action plans.

Page 30: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

3. Failure to Formalize and Communicate Rewards and Recognition for the Six Sigma Teams

o First-Wave projects must bear fruit to showcase the application of Six Sigma principles within the organization.

o Establish and formalize a reward and recognition plan for first-wave project participants before or shortly after the project starts. Recommendations are vacation time and awards banquet.

Page 31: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

4. Ignoring the Potential of “Converted” Resistors

o People have legitimate reasons for resistance.

o Almost 80% of resistors become supporters when the source of their resistance is taken seriously.

Page 32: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

5. Failure to Assign Your Best and Brightest o For this project and Six Sigma to be taken seriously your

best people must be on the team.o Improving the team dynamics of your high performers will

increase overall organizational effectiveness.

Page 33: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 34: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

6. Failure to Utilize Ground Rules in Six Sigma Meetings

o Having and reinforcing shared ground rules will make your meeting shorter and more effective.

o This is not a hollow exercise team culture is created through the discussions and reinforcement of ‘what works’ … The team needs to know the acceptable rules and feel comfortable enforcing them

Page 35: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 36: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

7. Using Facilitative Leadership to Eliminate Personality Differences

o A key component of Six Sigma implementation is dealing with maladaptive behavior.

o In marriage and Six Sigma Teams an appreciation for individual differences contributes to compatibility of values and beliefs.

o You are not a psychologist

Page 37: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

8. Jumping to “Divorce” too Early oWe can learn a great deal from resistance to Six Sigma

Projects. o The odds are good that the resistance is normal and if

treated respectfully they will turn into a valuable team member.

o Once we de-select a person from the team OR we choose to stop a project due to excessive resistance, it is visible to everyone and a win-win is no longer achievable.

Page 38: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

9. Expecting Six Sigma Teams to Solve All Organizational Issues

o Be careful not to diagnose poor Six Sigma Management as poor Team Dynamics.

o Six Sigma Projects need to have a high impact and be measurable

oWithout proper knowledge when and where to apply DMAIC, teams that are formed may have difficulty with their team dynamics for one major reason – they never should have been formed in the first place.

Page 39: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

10. Intervening Too Mucho At times it is more important to know

when not to intervene with a team. o If you are working harder than the

person to solve a problem, you are enlarging the problem itself.

Page 40: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 41: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Page 42: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Steps to Keep Lean Six Sigma Operational Within the Organization

Communication of the new process and results to the Senior Management and all staff within the company.

Capture Lessons LearnedMonitor Performance of the New ProcessRecognize, Reward and Celebrate both Success and Effort

Page 43: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Long Term Implementation of Lean Six Sigma within Organizations

Page 44: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Roles and Accountabilities Flow ChartContact Mike at [email protected] call

+1.716.629.3678 … to discuss this workshop and consulting with your company and team.

Page 45: Long Term Implementation of  Lean Six Sigma within Organizations

www.create-learning.com

Photo Attributionhttp://www.flickr.com/photos/pasukaru76/4307189567/http://www.flickr.com/photos/cappellmeister/5921913/http://www.flickr.com/photos/daquellamanera/355061741/http://www.flickr.com/photos/madflojo/3473020388/ http://www.flickr.com/photos/sneakerdog/2458112672/ http://www.flickr.com/photos/scragz/132750728/ http://www.flickr.com/photos/arnehendriks/3641560541/ http://www.flickr.com/photos/pasukaru76/8264671895/ http://www.flickr.com/photos/sidm/4813041379/ http://www.flickr.com/photos/duhdenise/4437114131/http://www.flickr.com/photos/wwarby/1584818205/ http://www.flickr.com/photos/vinothchandar/4278047231/http://www.flickr.com/photos/rs-foto/1242024959/ http://www.flickr.com/photos/kwl/4764667152/http://www.flickr.com/photos/meini/4167047432/ http://www.flickr.com/photos/47000103@N05/8161295976/http://www.flickr.com/photos/psycho-pics/4955354786/ http://www.flickr.com/photos/kwl/5127099146/