long-span mezzanine floorssuperiorracking.ie/.../uploads/2018/02/mezzanine-floors.pdf ·...
TRANSCRIPT
LONG-SPAN MEZZANINE FLOORS
GL8
Set up as a company specialising in the organisation of space, Armes has operated successfully in the field of warehousing and storage since 1956. Our company stands out as an example of a robust, reliable production system employing state-of-the-art equipment. Our advanced technological/managerial know-how gives added value to a product that has encountered widespread customer approval for years.
Starting from the diagnosis of the customer’s needs, through the planning stage and the installation of fully operational, integrated systems, we are able to offer a complete service. In addition to the vast range of our own products we also work closely with the associate companies that form part of the Ferretto Group: Promag Spa (San Polo d’Enza), specialists in the area of automated storage systems, Archimede Ingegneria Srl (Busto Arsizio) and Egeria Srl (Turin), specialists in the production of software.
Thus Armes has at its disposal the strength and flexibility of what is, in effect, a global partnership. We are able to offer solutions of varying degrees of sophistication, each one tailored to the customer’s unique requirements. We can furnish highly complex automatic installations on a turn-key basis and also provide after-sale service.
ARMES: PROFILE OF
PALLETRACKING
DRIVE-INPALLET RACKING
GRAVITY-FED RACKING
PUSH-BACK RACKING
FLOW-RAILPALLET RACKING
LIVE CARTON STORAGE
MOBILERACKING
CANTILEVER RACKING
The executive offices
4
Armes has always been tightly focused on two fundamental areas: high quality and the use of cutting-edge production methods and technology. As a result of this policy, our company can safely say that it is one of the leaders in its field. Proof of this claim lies in the fact that Armes belongs to an elite group of companies that have signed up to the CISI program of auto-certification created by the Association of Italian Steel Constructors.
The CISI logo, “CISI QUALITA’ E SICUREZZA” (CISI QUALITY AND SAFETY) represents a guarantee that the manufacturers who display it adopt certain specific, stringent procedures. Procedures which ensure that the products regulated and distinguished by said logo have been manufactured in accordance with codified norms and standards. Our policy of high quality also involves the various phases of the production process. The company has been awarded the WPQR (Welding Procedure Qualification Record), a certificate renowned at European level, by Bureau Veritas for all welding operations.
A COMPANY…
... AND OF A CERTIFIED SYSTEM
AUTOMATed STORAGE SYSTEMS
SELF-SUPPORTING WAREHOUSES
LIGHT/MEDIUM BOLTLESSSHELVING
CANTILEVER SHELVING
MEZZANINE FLOORS
COUNTERS DECKING LOCKERS AND ACCESSORIES
In line with our dedication to customer satisfaction in the areas of pre/post-sale service, we at Armes have certified our own QUALITY CONTROL SYSTEM based on UNI EN ISO 9001:2000 standards. Recently, we have also certified our own ENVIRONMENTAL HANDLING SYSTEM based on UNI EN ISO 14001:2004 standards. Both systems have been attested by the Certification Organisation “DET NORSKE VERITAS”.
5
GL8 A MODULAR ANDVERSATILE
LANDING
6
System GL8 consists of a modular set of components designed and manufactured for the creation of long-span mezzanine floors, in which the generous distance between columns means that floor space remains fully practicable.Competitors’ products in GL8’s market segment are all too often made with heavy-duty fabricated structures that require a complex design phase, prolonged and inconvenient
in-situ erection procedures, and can only be given their final protective coat at the work-site, resulting in a reduced level of finish quality. When using solutions of this type, the structure tends to be inflexible, since modifications after initial erection are complex and expensive and the original system cannot be readily adapted to serve altered requirements.On the contrary, GL8 is a standardized and codified system that is both modular and
MEZZANINE FLOOR
SLIDINGGATE
TWO-DOORGATE
OVERHEADSAFETY GATE
7
250 300
extremely versatile. Since all the components are appropriately calculated, the design stage, which can be based on a series of known and verified parameters, is both rapid and straightforward.Armes was one of the first companies in the world (first in Italy) to develop a system for long-span mezzanine floors.The GL8 mezzanine is accompanied from the outset by comprehensive design
documentation, which is a fundamental part of the system, especially when the structure is designed for pedestrian access as well as storage of material, in which case it must be furnished with a specific loading report. This is particularly important since apart from being employed in warehouse applications, GL8 is frequently used for the creation of offices, exhibition stands, maintenance catwalks and a series of other applications.
GL8 THE LONG-SPAN MEZZANINE
3003 or 4 mm thickness
made of qualified
high-resistance steel
8
FLOOR
2502, 3 or 4 mm thickness made
of qualified steel
9
250 300
Globally and in each individual component, the GL8 system has been optimized to obtain the highest possible performance with the smallest possible amount of material, thus maximizing savings in terms of weight and cost.Weight savings are particularly significant when compared to conventional fabricated steel structures. This is a result of the optimization of each component in the GL8 system starting from the design stage, so that the assembly phase, which is performed on site with the
minimum fuss, is straightforward, rapid and easy to plan.Since joints are made exclusively with nuts and bolts, all the components reach the site ready for assembly so that they can be finished in the Armes factory to the highest technological standards. If the structure requires modification at a later date, all the parts utilized in the initial layout can be re-used in all revised versions.One of the hallmark features of the GL8 system is its reduced number of components, all of which
GL8 THE HEART OF
10
are standardized and compatible with warehousing procedures.The central component of the system is the capital, which is available in different versions to fit uprights in accordance with their position in the structure; the capital is designed to allow easy and quick assembly between beams and uprights; the 8-fold sigma section beam, an essential component when long spans are required, is available in a range of different dimensions and thicknesses and is utilized both as main and as
secondary beam, with the use of brackets, spacers and other accessories.Different heights (250 and 300 mm), several thicknesses (from 2 to 4 mm) and the use of proper steels enable the beams to reach particularly significative performances.The GL8 mezzanine floor, which is a fully self-loading structure, is designed and built to comply with static and dynamic loading requirements that take into account risk factors, including seismic events.
A SYSTEM
250 300
11
The GL8 system is protected by international patent.
The GL8 system is equipped with a range of components that ensure it can be utilized in all types of surroundings and for numerous different applications.The access stairways, in single or double flight versions with or without landing, are fully in line with the requirements of the relevant legislation, which defines different criteria according to whether or not the structure is designed for public access.
The railing, which comply with the most stringent safety standards, is constituted of uprights, handrail and other components.There are various types of gate available, hinged with one or two doors, sliding, and overhead safety types, thus providing a comprehensive response to all types of access requirements to the various levels for goods loading, also using lift trucks.
GL8 BASIC COMPONE
12
HANDRAIL
KICK PLATE
SIGMA BEAM
SLIDINGGATE
NTS
13
CAPITAL
STAIRCASE
COLUMN
250 300
The main decking types are:• galvanized steel strips with closed anti-slip surface;• galvanized perforated steel strips, for use when the passage of air and light is required;• wooden panels (chipboard or MDF) with corrugated sheet iron;• wooden panels (chipboard or MDF)
The first two types of decking are more suitable for manual goods handling, while the latter two (which can have different structural characteristics) are suitable for wheeled traffic and, with suitable coverings, can be utilized for offices, exhibition stands and structures with elevated aesthetic requirements.All Armes decking systems are codified and supplied with the relative loading values.
GL8 DECKING FOR ALL REQUI
14
REMENTS
15
WOODENDECKING
WOOD AND CORRUGATEDSHEET IRON DECKING
GALVANIZED CLOSED STEEL STRIP DECKING
GALVANIZED PERFORATED STEEL STRIP DECKING
250 300
16
17
GL8
A versatile system
for every need
18
GL8
Modularity,
flexibility and safety
at the top
19
GL8
Easy and fast
assembly of
all components
20
21
22
23
GL8
Can be used
in every
situation
24
25
GL8
Observance of
the strictest
safety norms
GL8
give us a vacuum...
ISSUE SEPTEMBER 2009 COD. S.B40.I4.000 AR M E S R E S E R V E S T H E R I G H T A T A N Y T I M E T O M A K E C H A N G E S R E G A R D I N G T E C H N O L O G I C A L P L A N N I N G A N D P R O D U C T I O N . DESIGN AND CONCEPT: INDACO CREATIVITEAM
R A C K I N G • A U T O M A T E D S T O R A G E S Y S T E M S
Armes spa • Strada Padana verso Verona, 101 • 36100 Vicenza, Italia
Phone +39 0444 349688 (5 linee r.a.) • Fax +39 0444 349498 • E-mail: [email protected] • http://www.armes.it
REGGIO EMILIA • ITALIA
WWW.PROMAGSPA.IT
VARESE • ITALIA
WWW.ARCHIMEDEINGEGNERIA.IT
BANGALORE • INDIA
WWW.ARMESMAINI.COM
VICENZA • ITALIA
WWW.FERRETTOGROUP.COM
TORINO • ITALIA
WWW.EGERIASRL.NET