L/O/G/Owww.themegallery.com
Airport Planning and Design
交管 101 田蕙寧
交管 101 覃震霖 交管 101 王冠筑
交管 100 許哲瑋
![Page 2: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/2.jpg)
Outline
Introduction Types of Airport Planning Airport Master Planning Demand Analysis and Conceptual
Planning Runway Planning and Design Taxiway Planning and Design Parking Apron Planning and Design
![Page 3: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/3.jpg)
Introduction
Introduction 1986 “機場工程施工技術規範” (FAA) 2003 “民用機場設計暨運作規範” (ICAO) International airports or airports operating
international charter flights better to comply with international standards and recommended practices.
Special Airports announced by AIP
![Page 4: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/4.jpg)
Types of Airport Planning
• Airport System Plan
• Airport Master Plan
• Airport Project Plan
![Page 5: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/5.jpg)
http://www.anws.gov.tw/installment/installment.php#03
![Page 6: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/6.jpg)
Airport Master Plan
![Page 7: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/7.jpg)
The objectives of airport master plan
• Physical facilities• Land planning • Evaluating environmental impacts of airport
construction and operations • Ground access transportation• Technical, economic and financial feasibility
studies for each alternative • Establish project priority and schedule • Establish feasible financial plan for project
implementation
![Page 8: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/8.jpg)
The contents of Airport Master Plan(1/4)
1. Data collection Physical facilities of the airport Measures of utilization, volume and composition
of traffic The cost of transportation and related tariffs The financial situation of the airlines using the
airport Government transportation policies and
regulations2. Air traffic demand forecasting
short-term planning Medium planning Long-term planning
![Page 9: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/9.jpg)
The contents of Airport Master Plan(2/4)
3. Demand analysis and conceptual planning Airside capacity analysis
Runway Taxiway Apron
Landside capacity analysis Passenger terminal Parking area Ground access
![Page 10: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/10.jpg)
The contents of Airport Master Plan(3/4)
4. Site selection
5. Evaluation of environmental impacts
6. Simulation
7. Demonstration of development planAirport layoutLand useTerminal layoutGround access transportation
![Page 11: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/11.jpg)
The contents of Airport Master Plan(4/4)
8. ImplementationFeasible financial plan
![Page 12: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/12.jpg)
Airport Layout
1. Airport scope
2. Airside
3. Landside
4. Navigation aids
5. Approach
6. Obstacles
![Page 13: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/13.jpg)
Physical facilities in an airport
Airside
Runway Taxiway
![Page 14: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/14.jpg)
Physical facilities in an airport
Landside
Passenger terminal
Concourse
![Page 15: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/15.jpg)
Physical facilities in an airport
Cargo terminal area
![Page 16: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/16.jpg)
Physical facilities in an airportAir traffic control and navigation aids area
Control towerILSILS
ILSILS
GP/DMEGP/DME
GP/DME GP/DME
VOR/DME
ASR-9
![Page 17: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/17.jpg)
Physical facilities in an airport
Other facilities
Hangar
Fire stationOil depot
![Page 18: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/18.jpg)
The Procedure of Airport Master Plan
Preplanning considerations
• Policy objectives
• Critical aircraft/datum aircraft
• Classification of landing system
![Page 19: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/19.jpg)
Steps in the planning process
• Prepare a msater planning work programme
• Inventory and document existing conditions
• Forecast future air traffic demand
• Determine gross facility requirements and preliminary time-phased development.
• Evaluate existing and potential constraints
![Page 20: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/20.jpg)
Steps in the planning process
• Agree upon relative importance or priority of various elements:– Airport type– Constraints– Political and other considerations
• Develop several conceptual or master plan alternatives for purposes of comparative analysis.
![Page 21: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/21.jpg)
Steps in the planning process
• Review and screen alternative conceptual plans. Provice all interested parties with an opportunity to test each alternative.
• Select most acceptable and appropriate alternative. Modify as necessary in response to review process and prepare in final form.
![Page 22: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/22.jpg)
Goals & objectives
Data collection
location of airport function?
Analysis of demand
Estimation of facilities required
Evaluating existing and potential constraints
Agree upon relative importance or priority of various elements: airport type, contraints, political and other considerationsAirport master plan function estimate and suggestion
Airport master plan detail airport peripheral plan
land use planpublic facilities plantransportation plan
en
viron
me
nta
l e
ffect
instru
ction
\financial feasibility estimate
suggestions after implementing the plan
en
gin
ee
ring
p
lan
an
d co
st a
na
lysis
eco
no
mic
be
ne
fit estim
ate
fina
ncia
l pla
n
estim
ate
![Page 23: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/23.jpg)
The Outcomes of Airport Master Plan
• Including a series of planning graph and a master planning report.
• Establish data management and public information systems
![Page 24: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/24.jpg)
The Revision of Airport Master Plan
• Master plan and/or spcific elements should be reviewed at least annually and adjusted as appropriate to reflect conditions at the time of review.
• Master plan should be thoroughly evaluated and modified every five years, or more often if changes in economic, operational, environmental and financial conditions indicate an earlier need for each revision.
![Page 25: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/25.jpg)
NOTE: ILS of the airport
• An instrument landing system (ILS) is a ground-based instrument approach system that provides precision guidance to an aircraft approaching and landing on a runway, using a combination of radio signals and, in many cases, high-intensity lighting arrays to enable a safe landing during instrument meteorological conditions (IMC), such as low ceilings or reduced visibility due to fog, rain, or blowing snow.
![Page 26: L/O/G/O Airport Planning and Design 101 100](https://reader036.vdocuments.site/reader036/viewer/2022062511/551a2809550346545e8b4716/html5/thumbnails/26.jpg)
ILS categories
• Category I (CAT I)
• Category II (CAT II)
• Category III (CAT III)