location - conference · pdf filedelayed coker unit foster wheeler usa hydroprocessing complex...

24

Upload: trankhue

Post on 07-Feb-2018

230 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC
Page 2: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Location

Tüpraş Residue Upgrade Project (RUP)

1

Page 3: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Tüpraş Refineries

Tüpraş Residue Upgrade Project (RUP)

2

Total Refining Capacity : 28.1 Millions Tons - 100% of Turkey’s refining Capacity

Current Nelson Complexity (NC) : 7.25

Page 4: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Existing Refinery

Tüpraş Residue Upgrade Project (RUP)

3

• Crude Distillation Units (3) 37,500 m3/day

• Vacuum Distillation Units (3) 14,000 m3/day

• FCC Unit (1) 2,250 m3/day

• CCR Platforming Units (2) 7,200 m3/day

• Isomerization Unit (1) 3,600 m3/day

• Desulphurizer Units (3) 14,750 m3/day

• Hydrocracking Unit (1) 4,000 m3/day

• Sulphur Plants (2) 250 ton/day

• Kerosene Treating Unit (1) 5,500 m3/day

• Hydrogen Plant (1) 57,000 NM3/hr

Page 5: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Existing Refinery - Utilities

Tüpraş Residue Upgrade Project (RUP)

4

1. Power Plants: • Steam Generation (990ton/hr) • Electricity Generation

o Turbogenerator 45 MW o Co-gen 40 MW

2. Tank Farm

• Total 134 Tanks and over 2.000.000 m3 storage capacity

3. Sales

• Truck loading ve rail car loading • Marine loading,

o Platform: 300.000 DWT, FAZ II: 100.000 DWT, FAZ I: 80.000 DWT

4. Waste water treatment, including;

• Balast water treatment • Domestic waste treatment

5. Recovery Units • Flare Gas Recover : 3.000 m3/saat • Waste Water Recovery : 440 m3/saat

Page 6: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Purpose of RUP

Page 7: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Tüpraş Residue Upgrade Project (RUP)

7

• Integrate with the existing refineries (Kırıkkale Refinery by rail way, İzmir

refinery by vessels, Izmit Refinery by pipeline)

• Receive all black products from Tüpraş Refineries (Atmospheric residuum,

Vacuum Residuum, VGO’s, high sulphur diesel)

• Convert them into primarily ultra low sulphur diesel, jet fuel, naphtha, and

LPG

Page 8: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

RUP General View

Page 9: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

RUP Product Yields (Tons/year)

Tüpraş Residue Upgrade Project (RUP)

9

White Product Yield (3.476/4.496) = %77.3

Page 10: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

RUP Akım Şeması

Tüpraş Residue Upgrade Project (RUP)

10

Page 11: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

RUP Units

Tüpraş Residue Upgrade Project (RUP)

11

• Delayed Coker :8.200 m3/day

• Hydrocracker :8.000 m3/day

• Diesel Desulfurizer :4.000 m3/day

• Naphtha Hydrotreater :1200 m3/day

• Vacuum Unit :7.500 m3/day

• Hydrogen Plant :160.000 Nm3/hr

• Sulphur Recovery Unit (2 trains) :420 ton/day

• Amine Regenerator (2 trains) :26.400 m3/day

• Sour Water Stripper (2 trains) :3.033 m3/day

• Waste Water Treatment Unit :12.000 m3/day

• Cooling Tower :12.000 m3/hr

• Electrical Power (2 GTG+ 1 STG ) :120 MW

• Steam Production (VHPS) :440 ton/hour

• Tanks (23) :660.000 m3

• Flare

• Jetty

• Railway Station

• Central Control Building

Page 12: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Process Licensors

Tüpraş Residue Upgrade Project (RUP)

12

Unit Licensor

Vacuum Distilatıon Unit Shell GSI

Delayed Coker Unit Foster Wheeler USA

Hydroprocessing Complex UOP

Hydrogen Unit TECHNIP

Sulphur Recovery Unit JACOBS

LPG Caustic Treater Unit UOP

EPC Contractor : Technicas Reunidas

Page 13: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

13

Flare is fired

15 September 2014

Page 14: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

14

Gas turbines starts producing

electrical power

18 December 2014

Page 15: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

15

First ASRFO product from İzmir and Kırıkkale Refineries

discharges to RUP tanks.

18 December 2014

Page 16: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

16

Vacuum Unit starts up

16 March 2015

Page 17: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

17

Hydrocracker pressure

depressurization tests

19 March 2015

Page 18: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

18

Sour Water Stripping Unit starts up

20 March 2015

Amine Regenaration

Plant starts up

1 April 2015

Page 19: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

19

Hydrogen Plant start up

30 March 2015

Hydrocracker produces the

first on spec diesel and jet fuel

products.

2 May 2015

Page 20: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

20

Sulphur Unit produces sulphur

8 May 2015

Page 21: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

21

Waste Water Treatment Plant

starts up

25 May 2015

Page 22: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Important Dates

Tüpraş Residue Upgrade Project (RUP)

22

The first petrocoke production

in Turkey

30 May 2015

Page 23: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Current Status

Tüpraş Residue Upgrade Project (RUP)

23

• All unit performance tests are passed.

• All other process and utility units are operating at their design

capacities.

• All Tüpraş Refineries operating at maximum capacity

• Tüpraş black product production is now limited to the supply of asphalt,

local heating oil and marine fuel demands.

Page 24: Location - Conference · PDF fileDelayed Coker Unit Foster Wheeler USA Hydroprocessing Complex UOP Hydrogen Unit TECHNIP Sulphur Recovery Unit JACOBS LPG Caustic Treater Unit UOP EPC

Tüpraş Residue Upgrade Project (RUP)

24

Thank You