2013 2012 2011 2010 2009
1.1 a) Operating costs for governance and
corporate management as a
percentage of total municipal
operating costs.
1.9% 1.9% 5.4% 3.6% 11.9%
1.1 b) Total costs for governance and
corporate management as a
percentage of total municipal costs.1.6% 1.7% 4.8% 3.5%
OBJECTIVE:
Efficient local government.
Township of Sables-Spanish Rivers
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
Local Government
Municipal Performance Measurement Program (MPMP) ● 2013 RESULTS
Questions about MPMP results should be addressed to:
Title: Treasurer
Name: Patricia Deline Phone: 705-865-2646 ext. 225
Municipality: Township of Sables-Spanish Rivers
Email: [email protected]
1.1 GENERAL GOVERNMENT - EFFICIENCY
1
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
2.1 a) Operating costs for fire services per
$1,000 of assessment. 0.93$ 0.93$ 1.01$ 1.24$ 1.03$
2.1 b) Total costs for fire services per
$1,000 of assessment. 1.16$ 1.28$ 1.35$ 1.46$
2013 2012 2011 2010 2009
2.2 Number of residential fire related
civilian injuries per 1,000 persons. 0.325 0.000 0.000 0.000 0.690
2.3 Number of residential fire related
civilian injuries averaged over 5 years
per 1,000 persons.0.000 0.325 0.000 0.140 0.270
2013 2012 2011 2010 2009
2.4 Number of residential fire related
civilian fatalities per 1,000 persons. 0.000 0.000 0.000 0.000 0.000
2.5 Number of residential fire related
civilian fatalities averaged over 5
years per 1,000 persons.0.000 0.000 0.000 0.000 0.000
2013 2012 2011 2010 2009
2.6 Number of residential structural fires
per 1,000 households. 2.722 2.180 7.726 6.125 5.011
Fire Services
OBJECTIVE:
Efficient fire services.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
2.1 FIRE SERVICES - EFFICIENCY
2.2 & 2.3 CIVILIAN FIRE RELATED INJURIES - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Minimize the number of civilian injuries in residential fires.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
2.6 NUMBER OF RESIDENTIAL STRUCTURAL FIRES - EFFECTIVENESS
OBJECTIVE:
Minimize the number of residential structural fires.
2.4 & 2.5 CIVILIAN FIRE RELATED FATALITIES - EFFECTIVENESS
OBJECTIVE:
Minimize the number of civilian fatalities in residential fires.
2
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
3.1 a) Operating costs for police services
per person. 305.55$ 292.81$ 294.39$ 318.38$ 270.84$
3.1 b) Total costs for police services per
person. 305.55$ 292.81$ 294.39$ 318.38$
2013 2012 2011 2010 2009
3.2 Violent crime rate per 1,000 persons.9.1 9.8 13.7 11.3 8.2
2013 2012 2011 2010 2009
3.3 Property crime rate per 1,000
persons. 24.4 25.0 20.8 26.1 31.6
2013 2012 2011 2010 2009
3.4 Total crime rate per 1,000 persons
(Criminal Code offences, excluding
traffic). 42.0 40.7 38.0 41.2 45.4
2013 2012 2011 2010 2009
3.5 Youth crime rate per 1,000 youths. 62.7 27.5 15.9 25.4 15.9
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
This municipality receives service from the Ontario Provincial Police.
3.2 VIOLENT CRIME RATE - EFFECTIVENESS
OBJECTIVE:
Safe communities.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
3.4 TOTAL CRIME RATE - EFFECTIVENESS
OBJECTIVE:
Safe communities.
3.5 YOUTH CRIME RATE - EFFECTIVENESS
OBJECTIVE:
Safe communities.
OBJECTIVE:
Efficient police services.
Police Services
3.1 POLICE SERVICES - EFFICIENCY
3.3 PROPERTY CRIME RATE - EFFECTIVENESS
OBJECTIVE:
Safe communities.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
3
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013
4.1 a) Operating costs for building permits
and inspection services per $1,000 of
construction activity, averaged over
three years (based on permits
issued).
10.15$
4.1 b) Operating costs for building permits
and inspection services per $1,000 of
construction activity, averaged over
three years (based on permits
issued).
10.71$
2013 2012 2011
4.2
a) Category 1: Houses
(houses not exceeding 3 storeys/600
square metres).
Reference: provincial standard is 10
working days.
2 3 3
b) Category 2: Small Buildings
(small commercial/industrial not
exceeding 3 storeys/600 square
metres).
Reference: provincial standard is 15
working days.
1 7 4
c) Category 3: Large Buildings
(large residential/commercial/
industrial/ institutional).
Reference: provincial standard is 20
working days.
0 0 0
d) Category 4: Complex buildings
(post disaster buildings, including
hospitals, power/water,
fire/police/EMS, communications).
Reference: provincial standard is 30
working days.
0 0 0
Median number of days to review a complete building permit application and issue a
permit or not issue a permit, and provide all reasons for refusal:
OBJECTIVE:
Complete building permit applications are processed quickly and accurately.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient building permits and inspection services.
REFERENCE:
● In 2013, the formula for the denominator of the MPMP efficiency measures for building permits and inspection
services was changed to a three year average for total construction activity, divided by $1,000.
Building Permits & Inspection Services
4.1 BUILDING PERMITS & INSPECTION SERVICES - EFFICIENCY
4.2 REVIEW OF COMPLETE BUILDING PERMIT APPLICATIONS - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
Categories 3 and 4 are not applicable in this municipality for this year.
REFERENCE:
● The effectiveness measure reporting the number of working days to review complete building permit applications
was introduced in 2011.
4
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013
4.3 a)
# 11
4.3 a)
% 100%
4.3 b)
# 0
4.3 b)
% 0%
4.3 c) The subtotal for the number of
complete and incomplete building
permit applications.# 11
2013
4.3 a)
# 0
4.3 a)
% 0%
4.3 b)# 0
4.3 b)
% 0%
4.3 c) The subtotal for the number of
complete and incomplete building
permit applications.# 0
REFERENCE:
● Financial Information Return: 92 1265 07.
OBJECTIVE:
Safe communities.
4.3 Building Permits and Inspection Services - Effectiveness
Category 2:
Small Buildings (small commercial/industrial not exceeding 3 storeys/600 square metres)
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as complete
applications.
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as incomplete
applications.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
4.3 Building Permits and Inspection Services - Effectiveness
Category 1: Houses
(houses not exceeding 3 storeys/600 square metres)
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as incomplete
applications.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● Financial Information Return: 92 1265 07.● In 2013, effectiveness measures were introduced that record the number and percentage of complete and
incomplete building permit applications, by category.
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as complete
applications.
OBJECTIVE:
Safe communities.
● In 2013, effectiveness measures were introduced that record the number and percentage of complete and
incomplete building permit applications, by category.
5
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013
4.3 a)# 0
4.3 a)% 0%
4.3 b)# 0
4.3 b)% 0%
4.3 c) The subtotal for the number of
complete and incomplete building
permit applications.# 0
2013
4.3 a)
# 0
4.3 a)
% 0%
4.3 b)
# 0
4.3 b)
% 0%
4.3 c) The subtotal for the number of
complete and incomplete building
permit applications.# 0
2013
4.4 The total number of building permit
applications submitted and accepted
by the municipality (all categories)
11
4.3 Building Permits and Inspection Services - Effectiveness
Category 3:
Large Buildings (large residential/commercial/ industrial/ institutional)
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as complete
applications.
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as incomplete
applications.
4.3 Building Permits and Inspection Services - Effectiveness
Category 4: Complex buildings (post disaster buildings, including hospitals, power/water,
fire/police/EMS, communications)
● Introduced in 2013.
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as complete
applications.
REFERENCE:
● Financial Information Return: 92 1265 07.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Safe communities.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● Financial Information Return: 92 1265 07.● In 2013, effectiveness measures were introduced that record the number and percentage of complete and
incomplete building permit applications, by category.
The number and percentage of
building permit applications which
are submitted and accepted by the
municipality as incomplete
applications.
OBJECTIVE:
Safe communities.NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● Financial Information Return: 92 1265 07.● In 2013, effectiveness measures were introduced that record the number and percentage of complete and
incomplete building permit applications, by category.
OBJECTIVE:
Safe communities.
6
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010
5.1 a) Operating costs for paved (hard top)
roads per lane kilometre.1 234.11$ 430.68$ 416.30$ 228.72$
5.1 b) Total costs for paved (hard top) roads
per lane kilometre. 234.11$ 430.68$ 416.30$ 228.72$
2013 2012 2011 2010 2009
5.2 a) Operating costs for unpaved (loose
top) roads per lane kilometre. 735.79$ 830.11$ 927.28$ 1,450.48$ 590.81$
5.2 b) Total costs for unpaved (loose top)
roads per lane kilometre. 735.79$ 830.11$ 927.28$ 1,450.48$
2013 2012 2011 2010 2009
5.3 a) Operating costs for bridges and
culverts per square metre of surface
area.15.31$ 15.09$ 19.58$ 9.15$ 10.14$
5.3 b) Total costs for bridges and culverts
per square metre of surface area. 15.31$ 15.09$ 19.58$ 9.15$
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
5.3 BRIDGES AND CULVERTS - EFFICIENCY
5.2 UNPAVED ROADS - EFFICIENCY
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient maintenance of unpaved roads.
OBJECTIVE:
Efficient maintenance of bridges and culverts.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● 1 The formulas for efficiency measures for paved roads were revised in 2010 to net out revenue received from
utilities for utility cut repairs.
● The total cost measure was also revised in 2010. Total costs mean operating costs as defined in MPMP, plus
amortization and interest on long term debt, less revenue received from other municipalities for tangible capital assets.
OBJECTIVE:
Efficient maintenance of paved roads.
Roads
5.1 PAVED ROADS - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
7
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
5.4 a) Operating costs for winter
maintenance of roadways per lane
kilometre maintained in winter.607.43$ 463.26$ 379.75$ 280.92$ 494.87$
5.4 b) Total costs for winter maintenance of
roadways per lane kilometre
maintained in winter.607.43$ 463.26$ 379.75$ 280.92$
2013 2012 2011 2010 2009
5.5 Percentage of paved lane kilometres
where the condition is rated as good
to very good.1
75% 74% 46% 35% 37%
2013 2012 2011 2010 2009
5.6 Percentage of bridges and culverts
where the condition is rated as good
to very good.1
100% 100% 96% 89% 100%
2013 2012 2011 2010 2009
5.7 Percentage of winter events where
the response met or exceeded locally
determined municipal service levels
for road maintenance.
100% 100% 100% 100% 92%
5.4 WINTER MAINTENANCE OF ROADS - EFFICIENCY
OBJECTIVE:
Efficient winter maintenance of roads.
5.5 ADEQUACY OF PAVED ROADS - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● 1 Pavement condition is rated using a Pavement Condition Index (PCI) such as the Index used by the Ontario Good
Roads Association (OGRA) or the Ministry of Transportation’s Roads Inventory Management System (RIMS).
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
OBJECTIVE:
Safe bridges and culverts.
5.6 ADEQUACY OF BRIDGES AND CULVERTS - EFFECTIVENESS
OBJECTIVE:
Pavement condition meets municipal objectives.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
5.7 WINTER EVENT RESPONSES - EFFECTIVENESS
REFERENCE:
● The effectiveness measure for bridges and culverts was introduced in 2009.
● 1
A bridge or culvert is rated as being in good to very good condition if distress to the primary components is
minimal, requiring only maintenance. Primary components are the main load carrying components of the structure,
including the deck, beams, girders, abutments, foundations, etc.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Response to winter storm events meets locally determined service levels for winter road maintenance.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
8
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
7.1 a) Operating costs for the
collection/conveyance of wastewater
per kilometre of wastewater main.2,674.24$ 1,539.12$ 1,464.40$ 10,418.80$ 8,464.40$
7.1 b) Total costs for the
collection/conveyance of wastewater
per kilometre of wastewater main.3,146.00$ 2,010.88$ 1,936.16$ 10,418.80$
2013 2012 2011 2010 2009
7.2 a) Operating costs for the treatment and
disposal of wastewater per megalitre. 129.08$ 605.31$ 241.55$ 101.08$ 78.40$
7.2 b) Total costs for the treatment and
disposal of wastewater per megalitre. 151.16$ 630.50$ 289.60$ 101.08$
2013 2012 2011 2010 2009
7.3 a) Operating costs for the
collection/conveyance, treatment, and
disposal of wastewater per megalitre
(integrated system).
1,683.40$ 1,625.52$ 1,283.77$ 1,145.40$ 716.74$
7.3 b) Total costs for the
collection/conveyance, treatment, and
disposal of wastewater per megalitre
(integrated system).
1,979.68$ 1,963.41$ 1,646.57$ 1,145.40$
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient municipal wastewater treatment and disposal.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
7.2 WASTEWATER TREATMENT AND DISPOSAL - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient municipal wastewater system (integrated system).
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
Wastewater (Sewage)
7.1 WASTEWATER COLLECTION/CONVEYANCE - EFFICIENCY
7.3 WASTEWATER INTEGRATED SYSTEM - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
OBJECTIVE:
Efficient municipal wastewater collection/conveyance.
9
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
7.4 Number of wastewater main backups
per 100 kilometres of wastewater
main in a year.0.00 0.00 0.00 0.00 0.00
2013 2012 2011 2010 2009
7.5 Percentage of wastewater estimated
to have by-passed treatment. 0.000% 0.000% 0.000% 0.000% 0.000%
7.5 WASTEWATER BYPASSES TREATMENT - EFFECTIVENESS
OBJECTIVE:
Municipal sewage management practices prevent environmental and human health hazards.
7.4 WASTEWATER MAIN BACKUPS - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Municipal sewage management practices prevent environmental and human health hazards.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
10
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
8.1 a) Operating costs for urban storm water
management (collection, treatment,
disposal) per kilometre of drainage
system.
3,148.49$ 3,448.00$ 3,295.00$
8.1 b) Total costs for urban storm water
management (collection, treatment,
disposal) per kilometre of drainage
system.
3,148.49$ 14,558.00$ 14,405.00$
Storm Water
8.1 URBAN STORM WATER MANAGEMENT - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient urban storm water management.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
11
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
9.1 a) Operating costs for the treatment of
drinking water per megalitre. 1,761.59$ 2,018.20$ 1,174.38$ 956.20$ 909.36$
9.1 b) Total costs for the treatment of
drinking water per megalitre. 2,656.77$ 2,018.20$ 1,263.63$ 1,804.46$
2013 2012 2011 2010 2009
9.2 a) Operating costs for the distribution/
transmission of drinking water per
kilometre of water distribution pipe.1,874.73$ 1,207.30$ 5,298.70$ 7,701.13$ 9,426.00$
9.2 b) Total costs for the distribution/
transmission of drinking water per
kilometre of water distribution pipe.1,874.73$ 4,211.43$ 5,701.03$ 7,701.13$
9.1 DRINKING WATER TREATMENT - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
9.2 DRINKING WATER DISTRIBUTION/TRANSMISSION - EFFICIENCY
OBJECTIVE:
Efficient municipal water treatment services.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient municipal water distribution/transmission services.
Drinking Water
12
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
9.3 a) Operating costs for the treatment and
distribution/transmission of drinking
water per megalitre (integrated
system).
2,226.15$ 2,357.45$ 2,652.74$ 1,630.05$ 1,658.30$
9.3 b) Total costs for the treatment and
distribution/transmission of drinking
water per megalitre (integrated
system).
3,121.32$ 3,201.63$ 2,854.25$ 2,478.31$
2013 2012 2011 2010 2009
9.4 Weighted number of days when a boil
water advisory issued by the medical
officer of health, applicable to a
municipal water supply, was in effect.
0.0000 48.0000 5.4167 3.0000 1.0000
2013 2012 2011 2010 2009
9.5 Number of water main breaks per 100
kilometres of water distribution pipe in
a year.0.00 0.00 0.00 0.00 6.67
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
9.4 BOIL WATER ADVISORIES - EFFECTIVENESS
OBJECTIVE:
Water is safe and meets local needs.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient municipal water system (integrated system).
OBJECTIVE:
Improve system reliability.
9.5 BREAKS IN WATER MAINS - EFFECTIVENESS
9.3 DRINKING WATER INTEGRATED SYSTEM - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
13
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
10.1 a) Operating costs for garbage
collection per household. 62.06$ 62.18$ 60.50$ 57.58$ 53.53$
10.1 b) Total costs for garbage collection per
household. 62.06$ 62.18$ 60.50$ 57.58$
2013 2012 2011 2010 2009
10.2 a) Operating costs for garbage disposal
per household. 84.54$ 95.83$ 77.77$ 97.53$ 80.18$
10.2 b) Total costs for garbage disposal per
household. 84.54$ 95.85$ 77.79$ 97.64$
2013 2012 2011 2010 2009
10.3 a) Operating costs for solid waste
diversion per household.52.77$ 50.52$ 55.20$ 48.94$ 36.16$
10.3 b) Total costs for solid waste diversion
perhousehold. 52.77$ 50.52$ 55.20$ 48.94$
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
OBJECTIVE:
Efficient municipal garbage disposal services.
OBJECTIVE:
Efficient municipal garbage collection services.
10.2 GARBAGE DISPOSAL - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
Solid Waste Management (Garbage)
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
OBJECTIVE:
Efficient solid waste diversion (recycling) services.
10.3 SOLID WASTE DIVERSION (RECYCLING) - EFFICIENCY
10.1 GARBAGE COLLECTION - EFFICIENCY
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
14
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
10.4 a) Average operating costs for solid
waste management (collection,
disposal and diversion) per
household.
199.36$ 208.53$ 193.47$ 204.06$ 169.70$
10.4 b) Average total costs for solid waste
management (collection, disposal and
diversion) per household. 199.36$ 208.55$ 193.49$ 204.17$
2013 2012 2011 2010 2009
10.5 Number of complaints received in a
year concerning the collection of
garbage and recycled materials per
1,000 households.
49.5 0.0 28.7 13.4 13.4
2013 2012 2011 2010 2009
10.6 Total number of solid waste
management facilities owned by the
municipality with a Ministry of
Environment certificate of approval.
2 2 2 2 2
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
10.4 SOLID WASTE MANAGEMENT (INTEGRATED SYSTEM) - EFFICIENCY
10.5 COMPLAINTS - COLLECTION OF GARBAGE AND RECYCLED MATERIALS
EFFECTIVENESS
OBJECTIVE:
Improved collection of garbage and recycled materials.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
10.6 NUMBER OF MUNICIPAL SOLID WASTE MANAGEMENT FACILITIES
EFFECTIVENESS
OBJECTIVE:
Efficient solid waste management (integrated system).
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Context for solid waste management facility compliance measure.
15
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
10.7
FIR
line #
Days
2013
Days
2012
Days
2011
Days
2010
Days
2009
3553 0 0 0 0 0
3554 0 0 0 0 0
3555
2013 2012 2011 2010 2009
10.8 Percentage of residential solid waste
diverted for recycling. 75% 12% 13% 9% 9%
2013 2012 2011 2010 2009
10.9 Percentage of residential solid waste
diverted for recycling (based on
combined residential and ICI
tonnage).
12% 13% 9% 9%
OBJECTIVE:
Municipal solid waste services do not have an adverse impact on environment.
Separation of residential from ICI tonnage now in place.
OBJECTIVE:
Municipal solid waste reduction programs divert waste from landfills and/or incinerators.
REFERENCE:
● ICI means Industrial/Commercial/Institutional.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Municipal solid waste reduction programs divert waste from landfills and/or incinerators.
Number of days per year when a Ministry of Environment compliance order for remediation concerning an air or
groundwater standard was in effect for a municipally owned solid waste management facility, by facility.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
10.9 DIVERSION OF RESIDENTIAL SOLID WASTE
(Based on Combined Residential and Industrial/Commercial/Institutional Tonnage)
EFFECTIVENESS
Facility Name
Tennyson Landefill Site
Webbwood Landfill Site
10.7 FACILITY COMPLIANCE - EFFECTIVENESS
10.8 DIVERSION OF RESIDENTIAL SOLID WASTE
EFFECTIVENESS
16
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
11.1 a) Operating costs for parks per person.5.54$ 5.51$ 3.87$ 5.22$ 4.19$
11.1 b) Total costs for parks per person.8.21$ 8.18$ 6.54$ 5.22$
2013 2012 2011 2010 2009
11.2 a) Operating costs for recreation
programs per person. 0.80$ 1.07$ 1.41$ 2.50$ 1.89$
11.2 b) Total costs for recreation programs
per person. 0.80$ 1.07$ 1.41$ 2.50$
2013 2012 2011 2010 2009
11.3 a) Operating costs for recreation
facilities per person. 98.99$ 90.13$ 85.08$ 96.01$ 76.27$
11.3 b) Total costs for recreation facilities per
person. 108.02$ 101.30$ 95.53$ 106.29$
11.1 PARKS - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient operation of parks.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
Parks and Recreation
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
11.3 RECREATION FACILITIES - EFFICIENCY
OBJECTIVE:
Efficient operation of recreation programs.
11.2 RECREATION PROGRAMS - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient operation of recreation facilities.
17
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
11.4 a) Operating costs for recreation
programs and recreation facilities per
person (Subtotal).99.79$ 91.20$ 86.49$ 98.51$ 78.16$
11.4 b) Total costs for recreation programs
and recreation facilities per person
(Subtotal).108.82$ 102.37$ 96.94$ 108.79$
2013 2012 2011 2010 2009
11.6 Hectares of open space (municipally
owned). 1 1 1 3 3
11.6 Hectares of open space per 1,000
persons (municipally owned). 0.3 0.3 0.3 1.0 1.0
2013 2012 2011 2010 2009
11.7 Total participant hours for recreation
programs per 1,000 persons. 24,168.8 24,322.6 9,554.5 3,773.2 4,123.0
2013 2012 2011 2010 2009
11.8 Square metres of indoor recreation
facilities (municipally owned). 6,192 6,192 6,192 6,192 6,192
11.8 Square metres of indoor recreation
facilities per 1,000 persons
(municipally owned).2,013.7 2,013.7 2,013.7 2,027.8 2,127.8
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
11.6 OPEN SPACE - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
11.4 RECREATION PROGRAMS AND RECREATION FACILITIES (SUBTOTAL)
EFFICIENCY
11.8 INDOOR RECREATION FACILITY SPACE - EFFECTIVENESS
OBJECTIVE:
Indoor recreation facility space is adequate for population.
OBJECTIVE:
Open space is adequate for population.
OBJECTIVE:
Recreation programs serve needs of residents.
11.7 PARTICIPANT HOURS FOR RECREATION PROGRAMS
EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Efficient operation of recreation programs and facilities.
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
18
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
12.1 a) Operating costs for library services
per person. 56.86$ 50.84$ 66.38$ 46.10$ 50.60$
12.1 b) Total costs for library services per
person. 56.86$ 50.84$ 66.38$ 46.10$
2013 2012 2011 2010 2009
12.2 a) Operating costs for library services
per use.1 4.64$ 3.07$ 2.30$ 4.22$ 4.14$
12.2 b) Total costs for library services per
use. 4.64$ 3.07$ 2.30$ 4.22$
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
● 1 The calculation of electronic library uses was updated in 2009 to include the number of people using the public
library wireless connection. In 2011 three additional categories of reference transactions were added to the definition
of library uses. This may affect the comparability of 2011 results with earlier years.
12.2 LIBRARY COSTS PER USE - EFFICIENCY
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
Libraries
12.1 LIBRARY COSTS PER PERSON - EFFICIENCY
REFERENCE:
● The formulas for efficiency measures were revised in 2009 to reflect changes in the reporting of expenses
consistent with accrual accounting concepts. New total cost measures were introduced and revised in 2010. Total
costs mean operating costs as defined in MPMP, plus amortization and interest on long term debt, less revenue
received from other municipalities for tangible capital assets.
OBJECTIVE:
Efficient library services.
OBJECTIVE:
Efficient library services.
19
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
12.3 Library uses per person.1
12.25 16.57 28.80 10.93 12.22
2013 2012 2011 2010 2009
12.4 Electronic library uses as a
percentage of total library uses.1 10% 10% 25% 11% 12%
2013 2012 2011 2010 2009
12.5 Non-electronic library uses as a
percentage of total library uses.1 90% 90% 75% 89% 88%
OBJECTIVE:
Better information on library usage.
REFERENCE:
● 1 The calculation of electronic library uses was updated in 2009 to include the number of people using the public
library wireless connection. In 2011 three additional categories of reference transactions were added to the definition
of library uses. This may affect the comparability of 2011 results with earlier years.
12.5 NON - ELECTRONIC LIBRARY USES - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
12.3 LIBRARY USES - EFFECTIVENESS
REFERENCE:
● 1 The calculation of electronic library uses was updated in 2009 to include the number of people using the public
library wireless connection. In 2011 three additional categories of reference transactions were added to the definition
of library uses. This may affect the comparability of 2011 results with earlier years.
12.4 ELECTRONIC LIBRARY USES - EFFECTIVENESS
OBJECTIVE:
Better information on library usage.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
REFERENCE:
● 1 The calculation of electronic library uses was updated in 2009 to include the number of people using the public
library wireless connection. In 2011 three additional categories of reference transactions were added to the definition
of library uses. This may affect the comparability of 2011 results with earlier years.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Increased use of library services.
20
Township of Sables-Spanish RiversMunicipal Performance Measurement Program (MPMP) ● 2013 RESULTS
2013 2012 2011 2010 2009
13.1 Percentage of new residential units
located within settlement areas. 27% 87% 17% 17% 25%
2013 2012 2011 2010 2009
13.2 Percentage of land designated for
agricultural purposes which was not
re-designated for other uses during
the reporting year.
N/A N/A N/A N/A N/A
2013 2012 2011 2010 2009
13.3 Percentage of land designated for
agricultural purposes which was not
re-designated for other uses relative
to the base year of 2000.
N/A N/A N/A N/A N/A
2013 2012 2011 2010 2009
13.4 Number of hectares of land originally
designated for agricultural purposes
which was re-designated for other
uses during the reporting year.
0 0 0 0 0
2013 2012 2011 2010 2009
13.5 Number of hectares of land originally
designated for agricultural purposes
which was re-designated for other
uses since January 1, 2000.
0 0 0 0 0
13.1 LOCATION OF NEW RESIDENTIAL DEVELOPMENT - EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
New residential development is occurring within settlement areas.
13.5 CHANGE IN NUMBER OF AGRICULTURAL HECTARES SINCE 2000
EFFECTIVENESS
OBJECTIVE:
Preservation of agricultural land.
OBJECTIVE:
Preservation of agricultural land.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Preservation of agricultural land.
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
13.3 PRESERVATION OF AGRICULTURAL LAND RELATIVE TO 2000
EFFECTIVENESS
13.2 PRESERVATION OF AGRICULTURAL LAND DURING REPORTING YEAR
EFFECTIVENESS
NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS:
OBJECTIVE:
Preservation of agricultural land.
13.4 CHANGE IN NUMBER OF AGRICULTURAL HECTARES DURING REPORTING YEAR
EFFECTIVENESS
Land Use Planning
CONTACT PERSON FOR LAND USE PLANNING:
21