LNG RECEIVING TERMINAL NYNÄSHAMN Facts Project Description Full containment Tank 20.000 cbm - Design and Engineering City/Country Nynäshamn / Sweden Client AGA Linde Gas, Lidingö Contract Value € 1,03 Mio. Construction Period 1/2009 - 1/2010 (24 months) .

Upload: others

Post on 25-Jan-2021

18 views

Category:

Documents


0 download

TRANSCRIPT

  • LNG RECEIVING TERMINALNYNÄSHAMN

    Facts Project DescriptionFull containment Tank 20.000 cbm - Design and Engineering

    City/Country

    Nynäshamn / Sweden

    Client

    AGA Linde Gas, Lidingö

    Contract Value

    € 1,03 Mio.

    Construction Period

    1/2009 - 1/2010 (24 months)

    .