Transcript
  • LNG RECEIVING TERMINALNYNÄSHAMN

    Facts Project DescriptionFull containment Tank 20.000 cbm - Design and Engineering

    City/Country

    Nynäshamn / Sweden

    Client

    AGA Linde Gas, Lidingö

    Contract Value

    € 1,03 Mio.

    Construction Period

    1/2009 - 1/2010 (24 months)

    .


Top Related