25
Project Status Color Project Status Description Number of Projects Project Priority List Contracts ATAward Amount Contracts Certified Amount Short Term Loan Amount Project Year Estimate ACTIVE PROJECTS BLUE Project has received a Short-Term Loan Closing Date. 215 $2,277,704,318 $1,176,543,300 $1,575,059,183 $1,658,238,690 $1,658,238,690 PURPLE Project has received DEP Certification. 25 $741,006,728 $430,652,905 $492,624,349 $492,624,349 LIGHT PURPLE Project has received an Authorization to Award. 18 $109,617,979 $71,716,218 $109,617,979 GREEN Project has received an Authorization to Advertise. 24 $441,337,402 $441,337,402 YELLOW Project is under review. Letter of intent has been received. Environmental Planning Document has been declared sufficient by DEP. 165 $1,592,768,196 $1,592,768,196 ORANGE Awaiting sponsor's submission of Letter of Intent (LOI) and Environmental Planning Document. 142 $714,017,255 $714,017,255 SUB-TOTAL (ACTIVE PROJECTS) 589 $5,876,451,877 $1,678,912,424 $2,067,683,532 $1,658,238,690 $5,008,603,870 INACTIVE PROJECTS LIGHT RED Project anticipates funding in current SFY. SUB-TOTAL (INACTIVE PROJECTS) 0 TOTAL NUMBER OF PROJECTS (ACTIVE AND INACTIVE) 589 $5,876,451,877 $1,678,912,424 $2,067,683,532 $1,658,238,690 $5,008,603,870 Updated as of January 14, 2021 LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST SUMMARY REPORT

Upload: others

Post on 24-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Project Status Color Project Status Description Number ofProjects

Project PriorityList

ContractsATAward

Amount

ContractsCertified Amount

Short TermLoan Amount

Project YearEstimate

ACTIVEPROJECTS

BLUE Project has received a Short-Term Loan Closing Date. 215 $2,277,704,318 $1,176,543,300 $1,575,059,183 $1,658,238,690 $1,658,238,690

PURPLE Project has received DEP Certification. 25 $741,006,728 $430,652,905 $492,624,349 $492,624,349

LIGHTPURPLE

Project has received an Authorization to Award. 18 $109,617,979 $71,716,218 $109,617,979

GREEN Project has received an Authorization to Advertise. 24 $441,337,402 $441,337,402

YELLOW Project is under review.

Letter of intent has been received.Environmental Planning Document has been declaredsufficient by DEP.

165 $1,592,768,196 $1,592,768,196

ORANGE Awaiting sponsor's submission of Letter of Intent (LOI) andEnvironmental Planning Document.

142 $714,017,255 $714,017,255

SUB-TOTAL (ACTIVE PROJECTS) 589 $5,876,451,877 $1,678,912,424 $2,067,683,532 $1,658,238,690 $5,008,603,870

INACTIVEPROJECTS

LIGHTRED

Project anticipates funding in current SFY.

SUB-TOTAL (INACTIVE PROJECTS) 0

TOTAL NUMBER OF PROJECTS (ACTIVE AND INACTIVE) 589 $5,876,451,877 $1,678,912,424 $2,067,683,532 $1,658,238,690 $5,008,603,870

Updated as of January 14, 2021

LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST SUMMARY REPORT

Page 2: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type1 266 Allentown

BoroughS340567-05

Allentown BoroughWastewater TreatmentPlant Modifications

$5,100,000 - 2017-08-11

Level 1 2018-02-23 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Allentown BoroughWastewater Treatment PlantModifications

2018-04-06

2019-12-09

2019-12-18

$4,740,000

2020-02-14

$4,600,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

2 1176 AllentownBorough

S340567-06

Water Meter Replacement(FKA DW)

$664,938 - 2018-10-11

Level 1 2018-10-16 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

AllentownBorough

2018-10-19

2019-02-11

2019-03-29

$525,000

2019-06-07

$500,000 Water Efficiency /Water Meters

3 228 Bergen CountyUtilitiesAuthority

S340386-21

FST Improvements $7,600,000 - 2019-07-02

Exempt 2019-08-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Final Settling Tanks 1 to 12improvements at LittleFerry

2019-09-23

$160,000

Final Settling Tanks 1though 16

2020-03-25

2020-06-29

2020-07-24

$6,950,000

Final Settling Tanks 13 to16

2020-06-04

$65,000

2020-08-11

$6,927,530 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

4 228 Bergen CountyUtilitiesAuthority

S340386-23

Sludge DigesterImprovements

$18,700,000 - 2019-08-19

Exempt 2019-11-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sludge DigestersImprovements

2019-08-14

$1,785,000

Sludge Digesters CleaningServices

2020-02-04

$2,785,000

Two Gas Flare Assembliesprocurement.

2020-01-10

2020-08-12

2020-08-20

$1,420,000

Procurement of five dualmembrane digester coversystems and five digesterinternal draft tube mixingsystems

2020-03-25

2020-11-17

2020-12-02

$4,700,000

2020-09-09

$18,700,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

5 228 Bergen CountyUtilitiesAuthority

S340386-24

Tank HeaderImprovements

$1,950,000 - 2019-07-02

Exempt 2019-05-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Aeration Tank HeaderImprovements

2019-08-14

$70,000

2019-10-24

$1,950,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

6 427 Bergen CountyUtilitiesAuthority

S340386-25

Northern Valley Force MainImprovements

$4,000,000 - 2019-07-09

Level 1 2020-07-31 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Northern Valley (Phase I) andNorthvale (Phase II) Force MainImprovements

2019-09-23

$195,000

Northern Valley (Phase I) andNorthvale (Phase II) Force MainImprovements

-

2019-10-24

$4,000,000 Sanitary Sewer SystemRehabilitation

CW Generic

7 1155 BloomfieldTownship

S340516-01

Water Meter Replacement(FKA DW)

$7,230,970 - 2019-01-10

Exempt 2019-02-01 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Water MeterReplacement

2019-04-09

2019-05-30

2019-06-13

$5,675,000

2020-04-03

$5,018,768 Water Efficiency /Water Meters

8 643 Bradley BeachBorough

S340472-01

Sewer Main Installation andRepairs - Phase I

$2,700,000 - 2015-10-07

Level 1 2016-08-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer MainInstall/Repair BradleyBoulevard

2017-01-06

2017-06-19

2017-06-27

$2,005,000

2017-12-07

$1,952,123 Sanitary Sewer SystemRehabilitation

CW Generic

9 461 Brick TownshipMunicipalUtilitiesAuthority

S340448-11

Wastewater Pump StationRehabilitation - Phase II

$5,700,000 - 2017-05-11

Level 1 2018-03-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Wastewater Pump StationRehabilitation - Phase II

2018-11-29

2019-03-12

2019-04-24

$5,685,000

2019-05-31

$5,278,297 Sanitary Sewer SystemRehabilitation

CW Generic

10 1160 Brick TownshipMunicipalUtilitiesAuthority

S340448-14

Meter Replacement - PhaseII

$2,000,000 - 2019-05-16

Exempt 2019-06-20 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

MeterReplacement

2019-08-15

2019-11-01

2020-02-04

$1,920,000

2020-02-05

$1,609,341 Water Efficiency /Water Meters

11 641 BuenaBoroughMunicipalUtilitiesAuthority

S340518-06

Upgrades to Sanitary SewerPump Stations #1, 2 & 3

$1,298,000 - 2020-01-31

Level 1 2020-02-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

P/D - Upgrades to SanitarySewer Pump Stations #1, 2& 3

2019-12-09

$100,000

Upgrades to Sanitary SewerPump Stations #1, 2 & 3

2020-08-27

2020-11-06

2020-12-02

$1,370,000

2019-12-10

$1,250,000 Sanitary Sewer SystemRehabilitation

12 1147 Burlington City S340140-02

Meter Replacement (FKADW Meter replacement &Filter rehabilitation)

$2,600,000 - 2019-04-22

Level 1 2018-11-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Residential WaterMeter Replacement

2019-09-19

2019-12-09

2020-02-18

$2,270,000

2020-11-12

$1,990,596 Water Efficiency /Water Meters

13 92 CamdenCountyMunicipalUtilitiesAuthority

S340640-13

Delaware #1 PumpUpgrades

$12,800,000 - 2018-05-24

Exempt 2012-03-23 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Preliminary TreatmentFacility Pump Upgrades

2018-10-19

2019-04-11

2019-06-14

$11,260,000

2019-06-21

$10,226,713 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

14 27 CamdenCountyMunicipalUtilitiesAuthority

S340640-16

Wastewater TreatmentPlant Improvements

$13,300,000 - 2015-03-19

Level 1 2018-10-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

DELAWARE NO. 1 WATERPOLLUTION CONTROLFACILITY, SEPARATION OFCITY AND COUNTYINTERCEPTORS (VOLUME 1& 2 of 2)

2018-10-24

2018-12-20

2019-02-13

$7,605,000

Construction ManagementServices for DELAWARE NO.1 WATER POLLUTIONCONTROL FACILITY,SEPARATION OF CITY ANDCOUNTY INTERCEPTORS(VOLUME 1 & 2 of 2)

-

2020-09-25

$8,177,514 DecentralizedWastewater (or Septic)SystemRepair/Replacement

CSO -AbatementProjects

15 7 CamdenCountyMunicipalUtilitiesAuthority

S340640-17

Reduce Potential for CSOswithin City

$3,500,000 - 2015-03-06

Level 1 2017-07-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

5 Green InfrastructureProjects Phase 3

2017-09-11

2017-12-06

2018-01-11

$814,790

Cramer Hill NaturePreserve

2017-08-14

2017-10-26

2018-01-11

$515,493

Sewer ReconstructionProject Phase VI

2017-09-11

2017-12-06

2018-01-11

$1,310,980

2018-01-12

$2,641,264 Combined SewerOverflow (CSO) - GreenInfrastructure

CSO - GreenInfrastructure

16 47 CamdenCountyMunicipalUtilitiesAuthority

S340640-18

Phase I upgrades,improve/sustain optimalwastewater performance

$84,030,000 - 2015-03-21

Level 1 2017-06-09 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Anaerobic SludgeDigesters

2017-08-28

2018-01-24

2018-03-05

$55,720,000

Combine Heat andPower System

2017-08-28

2017-08-28

2018-02-05

$26,115,000

2018-03-20

$76,164,967 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

17 5 CamdenCountyMunicipalUtilitiesAuthority

S340640-20

Camden City GreenInfrastructure

$3,000,000 - 2019-03-20

Level 1 2019-07-26 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

North Camden GreenInfrastructure Project

2020-06-19

2020-10-13

2020-10-29

$1,935,000

2020-12-11

$1,679,070 StormwaterManagement - GreenInfrastructure

CSO - GreenInfrastructure

18 16 CamdenCountyMunicipalUtilitiesAuthority

S340640-22

Upgrades to Camden City'sCombined Sewer OverflowSystem

$3,500,000 - 2018-05-24

Exempt 2018-08-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Cooper Street PipeLining

2018-10-05

2018-12-13

2018-12-19

$1,259,300

Arch Street PumpStation Upgrades

2018-10-05

2018-12-13

2018-12-19

$710,700

2018-12-21

$2,005,428 StormwaterManagement - GrayInfrastructure

CSO -AbatementProjects

19 16 CamdenCountyMunicipalUtilitiesAuthority

S340640-23

Dredging Of Camden City'sCombined SewerOverflows To ReduceCombined SewageFlooding

$5,600,000 - 2018-07-19

Level 1 2018-12-17 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

DREDGING ANDREHABILITATION OF 9CSO OUTFALLS

2018-12-17

2019-04-11

2019-04-18

$5,540,000

2020-08-26

$5,570,000 StormwaterManagement - GrayInfrastructure

CSO -AbatementProjects

20 9 CamdenCountyMunicipalUtilitiesAuthority

S340640-24

Upgrade of CamdenCounty WastewaterTreatment Plant ToIncrease Wet WeatherCapacity

$6,500,000 - 2018-05-24

Level 1 2018-10-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Delaware No. 1 WaterPollution Control Facility WetWeather Upgrades - Phase 1

2018-11-28

2019-04-11

2019-06-03

$4,060,000

2019-06-21

$3,785,476 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

Living (Active Review Project) List (Sorted by Color)

Clean Water Projects Updated as of January 14, 2021

New Jersey Water Bank (NJWB)

Page 1 of 15

Page 3: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type21 793 Camden

CountyMunicipalUtilitiesAuthority

S340640-26

Newton Creek Dredgingand Erosion Control

$28,200,000 - 2018-10-04

Level 2 2019-09-13 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

NEWTON LAKEDREDGING &RECLAMATIONPROJECT

2020-03-26

2020-08-21

2020-09-04

$23,715,000

2020-09-25

$23,711,831 Non-Point Source(NPS) PollutionControls

CW Generic

22 430 CamdenCountyMunicipalUtilitiesAuthority

S340640-28

EmergencyRehabilitation/Replacementof the CCMUA Berlin Twp.Force Main

$7,500,000 - 2020-07-24

Exempt 2020-07-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

BERLIN FORCE MAINREHABILITATION

2020-08-05

2020-08-20

2020-09-04

$3,200,000

2020-09-25

$2,933,555 Emergency Repair Base CWSRF

23 9 CamdenCountyMunicipalUtilitiesAuthority

S345040-01

Camden City andGloucester City Long TermCSO Control Plan

$1,380,000 - 2020-07-02 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Camden City andGloucester City Long TermCSO Control Plan

2020-10-08

$1,250,000

2020-12-11

$1,249,973 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

24 527 CarteretBorough

S340939-10

Roosevelt Pump Stationand Bergen Street PumpStation Upgrades

$6,600,000 - 2020-01-30

Exempt 2020-01-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehabilitation ofRoosevelt Avenue PumpStation

2020-01-30

2020-05-19

2020-06-11

$4,395,000

Rehabilitation BergenStreet Pump Station

2020-06-24

2020-08-18

2020-09-04

$280,000

Engineering Services 2020-06-03

$226,000

2020-10-14

$4,800,000 Sanitary Sewer SystemRehabilitation

CW Generic

25 334 Chatham(MCJM)Borough

S340715-07A

Facility Improvements2018

$7,289,180 - 2019-03-11

Level 1 2019-08-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning and Design Loanfor "Facility Improvements2018"

2019-03-29

$180,000

Facility improvements2018

2019-10-07

2020-01-27

2020-02-18

$2,890,000

2019-04-05

$2,730,000 Sewage TreatmentPlant (STP) -Expansion

CW Generic

26 1026 Clinton Town S340924-07

Town of Clinton System-Wide Customer MeterReplacement

$800,000 - 2019-02-26

Exempt 2019-05-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

System Wide MeterReplacement - Phase II

2019-05-02

2019-06-12

2019-06-20

$250,000

Procurement of WaterMeters through Co-op

2019-06-20

$470,000

2019-06-24

$719,969 Water Efficiency /Water Meters

CW Generic

27 253 Clinton Town S340924-08

WWTP Filter and ResidualsBuilding ImprovementProject

$4,100,000 - 2019-11-26

Exempt 2019-06-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WWTP Filter andResiduals BuildingImprovement

2019-12-18

2020-04-08

2020-04-27

$4,050,000

2020-10-14

$3,889,400 Sewage TreatmentPlant (STP) -Improvement/Upgrade

28 889 CranfordTownship

S340858-04

Stormwater constr. variouslocations to improvedrainage/prevent flooding

$12,000,000 - 2015-03-05

Level 1 2018-05-29 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

CranfordPhase 2B

2018-08-01

2018-12-18

2019-01-03

$2,975,000

2019-06-19

$2,578,383 StormwaterManagement - GrayInfrastructure

CW Generic

29 872 CumberlandCounty

S340438-03

Downe TownshipFortescue Package Plant

$17,000,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning andDesign Contract

2018-04-19

$1,000,000

2018-05-15

$1,000,000 Sewage TreatmentPlant (STP) - New

CW Generic

30 393 DelranTownship

S340794-10

Clay Street Pump Station $2,100,000 - 2019-03-20

Level 1 2019-06-12 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Clay Street PumpStation

2019-08-29

2020-01-03

2020-02-18

$1,540,000

2020-11-12

$1,538,856 Sanitary Sewer SystemRehabilitation

31 284 East Orange(JMEUC) City

S340686-08a

Flood Mitigation FacilitiesProject

$1,245,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$105,593

2020-10-28

$915,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

32 284 East Orange(JMEUC) City

S340686-09A

Capital ImprovementsProjects 2019

$620,504 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects 2019

2019-06-13

$70,000

2019-07-30

$615,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

33 284 Elizabeth(JMEUC) City

S340686-08b

Flood Mitigation FacilitiesProject

$12,920,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$1,263,932

2020-10-28

$9,960,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

34 284 Elizabeth(JMEUC) City

S340686-09B

Capital ImprovementsProjects 2019

$6,505,876 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects2019

2019-06-13

$835,000

2019-07-30

$6,440,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

35 87 Elizabeth City S340942-17

South Street Flood ControlProject

$6,500,000 - 2014-03-04

Level 2 2014-12-30 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

South StreetFlood

2019-01-22

2019-04-04

2019-06-13

$5,295,000

2019-06-17

$5,320,111 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

36 87 Elizabeth City S345070-01

City of Elizabeth CSO LTCP $4,000,001 - 2016-02-25

ContractName

ATAdvActual

ATAwdActual Cert Date

CertAmount

PlanningLTCP

2017-01-18

$940,000

PlanningLTCP

2019-06-14

$975,000

PlanningLTCP

2019-06-14

$405,000

PlanningLTCP

2019-06-14

$345,000

PlanningLTCP

2020-06-04

$200,000

2016-04-05

$3,350,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

37 617 EmersonBorough

S340497-01

Small System AssetManagement Plan

$100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Small System AssetManagement Plan

2017-09-22

$100,000

2018-01-12

$99,966 Sanitary Sewer SystemRehabilitation

CW Generic

38 496 EveshamMunicipalUtilitiesAuthority

S340838-07

2018 Sewer SystemImprovements

$1,600,000 - 2019-02-13

Level 1 2019-03-04 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Locust Avenue PumpStation Upgrades

2019-08-29

2019-12-09

2020-02-21

$1,320,000

2020-09-11

$1,315,162 Sanitary Sewer SystemRehabilitation

CW Generic

39 477 FranklinTownshipSewerageAuthority

S340839-08

Hamilton St. PumpingStation

$4,200,000 - 2018-07-27

Level 1 2018-11-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Hamilton St.Pumping Station

2019-03-14

2019-06-26

2019-08-13

$4,160,000

2020-10-14

$4,044,510 Sanitary Sewer System- New

CW Generic

40 610 Glen RidgeBorough

S340861-04

GR-2017-SSR SanitarySewer Rehabilitation &Sanitary Sewer CollectionSystem AssetManagement Plan

$2,300,000 - 2018-08-10

Exempt 2018-12-18 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

SANITARY SEWERCOLLECTIONREHABILITATION

2019-01-15

2019-03-13

2019-05-28

$1,010,000

Sanitary SewerRehabilitation Phase 2

2019-05-02

2019-06-11

2019-06-13

$1,045,000

AMP -

2019-06-21

$1,856,145 Sanitary Sewer SystemRehabilitation

CW Generic

41 1132 GloucesterCountyImprovementAuthority

S342016-04

Cell 15 Construction $18,500,001 - 2020-01-28

Level 1 2020-05-08 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Cell 15Construction

2020-05-26

2020-08-06

2020-08-19

$10,875,000

GCIA-EngineeringServices

2020-06-04

$140,000

2020-09-23

$8,631,806 Landfill Construction Base CWSRF

42 260 GloucesterCounty UtilitiesAuthority

S340902-15

Combined Heat & Power $11,500,000 - 2015-03-03

Level 1 2015-06-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Biogas ConditioningSystem

2019-12-04

2020-03-30

2020-07-24

$3,485,000

Combined Heat andPower Units

-

SwitchgearEquipment Purchase

2020-10-09

2020-11-17

2020-12-15

$1,265,000

Bio Gas Storage -

2020-09-03

$11,500,000 Energy Efficiency /Renewable Energy

CW Generic

43 912 GloucesterTownship

S340364-11

Redwood Street CulvertReplacement

$950,000 - 2015-03-10

Level 1 2019-02-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Redwood St. CulvertReplacement

2019-08-29

2019-12-03

2020-01-09

$770,000

2020-10-15

$701,564 StormwaterManagement - GrayInfrastructure

CW Generic

Page 2 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 4: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type44 912 Gloucester

TownshipS340364-15

Gloucester TownshipStormwater Improvements

$1,450,000 - 2016-03-04

Level 1 2017-03-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lincoln Drive (CES#2542-44)

2018-02-02

2018-06-07

2018-06-18

$472,004

Spring Hill Drive (CES#2542-45)

2018-02-02

2018-06-07

2018-06-18

$255,354

Edgewater Court (CES#2542-46)

2018-02-02

2018-06-07

2018-06-18

$114,526

Block 9801 Lot 1 (CES#2542-47)

2018-02-02

2018-06-07

2018-06-18

$125,209

Pasadena Drive (CES#2542-48)

2018-02-02

2018-06-07

2018-06-18

$187,907

2020-03-20

$927,983 StormwaterManagement - GrayInfrastructure

CW Generic

45 175 HackensackCity

S340923-14

Sewer Separation toSupport Main StreetRedevelopment

$8,000,000 - 2019-12-20

Level 1 2020-02-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer Separation to SupportMain Street Redevelopment(Atlantic Street to MercerStreet)

2020-02-05

2020-03-11

2020-06-03

$1,918,000

Sewer Separation to SupportMain Street Redevelopment(Mercer Street to PassaicStreet)

2020-02-28

2020-04-07

2020-06-03

$3,562,000

2020-06-22

$5,204,010 Combined SewerOverflow (CSO) -TraditionalInfrastructure

46 612 HaddonHeightsBorough

S340877-02

Sanitary Sewer SystemAsset Management Plan

$100,000 - 2020-01-17 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer SystemAsset Management Plan

2019-10-16

$105,000

2020-12-15

$100,000 Sanitary Sewer SystemRehabilitation

CW Generic

47 655 HamburgBorough

S340149-03

Sanitary Sewer SystemAsset Management Plan

$100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer AssetManagement Plan

2019-06-03

$86,000

2019-08-28

$85,000 Sanitary Sewer SystemRehabilitation

48 880 HammontonTown

S340927-09

Stormwater Improvements $4,600,000 $4,600,000 2015-03-06

Level 1 2015-07-28 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

StormwaterRehab

2016-03-23

2016-06-08

2016-06-17

-

2016-11-14

$2,755,872 Sanitary Sewer SystemRehabilitation

CW Generic

49 284 Hillside(JMEUC)Township

S340686-08c

Flood Mitigation FacilitiesProject

$1,815,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$161,728

2020-10-28

$1,355,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

50 284 Hillside(JMEUC)Township

S340686-09C

Capital ImprovementsProjects 2019

$908,430 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects2019

2019-06-13

$110,000

2019-07-30

$900,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

51 129 Hoboken City S340635-07

Resilient GreenInfrastructure for CSOReduction

$5,000,000 $5,000,000 2015-03-06

Level 2 2016-08-31 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Green Infrastructure forCSO Reduction

2016-10-21

2016-10-27

2016-11-10

$4,670,000

2018-06-21

$4,335,696 Combined SewerOverflow (CSO) - GreenInfrastructure

CSO - GreenInfrastructure

52 129 Hoboken City S340635-09

ROW Green Infrastructureadjacent to Water Mains(2018)

$500,000 - 2018-08-17

Level 1 2018-11-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

ROW Gray Infrastructureadjacent to Water Mains

2019-02-27

2019-07-09

2019-08-01

$420,000

2020-06-26

$359,344 StormwaterManagement - GreenInfrastructure

CSO - GreenInfrastructure

53 395 HopatcongBorough

S340488-07

Sanitary Sewer SystemAsset Management Plan

$80,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Hopatcong Sanitary SewerSystem Asset ManagementPlan

2019-06-05

$76,000

2019-12-12

$75,000 Sanitary Sewer SystemRehabilitation

CW Generic

54 307 HowellTownship

S344040-02

Freewood Acres & Route 9Sanitary Sewer Extension

$14,680,000 - 2016-03-04

Level 2 2017-05-03 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Freewood Acres & Route9 Sanitary SewerExtension

2018-06-01

2018-08-13

2018-10-19

$14,680,000

2018-10-26

$12,076,776 Sanitary Sewer System- New

Barnegat Bay

55 284 Irvington(JMEUC)Township

S340686-08d

Flood Mitigation FacilitiesProject

$4,505,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$428,770

2020-10-28

$3,440,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

56 284 Irvington(JMEUC)Township

S340686-09D

Capital ImprovementsProjects 2019

$2,252,347 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects2019

2019-06-13

$285,000

2019-07-30

$2,230,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

57 65 Jersey CityMunicipalUtilitiesAuthority

S340928-15

Phase 3 & 4 SewerImprovements

$41,000,000 $41,000,000 2014-03-03

Level 1 2014-10-08 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Sewer Replacement &Blockage RemovalRepairs

2017-02-27

2017-09-11

2017-09-22

$34,450,000

2020-12-09

$38,918,490 Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

58 65 Jersey CityMunicipalUtilitiesAuthority

S340928-20

Outfall Chambers $7,200,000 - 2014-02-28

Level 1 2015-07-28

ContractName

ATAdvActual

ATAwdActual Cert Date

CertAmount

PumpStations

2017-04-13

2017-08-28 2017-09-08

$1,490,000

2018-02-08

$1,488,384 DecentralizedWastewater (or Septic)SystemRepair/Replacement

CSO -AbatementProjects

59 65 Jersey CityMunicipalUtilitiesAuthority

S340928-21

Sewer Pipe Replacement /Phase V CSO Study

$25,000,000 $12,000,000 2015-03-06

Level 1 2015-08-18 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

Sewer PipeReplacement

2019-11-26

2020-03-30

2020-06-03

$11,515,000

2020-06-30

$10,525,544 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

60 65 Jersey CityMunicipalUtilitiesAuthority

S340928-24

Phase 1/2 SewerRehabilitation

$108,000,000 - 2016-03-04

Level 1 2019-06-13 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

JCMUA Phase 1-2Sewer Rehabilitation

2019-11-14

2020-06-09

2020-06-11

$107,450,000

2020-06-30

$81,500,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

61 65 Jersey CityMunicipalUtilitiesAuthority

S340928-28

Van Winkle Ave. SanitarySewer Rehabilitation

$2,700,000 - 2016-03-02

Level 1 2016-06-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Van Winkle AvenueCombined Sewer and WaterRehabilitation

2018-05-24

2018-08-27

2018-10-19

$2,290,000

2019-02-19

$2,286,447 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

62 65 Jersey CityMunicipalUtilitiesAuthority

S340928-31

54 inch JCMUA/PVSCFORCEMAIN REPAIR

$11,059,600 - 2018-08-31

Level 1 2017-09-18 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Repair of 54" CrossTown Force Main

2018-10-02

2018-12-04

2019-01-10

$7,855,000

2019-02-19

$9,255,147 Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

63 65 Jersey CityMunicipalUtilitiesAuthority

S340928-33

Pine Street SyphonReplacement

$9,000,000 - 2019-06-14

Level 1 2020-06-17 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Pine Street SiphonReplacement

-

Pine Street "EmergencyContract"

2021-01-11

$6,760,000

Pine Street ConstructionMaterials and Pumping

2020-11-30

$1,340,334

2020-12-09

$9,000,000 Sanitary Sewer SystemRehabilitation

CW Generic

64 65 Jersey CityMunicipalUtilitiesAuthority

S340928-34

Sanitary Sewer MainRehabilitation/Lining

$1,300,000 - 2018-11-21

Exempt 2018-12-11 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer MainRehabilitation Project

2019-05-22

2019-08-27

2020-01-09

$1,145,000

2020-09-16

$1,181,180 Sanitary Sewer SystemRehabilitation

CW Generic

65 1105 Kearny Town S340259-12

Redev of recreationalcomplex as a modernartificial turf complex

$21,500,000 - 2015-03-06

Level 2 2018-06-11 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Remediation/Contaminatedsite cleanup

2018-10-03

2019-01-30

2019-02-13

$14,175,000

2019-06-20

$14,090,909 RemedialAction/ContaminatedSite Cleanups(Brownfields)

CW Generic

66 818 LakewoodTownshipMunicipalUtilitiesAuthority

S340465-02

Gravity Sewer LineInstallation

$4,320,000 - 2018-09-11

Level 2 2019-05-08 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

GRAVITY SANITARY SEWERSYSTEM EXTENSION - EASTCOUNTY LINE ROAD TORIDGE AVENUE

2019-06-07

2019-09-30

2019-10-16

$1,690,000

VASSAR - SPRUCESANITARY SEWER

2019-06-07

2019-09-30

2019-10-16

$2,375,000

2019-11-20

$4,063,763 Sanitary Sewer SystemRehabilitation

67 1153 LakewoodTownshipMunicipalUtilitiesAuthority

S340465-03

Administration BuildingAddition (FKA DW)

$1,750,000 - 2018-12-20

Level 1 2018-05-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Additions, Renovations andAlterations to the LakewoodTownship Municipal UtilityAuthority AdministrationBuilding

2018-09-27

2019-01-11

2019-04-24

$1,468,550

2019-05-31

$1,440,000 Water TreatmentPlant/Facilities

CW Generic

Page 3 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 5: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type68 244 Lambertville

MunicipalUtilitiesAuthority

S340882-09

WWTP rehab work $1,800,000 - 2019-05-14

Exempt 2019-08-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Repaving of WWTP Area andAccess Road

2019-10-29

2020-01-13

2020-04-01

$251,597

WWTP Roof Replacement 2019-10-29

2020-01-13

2020-04-01

$296,610

Purchase of RectangularClarifier Collectors

2019-10-29

2020-01-13

2020-04-01

$186,793

Rehabilitation of DisinfectionFacilities & DrainageImprovements

2020-01-24

2020-03-30

2020-04-15

$600,000

Lambertville Municipal UtilitiesAuthority S340882-09 P&D

2020-04-01

$75,000

2020-04-01

$1,725,444 Sewage TreatmentPlant (STP) -Improvement/Upgrade

69 649 LambertvilleMunicipalUtilitiesAuthority

S340882-10

Collection systemrehabilitation

$700,000 - 2019-04-12

Exempt 2019-05-06 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Asset Management Plan 2019-06-20

$99,700

Sanitary SewerCollection System Rehab

2019-05-20

2019-06-12

2019-06-13

$585,000

2019-08-21

$550,000 Sanitary Sewer SystemRehabilitation

CW Generic

70 241 Linden RoselleSewerageAuthority

S340299-09

Phase V BuildingImprovements

$2,100,000 - 2019-07-02

Exempt 2019-08-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase V BuildingImprovements

2019-09-05

2019-11-07

2020-02-04

$1,505,000

2020-08-07

$1,434,246 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

71 390 Little EggHarborMunicipalUtilitiesAuthority

S340579-03

Little Egg Harbor SewerMain Replacement

$2,900,000 - 2016-03-04

Level 1 2017-02-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Little Egg Harbor Water andSewer ImprovementsPhase I

2020-03-04

2020-05-15

2020-06-04

$1,800,000

2020-06-25

$1,797,091 Sanitary Sewer SystemRehabilitation

CW Generic

72 226 LoganTownshipMunicipalUtilitiesAuthority

S340123-02

Facility Improvements andEffluent Force MainReplacement Project.

$9,948,000 - 2019-06-25

Level 2 2020-07-01 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Facility Improvements andEffluent Force MainReplacement

2020-08-07

2020-10-13

2020-10-29

$11,795,000

2020-11-18

$9,948,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

73 656 Long BeachTownship

S340023-07

Sewer Main ReplacementProject

$4,600,000 - 2016-03-02

Level 1 2016-07-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2017 Water and Sewer MainReplacement Projects(Project Nos. 1517001-014and S340023-07)

2018-11-01

2019-01-11

2019-02-13

$4,260,000

2020-10-15

$4,023,807 Sanitary Sewer SystemRehabilitation

CW Generic

74 107 Long BranchSewerageAuthority

S340336-08

2018 CapitalImprovements Projects -Wastewater TreatmentPlant

$1,740,700 - 2019-12-20

Level 1 2019-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2018 Capital ImprovementsProjects - WastewaterTreatment Plant

2019-08-13

$110,000

WWTP Hot Water and FinalSettling Tank MechanicalImprovements

2020-01-07

-

2019-08-14

$1,700,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

75 368 Long BranchSewerageAuthority

S340336-09

2018 CapitalImprovements Projects -Collection System

$5,600,000 - 2020-05-22

Level 1 2019-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2018 CapitalImprovements Projects -Collection System

2019-08-13

$310,000

Hoey Avenue PumpStation Force MainReplacement

2020-09-21

2020-10-30

2020-12-02

$2,505,000

2019-08-14

$5,237,000 Sanitary Sewer SystemRehabilitation

CW Generic

76 334 Madison(MCJM)Borough

S340715-07B

Facility Improvements2018

$7,289,180 - 2019-03-12

Level 1 2019-08-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning and Design for"Facility Improvements2018"

2019-03-29

$310,000

Facility Improvements2018

2019-10-07

2020-01-27

2020-02-18

$5,045,000

2019-04-05

$4,770,000 Sewage TreatmentPlant (STP) -Expansion

CW Generic

77 1170 ManchesterTownship

S340650-08

Install automated watermeters (FKA DW)

$3,000,000 - 2018-08-07

Exempt 2016-10-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Installation of AutomatedMeter Reading System &Replacement of SelectedMeters

2018-04-24

2018-06-04

2018-08-22

$2,615,000

2018-08-23

$2,614,425 Water Efficiency /Water Meters

78 284 Maplewood(JMEUC)Township

S340686-08e

Flood Mitigation Project $1,845,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$164,835

2020-10-28

$1,380,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

79 830 MarlboroTownship

S340268-02

Harbor Rd. WastewaterPump Station

$964,250 - 2018-02-07

Level 1 2019-05-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Harbor Road WastewaterPump Station

2019-06-10

2020-06-24

2020-08-21

$910,000

2020-12-03

$907,853 Sanitary Sewer System- New

CW Generic

80 646 Medford LakesBorough

S340319-03

Collection System LiningImprovements

$11,000,000 - 2016-03-04

Level 1 2016-06-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Collection SystemLining Improvements

2020-05-06

2020-08-13

2020-08-21

$6,830,000

2020-10-19

$6,096,325 Sanitary Sewer SystemRehabilitation

CW Generic

81 648 MendhamBorough

S340159-03

Collection SystemImprovements

$3,200,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

P&D Activities - CCTVSewer Lines

2020-07-24

$465,000

2020-08-12

$1,993,300 Sanitary Sewer SystemRehabilitation

82 20 MendhamBorough

S340159-04

WWTP Improvements $3,500,000 - 2020-10-06

Exempt 2020-08-19 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

P&D 2020-06-03

$265,000

WATER RECLAMATIONFACILITY IMPROVEMENTSMLR PIPING REALIGNMENT

-

2020-08-12

$3,081,700 Sewage TreatmentPlant (STP) -Improvement/Upgrade

83 570 MiddlesexBorough

S340698-02

Sanitary Sewer MainImprovements

$2,568,750 - 2017-08-10

Level 1 2018-01-19 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehabilitation ofSanitary Sewer

2018-06-20

2018-08-07

2018-10-19

$1,385,000

2019-06-21

$1,381,868 Sanitary Sewer SystemRehabilitation

CW Generic

84 419 MiddlesexCounty UtilitiesAuthority

S340699-14

Main Truck Sewer RehabPhase II

$11,000,000 - 2014-03-04

Level 1 2015-01-02 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

Main TruckSewer Rehab

2018-04-23

2018-10-17

2019-01-03

$10,970,000

2019-02-21

$10,118,868 DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

85 284 MillburnTownship

S340686-08f

Flood Mitigation Project(JMEUC)

$1,650,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$145,667

2020-10-28

$1,230,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

86 428 MonmouthCountyBayshoreOutfallAuthority

S340325-04

Force Main Assessmentand Rehabilitation

$3,500,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Force Main Assessmentand Rehabilitation

2019-01-03

$1,605,000

2019-02-06

$3,000,000 Sanitary Sewer SystemRehabilitation

CW Generic

87 635 MountArlingtonBorough

S340451-05

Wastewater System AssetManagement Plan

$212,785 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Mount Arlington AssetManagement Plan

2018-12-12

$212,785

2018-12-18

$159,456 Sanitary Sewer SystemRehabilitation

88 134 Mount LaurelTownshipMunicipalUtilitiesAuthority

S340943-06

Sewer SystemImprovement Project(Bundle 1)

$8,000,000 - 2018-11-02

Level 1 2018-12-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Tank Rehabilitation andPrimary Sludge BuildingFloor Drain Replacement

2019-03-13

2019-08-21

2019-10-16

$2,845,000

Warehouse Conversion toVehicle Storage Facility

2019-03-13

2019-04-29

2019-06-03

$395,000

Plant Laboratory 2019-03-13

2019-04-29

2019-06-03

$320,000

Hartford Road WPCF FilterPress Control PanelReplacements

2019-05-01

2019-06-20

2019-06-20

$300,000

Hartford Road WPCF RoofReplacement and LightningProtection

2020-05-18

2020-06-24

2020-08-25

$490,000

Hartford Road WPCFLighting Replacement

2020-08-03

2020-09-30

2020-10-29

$205,000

Hartford Road WPCF PipingHeat Tracing and Insulation

2020-12-03

-

2019-08-21

$7,200,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

Page 4 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 6: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type89 1 Musconetcong

SewerageAuthority

S340384-09

Wastewater TreatmentPlant Improvements

$6,000,000 - 2019-08-06

Level 1 2019-12-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Pumps - Procurement 2020-02-04

$170,000

Influent ScreeningFacility

2020-01-09

2020-10-13

2020-10-21

$1,894,247

Wastewater TreatmentPlant Improvements

2019-10-16

$425,000

Tertiary TreatmentReplacement

2020-05-07

2020-07-20

2020-10-21

$3,695,753

2019-11-21

$6,000,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

90 895 New JerseyWater SupplyAuthority

S340421-01

D&R Canal Dredging $56,800,000 - 2017-09-07

Level 2 2017-08-17 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

D + R CanalDredging

2017-10-23

2017-12-20

2018-02-05

$48,555,000

D&R Canal 2017-10-23

-

2018-02-15

$49,548,569 Non-Point Source(NPS) PollutionControls

CW Generic

91 347 New JerseyWater SupplyAuthority

S340421-02

Round Valley ReservoirStructures Refurbishmentand Resource PreservationProject

$86,100,000 - 2019-05-06

Level 1 2018-10-19 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Round Valley ChannelDredging

2019-10-07

2019-05-14

2019-05-28

$1,180,000

North Dam and SouthDam AbutmentGrouting

2018-12-20

2019-04-04

2019-05-08

$5,170,000

Earthen Dam Rehab andAncillary Work

2019-10-07

2019-12-19

2020-01-03

$70,960,000

2020-07-09

$75,000,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

92 284 Newark(JMEUC) City

S340686-08g

Flood Mitigation FacilitiesProject

$2,705,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$250,232

2020-10-28

$2,045,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

93 284 Newark(JMEUC) City

S340686-09E

Capital ImprovementsProjects 2019

$1,363,042 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects2019

2019-06-13

$165,000

2019-07-30

$1,350,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

94 32 Newark City S340815-24

Structural eval & rehab of350 miles of small diametersewers

$21,000,000 - 2015-03-06

Level 1 2018-04-05 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Sewer Rehab -1(A)

2018-05-31

2018-12-20

2019-06-03

$3,740,000

Sewer Rehab -1(B)

2018-12-12

2019-03-12

2019-06-03

$9,445,000

Sewer Rehab. -1(C)

2019-04-16

2020-01-13

2020-02-21

$7,700,000

2019-06-26

$20,000,000 Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

95 21 Newark City S340815-28

South Street and AdamsStreet DrainageImprovements

$6,000,000 - 2019-03-22

Level 1 2019-08-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

South Street and AdamsStreet DrainageImprovements

2019-09-19

2020-02-10

2020-03-02

$4,705,000

2020-06-19

$4,700,474 Combined SewerOverflow (CSO) - GreenInfrastructure

CW Generic

96 49 North BergenMunicipalUtilitiesAuthority

S340652-14

Woodcliff AdditionalImprovements

$28,000,000 - 2016-03-03

Level 2 2017-03-03 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

Woodcliff WWTFUpgrade

2017-05-16

2017-08-03

2017-08-07

$19,900,000

2017-08-29

$19,892,394 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

97 1164 NorthBrunswickTownship

S340888-02

Water Meter Replacement(FKA DW)

$8,000,000 - 2019-01-16

Level 1 2019-02-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water Meter Replacement 2019-03-12

2019-05-14

2019-06-14

$7,000,000

Water Treatment PlantMeter & SCADAIntegration

2019-03-12

2019-06-20

2019-06-20

$690,000

2019-06-21

$5,427,000 Water Efficiency /Water Meters

CW Generic

98 603 North HaledonBorough

S340229-02

Small System AssetManagement Plan

$100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Small System AssetManagement Plan

2017-09-22

$100,000

2018-01-12

$99,966 Sanitary Sewer SystemRehabilitation

CW Generic

99 155 North HudsonSewerAuthority

S340952-30

2017 Adams StreetWastwater Treatment PlantImprovements, PuracSystem Upgrades, Phase 3Physical systemImprovements.

$23,200,000 - 2016-03-04

Exempt 2017-11-16 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

General ConstructionContract

2018-02-06

2018-07-02

2018-08-24

$15,680,000

Air Scours BlowersEquipment

2018-02-06

-

Influent Slide GatesEquipment

2018-02-06

-

Dissolved Air Flotation(DAF)Flo-Filter Processsystem

2018-02-06

2018-10-19

$3,000,000

2018-10-26

$17,500,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

100 155 North HudsonSewerAuthority

S340952-31

Green Infrastructure $547,350 - 2019-02-09

Level 1 2019-03-07 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Green Infrastructure 2020-07-07

2020-12-10

-

Planning andDesign Cost

2020-01-09

$80,000

2 2020-07-07

-

2020-01-09

$547,350 Combined SewerOverflow (CSO) - GreenInfrastructure

101 153 North HudsonSewerAuthority

S340952-33

H6/H7 Long Term ControlPlan Project

$27,000,000 - 2019-07-23

Exempt 2019-07-24 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

H6/H7 Combined SewerOverflow, Long TermControl Plan, Phase I

2019-11-15

2020-08-24

2020-09-17

$26,445,000

2020-10-29

$23,981,208 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

102 144 North HudsonSewerAuthority

S340952-34

2019 Collection SystemImprovements

$1,200,000 - 2019-10-03

Level 1 2020-01-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2019 CollectionSystem Improvements

2020-06-19

2020-09-16

2020-10-08

$1,125,000

2020-10-29

$800,000 Sanitary Sewer SystemRehabilitation

103 1016 North HudsonSewerAuthority

S340952-36

2019 EquipmentPurchases

$900,000 - 2019-10-03

Exempt 2019-10-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

PROCUREMENT OF TRUCKMOUNTED CCTV INSPECTIONEQUIPMENT

2019-11-04

2020-02-21

2020-03-02

$285,000

Procurement of a CombinationSewer Cleaner Truck

2019-11-04

2020-02-21

2020-03-02

$455,000

2020-08-19

$750,000 Equipment Purchase(Clean Water)

104 155 North HudsonSewerAuthority

S345190-01

Combined Sewer LongTerm Control Plan

$6,000,000 - 2015-12-03 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Planning andDesign LTCP

2016-10-27

$3,380,000

2018-10-26

$6,000,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

105 464 NorthwestBergen CountyUtilitiesAuthority

S340700-15

Wastewater Pump StationImprovements

$7,000,000 - 2016-03-04

Level 1 2017-10-17 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Construction Contract No. 1- Wastewater Pump StationImprovements

2017-12-13

2018-05-30

2018-06-18

$6,630,000

2019-02-13

$6,516,744 Sanitary Sewer SystemRehabilitation

CW Generic

106 218 NorthwestBergen CountyUtilitiesAuthority

S340700-16

Wastewater TreatmentPlant Improvements

$4,900,000 - 2016-03-04

Level 1 2017-03-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2016 WastewaterTreatment PlantImprovements

2017-04-05

2018-05-21

2018-06-15

$4,385,000

2019-02-13

$3,900,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

107 464 NorthwestBergen CountyUtilitiesAuthority

S340700-18

Interceptor SystemRehabilitation andPurchase of Equipment

$2,000,000 - 2018-06-13

Exempt 2018-08-02 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Ho-Ho-Kus Trunk SewerEast Rehabilitation

2018-08-02

2018-09-07

2018-10-19

$365,000

Purchase of Equipments 2018-10-29

-

Purchase of Equipment 2018-10-29

-

Purchase of Equipment 2019-03-29

$215,000

Equipment Purchase 2019-03-29

$510,000

2019-02-13

$1,200,000 Sanitary Sewer SystemRehabilitation

108 464 NorthwestBergen CountyUtilitiesAuthority

S340700-19

Interceptor Systemrehabilitation

$8,132,450 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Interceptor SystemRehabilitation

2019-02-13

$105,000

Interceptor SystemRehabilitation

-

2019-02-13

$8,000,000 Sanitary Sewer SystemRehabilitation

CW Generic

Page 5 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 7: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type109 117 Ocean County

UtilitiesAuthority

S340372-59

AW1611 Area WideClarifier Rehabilitation

$7,620,000 - 2018-02-14

Exempt 2017-09-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Ocean County UtilitiesAuthority Area WideClarifier Rehab

2018-04-04

2018-08-13

2018-10-19

$7,620,000

2019-06-30

$6,813,604 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

110 455 Ocean CountyUtilitiesAuthority

S340372-60

SD1821 SI-4 InterceptorRehabilitation MH 12-2 toMH 10-6

$870,000 - 2019-02-08

Exempt 2019-02-13 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

InterceptorRehabilitation

2019-04-09

2019-06-20

2019-06-20

$775,000

2019-06-30

$668,003 Sanitary Sewer SystemRehabilitation

111 114 Ocean CountyUtilitiesAuthority

S340372-61

ND1702 NWPCF InfluentScrew PumpImprovements

$5,300,000 - 2019-11-05

Exempt 2019-09-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Screw PumpImprovements

2020-01-08

2020-05-08

2020-05-13

$4,065,000

2020-09-17

$3,562,913 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

112 114 Ocean CountyUtilitiesAuthority

S340372-62

ND1712 NWPCF ClarifierRehabilitation FC-1 and FC-8

$4,300,000 - 2019-09-25

Exempt 2019-09-30 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

FC-1 & FC-8Clarifier Rehab

2019-10-18

2020-02-05

2020-08-21

$2,680,000

2020-09-17

$2,184,069 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

113 514 OceanTownshipSewerAuthority

S340750-12

Interlaken Pump Stationreconstruction

$4,500,000 $4,000,000 2014-02-28

Level 1 2014-05-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Interlaken Pump StationReconstruction

2018-05-31

2018-09-24

2019-02-13

$4,485,000

Bulkhead at InterlakenPump Station

2015-02-24

-

2019-06-28

$3,500,000 DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

114 511 OceanTownshipSewerAuthority

S340750-13

2016 Collection SystemImprovements

$550,000 - 2016-03-04

Level 1 2016-05-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2016 Collection SystemImprovement

2017-01-10

2017-03-27

2017-04-10

$550,000

2017-06-01

$522,805 Sanitary Sewer SystemRehabilitation

CW Generic

115 474 Old BridgeMunicipalUtilitiesAuthority

S340945-14

2015 Sewage PumpStation Upgrades

$3,600,000 - 2015-12-22

Level 1 2016-06-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2015 Sewage PumpStation Upgrades

2017-12-07

2018-07-10

2018-10-19

$3,290,000

2019-06-25

$3,290,000 Sanitary Sewer SystemRehabilitation

CW Generic

116 207 Passaic ValleySewerageCommission

S340689-30

Sump Pump Relocation $3,700,000 $2,500,000 2015-03-05

Level 1 2015-10-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Relocate SumpPumps/InstallGenerators

2016-08-03

2016-12-05

2017-04-10

$1,580,000

2018-01-23

$2,478,251 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

117 207 Passaic ValleySewerageCommission

S340689-32

Plant wide improvment toincrease wet weathertreatment capacity

$10,000,000 - 2015-03-05

Level 1 2017-03-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

B061 Newark Bay CSOOutfall Dechlorination

2017-04-12

2017-08-02

2017-08-07

$8,000,000

2018-01-23

$7,772,364 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

118 191 Passaic ValleySewerageCommission

S340689-37

Substation "M"Replacement andHeadworks ReconstructionProject (increased scopefrom 689-47)

$121,500,000 - 2016-03-04

Level 1 2016-10-12 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Substation "M"Replacement andHeadworksReconstruction Project

2019-02-28

2020-10-07

2020-10-29

$119,065,000

2020-12-29

$120,269,892 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

119 199 Passaic ValleySewerageCommission

S340689-38

Final Clarifier ConcreteRehabilitation Project

$21,500,000 - 2016-03-04

Exempt 2016-05-06 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Final Clarifier ConcreteRehabilitation Project

2016-09-12

2017-05-17

2017-06-05

$20,970,000

2018-01-23

$19,618,381 Sewage TreatmentPlant (STP) - New

CSO -AbatementProjects

120 199 Passaic ValleySewerageCommission

S340689-40

Plant wide Replacement &Relocation of ElectricalSwitchgear and MCCs

$123,300,000 - 2016-03-04

Level 1 2016-10-12 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

PlantReplacement/Relocationof Equipment

2017-05-18

2017-10-23

2017-12-13

$31,995,000

2018-01-23

$13,217,254 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

121 686 Passaic ValleySewerageCommission

S340689-45

Sludge StorageImprovements

$10,210,102 - 2018-10-11

Level 1 2019-02-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sludge StorageImprovements

2019-03-20

2019-05-28

2019-06-20

$6,475,000

2019-11-07

$6,059,402 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

122 191 Passaic ValleySewerageCommission

S340689-48

Crane Procurement $900,410 - 2019-07-30

Exempt 2019-08-13 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

CraneProcurement

2019-11-06

$785,000

2019-11-07

$780,670 Equipment Purchase(Clean Water)

CW Generic

123 199 Passaic ValleySewerageCommission

S345200-01

Combined Sewer OverflowLong Term ControlPlanning

$9,500,000 - 2016-03-04 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Planning andDesign

2016-07-26

$7,547,516

LTCP P&D#2 2020-11-30

$1,270,000

2016-10-06

$8,000,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

124 199 Passaic ValleySewerageCommission

S345200-02

Asset Management Plan $2,000,000 - 2016-03-04 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

AssetManagement Plan

2017-07-25

$643,446

2018-01-23

$649,880 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

125 56 Paterson City S340850-03-1

Change Order 2 CSO 029Solids and FloatablesControl

$2,550,000 - 2019-08-21

Undetermined 1998-12-17

ContractName

ATAdvActual

ATAwdActual Cert Date

CertAmount

ChangeOrder

2020-02-04

$2,400,000

2020-07-08

$2,458,630 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CWSupplemental

126 978 PaulsboroBorough

S340164-01

Replace storm sewer alongThomson & Wood Aves.

$2,750,000 - 2015-03-06

Level 1 2015-05-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Storm Sewer & Mainreplacement

2016-10-25

2017-07-06

2018-01-11

$2,385,000

2018-10-23

$2,209,814 StormwaterManagement - GrayInfrastructure

CW Generic

127 168 Perth AmboyCity

S340435-11

Replace pumps, relocateelect equip, to improveresiliency

$6,459,351 - 2015-03-05

Exempt 2015-05-15 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

PumpReplacement

2017-01-23

2017-04-10

2017-04-27

$3,460,000

2019-06-20

$350,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

128 168 Perth AmboyCity

S340435-14

CSO Separation (PulaskiAve / Parker St / State St)

$2,608,000 - 2016-03-04

Level 1 2016-11-04 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer (CSO)Separation Project

2018-12-19

2019-08-14

2019-09-23

$2,000,000

2020-10-21

$2,172,015 Combined SewerOverflow (CSO) - GreenInfrastructure

CSO - GreenInfrastructure

129 168 Perth AmboyCity

S345220-01

CSO Permit Developmentof Long Term Control Plan

$1,000,000 - 2016-03-04

UndeterminedContract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Planning andDesign

2017-06-05

$670,000

2019-06-20

$665,156 Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

130 724 PlumstedTownship

S340607-03

Advanced WW treatment &collection system

$34,000,000 - 2017-03-02

Level 2 2017-08-23 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Plumsted WWTP andCollection System

2017-11-21

2015-10-25

$1,250,000

Plumsted CollectionSystem

2018-11-08

2019-01-11

2019-02-13

$15,670,000

Plumsted WWTP 2018-12-13

2020-06-03

$11,625,000

2019-06-19

$25,000,000 Sanitary Sewer System- New

CW Generic

131 1175 Point PleasantBeach Borough

S340479-04

Water Meter ReplacementProject (FKA DW)

$1,930,000 - 2018-10-11

Exempt 2017-08-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MeterReplacement Project

2019-02-07

2019-03-13

2019-04-24

$1,450,000

2019-05-15

$1,540,650 Equipment Purchase(Clean Water)

CW Generic

132 341 Point PleasantBeach Borough

S344190-02

Little Silver Lake DrainageImprov. Project

$3,150,000 - 2015-03-19

Level 2 2015-12-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Little Silver LakeDrainageImprovements

2017-08-23

2017-11-22

2017-12-18

$3,110,000

2018-02-16

$2,995,000 StormwaterManagement - GrayInfrastructure

Barnegat Bay

133 12 Rahway ValleySewerageAuthority

S340547-14

Replace existing digestertank covers & mixers;replacing gas flares

$9,500,000 - 2015-03-06

Level 1 2015-06-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Digester Replacement& gas flares

2017-03-15

2017-07-12

2017-07-25

$4,880,000

2017-12-19

$4,210,947 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

134 15 Rahway ValleySewerageAuthority

S340547-15

Trucked-in Waste ReceivingStation

$2,588,518 - 2017-03-16

Level 1 2017-03-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Waste Management ofNew Jersey, Inc.

2017-10-04

2017-10-04

2017-12-18

$2,260,000

2018-04-17

$2,356,560 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

135 252 RaritanTownshipMunicipalUtilitiesAuthority

S340485-12

Main Treatment PlantImprovements 2016

$4,900,000 - 2016-02-25

Level 1 2016-08-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Main Treatment PlantImprovements 2016

2018-05-30

2018-08-30

2018-10-19

$4,350,000

2019-05-15

$3,904,852 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

136 447 RockawayValley RegionalSewerAuthority

S340821-06-1

Supplemental Loan for OldJersey Trunk SewerReplacement (S340821-06)

$775,000 - Level 2 2012-12-24 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

SupplementalLoan

2019-06-13

$700,000

2019-06-24

$738,042 Sanitary Sewer SystemRehabilitation

CWSupplemental

Page 6 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 8: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type137 327 Rockaway

Valley RegionalSewerAuthority

S340821-07

Rehab & enhancement offour existing final clarifiers

$8,200,000 - 2016-03-03

Level 1 2016-08-09 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Final ClarifiersUpgrade

2016-09-12

2017-07-19

2017-07-25

$7,590,000

2017-09-08

$7,483,999 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

138 284 Roselle Park(JMEUC)Borough

S340686-08h

Flood Mitigation Project(JMEUC)

$905,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$71,257

2020-10-28

$650,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

139 310 Rutgers, TheState Universityof New Jersey

S340500-01

Busch Cogeneration PlantUpgrade

$37,000,000 - 2019-10-25

Exempt 2019-10-18 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Busch CogenerationPlant Upgrade DESIGNBUILD RFP

2019-10-30

2019-12-18

$37,000,000

P&D A/E Agreement 2019-05-28

$370,000

2019-06-17

$37,000,000 Energy Efficiency /Renewable Energy

CW Generic

140 1143 Salem CountyImprovementAuthority

S342022-02

Cell 10 Construction $8,500,000 - 2019-08-20

Level 1 2019-11-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Landfill Expansion - Cell10 Construction

2020-03-04

2020-05-08

2020-05-13

$6,890,000

SCIA P& D Services 2020-02-18

$310,000

2020-02-19

$8,500,000 Landfill Construction CW Generic

141 1177 Ship BottomBorough

S340311-04

Residential Water MeterProject

$2,750,000 - 2019-08-14

Exempt 2019-03-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Residential WaterMeter Project

2019-08-20

2019-10-23

2019-12-18

$600,000

Procurement of MeterPits

2020-10-30

-

Installation of WaterMeters

2020-10-30

-

2020-02-14

$2,400,000 Water Efficiency /Water Meters

CW Generic

142 182 SomersetRaritan ValleySewerAuthority

S340801-07

Stormwater Control Facilityto eliminate sewagedischarge

$34,000,000 - 2016-03-03

Level 2 2016-12-16 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

Storm ControlFacility

2019-01-22

2019-06-19

2019-04-24

$29,025,000

2019-06-25

$33,000,000 Sewage TreatmentPlant (STP) - New

CW Generic

143 181 SomersetRaritan ValleySewerAuthority

S340801-09

WWTP RehabilitationImprovements (SFY2019)

$6,500,000 - 2019-04-11

Level 1 2019-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Plantwide ElectricalRehabilitation Project

2019-06-13

2019-10-02

2019-10-16

$5,640,000

2020-01-17

$5,144,453 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

144 1126 SomervilleBorough

S342013-01-1

Green Seam Phase IIGround Water Treatment

$1,850,000 - 2020-05-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Green Seam Phase IIGround Water Treatment

2020-03-02

$1,850,000

2020-10-27

$808,710 RemedialAction/ContaminatedSite Cleanups(Brownfields)

CW Generic

145 492 SouthMonmouthRegional SewerAuthority

S340377-04A

Pitney Pump StationImprovements

$6,981,600 $1,600,000 2015-03-13

Level 1 2014-05-23 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Pitney Ave PSRehab

2014-09-08

$1,554,869

2014-09-23

$1,532,225 Sanitary Sewer SystemRehabilitation

CW Generic

146 284 South OrangeVillage(JMEUC)Township

S340686-08i

Flood Mitigation FacilitiesProject

$1,305,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$111,408

2020-10-28

$960,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

147 284 South OrangeVillage(JMEUC)Township

S340686-09F

Capital ImprovementsProjects 2019

$650,806 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering planning &Design Capital Projects 2019

2019-06-13

$75,000

2019-07-30

$645,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

148 969 SpotswoodBorough

S340510-01

Roadway, StormwaterManagement and SanitarySewer SystemImprovements

$5,427,000 - 2018-09-28

Level 1 2018-09-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Cottage Streets AreaInfrastructureImprovements

2019-05-02

2019-07-31

2019-09-23

$2,150,000

2019-10-24

$1,987,954 StormwaterManagement - GrayInfrastructure

CW Generic

149 284 Summit(JMEUC) City

S340686-08j

Flood Mitigation Project(JMEUC)

$2,375,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$217,237

2020-10-28

$1,790,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

150 284 Summit(JMEUC) City

S340686-09G

Capital ImprovementsProjects 2019

$1,186,322 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital projects

2019-06-13

$145,000

2019-07-30

$1,175,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

151 1044 Sussex CountyMunicipalUtilitiesAuthority

S342008-04

SCMUA Leachate PumpStation/Force Main Project

$8,400,000 - 2019-09-23

Level 2 2020-05-07 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Contractfor Pump Station & ForceMain

2018-10-19

$660,000

Leachate Pump Station &Force main

2020-06-18

2020-08-11

2020-08-21

$6,735,000

2020-08-27

$7,479,947 Sanitary Sewer System- New

CW Generic

152 451 Toms RiverMunicipalUtilitiesAuthority

S340145-05

Sanitary SewerRehabilitation

$4,500,000 - 2019-04-12

Level 1 2019-09-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer and ManholeRehabilitations

2019-12-31

2020-06-15

2020-06-19

$900,000

Sanitary Sewer Pipe (Digand Replace) RehabilitationProject

2019-12-31

2020-06-15

2020-06-19

$1,370,000

Windsor Ave. EmergencyRepair

2020-05-07

$2,000,000

2020-06-22

$3,100,000 Sanitary Sewer SystemRehabilitation

153 460 Two RiversWaterReclamationAuthority

S340117-10

New Main Pump Station $75,000,000 - 2020-09-18

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Pleasure Bay Crossing &Main PS Replacement P/D

2020-01-09

$2,955,000

Pleasure Bay Crossing &Main PS Replacement

-

2020-04-01

$75,000,000 Sanitary Sewer SystemRehabilitation

154 284 Union (JMEUC)Township

S340686-08k

Flood Mitigation FacilitiesProject

$4,885,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$466,909

2020-10-28

$3,735,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

155 284 Union (JMEUC)Township

S340686-09H

Capital ImprovementsProjects 2019

$2,449,335 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects2019

2019-06-13

$310,000

2019-07-30

$2,425,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

156 1168 UniversityHospital

S340500-03

Univeristy Hospital CoGeneration Plant

$7,800,000 - 2019-10-30

Exempt 2019-10-11 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

University Hospital CoGeneration Plant DesignBuild Auth to ExecDocumentation

-

University Hospital Co-generation Plant P&D

2019-11-27

$890,000

University Hospital CoGeneration Plant DesignBuild Auth to ConstructDocumentation

2021-01-11

$6,525,000

2019-12-04

$7,380,000 Energy Efficiency /Renewable Energy

Base CWSRF

157 387 VernonTownship

S340745-03

Asset Management Plan $110,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Vernon Twp AssetManagement

2018-06-18

$105,000

2018-09-18

$100,000 Sanitary Sewer SystemRehabilitation

CW Generic

158 563 WarrenTownshipSewerageAuthority

S340964-05

Stage I/II, IV CollectionSystem Rehabilitation

$10,800,000 - 2018-09-12

Exempt 2018-11-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WTSA Stage I/IICollection SystemRehab

2018-12-04

2019-01-24

2019-06-13

$1,500,000

WTSA Stage IVCollection SystemRehab

2019-06-26

2019-08-28

2019-10-16

$1,160,000

2020-01-16

$3,000,000 Sanitary Sewer SystemRehabilitation

159 537 West DeptfordTownship

S340947-05

Replacement of PumpStations 4 and 6

$1,415,000 - 2016-03-04

Level 1 2016-12-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Replacement of PS4and PS6

2017-01-30

2018-08-27

2018-10-31

$1,415,000

2018-10-31

$1,400,000 Sanitary Sewer SystemRehabilitation

CW Generic

Page 7 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 9: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type160 284 West Orange

(JMEUC)Township

S340686-08l

Flood Mitigation FacilitiesProject

$3,170,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-22

$296,027

2020-10-28

$2,405,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

161 284 West Orange(JMEUC)Township

S340686-09I

Capital ImprovementsProjects 2019

$1,585,429 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Planning &Design Capital Projects2019

2019-06-13

$200,000

2019-07-30

$1,570,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade

162 472 WesternMonmouthUtilitiesAuthority

S340128-05

Route 79 Pump Stationand Force MainReplacement

$7,850,000 - 2016-03-03

Level 1 2017-01-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Route 79 PS and FMreconstruction

2018-10-11

2018-12-04

2019-04-24

$7,830,000

2019-06-28

$6,480,000 Sanitary Sewer SystemRehabilitation

CW Generic

163 330 WesternMonmouthUtilitiesAuthority

S340128-06

Pine Brook SewageTreatment PlantImprovements

$13,100,000 - 2016-03-03

Level 1 2017-01-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Construction Contract No. 1- Raw Sewage Pump StationImprovements

2017-06-06

2017-10-10

2018-02-08

$3,985,000

Construction Contract No. 2- Concrete Equalization TankNo. 3

2018-06-27

2018-11-20

2019-01-03

$9,175,000

2019-06-28

$12,843,750 Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

164 340 Wildwood City S340664-06

2019 CapitalImprovements

$15,713,010 - 2019-10-15

Level 1 2020-02-06 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2019 CapitalImrpovements

2020-02-27

2020-05-22

2020-06-03

$710,000

2019 CapitalImprovement ProgramPhase 2A

-

2020-09-29

$1,395,000 Sanitary Sewer SystemRehabilitation

165 685 WillingboroMunicipalUtilitiesAuthority

S340132-10

Energy SavingsImprovement Program

$18,200,000 -Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Planning andDesign

2020-12-24

$3,540,000

2021-01-07

$18,200,000 SludgeTreatment/DisposalFacilities

166 1150 WillingboroMunicipalUtilitiesAuthority

S340132-11

Water Meter InfrastructureProject

$10,000,000 - 2019-07-19

Exempt 2019-08-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Purchase of WaterMeters

2019-10-11

2020-04-02

2020-09-04

$3,470,000

Replacement ofWater Meters

2020-10-09

2020-11-30

$2,705,000

2020-12-15

$7,950,000 Water Efficiency /Water Meters

167 433 Atlantic CountyUtilitiesAuthority

S340809-29

Replace a portion ofBrigantine Force Main

$4,000,000 - 2015-03-05

Level 1 2016-02-11 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Brigantine FMReplacement

2020-03-31

2020-08-18

2020-09-15

$2,330,000

- Sanitary Sewer SystemRehabilitation

CW Generic

168 93 Bayonne City S340399-31

STORMWATERMANAGEMENTFACILITIES AND FRANCISG. FITZPATRICK PARKIMPROVEMENTS

$1,618,539 - 2019-12-11

Level 2 2019-09-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

STORMWATERMANAGEMENT FACILITIESAND FRANCIS G.FITZPATRICK PARKIMPROVEMENTS ProjectCounty: Hudson

2019-12-13

2020-09-24

2020-10-21

$2,110,000

- StormwaterManagement - GrayInfrastructure

CW Generic

169 529 BurlingtonTownship

S340712-17

Sanitary SewerRehabilitation in VariousLocations

$1,000,000 - 2019-06-17

Exempt 2019-06-20 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Sanitary SewerRehabilitation

2020-03-04

2020-07-30

2020-08-21

$875,000

- Sanitary Sewer SystemRehabilitation

170 38 Camden City S340366-15

Rehabilitation of CombinedSewer Regulator Chambers

$13,330,000 - 2017-03-22

Exempt 2018-08-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehabilitation ofCombined SewerRegulators

2020-07-10

2019-06-03

$4,475,000

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

171 684 FieldsboroBorough

S340522-01

Sewer @ Stormwater AssetManagement plan

$150,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Engineering Servicesfor AMP

2019-06-14

$115,000

- Sanitary Sewer SystemRehabilitation

CW Generic

172 58 HopatcongBorough

S340488-08

Hudson Avenue SanitarySewer Installation

$600,000 - 2019-11-14

Level 2 2020-05-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Hudson Avenue SanitarySewer Installation

2020-08-25

2020-10-26

2020-12-02

$600,000

- Sanitary Sewer System- New

173 1108 Jersey CityMunicipalUtilitiesAuthority

S340928-32

Remote Water MeterReading (AMI) (FKA DW)

$12,300,000 - 2018-08-07

Exempt 2016-09-22 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

Water MeterContract

2019-10-15

2020-04-22

2020-06-04

$12,245,000

- Water Efficiency /Water Meters

174 284 Joint Meetingof Essex &Union Counties

S340686-08

Flood Mitigation FacilitiesProject

$101,231,766 - 2020-06-01

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Wastewater Treatment Plant(Effluent Pumping Station)

-

Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station

2020-10-01

$3,725,000

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

175 852 MantuaTownshipMUA

S340514-02

Barnsboro SewerExtension

$2,250,000 - 2019-06-18

Level 2 2019-07-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Barnsboro Pump StationContract 1 of 2

2019-09-17

2020-09-23

2020-10-08

$818,574

Barnsboro Gravity CollectionSystem/Force Main Bid B1and B2

2020-06-02

2020-09-23

2020-10-08

$1,226,426

- Sanitary Sewer System- New

CW Generic

176 500 Mount LaurelTownshipMunicipalUtilitiesAuthority

S340943-07

Sewer SystemImprovement Project(Bundle 2)

$3,200,000 - 2019-10-02

Level 1 2019-12-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Replacement of Briggs Rdand Library Pump StationForce Main Connections

2020-02-28

2020-05-14

2020-05-28

$1,100,000

- Sanitary Sewer SystemRehabilitation

177 382 NetcongBorough

S340538-01

Sewer System AssetManagement Plan

$100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer System AssetManagement Plan

2020-06-04

$96,000

- Sanitary Sewer SystemRehabilitation

CW AssetManagementPlanDevelopment(Small System )

178 114 Ocean CountyUtilitiesAuthority

S340372-63

ND1811 NWPCF SolidsHandling Facility RoofReplacement

$2,200,000 - 2020-02-13

Exempt 2020-05-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

ND1811 NWPCF SolidsHandling Facility RoofReplacement

2020-05-22

2020-10-02

2020-10-29

$2,185,000

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

179 199 Passaic ValleySewerageCommission

S340689-23

Standby Power GeneratingFacility

$183,500,000 - 2016-03-04

Level 1 2017-05-31 Contract Name

ATAdvActual

ATAwdActual Cert Date Cert Amount

Planning andDesign

2017-07-25

$4,735,000

Site Prep 2018-12-11

2019-04-01

2019-06-18

$7,328,000

EquipmentPurchase

2018-07-05

2019-06-17

2019-06-18

$68,617,000

Installation ofEquipment

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

180 206 Passaic ValleySewerageCommission

S340689-49

PVSC Perimeter Flood Wall,Storm Water CollectionSys. & Pumping Stations(Merged (S340689-41,42,43)

$296,136,901 - 2016-03-04

Exempt 2017-05-31 Contract Name

ATAdvActual

ATAwdActual

CertDate Cert Amount

Perimeter Flood Wall,Storm Water CollectionSystem & PumpingStations

2019-08-01

2020-02-04

2020-02-21

$278,440,000

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

181 688 Passaic ValleySewerageCommission

S340689-54

5th Thickening CentrifugeProject

$15,523,844 - Level 1 2020-10-22 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

EquipmentProcurement

2020-12-15

$5,645,000

Installation -

- SludgeTreatment/DisposalFacilities

CW Generic

182 577 PennsvilleSewerageAuthority

S340870-04

Pumping Station No. 3Force Main Replacement

$1,600,000 - 2020-06-22

Level 1 2020-10-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Pumping Station No. 3Force Main Replacement

2020-10-07

2020-12-14

2021-01-11

$735,000

- Sanitary Sewer SystemRehabilitation

CW Generic

183 558 Princeton S340656-11

Improvements to LindenLane and Spruce Street

$3,925,678 - Level 1 2018-10-09 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Improvements to LindenLane and Spruce Street

2019-02-20

2019-05-14

2019-06-03

$1,875,000

- Sanitary Sewer SystemRehabilitation

Page 8 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 10: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type184 578 Red Bank

BoroughS340528-01

White Street Water & SewerImprovements

$1,500,000 - 2019-10-08

Level 1 2019-09-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

White Street Water & SewerImprovements

2020-03-03

2020-04-09

2020-06-03

$430,000

1 of 1 Broad Street SanitarySewer Improvements

-

- Sanitary Sewer SystemRehabilitation

CW Generic

185 164 RiversideSewerageAuthority

S340490-01

Riverside SewerageAuthority Primary DigesterMixing System

$840,000 - 2016-03-04

Exempt 2016-08-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Primary DigesterMixing System

2017-02-27

2017-06-27

2017-07-25

$840,000

- SludgeTreatment/DisposalFacilities

CW Generic

186 526 Scotch PlainsTownship

S340512-01

Sewer Pump StationUpgrades

$2,700,000 - 2019-08-26

Exempt 2019-09-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer PumpStation ImprovementsProject

2019-11-22

2020-02-13

2020-04-15

$2,310,000

- Sanitary Sewer SystemRehabilitation

187 679 Ship BottomBorough

S340311-05

Sewer Main ReplacementProject

$5,000,000 - 2020-03-31

Level 1 2020-06-15 Contract Name

ATAdvActual

ATAwdActual Cert Date

CertAmount

Sewer MainReplacement

2020-06-18

2020-08-11

2020-08-21

$5,000,000

- Sanitary Sewer SystemRehabilitation

CW Generic

188 261 StaffordTownship

S344100-03

Neptune Basin Expansion $5,600,000 $5,600,000 2015-03-23

Level 2 2013-11-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2014 Neptune BasinExpansion

2016-06-16

2016-08-22

2016-09-16

$5,253,349

- StormwaterManagement - GrayInfrastructure

Barnegat Bay

189 315 WillingboroMunicipalUtilitiesAuthority

S340132-09

Water Pollution ControlPlant-Installation ofScreening and Grit RemovalEquipment

$9,000,000 - 2019-12-10

Level 1 2020-01-09 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water Pollution Control Plant-Installation of Screening andGrit Removal Equipment

2020-04-03

2020-09-24

2020-10-29

$6,780,000

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

190 504 WinslowTownship

S340895-10

Various Sanitary SewerSystem Rehab

$1,700,000 - 2017-10-26

Level 1 2018-07-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Asbury Place - Pipe Lining 2019-07-09

2019-10-07

2020-08-25

$76,151

Lehigh Manor Drive - PipeLining

2019-07-09

2019-10-07

2020-08-25

$331,806

Primrose Gate Drive 2019-07-09

2019-10-07

2020-08-25

$326,350

Eastmont Lane - PipeReplacement

2019-07-09

2019-12-11

2020-08-25

$74,017

Evergreen Avenue - PipeReplacement

2019-07-09

2020-08-03

2020-08-25

$130,885

South Cedarbrook Road -Manhole replacement

2019-07-09

2019-12-11

2020-08-25

$159,327

Thousand Oaks Drive -Manhole Replacement

2019-07-09

2019-12-11

2020-08-25

$101,464

- Sanitary Sewer SystemRehabilitation

CW Generic

191 843 LowerTownshipMunicipalUtilitiesAuthority

S340810-05

LTMUA Collection SystemExpansion

$17,100,000 - 2020-12-17

Level 2 2020-09-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

EquipmentProcurement

2020-11-13

2021-01-06

-

Construction ofVacuum System

-

- Sanitary Sewer System- New

CW Generic

192 459 Two RiversWaterReclamationAuthority

S340117-09

Interceptor and PumpStation Improvements

$4,000,000 - 2019-10-01

Exempt 2020-07-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Interceptor RehabContract 169A

2020-08-14

-

Pump StationImprovements

2020-08-18

2020-12-03

-

- Sanitary Sewer SystemRehabilitation

193 437 Atlantic CountyUtilitiesAuthority

S340809-30

Ventnor-MargateForcemain Replacement -Phase 1

$10,100,000 - 2019-05-31

Level 1 2020-02-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Ventnor-Margate Force mainReplacement - Phase 1B

2020-08-28

-

Emergency - Bader Field -Phase 1A

2020-04-20

-

- Sanitary Sewer SystemRehabilitation

CW Generic

194 501 BerkeleyTownshipSewerAuthority

S340969-14

Bayview Ave. Force MainReplacement

$3,000,000 - 2020-10-19

Level 1 2020-09-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Bayview Ave. Force MainReplacement

2021-01-12

-

- Sanitary Sewer SystemRehabilitation

CW Generic

195 38 Camden City S340366-07

2014 Sanitary/CombinedSewer Rehab /Replacement Project

$59,000,000 - 2016-03-02

Level 1 2018-03-26 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2014 Sanitary/Combined SewerReconstruction Project Contract A

2018-11-29

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

196 1115 Camden City S340366-16

New Auto Meter ReadingEquip for entire City (FKADW)

$1,800,000 - 2018-08-08

Exempt 2018-04-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Advanced MeteringInfrastructure

2018-10-19

-

Furnishing and Delivery ofCold Water Meters

2018-10-19

-

- Water Efficiency /Water Meters

CW Generic

197 272 EveshamMunicipalUtilitiesAuthority

S340838-09

Elmwood WWTP ResiliencyImprovements

$400,000 - 2020-02-18

Exempt 2019-10-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Elmwood WWTP ResiliencyImprovements

2020-10-20

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

198 477 FranklinTownshipSewerageAuthority

S340839-09

Marcy Street Sanitary SewerRehab

$7,500,000 - 2020-06-17

Exempt 2019-10-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Marcy Street SanitarySewer Rehab

2020-10-20

-

- Sanitary Sewer SystemRehabilitation

199 96 Kearny Town S340259-11

Dukes St StormwaterPump Station

$17,000,000 - 2015-03-06

Level 1 2020-09-02 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Stormwater PumpStation

2020-12-10

-

- StormwaterManagement - GrayInfrastructure

CSO -AbatementProjects

200 21 Newark City S340815-25

Green Infrastructure for theSewer System

$475,000 - 2015-03-06

Level 1 2015-07-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer Rehab (GreenInfrastructure)

2018-11-05

-

- StormwaterManagement - GreenInfrastructure

CSO - GreenInfrastructure

201 207 Passaic ValleySewerageCommission

S340689-33

Weatherproof tunnellocations incl HVAC forventilation

$107,000,000 - 2015-03-06

Level 1 2015-10-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WWTPImprovements

2020-12-23

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

202 686 Passaic ValleySewerageCommission

S340689-46

Decant FacilityImprovements Project

$96,000,000 - 2019-08-14

Level 1 2019-10-11 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Decant FacilityImprovements Project

2019-10-24

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

203 248 Passaic ValleySewerageCommission

S340689-50

Improvements to theVehicle MaintenanceBuilding

$7,348,000 - 2019-08-20

Level 1 2020-08-25 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Improvements to the VehicleMaintenance Building

2021-01-07

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

204 558 Princeton S340656-12

Improvements to BankStreet

$1,871,602 - 2019-10-28

Level 1 2019-08-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Improvements toBank Street

2020-04-03

-

- Sanitary Sewer SystemRehabilitation

205 327 RockawayValley RegionalSewerAuthority

S340821-08

Upgrades for compliancewith effleunt limitation forphosphorus w/ addition ofchem storage & feed syst,implement add'tl SCADAimprovements to enhancemonitoring & control

$15,500,000 - 2019-07-11

Level 1 2020-03-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phosphorus removal & plantupgrades, filtration facilities

2020-08-27

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

206 677 Seaside ParkBorough

S340083-04

Phase III A Sanitary SewerReplacement

$4,000,000 - 2020-04-17

Level 1 2020-07-09 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase III Sanitary SewerReplacement

2020-10-22

-

- Sanitary Sewer SystemRehabilitation

207 373 StaffordTownship

S340946-07

Beach Haven West SewerRehab

$5,000,000 - 2020-05-07

Level 1 2020-09-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Beach Haven West SewerRehabiliation

2020-10-22

-

- Sanitary Sewer SystemRehabilitation

208 267 Stony BrookRegional SewerAuthority

S340400-11

Contract 19-2: River RoadWastewater TreatmentPlant UV Disinfection andEffluent Filtration Project

$22,000,000 - 2020-02-25

Level 1 2019-11-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

River Road Wastewater TreatmentPlant UV Disinfection and EffluentFiltration Project

2020-09-11

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

Page 9 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 11: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type209 1139 Sussex County

MunicipalUtilitiesAuthority

S342008-06

Landfill Life Stage 2Expansion/InfratstructureRelocation Project

$43,000,000 - Level 1 2020-11-23 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Stage 2Expansion

2021-01-13

-

- Landfill Construction CW Generic

210 1171 West DeptfordTownship

S340947-06

Water Meter ReplacementProject (FKA DW)

$3,800,000 - 2019-10-17

Exempt 2019-08-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MeterReplacement

2020-10-21

-

- Water Efficiency /Water Meters

211 442 WoodbridgeTownship

S340433-11

Control of Odors andCorrosion in the PortReading Interceptor

$15,300,000 - 2020-06-15

Level 1 2018-11-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Control of Odors and Corrosionin the Port Reading Interceptor

2020-09-01

-

- Sanitary Sewer SystemRehabilitation

CW Generic

212 1120 Atlantic CityMunicipalUtilitiesAuthority

S340439-04

Water Meter and MTUReplacement

$3,066,667 - 2019-10-31

Exempt 2019-12-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water Meter -Automatic Meter Reading (AMR)and Meter Transmission Units(MTU)

-

- Water Efficiency /Water Meters

213 1040 Atlantic CountyUtilitiesAuthority

S342001-03

MSE Berm Construction $36,042,396 - 2020-09-11

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

MSE Berm ConstructionPhase 2

-

MSE Berm ConstructionPhase 3

-

- Landfill Construction CW Generic

214 224 Beach HavenBorough

S344220-01

SFY2018 StormwaterPump and Drainage Project

$2,038,640 - 2020-12-23

Level 1 - StormwaterManagement - GrayInfrastructure

215 234 Bergen CountyUtilitiesAuthority

S340386-16

Plant-wide Improvements $42,000,000 - Level 1 - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

216 264 BerkeleyTownship

S344020-02

Water Quality RetentionBasin at Moorage Park

$905,063 - Level 1 - StormwaterManagement - GrayInfrastructure

Barnegat Bay

217 461 Brick TownshipMunicipalUtilitiesAuthority

S340448-12

Sanitary Sewer ManholeRehabilitation andReplacement

$4,824,000 - Level 1 2018-09-13

- Sanitary Sewer SystemRehabilitation

218 461 Brick TownshipMunicipalUtilitiesAuthority

S340448-13

Sanitary Sewer MainReplacement on CartagenaDrive, Alhama Drive, CadizDrive, Valencia Drive andMonterey Drive

$4,060,000 - 2019-08-20

Level 1 2019-10-11 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Cartagena Drive SanitarySewer Replacement

-

- Sanitary Sewer System- New

219 595 Brigantine City S340827-04

Emergency Generators $3,300,000 - 2015-03-17

Level 1 2014-08-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

EmergencyGenerators

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

220 959 Brigantine City S340827-06

Municipal SystemImprovements

$1,001,066 - 2015-03-17

Level 1 2015-05-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Municipal StormwaterSystem Improvements

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

221 38 Camden City S340366-12

Cooper Street PumpStation

$2,300,000 - 2016-03-01

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Camden Cooper stPump Station

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

222 38 Camden City S340366-14

Rehabilitation of Combinedand Storm Sewer Outfalls

$9,370,000 - 2018-11-20

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Separate Stormwater SewerOutfalls Maintenance andRehabilitation

-

Combined Sewer OutfallsMaintenance and Rehabilitation

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

223 3 CamdenCountyMunicipalUtilitiesAuthority

S340640-19

Camden City Green andGrey Infrastructure Project -Phase 4

$11,500,000 - 2016-03-04

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Camden City Combined SewerReplacement ---Phase 6

-

Installation of StormwaterPlanters For Creation of a GreenStreet

-

Construction Management forGreen and Grey Infrastructure

-

- Combined SewerOverflow (CSO) - GreenInfrastructure

CSO - GreenInfrastructure

224 28 CamdenCountyMunicipalUtilitiesAuthority

S340640-29

Delaware #1 WPCF Pipingand Treatment Upgrades

$11,300,000 - 2020-06-04

Exempt 2020-11-04 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Delaware #1 WPCF Piping andTreatment Upgrades

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

225 430 CamdenCountyMunicipalUtilitiesAuthority

S340640-30

CCMUA Pump StationElectrical Upgrades

$7,500,000 - 2020-06-23

Level 1 2020-08-25 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

CCMUA Pump StationElectrical Upgrades

-

- Sanitary Sewer SystemRehabilitation

Base CWSRF

226 605 Carneys PointSewerageAuthority

S340502-08

LAFAYETTE ROADSANITARY SEWER

$1,057,203 - Level 1 2019-03-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lafayette RoadSanitary sewer

-

- Sanitary Sewer SystemRehabilitation

CW Generic

227 103 Carneys PointSewerageAuthority

S340502-09

UV Disinfection & FilterSystem Improvements

$1,497,445 - Exempt 2019-02-28

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

228 136 Cliffside ParkBorough

S340847-04

Combined SewerSeparation

$5,300,000 - 2015-03-06

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Combined SewerSeparation

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

229 416 CollingswoodBorough

S340291-04

harrison avenue areasanitary sewerimprovements

$800,000 - Level 1 - Sanitary Sewer SystemRehabilitation

230 1135 CumberlandCountyImprovementAuthority

S342015-04

Side Slope Restoration andStorm Water Management

$5,919,704 - Level 1 - Landfill Construction CW Generic

231 537 DeptfordTownshipMunicipalUtilitiesAuthority

S340066-03

Sanitary SewerRehabilitation at CountryClub Estates

$1,000,000 - 2019-12-06

Level 1 2020-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer Rehabilitation atCountry Club Estates

-

- Sanitary Sewer SystemRehabilitation

232 537 DeptfordTownshipMunicipalUtilitiesAuthority

S340066-04

Sanitary SewerRehabilitation at EastWoodbury

$700,000 - 2019-12-06

Level 1 2020-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer Rehabilitationat East Woodbury

-

- Sanitary Sewer SystemRehabilitation

233 894 DunellenBorough

S340916-03

Borough of Dunellen FloodMitigation Project

$2,599,998 - 2018-08-29

Level 1 2018-09-18 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Borough of Dunellen FloodMitigation Project

-

- StormwaterManagement - GrayInfrastructure

CW Generic

234 1116 East OrangeCity

S340843-02

Water Meter ReplacementProject 2017

$6,840,000 - 2018-12-11

Exempt 2016-09-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MeterReplacement

-

- Water Efficiency /Water Meters

CW Generic

235 498 Egg HarborTownshipMunicipalUtilitiesAuthority

S340753-06

FAA Pump StationReconstruction

$1,250,000 - 2014-03-04

Level 1 2014-07-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

FAA Sanitary Sewer Pump StationReplacement Project, Contract No.56

-

- Sanitary Sewer SystemRehabilitation

CW Generic

236 87 Elizabeth City S340942-13

Western InterceptorModifications

$13,146,000 - 2011-03-02

Level 2 2011-10-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Western InterceptorModifications

-

- Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

237 87 Elizabeth City S340942-20

South Second StreetDrainage and Atlantic StreetCSO Tank Project

$10,300,000 - 2020-08-13

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

South Second StreetDrainage

-

Atlantic Street CSOTank

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

238 789 Elizabeth City S340942-21

Lincoln Avenue DrainageImprovements Project

$3,000,000 - Level 2 - StormwaterManagement - GrayInfrastructure

CW Generic

Page 10 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 12: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type239 918 Evesham

MunicipalUtilitiesAuthority

S340838-06

Elmwood WWTP StorageBuilding

$2,500,000 - Level 1 2019-03-04

- Sanitary Sewer System- New

CW Generic

240 497 EveshamMunicipalUtilitiesAuthority

S340838-08

Route 70 SewerRehabilitation

$1,000,000 - Exempt 2019-09-06

- Sanitary Sewer SystemRehabilitation

CW Generic

241 272 EveshamMunicipalUtilitiesAuthority

S340838-10

Elmwood Tertiary FilterRehabilitation

$1,500,000 - Exempt 2019-10-29

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

242 610 Glen RidgeBorough

S340861-03

GR-Procurement-SewerCleaning Truck

$445,848 - Exempt 2017-09-07 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Contract Not Submitted - GR-Procurement-Sewer CleaningTruck

-

- Equipment Purchase(Clean Water)

CW Generic

243 692 GloucesterCounty UtilitiesAuthority

S340902-17

Sludge Drying System $10,000,000 - 2016-02-24

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sludge DryingSystem

-

- SludgeTreatment/DisposalFacilities

CW Generic

244 175 HackensackCity

S340923-13

The Long Term ControlPlan and CSO SewerSeparation Efforts (Phase3)

$14,700,000 - 2020-12-24

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Clay Street - Union Street toOutfall

-

Clay Street - Railroad Avenueto Union Street

-

Clay Street - Clay Street Westof Railroad Avenue

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

245 790 HackensackCity

S340923-15

Stormwater InfrastructureImprovements 2020

$1,600,000 - 2020-01-31

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Polifly Park DrainageImprovements

-

Pine Street RoadwayImprovements

-

- StormwaterManagement - GrayInfrastructure

246 545 HamiltonTownshipMunicipalUtilitiesAuthority

S340903-06

2019 Wastewater FacilityUpgrades and Renovations

$2,500,000 - Level 1 2019-12-17

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

OfficeBuilding

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

247 636 HighlandsBorough

S340901-05

Coastal Community WaterQuality Restoration

$5,500,000 - Level 1 2020-10-15

- Sanitary Sewer SystemRehabilitation

CW Generic

248 540 Hillside(JMEUC)Township

S340686-10

North Avenue PumpingStation

$1,300,000 - 2019-12-09

Level 1 2020-09-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Improvements to NorthAvenue Pump Station

-

Street Sweeper EquipmentPurchase

-

- Sanitary Sewer SystemRehabilitation

249 51 Hoboken City S340635-08

Southwest Resiliency Park -Acquisition, Rehabilitation

$6,600,000 - 2016-03-04

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Land Acquisition -Planning and DesignLoan

-

- Combined SewerOverflow (CSO) - GreenInfrastructure

CSO - GreenInfrastructure

250 1109 HudsonCountyImprovementAuthority

S340094-02

Koppers PeninsulaInfrastructure, HudsonCounty

$51,000,000 - Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Koppers PeninsulaInfrastructure, HudsonCounty

-

- RemedialAction/ContaminatedSite Cleanups(Brownfields)

CW Generic

251 142 Jersey City S340928-30

Street Cleaning for CleanWater

$2,711,000 - 2017-05-18

Exempt 2017-09-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Street CleaningEquipment

-

- Equipment Purchase(Clean Water)

CSO -AbatementProjects

252 65 Jersey CityMunicipalUtilitiesAuthority

S340928-16

Sixth Street CombinedSewer Outfall

$9,500,000 - 2015-03-20

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

CSO & Floatables forOutfall 029

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CSO -AbatementProjects

253 65 Jersey CityMunicipalUtilitiesAuthority

S340928-18

Claremount Carteret outfallrep

$5,600,000 - 2015-03-20

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Claremont Carteret TideGate Chamber

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CSO -AbatementProjects

254 43 Jersey CityMunicipalUtilitiesAuthority

S340928-27

Green Infrastructure- MartinLuther King Drive TreeTrenches

$500,000 - 2016-03-04

Level 1 2017-09-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Martin Luther King Drive TreeTrenches Green InfrastructureProject

-

- StormwaterManagement - GreenInfrastructure

CSO - GreenInfrastructure

255 65 Jersey CityMunicipalUtilitiesAuthority

S340928-36

Phase 5-B Sewer $10,800,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 5B Sewer & WaterRehabilitation

-

- Sanitary Sewer SystemRehabilitation

CW Generic

256 43 Jersey CityMunicipalUtilitiesAuthority

S340928-37

Sewer Improvements 2a $50,202,482 - 2019-03-22

Level 1 2020-06-17 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 2A Combined Sewer andWater Main Rehabilitation

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

257 65 Jersey CityMunicipalUtilitiesAuthority

S340928-38

Sewer ImprovementsPhase 5a

$35,273,044 - 2019-03-22

Level 1 2020-11-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 5A Combined Sewer &Water main Rehabilitation

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

258 65 Jersey CityMunicipalUtilitiesAuthority

S340928-39

PHASE 6B SEWER MAINREHABILITATIONPROJECT

$33,000,000 - Level 1 - Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

259 64 Jersey CityMunicipalUtilitiesAuthority

S340928-40

Eastside and WestsidePump Station MechanicalScreens

$3,600,000 - 2020-03-26

Exempt 2019-08-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Bar ScreenFilters

-

- Sanitary Sewer SystemRehabilitation

260 65 Jersey CityMunicipalUtilitiesAuthority

S340928-41

Van Winkle CombinedSewer Outfall

$4,500,000 - 2019-08-06

Level 1 2019-11-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Vanwinkle CSO OutFall

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

261 59 Jersey CityMunicipalUtilitiesAuthority

S340928-43

Phase 7a SewerImprovements

$61,751,143 - Level 1 - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

262 59 Jersey CityMunicipalUtilitiesAuthority

S340928-44

Claremont Carteret PumpStation

$37,000,000 - Level 2 - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

263 1107 Jersey CityMunicipalUtilitiesAuthority

S340928-45

Bayfront Clean Water Sewer $4,520,000 - Level 2 - Sanitary Sewer System- New

BrownfieldRedevelopment(ConduitProjects)

264 59 Jersey CityMunicipalUtilitiesAuthority

S340928-47

Van Horne Street SewerImprovements

$11,400,000 - Level 1 - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

265 356 KearnyMunicipalUtilitiesAuthority

S340259-14

Kearny Point PumpingStation Grit CollectorReplacement Project ANDCentral Avenue &Pennsylvania AvenueSewer Rehabilitation Project

$1,582,000 - 2019-09-18

Level 1 2020-03-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Kearny Point Pumping StationGrit Collector Replacement

-

Central Avenue & PennsylvaniaAvenue Rehabilitation

-

- Sanitary Sewer SystemRehabilitation

266 877 Little EggHarborTownship

S340579-04

Mystic Island DrainageImprovements - Phase 2

$1,714,000 - 2020-11-16

Level 1 ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

-

- StormwaterManagement - GrayInfrastructure

CW Generic

267 656 Long BeachTownship

S340023-09

2020 North Beach SewerMain Replacement

- - 2020-12-24

Level 1 - Sanitary Sewer SystemRehabilitation

CW Generic

268 275 Long HillTownship

S340404-10

Capacity Assurance andSystem RehabilitationProject

$7,500,000 - 2019-04-29

Exempt 2019-12-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WWTP and Pump StationImprovements

-

Sanitary SewerRehabilitation Project

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

Page 11 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 13: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type269 717 Manasquan

BoroughS340450-02

Stockton Lake Bulkheadand StormwaterManagement Project

$4,505,800 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Stockton Lake Bulkhead andStormwater Management

-

- StormwaterManagement - GreenInfrastructure

270 384 ManasquanRiver RegionalSewerageAuthority

S340911-03

MRRSA Vehicle Fleet andEquipment Replacement

$660,000 - Exempt 2019-09-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

MRSSA Vehicle Fleet andEquipment Replacement

-

- Equipment Purchase(Clean Water)

CW Generic

271 565 MantuaTownshipMUA

S340514-01

Austin Street Sewer PumpStation

$1,400,000 - Level 1 2020-12-01

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

272 565 MantuaTownshipMUA

S340514-03

Royal Oaks Sewer PumpStation

$1,000,000 - 2020-12-29

Level 1 2020-12-01

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

273 376 MetuchenBorough

S340360-02

Sewage Pump StationReplacement

$4,000,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Jersey Avenue PumpStation Replacement

-

- Sanitary Sewer SystemRehabilitation

274 570 MiddlesexBorough

S340698-03

Middlesex BoroughRehabilitation of SanitarySewers Phase II(Greenbrook Rd. and LouisAve. Pump Stations)

$1,000,000 - 2020-03-16

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehabilitation of Sanitary SewersPhase II (Greenbrook Rd. andLouis Ave. Pump Stations)

-

- Sanitary Sewer SystemRehabilitation

275 419 MiddlesexCounty UtilitiesAuthority

S340699-16

Main Trunk SewerRehabilitation Phase III

$18,100,000 - Level 1 2020-08-25 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Main Trunk SewerRehabilitation Phase III

-

Meter ChamberRehabilitation, Ph. II

-

- Sanitary Sewer SystemRehabilitation

276 46 MiddlesexCounty UtilitiesAuthority

S340699-17

ctp rehabiltation phase 4 $14,000,000 - Exempt 2019-11-04

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

277 29 MontgomeryTownship

S340130-03

Stage II WastewaterTreatment Plant FloodProtection Project

$12,000,000 - Level 2 - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

278 742 MontvilleTownship

S340931-04

Old Lane Sewer Project $2,800,000 - 2020-08-17

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Old Lane SewerProject

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

279 32 Newark City S340815-26

Improvements to thePeddie CSO

$3,300,000 - 2016-03-04

Level 1 2016-10-06 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

CSO Solids/Floatables ControlMeasures Netting Facility AtPeddie Ditch, Site 025

-

Engineering Services -

- Combined SewerOverflow (CSO) - GreenInfrastructure

CSO -AbatementProjects

280 21 Newark City S340815-27

Greenstreet Projects for theCity of Newark

$3,800,000 - 2016-03-04

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Greenstreet Projects forNewark

-

- StormwaterManagement - GreenInfrastructure

CSO - GreenInfrastructure

281 502 NorthBrunswickTownship

S340888-03

Sanitary SewerImprovement Project

- - Level 1 - Sanitary Sewer SystemRehabilitation

CW Generic

282 143 North HudsonSewerAuthority

S340952-35

2019 Adams Street WWTPImprovements

$250,000 - Exempt - Sewage TreatmentPlant (STP) -Improvement/Upgrade

283 966 Northfield City S340508-02

Vactor Truck Purchase $150,000 - Exempt 2020-09-09

- Equipment Purchase(Clean Water)

CW Generic

284 2 OaklandBorough

S340418-06

Oakland Sewer SystemImprovements

$5,720,000 - 2020-10-05

Level 2 - Sanitary Sewer SystemRehabilitation

285 329 Ocean County S344080-09

Barnegat Bay Storm Water -Manufactured TreatmentDevices

$1,300,000 - 2016-03-03

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Barnegat Bay Storm Water -Manufactured TreatmentDevices

-

- StormwaterManagement - GrayInfrastructure

Barnegat Bay

286 325 Ocean County S344080-10

Camera Pipe LineInspection Truck System -Equipment

$250,000 $240,000 2016-03-04

Exempt 2016-05-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Motor Vehicle: Camera PipelineInspection Truck System

-

- Equipment Purchase(Clean Water)

Barnegat Bay

287 325 Ocean County S344080-11

Mechanical Street Sweeper- Equipment

$350,000 $336,000 2016-03-04

Exempt 2017-05-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Motor Vehicle: MechanicalStreet Sweeper

-

- Equipment Purchase(Clean Water)

Barnegat Bay

288 118 Ocean CountyUtilitiesAuthority

S340372-64

CD1008 CWPCF ProcessImprovements

$37,774,000 - Level 1 2020-12-16

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

289 342 Ocean GateBorough

S344180-01

Storm Sewer MTD $2,600,000 - 2015-03-12

Level 1 2011-12-07 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

MTD's - StormSewer

-

- StormwaterManagement - GrayInfrastructure

Barnegat Bay

290 1157 Orange City S340859-04

S-4 (10888779.1) WATERMETER REPLACEMENT

$5,100,000 - 2020-08-14

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

S-4 (10888779.1) WATERMETER REPLACEMENT

-

- Water Efficiency /Water Meters

CW Generic

291 194 Passaic ValleySewerageCommission

S340689-44

Wallington Pump StationRehabilitation Project

$16,100,000 - 2020-04-01

Level 1 2020-06-04 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Wallington Pump StationRehabilitation Project

-

- Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

292 191 Passaic ValleySewerageCommission

S340689-47

Headworks ReconstructionProject

$94,965,434 - 2018-01-23

Level 1 2019-06-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

HeadworksReconstruction

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

293 205 Passaic ValleySewerageCommission

S340689-51

Secondary Bypass andSludge Train RecyclesRerouting Project

$39,087,360 - Level 1 - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

294 195 Passaic ValleySewerageCommission

S340689-52

Advanced Electrical Project $66,477,527 - 2020-11-16

Level 1 2020-10-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Advanced ElectricalProject

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

295 195 Passaic ValleySewerageCommission

S340689-53

Plantwide SCADAImprovements

$16,843,200 - Exempt 2020-12-22

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

296 168 Perth AmboyCity

S340435-19

The Purchasing of a CCTVVideo Pipeline InspectionSystem Project

$400,000 - Exempt 2020-01-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

The Purchasing of a CCTV VideoPipeline Inspection System

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

297 1140 PollutionControlFinancingAuthority ofWarren County

S342026-01

Pollution Control FinancingAuthority Cell 7 Project

$24,000,000 - 2019-10-18

Level 1 - Landfill Construction

298 371 Princeton S340656-08

System-wide SanitarySewer Rehabilitation

$4,300,000 - 2013-03-04

Level 1 2013-05-23 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary SewerRehab

-

- Sanitary Sewer SystemRehabilitation

CW Generic

299 544 RoselleBorough

S340332-02

Cleaning & lining of sanitarysewer

$3,800,000 - 2015-03-05

Level 1 2015-11-09 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary SewerRehab

-

- Sanitary Sewer SystemRehabilitation

CW Generic

300 602 RunnemedeBorough

S340363-06

Sanitary Sewer slip-lining atvarious locations

$1,800,000 - 2015-03-06

Level 1 2015-12-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer slip-lining

-

- Sanitary Sewer SystemRehabilitation

CW Generic

301 378 SomervilleBorough

S340551-01

Somerville Sanitary SewersProject 19-001

$3,700,000 - 2020-08-18

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Somerville Sanitary SewersProject 19-001

-

- Sanitary Sewer SystemRehabilitation

CW Generic

302 588 SouthMonmouthRegional SewerAuthority

S340377-06

Pump Station Upgrades -Brielle and Glimmer Glass

$1,700,000 - 2020-06-22

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Pump Station Upgrades -Brielle and Glimmer Glass

-

- Sanitary Sewer SystemRehabilitation

CW Generic

Page 12 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 14: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type303 1159 South Orange

VillageS340103-02

The Township of SouthOrange Village Water Utility -Advanced MeteringInfrastructure (AMI)Implementation Project

$2,670,000 - 2020-09-18

Exempt 2020-11-16

- Water Efficiency /Water Meters

CW Generic

304 451 Toms RiverMunicipalUtilitiesAuthority

S340145-07

Sanitary SewerRehabilitation

$8,500,000 - Level 1 - Sanitary Sewer SystemRehabilitation

CW Generic

305 451 Toms RiverMunicipalUtilitiesAuthority

S340145-08

Equipment Purchase $1,358,400 - 2020-10-09

Exempt 2020-11-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Procurement of one replacementDump Truck Vehicle

-

Procurement of one Utility TruckVehicle with Crane

-

Procurement of one JetVac TruckVehicle

-

Procurement of three replacementportable generators

-

Procurement and installation offour wetwell-mounted grinders forPump Stations 24, 25, 26 and 30

-

- Equipment Purchase(Clean Water)

CW Generic

306 404 TuckertonBorough

S340034-05

Curlew Rd., Kingfisher Rd.and Bass Rd. SanitarySewer SystemRehabilitation

$3,300,000 - 2020-02-12

Level 1 2020-08-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

SFY 2020 Sewer MainReplacement Project

-

- Sanitary Sewer SystemRehabilitation

CW Generic

307 126 Two RiversWaterReclamationAuthority

S340117-08

Plant RAS Improvements $2,400,000 - Exempt 2019-12-10

- Sanitary Sewer SystemRehabilitation

308 471 WesternMonmouthUtilitiesAuthority

S340128-08

Hawkins Road andMillponds ForcemainReplacement

$8,000,000 - 2020-03-12

Level 1 2020-09-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Replacement of Hawkins Roadand Mill Ponds Force Mains

-

- Sanitary Sewer SystemRehabilitation

CW Generic

309 386 WillingboroMunicipalUtilitiesAuthority

S340132-08

Collection SystemResiliency

$1,900,000 $1,800,000 2015-03-18

Level 1 2014-09-02 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Collection System ResiliencyImprovements - Manhole Repair

-

Collection System ResiliencyImprovements - Timber CrossingReplacement

-

- Sanitary Sewer SystemRehabilitation

CW Generic

310 1121 Asbury ParkCity

S340883-08

Sewer Plant $63,000,000 - 2016-03-04

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sewer Plant -

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

311 111 BayshoreRegional SewerAuthority

S340697-07

Power Resiliency Project5182

- - - Flood Resiliency CW Generic

312 234 Bergen CountyUtilitiesAuthority

S340386-15

Power Supply MitigationImprovements

$57,000,000 - Undetermined - Energy Efficiency /Renewable Energy

CW Generic

313 234 Bergen CountyUtilitiesAuthority

S340386-18

Pump Station ResiliencyProject

$2,491,339 - Level 1 - Sanitary Sewer SystemRehabilitation

314 228 Bergen CountyUtilitiesAuthority

S340386-19

Infrastructure ProtectionImprovements

$3,240,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

315 228 Bergen CountyUtilitiesAuthority

S340386-20

Primary Settling TanksImprovements

$9,000,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

316 228 Bergen CountyUtilitiesAuthority

S340386-22

Facility Assessment andImprovements

$5,690,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

317 26 BerkeleyHeightsTownship

S340385-05

STP Upgrade $1,973,289 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

318 945 BerkeleyHeightsTownship

S340385-06

West Side Drainage Project $25,500,000 - - Non-Point Source(NPS) PollutionControls

CW Generic

319 264 BerkeleyTownship

S344020-01

Water Quality RetentionBasin at Veterans Park

$905,063 - - StormwaterManagement - GrayInfrastructure

320 668 Borough ofWenonah

S340531-01

Sanitary Sewer CollectionSystem AssetManagement and SystemImprovements

$1,330,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Sanitary Sewer Collection SystemAsset Management and SystemImprovements

-

- Sanitary Sewer SystemRehabilitation

321 959 Brigantine City S340827-05

Flood Control and PumpStation Improvements

$4,600,000 - 2015-03-17

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Evans Blvd.Stormwater

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

322 3 CamdenCountyMunicipalUtilitiesAuthority

S340640-25

Camden City GreenInfrastructure, Phase 5

$14,300,000 - - StormwaterManagement - GrayInfrastructure

323 8 CamdenCountyMunicipalUtilitiesAuthority

S340640-27

InfrastructureImprovements on South27th Street (CR 609) in theCity of Camden

$4,862,636 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

324 897 CamdenCountyMunicipalUtilitiesAuthority

S340640-31

Newton Lake BankStabilization

- - - Non-Point Source(NPS) PollutionControls

CW Generic

325 872 CumberlandCounty

S340438-01

Downe WastewaterInfrastructure

$16,000,000 - Level 2 - Sanitary Sewer System- New

CW Generic

326 402 DelancoSewerageAuthority

S340956-03

Collection SystemImprovement Project

- - Level 1 - Sanitary Sewer SystemRehabilitation

CW Generic

327 189 DelranTownship

S340794-11

Service Water SystemUpgrades and AerationBlower ReplacementProject

$2,100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Wastewater Treatment PlantService Water System and AerationBlowers Upgrade

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

328 1125 East OrangeCity

S340843-03

The Crossings at BrickChurch

$12,000,000 - - Sanitary Sewer SystemRehabilitation

329 488 FranklinTownshipSewerageAuthority

S340839-06-1

Supplemental Loan-Rodney Ave Pump Station

$1,000,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Supplemental Loan - RodneyAve Pump Station

-

- Sanitary Sewer System- New

CWSupplemental

330 243 Gloucester City S345090-01

City of Gloucester CSOAsset Management Plan

$1,000,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

City of Gloucester CSO AssetManagement Plan

-

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

331 101 GuttenbergTown

S340854-03

Guttenberg CSO $3,500,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

332 612 HaddonHeightsBorough

S340877-03

Sanitary Sewer PumpStation Rehabilitation

$953,580 - - Sanitary Sewer SystemRehabilitation

CW Generic

333 612 HaddonHeightsBorough

S340877-04

Sanitary SewerRehabilitation (CIPP)

$2,052,912 - - Sanitary Sewer SystemRehabilitation

CW Generic

334 612 HaddonHeightsBorough

S340877-05

Sanitary Sewer MainReplacement

$4,974,434 - - Sanitary Sewer SystemRehabilitation

CW Generic

335 698 HammontonTown

S340927-10

Waste Water TreatmentPlant Sludge DryingReplacement (Centerfuge)

- - - SludgeTreatment/DisposalFacilities

CW Generic

336 1124 HardystonMunicipal UtilityAuthority

S340532-01

Water Meter Replacement $486,000 - - Water Efficiency /Water Meters

337 1173 Highland ParkBorough

S340938-03

Replacement of customer-owned large diameter watermeters

$2,400,000 - - Equipment Purchase(Clean Water)

CW Generic

Page 13 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 15: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type338 555 Hopewell

TownshipS340282-03

Sanitary Sewer SystemAsset Management Plan -Sewer RehabilitationProjects

$1,640,000 - - Sanitary Sewer SystemRehabilitation

339 65 Jersey CityMunicipalUtilitiesAuthority

S340928-23

3 Pump Stations FloodHardening Improvements

$1,846,000 - 2017-01-31 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Pump Stations PS-1 & PS-2Flood Hardening Improvements

-

Engineering Design Contract -Engineering Construction -Contract No. 1

-

TBD --

- Sanitary Sewer SystemRehabilitation

CSO -AbatementProjects

340 65 Jersey CityMunicipalUtilitiesAuthority

S340928-35

Carteret Phase II $7,774,166 - - Sanitary Sewer SystemRehabilitation

341 59 Jersey CityMunicipalUtilitiesAuthority

S340928-42

-- Phase 6A SewerRehabilitation

$36,000,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

342 59 Jersey CityMunicipalUtilitiesAuthority

S340928-46

Jersey City ClaremontEmergency Repair.

$3,600,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

343 333 LaceyTownship

S344140-02

Yacht Basin Plaza North &South Bulkhead andStormwater Management

$1,559,000 - - StormwaterManagement - GrayInfrastructure

CSO - GreenInfrastructure

344 242 Linden RoselleSewerageAuthority

S340299-08

2019 Capital ImprovementProjects

$17,000,000 - 2020-11-17

Undetermined 2020-01-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Emergency GeneratorSwitchgear Replacement

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

345 390 Little EggHarborMunicipalUtilitiesAuthority

S340579-05

Little Egg Harbor SewerMain Replacement Phase II

- - - Sanitary Sewer SystemRehabilitation

CW Generic

346 656 Long BeachTownship

S340023-08

asset management $120,000 - - Sanitary Sewer SystemRehabilitation

CW Generic

347 385 ManasquanRiver RegionalSewerageAuthority

S340911-04

Mingamahone PumpStation Improvements

$2,388,541 - - Sanitary Sewer SystemRehabilitation

CW Generic

348 1151 MilltownBorough

S340102-01

Milltown Ford AveRedevelopment

$21,000,000 - 2015-03-19

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Milltown Ford AveRedevelopment

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

349 1151 MilltownBorough

S340102-04

Ford Ave Redevelopment $5,500,000 - 2015-03-19

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Ford AveRedevelopment

-

- DecentralizedWastewater (or Septic)SystemRepair/Replacement

CW Generic

350 714 MilltownBorough

S340102-05

Flood Mitigation Boroughof Milltown MunicipalComplex Relocation

$13,726,000 - Undetermined - StormwaterManagement - GrayInfrastructure

CW Generic

351 507 MonroeMunicipalUtilitiesAuthority

S340423-05

Video InspectionEquipment

$300,000 - Exempt - Equipment Purchase(Clean Water)

CW Generic

352 409 MontclairTownship

S340837-05

Montclair Twp -SanitarySewer ManholeRehabilitation

$800,000 - Undetermined - Sanitary Sewer SystemRehabilitation

353 861 Newton Town S340449-04

Memory Park DrainageImprovements

$538,000 - - StormwaterManagement - GrayInfrastructure

CW Generic

354 6 Newton Town S340449-05

Improvements to theWaste Water TreatmentPlant, Digester conversionand primary sludge pumpreplacement.

- - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

355 160 North HudsonSewerAuthority

S340952-37

Madison StreetImprovements

$5,400,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

356 160 North HudsonSewerAuthority

S340952-38

W1234 Outfall EmergencyRepair

$1,351,200 - Undetermined - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

357 599 Northfield City S340508-03

Preparation of an AssetManagement Plan

$180,000 - - Sanitary Sewer SystemRehabilitation

CW Generic

358 312 Northfield City S340508-04

Zion Road Pump StationUpgrade and Preparation ofAsset Management Plan

$720,000 - 2020-07-07

- Sanitary Sewer SystemRehabilitation

CW Generic

359 702 Ocean CountyUtilitiesAuthority

S340372-65

CD1713 CWPCFThickened Sludge Storageand Blend TankRehabilitation

- - 2020-12-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Thickened Sludge Storage andBlend Tank Rehabilitation

-

- Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

360 412 Orange City S340859-03

S-3 (10888772.1)Collection SystemRehabilitation andReplacement

$3,377,600 - - Sanitary Sewer SystemRehabilitation

CW Generic

361 487 ParsippanyTroy HillsTownship

S340886-05

Pump Station No.4Sanitary SewerRedirection Project

$11,733,500 - - Sanitary Sewer System- New

CW Generic

362 195 Passaic ValleySewerageCommission

S340689-55

Improvements to the UtilityTunnel Process PipingProject

$9,288,380 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

363 195 Passaic ValleySewerageCommission

S340689-56

O2 Deck Rehabilitation - - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CSO -AbatementProjects

364 53 Paterson City S340850-05

CSO 023 Elimination-Sewer Separation atSecond Avenue

$1,935,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

365 53 Paterson City S340850-06

21st Avenue SewerReconstruction

$2,161,100 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

366 53 Paterson City S340850-07

West Railway SewerReconstruction

$2,137,200 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CW Generic

367 105 Paterson City S345210-01

Investigation of TributarySewers from AdjacentMunicipalities

$200,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

368 106 Perth AmboyCity

S340435-17

Second Street CorridorProject

$4,418,400 - Level 2 - StormwaterManagement - GreenInfrastructure

CSO - GreenInfrastructure

369 363 PhillipsburgTown

S340874-08

Sanitary and Storm SewerInfrastructureImprovements

$2,600,000 - - Sanitary Sewer SystemRehabilitation

CW Generic

370 225 PhillipsburgTown

S340874-09

Wastewater TreatmentPlant Odor ControlManagement

$3,123,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

CW Generic

371 914 PlainfieldMunicipalUtilitiesAuthority

S340240-06

Transfer StationImprovement

$11,675,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Transfer StationImprovement

-

- StormwaterManagement - GrayInfrastructure

CW Generic

372 371 Princeton S340656-09

Linden Lane Improvements $1,821,582 - - Sanitary Sewer SystemRehabilitation

373 891 Ridgefield ParkVillage

S340688-05

Village of Ridgefield ParkSkymark Project -- CleanWater

$30,211,486 - - StormwaterManagement - GrayInfrastructure

374 100 Ridgefield ParkVillage

S345230-01

Planning for Long TermControl Plan CSO

$800,002 - 2016-03-03

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

TBD -

- Combined SewerOverflow (CSO) -TraditionalInfrastructure

CSO -AbatementProjects

375 628 Rochelle ParkTownship

S340310-02

Sewer Pumping Station - - - Flood Resiliency CW Generic

Page 14 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 16: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

Color RankProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan Closing

Amount Project Type Loan Type376 887 Tuckerton

BoroughS340034-04

Dredging of TuckertonWaterways (Clean Water)

$7,750,000 - - Non-Point Source(NPS) PollutionControls

377 31 WarrenTownshipSewerageAuthority

S340964-06

Contract 56 WastewaterTreatment PlantImprovements

$4,550,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade

378 888 WestWildwoodBorough

S340626-05

Storm SewerImprovements to AvenuesP, Q, R, S & Mueller Avenue

$1,890,000 - 2016-03-03

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Construction -Construction Managementand Inspection

-

Construction -Construction Managementand Inspection

-

- StormwaterManagement - GrayInfrastructure

CW Generic

379 725 WoodbineBorough

S340370-02

Sanitary Sewer SystemPhase 1

$6,542,000 - - Sanitary Sewer System- New

CW Generic

380 442 WoodbridgeTownship

S340433-12

Segment Five KeasbeyInterceptor Phase 1 and 2

$28,919,899 - - Sanitary Sewer SystemRehabilitation

CW Generic

Page 15 of 15

Clean Water Projects - Living (Active Review Project) List - Sorted by Color

Page 17: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

1 603.14900 Passaic ValleyWaterCommission

1605002-014

Levine Reservoir WaterStorageImprovements -Phase 1

$26,100,000 - 2016-03-04

Level 2 2018-08-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

CH2M/HMM -Levine ReservoirWater StorageImprovements

-

- Cover OpenFinishedReservoir

DW Generic

2 407.90139 Newark City 0714001-020

Phase-2 Lead ServiceLine Replacement(LSLR) Project

$17,500,000 - 2019-05-29

Level 1 2018-06-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Newark LeadService LineReplacementPhase 2(A)

2019-06-07

2019-12-23

2020-02-04

$3,365,000

Newark LeadService LineReplacementPhase 2(B)

2019-06-07

2019-08-29

2019-11-04

$4,745,000

Newark LeadService LineReplacementPhase 2(C)

2019-06-07

2019-08-29

2019-11-04

$4,230,000

2019-11-07

$13,500,000 Lead ServiceLinesReplacement(LSLR)

3 403.91000 Trenton City 1111001-011

Lead Service linereplacement

$20,340,000 - 2019-02-13

Level 1 2018-08-16

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

TrentonLSLR Phase1A

2019-10-30

2019-12-17

2019-12-18

$10,280,000

TrentonLSLR Phase1B

2019-02-14

2019-05-28

2019-11-15

$9,934,000

2019-11-20

$15,000,000 Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

4 402.80139 Newark City 0714001-019

Phase-1 Lead ServiceLine Replacement(LSLR) Project

$12,500,000 - 2018-05-04

Level 1 2018-06-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Newark LeadService LineReplacementPhase 1(A)

2018-07-12

2018-12-18

2019-01-03

$4,350,987

Newark LeadService LineReplacementPhase 1(B)

2018-10-19

2018-12-18

2019-01-03

$4,511,769

Newark LeadService LineReplacementPhase 1(C)

2018-10-19

2018-12-18

2019-01-03

$3,312,244

2019-05-20

$12,296,528 Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

5 357.94274 Newark City 0714001-021

Phase 3-10 LeadService LineReplacement (LSLR)Project

$145,000,000 - 2019-09-22

Level 1 2018-06-29

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

NewarkLSLR Phase5A

2019-10-29

2020-03-10

2020-10-08

$5,264,344

NewarkLSLR Phase5B

2019-10-29

2020-03-11

2020-10-08

$1,680,796

NewarkLSLR Phase6

2019-10-29

2020-03-03

2020-10-08

$8,824,058

NewarkLSLR Phase7

2019-10-29

2020-02-21

2020-10-08

$8,405,787

NewarkLSLR Phase8

2019-10-29

2020-03-03

2020-10-08

$7,927,644

NewarkLSLR Phase9

2019-10-29

2020-03-16

2020-10-08

$7,887,371

NewarkLSLR Phase10A

2020-08-14

2020-12-03

-

NewarkLSLR Phase10B

2020-08-14

2020-11-12

-

2020-10-20

$40,000,000 Lead ServiceLinesReplacement(LSLR)

Affordability -Public only

6 353.10121 Passaic ValleyWaterCommission

1605002-002

Lead Service LineReplacement in MainSystem

$26,500,000 - Level 1 2020-12-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lead Service LineReplacement

-

- Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

7 353.10121 Passaic ValleyWaterCommission

1605002-026

PVWC Lead ServiceLine Replacement

$1,978,000 - - Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

8 350.55000 NewBrunswickCity

1214001-005

Water Treatment PlantImprovements

$15,500,000 - 2016-03-04

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Contract 511-16W -Pretreatment SystemUpgrades

-

- WaterTreatmentPlant/Facilities

DW Generic

9 340.30134 Orange City 0717001-011

Orange Twp |PFAS inWell 8 Drinking WaterSystem

$1,550,000 - Level 1 - WellConstruction /Replacement

Affordability -Public only

10 340.30134 Orange City 0717001-013

Orange Twp | Well 5Rehabilitation Project

$700,000 - Level 1 ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well 5Rahabilitation

-

- WellConstruction /Replacement

Affordability -Public only

11 340.30134 Orange City 0717001-015

Orange Twp |PFAS inWell 7 Drinking WaterSystem

$1,440,000 - - WaterTreatmentPlant/Facilities

Affordability -Public only

12 332.94274 Newark City 0714001-022

PROCESS ANDOPERATIONALUPGRADES AT THEPEQUANNOCKWATER TREATMENTPLANT

- - - WaterTreatmentPlant/Facilities

Base DWSRF- Public

13 320.00105 North ShoreWaterAssociation

1904004-001

Existing Well RequiresReplacement

$500,000 - 2015-03-18

Level 1 ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

WellReplacement

-

- Surface waterintake

DW Generic

14 305.47315 BloomfieldTownship

0702001-003

Lead Service LineReplacement

$1,098,395 - 2018-12-13

Level 1 2019-05-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Bloomfield LeadService LineReplacement

2019-05-06

2019-07-29

2020-06-03

$330,000

2020-06-26

$284,747 Lead ServiceLinesReplacement(LSLR)

15 302.90470 NJ AmericanWaterCompany,Incorporated

1345001-017

Oak Street TreatmentPlant Improvements

$10,100,000 - 2016-03-04

Level 1 2017-04-18

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Oak StreetTreatmentPlant

2017-07-10

2017-10-10

2017-10-23

$4,735,000

2018-02-22

$7,413,000 WaterTreatmentPlant/Facilities

DW Generic

16 300.09835 BurlingtonCity

0305001-002

Rehabilitation of DualMedia Filters

$3,600,000 - 2019-01-22

Level 1 2018-11-29

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

FilterRehabilitation

2019-09-19

2019-11-19

2020-03-02

$1,165,000

2020-06-26

$1,012,911 Water Efficiency/ Water Meters

Updated as of January 14, 2021Drinking Water Projects

New Jersey Water Bank (NJWB)

Living (Active Review Project) List (Sorted by Rank Pts.)

Page 1 of 9

Page 18: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

17 287.17000 Trenton City 1111001-005

5-year Lead ServiceLine Replacement &Verification Project

$239,000,000 - 2020-09-28

Level 1 2020-10-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lead Service LineReplacement ProjectContracts 2A

-

Lead Service LineReplacement ProjectContracts 2B

-

Lead Service LineReplacement ProjectContracts 2C

-

Lead Service LineReplacement &Verification Project3A

-

Lead Service LineReplacement &Verification Project 3B

-

Lead Service LineReplacement &Verification Project3C

-

- Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

18 270.47315 BloomfieldTownship

0702001-004

InterconnectionProject

$2,600,000 - 2020-10-15

Level 1 2020-01-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

InterconnectionProject

-

- Pump Stations

19 265.47144 MerchantvillePennsaukenWaterCommission

0424001-002

Woodbine PFNA plant $5,646,000 - - WaterTreatmentPlant/Facilities

Base DWSRF- Public

20 265.35129 BellevilleTownship

0701001-008

Belleville Lead ServiceLine Replacement

$3,568,752 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lead Service LineReplacementProgram, Phase 1

-

- Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

21 265.30134 Orange City 0717001-014

Orange Twp |Relocation of theexisting transmissionmain under the GlenAvenue Bridge for thestabilization of thepipe

$2,000,000 - 2020-08-14

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Relocation ofTransmissionMain

-

- Water Mains Affordability -Public only

22 265.03144 National ParkBorough

0812001-005

Addition of PFOSTreatment at ExisitingWater Plant

$1,526,500 - 2020-11-17

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water TreatmentFacility Upgrades forPFNA

-

- WaterTreatmentPlant/Facilities

Nano-Eligible

23 265.00055 ButtonwoodMobile HomePark

0301001-001

Buttonwood system $318,000 - - WaterTreatmentPlant/Facilities

Nano-Eligible

24 250.67215 Old BridgeMunicipalUtilitiesAuthority

1209002-014

Perrine Road CarbonAbsorber Facility

$1,750,000 - 2015-10-19

Level 1 2016-07-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Perrine RoadCarbon AdsorberFacility

2016-11-21

-

- Other (InCompliancewith SDWA)

DW Generic

25 250.20726 MoorestownTownship

0322001-001

North Church StreetWater Treatment PlantUpgrade

$24,625,000 - 2018-06-15

Level 1 2018-09-26

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

N. ChurchStreet WaterTreatmentPlant Upgrade

2018-10-25

2019-01-11

2020-04-15

$24,625,000

2020-06-23

$20,880,000 WaterTreatmentPlant/Facilities

26 250.09653 WaldwickBorough

0264001-003

Water TreatmentSystems

$3,550,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WaterTreatmentSystems

-

- WaterTreatmentPlant/Facilities

Nano-Eligible

27 250.04060 Ho-Ho-KusBorough

0228001-002

Ho-Ho-Kus WaterTreatment System

$2,110,000 - Undetermined - WaterTreatmentPlant/Facilities

Nano-Eligible

28 235.86898 BrickTownshipMunicipalUtilitiesAuthority

1506001-011

Granular ActivatedCarbon (GAC)Treatment Addition

$20,890,000 - 2018-04-02

Level 1 2018-08-07

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

GranularActivatedCarbon (GAC)TreatmentAddition

2018-12-12

2019-02-19

2020-03-02

$16,900,000

2020-06-29

$17,094,937 WaterTreatmentPlant/Facilities

DW Generic

29 235.75000 East OrangeCity

0705001-014

Water SystemImprovement andResiliency Project2017

$33,000,000 - 2016-03-04

Level 1 2016-09-29

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

White OakRidgePumpingStationGenerator

2020-01-07

2020-12-02

-

Water SystemDistributionImprovements

2019-05-28

2019-10-07

2020-03-02

$15,910,000

WORPSDisinfection

-

2020-06-25

$23,100,000 Other (InCompliancewith SDWA)

DW Generic

30 227.94274 Newark City 0714001-017

Water DistributionSystem Upgrades

$2,000,000 - 2011-03-07

Level 1 2011-07-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water DistributionSystem Upgrades

-

- Water Mains DW Generic

31 227.85000 Newark City 0714001-008

Cleaning and lining ofwater mains,upgrading 4 inchmains to 6 & 8 inchmains, replace old firehydrants

$34,196,000 - -

32 225.10800 BerkeleyTownshipMunicipalUtilitiesAuthority

1505004-010

Berkeley TownshipMUA Phase VII WaterMain Installation

$8,000,000 - Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase VII WaterMain Installation

-

- Water Mains

33 208.72153 North JerseyDistrict WaterSupplyCommission

1613001-032

Rehabilitation ofTreatment Facility

$3,600,000 - 2015-03-06

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

RehabTreatmentFacility

-

- WaterTreatmentPlant/Facilities

DW Generic

34 200.09550 EastGreenwichTownship

0803001-004

Installation of filtrationsystem for PFCremoval at #3 Well

$2,600,000 - 2020-10-16

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Planning andDesignAllowance

2018-03-02

$310,000

2018-07-25

$2,280,200 WaterTreatmentPlant/Facilities

Nano-Eligible

35 197.85000 Newark City 0714001-011

Rehabilitation of thebasculate gate at theCharlotteburghReservoir with alarmand control systems

$3,140,000 - -

Page 2 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 19: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

36 197.62004 Jersey CityMunicipalUtilitiesAuthority

0906001-017

Boonton PlantCentrifuge

$1,740,240 - 2019-05-29

Exempt 2018-02-09 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WaterTreatment PlantResidualsHandlingImprovements

2018-10-29

2019-06-12

2020-03-02

$1,730,000

2020-06-30

$1,458,905 WaterTreatmentPlant/Facilities

DW Generic

37 195.25349 BridgetonCity

0601001-006

Well 14/15Rehabilitation

$6,810,000 - - WellConstruction /Replacement

38 191.15430 NJ AmericanWaterCompany,Incorporated

2004002-012

NJ American WaterLead Service LineReplacement ProgramPWSID 2004002

$20,000,000 - 2017-06-13

Level 1 2020-11-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

NJAW Lead ServiceLine ReplacementProgram

2020-12-08

2020-12-15

-

- Lead ServiceLinesReplacement(LSLR)

DW Generic

39 190.02964 UpperDeerfieldTownship

0613004-002

Seabrook WaterTower Replacement(Upper Deerfield)

$2,000,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Seabrook WaterTowerReplacement

-

- Storage Tanks Nano-Eligible

40 187.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-027

PHASE 6B WATERMAINREHABILITATIONPROJECT

$8,500,000 - Level 1 - Water Mains DW Generic

41 187.61996 Jersey CityMunicipalUtilitiesAuthority

0906001-029

Phase 6A WaterRehabilitation

$19,000,000 - - Water Mains Base DWSRF- Public

42 180.02650 WoodbineBorough

0516001-001

WTP Upgrade andwater main extension

$5,000,000 - 2020-06-09

Exempt 2017-07-26 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WATERTREATMENTPLAT SYSTEMUPGRADES

2020-12-07

-

WATER MAINEXTENSIONS

-

Woodbine AssetManagementPlan

2020-06-03

$101,000

Planning andDesign of WTPUpgrades andWater MainExtensions

2020-06-03

$204,000

2020-06-26

$5,000,000 WaterTreatmentPlant/Facilities

Nano-Eligible

43 177.73000 Newark City 0714001-018

Replacement of WaterDistribution Mains

$5,150,000 - 2016-03-04

Level 1 2016-07-20

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Contract09-WS2016

2018-04-23

2018-07-10

2018-08-24

$5,150,000

2018-11-27

$4,698,840 Water Mains DW Generic

44 175.95000 Atlantic CityMunicipalUtilitiesAuthority

0102001-007

Water MainReplacement Program

$1,620,000 - - Water Mains DW Generic

45 172.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-019

Route 139 Water MainReplacement Project

$6,700,000 - 2018-03-08

Level 1 2018-04-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

RT 139 WaterMainReplacementProject

2018-04-20

2019-05-20

2019-06-18

$6,670,000

2019-06-28

$5,280,963 Water Mains DW Generic

46 170.94333 WildwoodCity

0514001-006

2019 CapitalImprovements(Drinking Water)

$6,183,204 - 2020-02-13

Level 1 2020-02-06 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2019 CapitalImprovement

2020-02-27

2020-05-22

2020-06-04

$165,000

2019 CapitalImprovements

2020-03-02

$125,000

2019 CapitalImprovementsPhase 2A

-

2020-06-30

$1,924,000 Water Mains

47 170.24215 Little EggHarborMunicipalUtilitiesAuthority

1516001-005

Little Egg HarborWater ImprovementsPhases I

$1,450,000 - 2016-03-04

Level 1 2017-02-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Little EggHarbor Waterand SewerImprovementsPhase I

2020-03-04

2020-05-15

2020-06-03

$1,050,000

Planning andDesignAgreement

2020-03-02

$80,000

2020-06-25

$1,095,374 Water Mains DW Generic

48 170.07222 LowerTownshipMunicipalUtilitiesAuthority

0505002-004

Del Haven Water MainExpansion /Wildwood Water UtilityInterconnect

$10,260,000 - Level 2 - Water MainExtensions

Base DWSRF- Public

49 170.01700 Seaside ParkBorough

1527001-004

Well 10 TreatmentFacility

$1,500,000 - 2016-09-15

Level 1 2018-11-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well 10 TreatmentPlant Upgrade PhaseII

-

- WellConstruction /Replacement

Nano-Eligible

50 170.00150 North JerseyDistrict WaterSupplyCommission

1613001-026

Low Lift Gas Pump $12,900,000 - 2013-03-04

Exempt 2013-07-11

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Low Lift GasPump

-

- Pump Stations DW Generic

51 170.00150 North JerseyDistrict WaterSupplyCommission

1613001-031

Purchase and InstallNew DewateringSystem

$3,800,000 - 2015-03-06

Level 1 ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Upgrade toRTF

-

- WaterTreatmentPlant/Facilities

DW Generic

52 168.35449 NJ AmericanWaterCompany,Incorporated

1345001-021

Swimming River WTP2nd Clearwell

$26,345,000 - 2017-06-13

Level 1 2017-09-21

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

SwimmingRiver WTPImprovement

2018-12-19

2019-04-24

2020-06-03

$26,345,000

2020-06-29

$24,103,961 WaterTreatmentPlant/Facilities

DW Generic

53 160.86898 BrickTownshipMunicipalUtilitiesAuthority

1506001-014

Water MainReplacement onCartagena Drive,Alhama Drive, CadizDrive, Valencia Driveand Monterey Drive

$3,600,000 - 2019-08-20

Level 1 2019-10-11 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Cartagena DriveWater MainReplacement

-

- Water Mains

54 160.24136 Passaic ValleyWaterCommission

0231001-002

Lead Service LineReplacement in LodiSystem

$7,400,000 - Level 1 2020-12-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lead Service LineReplacement

-

- Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

55 155.45500 WildwoodCity

0514001-004

Wildwood Boardwalkwater mainreplacement

$2,494,096 - - Water Mains

56 155.21083 ManchesterTownship

1518005-002

Repaint and repair oneMG elevated storagefacility

$5,500,000 - 2016-03-02

Exempt 2016-10-13

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Repaint andRepair 1 MGStorage Tank

2017-01-31

2017-07-17

2017-07-25

$1,600,000

2017-12-18

$1,399,860 Storage Tanks DW Generic

Page 3 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 20: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

57 155.07224 HopatcongBorough

1912001-001

Hudson AvenueWater MainInstallation

$1,000,000 - 2018-05-01

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Hudson AvenueWater MainInstallation

-

- Water MainExtensions

Nano-Eligible

58 155.06025 PaulsboroBorough

0814001-003

Water MainReplacement(Thomson, Wood,Eliz. and CommerceSt.)

$2,800,000 - 2015-03-06

Level 1 2015-05-20

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement

2016-10-25

2017-07-06

2018-01-11

$670,000

2018-10-23

$635,400 Water Mains Nano-Eligible

59 155.05006 ClementonBorough

0411001-001

Rehab of GibbsboroWater Main (WhiteHorse Pike & WhiteHorse Rd.)

$500,000 - 2015-03-06

Exempt 2015-08-24

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

water mainrehab

-

- Water Mains Nano-Eligible

60 155.02201 SussexBorough

1921001-007

Sussex Borough MainStreet Water MainReplacement Project

$595,772 - - Water Mains Nano-Eligible

61 152.33376 MiddlesexWaterCompany

1225001-029

CJO Plant Upgrade -DBP RemovalTreatment

$72,000,000 - 2018-01-26

Level 1 2018-08-03

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

OzonationFacility

2018-10-03

2019-04-01

2020-06-03

$67,071,216

Procurementof OzoneSystem

2018-10-03

2019-04-01

2020-06-03

$4,463,784

- WaterTreatmentPlant/Facilities

DW Generic

62 150.12052 FreeholdBorough

1315001-002

Water PlantDevelopment

$6,440,000 - Level 2 2019-08-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water TreatmentPlant Development

-

- WaterTreatmentPlant/Facilities

DW Generic

63 150.04931 Salem City 1712001-004

Salem City WaterMeter

$1,900,000 - Exempt 2019-01-25 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Salem City WaterMeter Replacement

-

- Water Efficiency/ Water Meters

64 145.03382 HamburgBorough

1909001-002

Water Storage TankRehabilitation

$1,100,000 - 2019-07-02

Exempt 2019-06-04 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water StorageTank Rehab

-

- Storage Tanks Nano-Eligible

65 140.05400 HightstownBorough

1104001-009

Water Tank Painting &Repairs

$950,000 - Exempt 2020-04-23

- Storage Tanks Nano-Eligible

66 140.01978 MountArlingtonBorough

1426005-003

Altenbrand,Windemere, McGregorand Lee Water MainExtension

$2,020,000 - - Water MainExtensions

Nano-Eligible

67 137.64290 Jersey CityMunicipalUtilitiesAuthority

0906001-016

Large ValveReplacementProgram- Phase 2

$7,321,200 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Large ValveReplacement

-

- Water Mains DW Generic

68 137.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-012

Water MainReplacement

$18,000,000 - 2015-03-20

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement

-

- Water Mains DW Generic

69 137.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-025

Phase 1 & 2 WaterMain ReplacementProject

$32,000,000 - 2019-04-29

Level 1 2019-06-13

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

Phase 1 & 2Water MmainRehabilitation

2019-11-14

2020-06-09

2020-06-11

$31,925,000

2020-06-30

$25,000,000 Water Mains

70 137.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-026

5-B Water Project $7,320,000 - Level 1 - Water Mains DW Generic

71 137.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-032

Van Horne StreetWater Improvements

$4,200,000 - Level 1 - Water Mains Base DWSRF- Public

72 135.52328 Perth AmboyCity

1216001-010

The Painting of theBackwash Tank andStand Pipe Project

$1,651,532 - - Storage Tanks Base DWSRF- Public

73 135.35000 WillingboroMunicipalUtilitiesAuthority

0338001-011

Well 6 WaterTreatment PlantUpgrade

$10,621,600 - 2016-03-04

Level 1 2020-01-09

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

N/A -N/A -N/A -WillingboroWell No. 6

-

- WaterTreatmentPlant/Facilities

DW Generic

74 132.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-009

Burma Road AreaWater SystemImprovements

$5,000,000 - 2018-02-28

Level 1 2018-08-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Burma RoadWater SystemImprovements

2019-07-30

2020-03-03

2020-06-03

$5,000,000

2020-06-30

$2,770,000 Water Mains DW Generic

75 132.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-030

Phase 7a WaterImprovements

$29,985,841 - Level 1 - Water Mains Base DWSRF- Public

76 132.57342 Jersey CityMunicipalUtilitiesAuthority

0906001-018

Tonnele AvenueWater MainReplacement andRelining

$7,442,800 - 2018-05-14

Level 1 2018-08-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Tonnele AvenueWater MainReplacement andRelining

2020-06-18

-

- Water Mains DW Generic

77 132.47000 Jersey CityMunicipalUtilitiesAuthority

0906001-006

Transmission MainInstall

$19,000,000 - 2011-03-04

Level 1 2011-03-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

TransmissionMain Install

-

- Water MainExtensions

DW Generic

78 131.74985 NJ AmericanWaterCompany,Incorporated

0712001-016

NJ American WaterLead Service LineReplacement ProgramPWSID 0712001

$6,576,000 - 2017-06-16

- Lead ServiceLinesReplacement(LSLR)

DW Generic

79 130.21200 ManchesterTownship

1518005-004

MANCHESTERTOWNSHIP 1.0MGELEVATED TANK

$6,135,130 - - Storage Tanks

80 126.33355 MiddlesexWaterCompany

1225001-028

RENEW 2018 -Woodbridge Twp.

$11,200,000 - 2017-05-03

Level 1 2018-01-02 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

RENEW 2018 -PipelineRehabilitation

2018-04-06

2018-06-18

2018-08-25

$9,215,000

2018-09-12

$8,656,747 Water Mains DW Generic

81 125.67215 Old BridgeMunicipalUtilitiesAuthority

1209002-005

Laurence HarborWater SystemUpgrade, Phase 1

$2,500,000 - 2019-09-26

Level 1 2020-03-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Laurence HarborWater SystemImprovements -Phase 1

2020-05-29

-

- Other (InCompliancewith SDWA)

82 125.54379 Hoboken City 0905001-002

Water Main Upgrades(2018)

$8,000,000 - 2018-08-17

Level 1 2018-10-25

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainUpgrades

2019-02-27

2019-07-09

2020-06-04

$6,820,000

2020-06-26

$6,196,314 Water Mains DW Generic

83 125.26146 WallTownship

1352003-001

Route 138 Water MainImprovements

$1,800,000 - 2015-03-05

Level 1 2015-05-20

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainImprovements

2018-07-23

2018-11-14

2019-06-20

$1,230,000

2019-12-12

$1,316,909 Water MainExtensions

DW Generic

Page 4 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 21: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

84 125.26146 WallTownship

1352003-002

Route 34 Water MainImprovements

$3,700,000 - 2015-03-06

Level 1 2015-05-20

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainImprovements

2018-07-23

2018-11-14

2019-01-03

$2,885,000

2019-12-12

$3,128,728 Water MainExtensions

DW Generic

85 125.22000 HackettstownMunicipalUtilitiesAuthority

2108001-001

Construction of NewWater Storage Tank w/related waterdistribution lines

- - - Storage Tanks Base DWSRF- Public

86 125.12500 Clinton Town 1005001-010

West Main StreetWater MainReplacement Project -Asset ManagementPlanning

$2,640,000 - 2018-07-20

Level 1 2018-08-29 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

West mainStreet WaterMainReplacement -Phase 1

2018-10-29

2019-03-05

2020-05-21

$440,000

West MainStreet WaterMainReplacement -Phase II

2020-04-30

2020-06-04

2020-06-17

$1,705,000

2020-06-30

$1,448,187 Water Mains DW Generic

87 125.12500 Clinton Town 1005001-011

2017-TOC-WMR-CTWP-Glen EaglesDrive, Muirfield Lane,and Heather Hill Way

$1,265,807 - 2018-07-20

Level 1 2018-10-25 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Glen Eagles Drive,Muirfield Laneand Heather HillWay Water MainReplacement

2018-10-31

2019-03-05

2020-05-21

$970,000

2020-06-30

$966,537 Water Mains DW Generic

88 125.12028 ManchesterUtilitiesAuthority

1603001-001

Heights TankRehabilitation

$500,000 - Exempt 2020-11-16

- Storage Tanks

89 125.08300 SpotswoodBorough

1224001-001

Cleaning and lining ofapproximaty 3,600 LFof water mains

$3,443,914 - 2018-09-10

Level 1 2018-09-27

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

SpotswoodWater Main

2019-05-02

2019-07-31

2020-06-04

$820,000

2020-06-29

$730,010 Water Mains Nano-Eligible

90 125.07733 PointPleasantBeachBorough

1525001-002

Ocean Avenue WaterMain Replacement

- - - Water Mains Nano-Eligible

91 125.07681 Glen RidgeBorough

0708001-008

GR-2017-LSL-R/FH-RR Lead Service Water-Line Replacement/FireHydrant - Repairs &Replacement & WaterSystem AssetManagement Plan

$2,573,210 - 2018-08-13

Level 1 2019-02-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lead ServiceLine and FireHydrantReplacement

2019-02-28

2019-08-14

2020-05-21

$2,650,000

Water SystemAssetManagementPlan

-

2020-06-23

$2,367,774 Lead ServiceLinesReplacement(LSLR)

DW Generic

92 125.03968 Passaic ValleyWaterCommission

0239001-002

Lead Service LineReplacement in NorthArlington System

$10,500,000 - Level 1 2020-12-14 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Lead Service LineReplacement

-

- Lead ServiceLinesReplacement(LSLR)

Lead LineReplacement

93 125.03300 High BridgeBorough

1014001-003

West Main StreetWater Main Upgrades

$462,000 - - Water Mains Nano-Eligible

94 122.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-022

Hackensack River 36"Aqueductreplacement

$30,211,486 - - Water Mains DW Generic

95 122.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-023

Phase 5A WaterProject

$9,300,000 - Level 1 2020-11-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 5A CombinedSewer and WaterMain Rehabilitation

-

- Water Mains DW Generic

96 122.62000 Jersey CityMunicipalUtilitiesAuthority

0906001-024

Phase 2A Water $11,640,000 - Level 1 2020-06-17 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 2ACombined Sewer &Water

-

- Water Mains DW Generic

97 120.36250 Vineland City 0614003-017

2016 WaterDistributionRehabilitation Project

$3,100,000 - 2016-03-03

Level 1 2017-06-02 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

TBD -2016 WaterDistribution SystemRehab

-

- Water Mains DW Generic

98 120.30134 Orange City 0717001-012

Orange Twp |Interconnection andDistribution Project

$1,440,240 - - Interconnection Affordability -Public only

99 120.06285 TuckertonBorough

1532002-007

Curlew Rd. andKingfisher Rd. WaterMain Replacementand Well#3, Well#4Rehabilitation/Repairs.

$1,700,000 - 2020-02-12

Level 1 2020-08-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

SFY 2020 WaterMain ReplacementProject

-

- Water Mains Nano-Eligible

100 117.61666 Jersey CityMunicipalUtilitiesAuthority

0906001-020

Phase 3 and 4 WaterMain ReplacementProject

$6,620,000 - 2018-11-21

Level 1 2019-02-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 3&4 WaterMain Replacement

2019-05-22

2019-10-21

-

- Water Mains DW Generic

101 117.61666 Jersey CityMunicipalUtilitiesAuthority

0906001-021

Phase 5 Water Mains $11,000,000 - 2018-06-04

Level 1 2019-09-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Phase 5 Water MainReplacement Project

2019-11-26

2020-03-30

-

- Water Mains DW Generic

102 115.45200 JacksonTownshipMunicipalUtilitiesAuthority

1511001-013

Six Flags GreatAdventure WaterTreatment PlantReplacement

$20,000,000 - 2016-03-03

Level 2 2017-07-25

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

Six Flags GreatAdventureWaterTreatmentPlantReplacementBid and CMServices

2017-10-30

2018-02-14

2018-04-16

$16,730,000

2018-05-11

$15,603,769 WaterTreatmentPlant/Facilities

DW Generic

103 115.21720 HamiltonTownshipMunicipalUtilitiesAuthority

0112001-004

HTMUA WELL #8REHABILITATION

- - - WaterTreatmentPlant/Facilities

Base DWSRF- Public

104 115.17437 Ship BottomBorough

1528001-003

Water Treatment PlantReconstruction

$10,000,000 - 2020-03-19

Level 1 2020-06-09 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water TreatmentPlantReconstruction

2020-06-12

2020-08-06

-

- WaterTreatmentPlant/Facilities

Base DWSRF- Public

105 115.16964 South OrangeVillage

0719001-012

South OrangeNewsteadWatersphereEmergency Repairs

$640,000 - Exempt 2018-12-19 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

NewsteadEmergencyRepairs

2020-08-19

$720,000

2020-10-21

$640,000 Other (InCompliancewith SDWA)

106 115.08130 BerkeleyTownshipMunicipalUtilitiesAuthority

1505004-009

Installation of newWell 4 with WM toconnect to WTP

$2,500,000 - 2015-03-18

Level 2 2013-10-11

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well No. 4 -Phase II

2017-06-14

2017-10-10

2017-10-23

$2,375,000

2017-12-07

$1,799,146 WellConstruction /Replacement

Nano-Eligible

Page 5 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 22: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

107 115.01828 AllentownBorough

1302001-004

Water Treatment PlantImprovements

$2,328,960 - Level 1 ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

AllentownBorough

-

- WaterTreatmentPlant/Facilities

Nano-Eligible

108 115.00150 North JerseyDistrict WaterSupplyCommission

1613001-034

Security, IT and SafetyProjects

$1,600,000 - 2015-03-06

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Security, IT andSafety Projects

-

- WaterTreatmentPlant/Facilities

DW Generic

109 112.47000 Jersey CityMunicipalUtilitiesAuthority

0906001-015

Van Winkle Ave. WaterMain Replacement

$3,589,266 - 2017-07-12

Level 1 2017-09-27 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Van Winkle Ave.Water MainReplacement

2018-05-24

2018-08-27

2018-10-31

$3,120,000

2019-02-19

$3,116,740 Water Mains DW Generic

110 110.86898 BrickTownshipMunicipalUtilitiesAuthority

1506001-008

Undersized WaterMain ReplacementCedar Park East andWest

$6,550,000 - 2018-03-28

Level 1 2017-07-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Cedar Park WaterMain Replacement

2019-03-21

-

- Water Mains DW Generic

111 110.50005 Hoboken City 0905001-001

Washington St. WaterMain / GreenInfrastructureDrainage Improv.

$8,500,000 $8,500,000 2015-03-06

Level 2 2016-08-31 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WashingtonStreet WaterMainReplacement &GreenInfrastructureDrainageImprovement

2016-10-21

2016-10-27

2016-11-10

$7,940,000

2018-06-21

$7,200,000 Water Mains DW Generic

112 107.65932 Jersey CityMunicipalUtilitiesAuthority

0906001-028

Dam SecurityImprovements

$1,700,000 - 2019-08-06

Exempt 2020-02-12 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

BOONTON DAM ANDPARSIPPANY DIKESECURITYIMPROVEMENTS

-

- SecurityMeasures

Base DWSRF- Public

113 105.24215 Little EggHarborMunicipalUtilitiesAuthority

1516001-007

Little Egg HarborWater ImprovementsPhase II

- - - Water Mains Base DWSRF- Public

114 105.23992 MiddlesexWaterCompany

1225001-027

RENEW 2019 -Carteret

$11,200,000 - 2018-07-20

Level 1 2018-12-18

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

RENEW 2019Carteret

-

- Water Mains

115 105.16964 South OrangeVillage

0719001-008

Well 17 Air Stripper $425,000 - Undetermined - WaterTreatmentPlant/Facilities

116 105.12350 Red BankBorough

1340001-003

White Street WaterMain

$562,350 - - Water Mains

117 105.05567 HightstownBorough

1104001-010

2017 Water MainImprovements

$1,775,678 - 2018-06-28

Level 1 2018-07-10 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

First Avenue andForman AvenueWater Main Extension

2018-09-25

2018-11-20

-

Stockton StreetWatermainReplacement

2019-03-13

2019-06-18

-

- Water Mains Nano-Eligible

118 105.00100 Oak RidgeSeniorHousingCommunity

1414008-001

Oakridge SeniorCommunity WaterLines

$530,300 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Oakridge SeniorCommunity WaterLines

-

- Water Mains Nano-Eligible

119 102.33376 MiddlesexWaterCompany

1225001-025

Western TransmissionMain

$57,000,000 - 2016-03-03

Level 2 2017-09-21

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

WesternTransmissionMain (A)

2017-12-12

2018-03-06

2018-05-14

$13,740,000

WesternTransmissionMain (B)

2017-12-12

2018-03-06

2018-05-14

$17,865,000

WesternTransmissionMain (C)

2017-12-12

2018-03-06

2018-05-14

$17,990,000

2018-08-01

$43,474,714 Water Mains DW Generic

120 100.43200 EveshamMunicipalUtilitiesAuthority

0313001-001

Wells 13 TreatmentImprovements

$2,600,000 - 2012-03-02

Level 1 2012-07-23

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

ASR WellTreatment

2019-05-13

2019-06-26

2019-06-27

$1,845,000

2019-06-28

$2,280,200 WaterTreatmentPlant/Facilities

DW Generic

121 100.20726 MoorestownTownship

0322001-002

Hartford Road WaterTreatment PlantUpgrade

$15,240,000 - 2018-06-15

Level 1 2018-09-26 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Hartford RoadWTP Upgrade

2018-10-25

2019-01-11

-

- WaterTreatmentPlant/Facilities

122 100.18651 PointPleasantBorough

1524001-002

Water Treatment PlantFilter Replacement

$2,112,000 - - WaterTreatmentPlant/Facilities

DW Generic

123 96.76240 Atlantic CityMunicipalUtilitiesAuthority

0102001-010

Asset ManagementPlan - ProfessionalConsulting Services InCompliance With TheNew Jersey WaterQuality AccountabilityAct

$150,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Atlantic City MUAAsset ManagementPlan

-

- Other (InCompliancewith SDWA)

DW Generic

124 96.00000 BrickTownshipMunicipalUtilitiesAuthority

1506001-009

Breton Woods WaterMain Replacement -Phase I

$5,928,760 - 2017-01-03

Level 1 2017-07-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Breton woodsWater MainReplacement

2017-08-17

2019-01-11

2018-01-11

$3,275,000

2019-05-31

$3,000,000 Water Mains DW Generic

125 95.45500 WildwoodCity

0514001-005

Well #39Redevelopment

$378,000 - - WellConstruction /Replacement

126 95.45061 BloomfieldTownship

0702001-001

Cleaning and Lining ofwater mains

$1,700,000 - - Water Mains

127 95.07052 MilltownBorough

1212001-002

Ford AveRedevelopment

$1,606,000 - 2015-03-20

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Ford AveRedevelopment

-

- Water Mains Nano-Eligible

128 95.05006 ClementonBorough

0411001-002

Rehab of well 9including slip lining toimprove conveyance

$1,400,000 - 2015-03-06

Level 1 2015-09-25

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well 9Rehab

-

- Water Mains Nano-Eligible

129 95.04389 FlemingtonBorough

1009001-009

Additional Water Tankand Improvements

$4,500,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

300,000 GallonWater StorageTank

-

- Storage Tanks Nano-Eligible

130 91.30134 Orange City 0717001-006

asset managementplan

$7,200,000 - - Other (InCompliancewith SDWA)

Nano-Eligible

131 91.30134 Orange City 0717001-016

Orange Twp | WaterSystem HydraulicModel, GIS, AMP

$936,600 - - Other (InCompliancewith SDWA)

Affordability -Public only

Page 6 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 23: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

132 90.86898 BrickTownshipMunicipalUtilitiesAuthority

1506001-013

Water Main StreamCrossingsReplacements atRoute 70 (16"Diameter), at theBeaver Dam Creek atMidstreams Road (16"Diameter), and Five12" Diameter StreamCrossings in theTownship of Brick

$4,188,419 - 2018-12-12

Level 1 2018-10-16 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water SystemRehab/Replacement

-

- Water Mains DW Generic

133 90.63000 Bayonne City 0901001-006

AqueductReplacement

$12,000,000 - 2016-03-02

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

AqueductReplacement ProjectCM Services

-

Phase 2 AqueductReplacement Project

-

- Water Mains DW Generic

134 90.52000 Hoboken City 0905001-003

Water Main UpgradesPhase II

$5,200,000 - Level 1 - Water Mains Base DWSRF- Public

135 90.36908 MonroeMunicipalUtilitiesAuthority

0811002-001

Tank Painting $2,300,000 - 2018-08-01

Exempt 2018-10-05 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Knights of ColumbusElevated WaterStorage Tank

-

- Storage Tanks DW Generic

136 90.30590 DeptfordTownshipMunicipalUtilitiesAuthority

0802001-002

Water MainReplacement at EastWoodbury

$1,550,000 - 2019-12-06

Level 1 2020-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement at EastWoodbury

-

- Water Mains

137 90.30590 DeptfordTownshipMunicipalUtilitiesAuthority

0802001-003

Water MainReplacement atCountry Club Estates

$1,200,000 - 2019-12-06

Level 1 2020-06-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement atCountry Club Estates

-

- Water Mains

138 90.24244 GlassboroBorough

0806001-001

2.0 mg elevated towerrepainting

$3,250,000 - - Storage Tanks Base DWSRF- Public

139 90.11583 WallingtonBorough

0265001-002

Wallington AvenueWater Main

$2,600,000 - Level 1 2020-08-11

- Water Mains

140 90.05762 Ship BottomBorough

1528001-004

Water MainReplacement Project

$4,100,000 - 2020-03-31

Level 1 2020-06-15 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement

2020-06-18

2020-08-11

-

- Water Mains Base DWSRF- Public

141 90.02654 LakehurstBorough

1513001-002

Water MainReplacement ProjectPhase I

$1,200,000 - 2017-09-07

Level 1 2018-02-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement onPoplar Street, MyrtleStreet and WillowStreet

2018-11-28

2019-02-05

-

- Water MainExtensions

Nano-Eligible

142 90.00356 HopewellTownship

1106001-001

Water SystemImprovements

$1,285,000 - - Water Mains

143 81.03753 Seaside ParkBorough

1527001-003

Water AssetManagement Plan

$70,200 - - Other (InCompliancewith SDWA)

DW AssetManagementPlanDevelopment

144 80.52328 Perth AmboyCity

1216001-005

THE INSTALLATIONOF A NEW STANDBYGENERATOR AT THERUNYON WATERTREATMENT PLANT

$1,100,000 - Exempt 2020-05-05

- EmergencyGenerator

Base DWSRF- Public

145 80.52328 Perth AmboyCity

1216001-500

Install New Stand-byGenerator for RunyonWater Treat. Plant

$2,750,000 - 2015-03-13

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Install Generator@ Runyon WTP

-

- Aquifer Storageand RecoveryWell

DW Generic

146 80.16964 South OrangeVillage

0719001-009

Scotland Road WaterMains

$4,100,000 - Level 1 2020-11-04 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Scotland RoadWater MainReplacement

-

- Water Mains

147 75.27190 East WindsorMunicipalUtilitiesAuthority

1101002-005

Twin Rivers (Hsection) Water MainReplacement Project

$2,000,000 - 2019-08-01

Level 1 2018-08-03 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement -Huntington Drive

2019-05-29

2019-08-06

-

- Water Mains DW Generic

148 75.21333 Little EggHarborMunicipalUtilitiesAuthority

1516001-006

Water Storage TankPainting andUpgrades

$2,659,837 - - Storage Tanks DW Generic

149 75.21248 WestDeptfordTownship

0820001-004

Jessup Road WaterStorage Tank Repairand Repainting

$3,300,000 - 2020-06-22

Exempt 2019-10-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Jessup Road WaterStorage Tank Repairand Repainting

-

- Storage Tanks

150 75.12711 MantuaTownshipMUA

0810004-004

Centre CityWater/SewerInfrastructureImprovements

$4,750,000 - - Water Mains DW Generic

151 75.12500 Clinton Town 1005001-006

Lebanon BoroughWater MainReplacements - Phase2-5

$4,300,000 - 2015-03-12

Level 1 2015-04-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement

-

- Water Mains DW Generic

152 75.12500 Clinton Town 1005001-012

WQAAImplementation -Water InfrastructureAudit and Upgrades

$3,500,000 - 2019-05-28

Exempt 2019-07-18 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WQAA WaterValve Exercising

2019-08-02

2019-12-09

-

- Other (InCompliancewith SDWA)

153 75.11000 NorthBrunswickTownship

1215001-007

Water MainReplacement

- - - Water Mains Base DWSRF- Public

154 75.09962 Long BeachTownship

1517001-015

Water MainReplacement Project

$4,159,201 - 2016-03-03

Level 1 2016-07-20 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

2017 Water andSewer MainReplacement Projects

2018-11-01

2019-01-11

-

- Water Mains DW Generic

155 75.07000 MilltownBorough

1212001-005

Water Storage TankRehabilitation

$1,800,000 - 2016-03-04

Exempt 2015-12-23

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water StorageTankRehabilitation

2018-05-30

2018-09-07

2019-01-03

$1,645,000

2019-04-10

$1,450,000 Storage Tanks Nano-Eligible

156 75.02000 AllentownBorough

1302001-002

Elevated Water TankImprovements

$549,100 - 2018-08-13

Exempt 2018-08-28

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

AllentownBorough

2018-10-03

2019-06-24

-

- Storage Tanks Nano-Eligible

157 75.01329 FarmingdaleBorough

1314001-002

Painting and repairs towater tower and othermisc systemimprovements

$907,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Walnut StreetWaterSphere

-

- Storage Tanks

Page 7 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 24: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

158 75.00882 RooseveltBorough

1341001-007

Homestead, Cedarand Elm Water MainsProject.

$600,000 - 2019-06-06

Level 1 2019-09-23 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Homestead, Cedarand Elm Water MainsProject

2019-10-02

2019-12-27

-

- Water Mains

159 75.00055 WoodlandHeightsHomeownersAssociation

1615022-001

WellRehabilitation/SystemImprovements

$560,000 - - WellConstruction /Replacement

Nano-Eligible

160 72.10000 NJ AmericanWaterCompany,Incorporated

2004002-013

RM WTP EmergencyGenerator

$16,000,000 - 2017-02-27

Level 1 2017-06-02

ContractName

ATAdvActual

ATAwdActual

CertDate Cert Amount

RaritanMillstone WTPEmergencyGenerator

2017-07-24

2017-11-06

2017-12-13

$14,585,000

2018-02-22

$13,948,660 EmergencyGenerator

DW Generic

161 65.55254 JacksonTownshipMunicipalUtilitiesAuthority

1511001-012

Western Water MainExtension

$11,000,000 - 2016-03-03

Level 2 2017-07-25

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

WesternWater MainExtension

2017-11-28

2018-02-14

2018-04-12

$7,735,000

2018-05-11

$6,312,365 Water MainExtensions

DW Generic

162 65.16964 South OrangeVillage

0719001-005

Crest Drive Standpipe $3,140,000 - Undetermined - Storage Tanks

163 65.16964 South OrangeVillage

0719001-006

Repair or ReplaceNewstead Shere

$1,950,000 - - Storage Tanks

164 65.12052 FreeholdBorough

1315001-003

Replacement of WellNo. 3

$2,152,400 - Level 2 2019-08-05

- WaterTreatmentPlant/Facilities

DW Generic

165 65.12028 ManchesterUtilitiesAuthority

1603001-003

High Service PumpStation Replacement

$2,000,000 - - Pump Stations

166 65.03300 High BridgeBorough

1014001-004

High Bridge WaterSystem: Bunnvale Welland West Main StreetWater Main Upgrades

$1,477,872 - - WellConstruction /Replacement

Nano-Eligible

167 60.29480 MarlboroTownship

1328002-003

Beacon Hill storgetank Rehab

$1,714,000 - 2018-08-14

Exempt 2018-12-18 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Beacon Hill WaterStorage TankRehabilitation

2019-04-09

2019-08-21

-

- WaterTreatmentPlant/Facilities

DW Generic

168 60.12959 OaklandBorough

0220001-004

Iroquois PumpingStation - Rehabilitation

$3,133,000 - 2015-03-06

Level 1 2015-11-06

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehab ofPS

-

- Water Efficiency/ Water Meters

DW Generic

169 60.12500 Clinton Town 1005001-013

Foster WheelerBooster Pump StationModifications - AssetManagementPlanning

$3,000,000 - 2019-10-15

Exempt 2020-01-21 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Foster WheelerBooster PumpStationImprovements

2020-06-12

-

Fox Fire BoosterPump StationImprovements

2020-06-12

-

Foster Wheeler andFox Fire BoosterPump StationsImprovements

-

- Pump Stations

170 60.11117 BrigantineCity

0103001-501

Installation ofGenerators at well

$2,900,000 - 2015-03-19

Level 1 2014-08-28

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

InstallGenerators

-

- EnergyEfficiency /RenewableEnergy

DW Generic

171 60.11117 BrigantineCity

0103001-501

Installation ofGenerators at well

$2,900,000 - 2015-03-19

Level 1 2014-08-28

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

InstallGenerators

-

- EnergyEfficiency /RenewableEnergy

DW Generic

172 60.04800 BrielleBorough

1308001-004

Brielle Drinking WaterStorage Tank Project

$2,460,000 - 2018-09-20

Level 1 2018-09-26 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Brielle DrinkingWater StorageTank

2019-02-11

2019-04-11

-

- Storage Tanks Nano-Eligible

173 60.04060 Ho-Ho-KusBorough

0228001-001

Water Tank Upgrade $928,000 - - Storage Tanks DWSupplemental

174 60.02357 Borough ofWenonah

0819001-001

Water System AssetManagement Planand SystemImprovements - WaterTank Rehabilitation

$2,000,000 - - Storage Tanks Base DWSRF- Public

175 55.39147 WinslowTownship

0436007-010

Well #2 Filter PlantUpgrade

$3,100,000 - 2020-10-14

Level 1 2020-03-13 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well #2 FilterPlant Upgrade

-

- WaterTreatmentPlant/Facilities

176 51.05187 MountArlingtonBorough

1426005-001

Mount ArlingtonAsset ManagementPlan

$250,285 - ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

AssetManagementPlan

2018-12-12

$250,285

2018-12-18

$165,836 Water Mains Nano-Eligible

177 50.16964 South OrangeVillage

0719001-002

Well 17 EmergencyPower

$85,000 - Undetermined - EmergencyGenerator

178 50.04774 BrielleBorough

1308001-005

Old Bridge RoadElevated WaterStorage Tank

$3,600,000 - 2019-03-27

Level 1 2019-07-22 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

OLD BRIDGE ROADELEVATED WATERTANK

2019-08-29

2020-06-30

-

- Storage Tanks DW Generic

179 45.36250 Vineland City 0614003-016

Well 17 TreatmentFacility

$9,000,000 - 2016-02-11

Level 2Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Ion ExchangeEquipment Purchase

-

Radium TreatmentEquipment Purchase

-

City of Vineland No17 Treatment FacilityConstructionContract (Volume I){and Volume II [Book1 of 2]}?

-

- WaterTreatmentPlant/Facilities

DW Generic

180 45.12959 OaklandBorough

0220001-003

Well 9 - DieselGenerator

$3,133,000 - 2015-03-06

Level 1 2015-11-06

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well 9Generator

-

- Water Efficiency/ Water Meters

DW Generic

181 45.01500 HamptonBorough

1013001-001

New back up well 5 toaddress firm capacityrequirements

$1,800,000 - 2012-03-02

Level 2 2012-11-16

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Back up Well5 (New)

2017-06-20

2018-06-18

2018-08-25

$940,000

2018-12-21

$930,445 WellConstruction /Replacement

DW Generic

182 40.14245 Highland ParkBorough

1207001-001

2018-19 WaterSystemImprovements

$3,320,000 - - Water Efficiency/ Water Meters

DW Generic

183 40.07224 HopatcongBorough

1912001-005

Hopatcong BoroughWater MeterReplacement Project

$778,000 - - Other (InCompliancewith SDWA)

184 40.03900 High BridgeBorough

1014001-002

Improvements to theHigh Bridge WaterSystem

$1,076,758 - - Water Efficiency/ Water Meters

DW Generic

Page 8 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank

Page 25: LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST … · Col or Ra nk Proj e c t S pons or Proj e c t N um be r Proj e c t N a m e Proj e c t Pri ori t y L i s t Cos t Proj e c t El

ColorRank

PointsProject

SponsorProject

Number Project Name

ProjectPriority List

Cost

ProjectEligibility

Cost

LoanAppDate Env Rev Lvl

EDDActualDate Contracts

ShortTermLoan

ClosingDate

Short TermLoan

ClosingAmount Project Type Loan Type

185 40.01963 HardystonMunicipalUtilityAuthority

1911006-001

Water MeterReplacement

$477,400 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MeterReplacements

-

- Water Efficiency/ Water Meters

186 36.35000 WillingboroMunicipalUtilitiesAuthority

0338001-005

Energy SavingsImprovementProgram (DW)

- - - WaterTreatmentPlant/Facilities

DW Planning& Design

187 36.03342 NetcongBorough

1428001-001

Water SystemAssmentManagement Plan

- - - Other (InCompliancewith SDWA)

Small System("Nano") <=10,000customers

188 35.16964 South OrangeVillage

0719001-004

Farrell Field (WaltonAve & Audley St.)InterconnectionRehab.

$150,000 - 2016-03-04

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Farrell FieldInterconnectionRehabilitation

-

- Interconnection DW Generic

189 35.16964 South OrangeVillage

0719001-007

Replace PressureReducing Valves

$272,000 - - Water Mains

190 31.20065 Little EggHarborMunicipalUtilitiesAuthority

1516001-003

Water Treatment Plantat Mathistown Road

$5,525,000 $4,600,000 2014-03-03

Level 2 2015-09-30 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

WaterTreatment Plantat MathistownRoad

2019-02-19

2019-05-30

2019-06-13

$5,525,000

2019-06-17

$4,750,000 WaterTreatmentPlant/Facilities

DW Generic

191 30.14000 South RiverBorough

1223001-003

Rehabilitation ofBorough Wells

$1,300,000 - Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehabilitation ofBorough Wells

-

- WellConstruction /Replacement

Base DWSRF- Public

192 30.14000 South RiverBorough

1223001-003

Rehabilitation ofBorough Wells

$1,300,000 - 2019-11-12

Level 1Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Rehabilitation ofBorough Wells

-

- WellConstruction /Replacement

Base DWSRF- Public

193 30.03051 National ParkBorough

0812001-004

Replacement of Wells5 & 6

$1,700,000 - 2017-11-07

Level 1 2018-01-18

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Replacementof Wells 5 & 6

2018-06-08

2018-07-30

2018-08-24

$1,470,000

2018-08-29

$1,495,000 WellConstruction /Replacement

Nano-Eligible

194 30.02600 Ocean GateBorough

1521001-003

Well WaterConstruction/Drillinga new well

$720,000 - Level 1 2019-06-28 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well WaterConstruction

-

- WellConstruction /Replacement

195 25.12959 OaklandBorough

0220001-002

Replace 4600 WaterMeters

$3,133,000 - 2015-03-06

Level 1 2015-11-06 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MeterReplacement

-

- Water Efficiency/ Water Meters

DW Generic

196 25.12500 Clinton Town 1005001-007

Replace Water Meters $4,277,804 - 2015-03-13

Level 1 2015-04-24 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Water MainReplacement

-

- Water Mains DW Generic

197 20.16964 South OrangeVillage

0719001-001

Well 17 Rehabilitation $250,000 - 2016-03-04

Exempt 2017-06-30

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

Well 17Rehabilitation

-

- EquipmentPurchase(Drinking Water)

DW Generic

198 16.35129 BellevilleTownship

0701001-007

Township of BellevilleAsset ManagementPlan

$220,000 - - Other (InCompliancewith SDWA)

DW AssetManagementPlanDevelopment

199 16.07224 HopatcongBorough

1912001-004

Small System AssetManagement

$100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

HopatcongAssetManagmentPlan

2018-06-26

$100,000

2018-12-19

$100,000 Other (InCompliancewith SDWA)

200 16.03382 HamburgBorough

1909001-001

Small System AssetManagement

$85,000 - UndeterminedContract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Hamburg AssetManagementPlan

2018-10-31

$85,000

2018-12-14

$85,000 Other (InCompliancewith SDWA)

201 16.02229 MountArlingtonBorough

1426005-002

Windemere,Altenbrand, NorthGlen and Park WaterMain Extension

$1,202,100 - - Water MainExtensions

202 16.02000 AllentownBorough

1302001-001

Asset ManagementPlan

- - - Other (InCompliancewith SDWA)

Small System("Nano") <=10,000customers

203 15.29480 MarlboroTownship

1328002-004

New Stand-by Well 5A(Tennent RdTreatment Plant &Booster PumpStation)

$1,385,000 - 2018-04-13

Level 1 ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

New stand-byWell-5A

-

- WellConstruction /Replacement

DW Generic

204 15.12959 OaklandBorough

0220001-001

Construct new Well10A as backup forWell 10

$3,133,000 - 2015-03-06

Level 1 2015-11-06

ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

New Well10A

-

- Water Efficiency/ Water Meters

DW Generic

205 15.03165 HarveyCedarsBorough

1509001-002

Installation of a WaterMonitoring Well

$1,100,000 - 2016-02-22

Level 2 2017-08-01 Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

Owen, Little &Associates, Inc.

-

2017 Test/Production Well

-

- WellConstruction /Replacement

Nano-Eligible

206 1.12729 RidgefieldPark Village

0238001-002

Village of RidgefieldPark Skymark Project -- Drinking Water

$1,752,308 - - Water MainExtensions

207 1.08257 SpotswoodBorough

1224001-002

SPOTSWOOD WATERMASTER PLAN

$85,265 - - Water Mains DW Generic

208 1.03900 High BridgeBorough

1014001-001

Asset ManagementPlan for the HighBridge Water System

$100,000 -Contract Name

ATAdvActual

ATAwdActual

CertDate

CertAmount

High BridgeBorough AMP

2018-06-18

$70,000

2019-05-10

$100,000 Water Efficiency/ Water Meters

DW Generic

209 1.02600 PenningtonBorough

1108001-004

Asset ManagementPlan for PenningtonWater Utility '

$360,000 - - Water Mains

210 1.02552 Sea GirtBorough

1344001-005

Sea Girt BoroughCMMS

$100,000 - Exempt - Other (InCompliancewith SDWA)

Nano-Eligible

211 1.01963 HardystonMunicipalUtilityAuthority

1911006-003

Asset ManagementPlan

$100,000 - ContractName

ATAdvActual

ATAwdActual

CertDate

CertAmount

AssetManagementPlan

2018-09-18

$84,840

2018-09-12

$84,840 Other (InCompliancewith SDWA)

Page 9 of 9

Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank