Project Status Color Project Status Description Number ofProjects
Project PriorityList
ContractsATAward
Amount
ContractsCertified Amount
Short TermLoan Amount
Project YearEstimate
ACTIVEPROJECTS
BLUE Project has received a Short-Term Loan Closing Date. 215 $2,277,704,318 $1,176,543,300 $1,575,059,183 $1,658,238,690 $1,658,238,690
PURPLE Project has received DEP Certification. 25 $741,006,728 $430,652,905 $492,624,349 $492,624,349
LIGHTPURPLE
Project has received an Authorization to Award. 18 $109,617,979 $71,716,218 $109,617,979
GREEN Project has received an Authorization to Advertise. 24 $441,337,402 $441,337,402
YELLOW Project is under review.
Letter of intent has been received.Environmental Planning Document has been declaredsufficient by DEP.
165 $1,592,768,196 $1,592,768,196
ORANGE Awaiting sponsor's submission of Letter of Intent (LOI) andEnvironmental Planning Document.
142 $714,017,255 $714,017,255
SUB-TOTAL (ACTIVE PROJECTS) 589 $5,876,451,877 $1,678,912,424 $2,067,683,532 $1,658,238,690 $5,008,603,870
INACTIVEPROJECTS
LIGHTRED
Project anticipates funding in current SFY.
SUB-TOTAL (INACTIVE PROJECTS) 0
TOTAL NUMBER OF PROJECTS (ACTIVE AND INACTIVE) 589 $5,876,451,877 $1,678,912,424 $2,067,683,532 $1,658,238,690 $5,008,603,870
Updated as of January 14, 2021
LIVING LIST (ACTIVE REVIEW PROJECT) PROJECT COST SUMMARY REPORT
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type1 266 Allentown
BoroughS340567-05
Allentown BoroughWastewater TreatmentPlant Modifications
$5,100,000 - 2017-08-11
Level 1 2018-02-23 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Allentown BoroughWastewater Treatment PlantModifications
2018-04-06
2019-12-09
2019-12-18
$4,740,000
2020-02-14
$4,600,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
2 1176 AllentownBorough
S340567-06
Water Meter Replacement(FKA DW)
$664,938 - 2018-10-11
Level 1 2018-10-16 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
AllentownBorough
2018-10-19
2019-02-11
2019-03-29
$525,000
2019-06-07
$500,000 Water Efficiency /Water Meters
3 228 Bergen CountyUtilitiesAuthority
S340386-21
FST Improvements $7,600,000 - 2019-07-02
Exempt 2019-08-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Final Settling Tanks 1 to 12improvements at LittleFerry
2019-09-23
$160,000
Final Settling Tanks 1though 16
2020-03-25
2020-06-29
2020-07-24
$6,950,000
Final Settling Tanks 13 to16
2020-06-04
$65,000
2020-08-11
$6,927,530 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
4 228 Bergen CountyUtilitiesAuthority
S340386-23
Sludge DigesterImprovements
$18,700,000 - 2019-08-19
Exempt 2019-11-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sludge DigestersImprovements
2019-08-14
$1,785,000
Sludge Digesters CleaningServices
2020-02-04
$2,785,000
Two Gas Flare Assembliesprocurement.
2020-01-10
2020-08-12
2020-08-20
$1,420,000
Procurement of five dualmembrane digester coversystems and five digesterinternal draft tube mixingsystems
2020-03-25
2020-11-17
2020-12-02
$4,700,000
2020-09-09
$18,700,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
5 228 Bergen CountyUtilitiesAuthority
S340386-24
Tank HeaderImprovements
$1,950,000 - 2019-07-02
Exempt 2019-05-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Aeration Tank HeaderImprovements
2019-08-14
$70,000
2019-10-24
$1,950,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
6 427 Bergen CountyUtilitiesAuthority
S340386-25
Northern Valley Force MainImprovements
$4,000,000 - 2019-07-09
Level 1 2020-07-31 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Northern Valley (Phase I) andNorthvale (Phase II) Force MainImprovements
2019-09-23
$195,000
Northern Valley (Phase I) andNorthvale (Phase II) Force MainImprovements
-
2019-10-24
$4,000,000 Sanitary Sewer SystemRehabilitation
CW Generic
7 1155 BloomfieldTownship
S340516-01
Water Meter Replacement(FKA DW)
$7,230,970 - 2019-01-10
Exempt 2019-02-01 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Water MeterReplacement
2019-04-09
2019-05-30
2019-06-13
$5,675,000
2020-04-03
$5,018,768 Water Efficiency /Water Meters
8 643 Bradley BeachBorough
S340472-01
Sewer Main Installation andRepairs - Phase I
$2,700,000 - 2015-10-07
Level 1 2016-08-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer MainInstall/Repair BradleyBoulevard
2017-01-06
2017-06-19
2017-06-27
$2,005,000
2017-12-07
$1,952,123 Sanitary Sewer SystemRehabilitation
CW Generic
9 461 Brick TownshipMunicipalUtilitiesAuthority
S340448-11
Wastewater Pump StationRehabilitation - Phase II
$5,700,000 - 2017-05-11
Level 1 2018-03-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Wastewater Pump StationRehabilitation - Phase II
2018-11-29
2019-03-12
2019-04-24
$5,685,000
2019-05-31
$5,278,297 Sanitary Sewer SystemRehabilitation
CW Generic
10 1160 Brick TownshipMunicipalUtilitiesAuthority
S340448-14
Meter Replacement - PhaseII
$2,000,000 - 2019-05-16
Exempt 2019-06-20 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
MeterReplacement
2019-08-15
2019-11-01
2020-02-04
$1,920,000
2020-02-05
$1,609,341 Water Efficiency /Water Meters
11 641 BuenaBoroughMunicipalUtilitiesAuthority
S340518-06
Upgrades to Sanitary SewerPump Stations #1, 2 & 3
$1,298,000 - 2020-01-31
Level 1 2020-02-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
P/D - Upgrades to SanitarySewer Pump Stations #1, 2& 3
2019-12-09
$100,000
Upgrades to Sanitary SewerPump Stations #1, 2 & 3
2020-08-27
2020-11-06
2020-12-02
$1,370,000
2019-12-10
$1,250,000 Sanitary Sewer SystemRehabilitation
12 1147 Burlington City S340140-02
Meter Replacement (FKADW Meter replacement &Filter rehabilitation)
$2,600,000 - 2019-04-22
Level 1 2018-11-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Residential WaterMeter Replacement
2019-09-19
2019-12-09
2020-02-18
$2,270,000
2020-11-12
$1,990,596 Water Efficiency /Water Meters
13 92 CamdenCountyMunicipalUtilitiesAuthority
S340640-13
Delaware #1 PumpUpgrades
$12,800,000 - 2018-05-24
Exempt 2012-03-23 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Preliminary TreatmentFacility Pump Upgrades
2018-10-19
2019-04-11
2019-06-14
$11,260,000
2019-06-21
$10,226,713 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
14 27 CamdenCountyMunicipalUtilitiesAuthority
S340640-16
Wastewater TreatmentPlant Improvements
$13,300,000 - 2015-03-19
Level 1 2018-10-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
DELAWARE NO. 1 WATERPOLLUTION CONTROLFACILITY, SEPARATION OFCITY AND COUNTYINTERCEPTORS (VOLUME 1& 2 of 2)
2018-10-24
2018-12-20
2019-02-13
$7,605,000
Construction ManagementServices for DELAWARE NO.1 WATER POLLUTIONCONTROL FACILITY,SEPARATION OF CITY ANDCOUNTY INTERCEPTORS(VOLUME 1 & 2 of 2)
-
2020-09-25
$8,177,514 DecentralizedWastewater (or Septic)SystemRepair/Replacement
CSO -AbatementProjects
15 7 CamdenCountyMunicipalUtilitiesAuthority
S340640-17
Reduce Potential for CSOswithin City
$3,500,000 - 2015-03-06
Level 1 2017-07-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
5 Green InfrastructureProjects Phase 3
2017-09-11
2017-12-06
2018-01-11
$814,790
Cramer Hill NaturePreserve
2017-08-14
2017-10-26
2018-01-11
$515,493
Sewer ReconstructionProject Phase VI
2017-09-11
2017-12-06
2018-01-11
$1,310,980
2018-01-12
$2,641,264 Combined SewerOverflow (CSO) - GreenInfrastructure
CSO - GreenInfrastructure
16 47 CamdenCountyMunicipalUtilitiesAuthority
S340640-18
Phase I upgrades,improve/sustain optimalwastewater performance
$84,030,000 - 2015-03-21
Level 1 2017-06-09 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Anaerobic SludgeDigesters
2017-08-28
2018-01-24
2018-03-05
$55,720,000
Combine Heat andPower System
2017-08-28
2017-08-28
2018-02-05
$26,115,000
2018-03-20
$76,164,967 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
17 5 CamdenCountyMunicipalUtilitiesAuthority
S340640-20
Camden City GreenInfrastructure
$3,000,000 - 2019-03-20
Level 1 2019-07-26 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
North Camden GreenInfrastructure Project
2020-06-19
2020-10-13
2020-10-29
$1,935,000
2020-12-11
$1,679,070 StormwaterManagement - GreenInfrastructure
CSO - GreenInfrastructure
18 16 CamdenCountyMunicipalUtilitiesAuthority
S340640-22
Upgrades to Camden City'sCombined Sewer OverflowSystem
$3,500,000 - 2018-05-24
Exempt 2018-08-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Cooper Street PipeLining
2018-10-05
2018-12-13
2018-12-19
$1,259,300
Arch Street PumpStation Upgrades
2018-10-05
2018-12-13
2018-12-19
$710,700
2018-12-21
$2,005,428 StormwaterManagement - GrayInfrastructure
CSO -AbatementProjects
19 16 CamdenCountyMunicipalUtilitiesAuthority
S340640-23
Dredging Of Camden City'sCombined SewerOverflows To ReduceCombined SewageFlooding
$5,600,000 - 2018-07-19
Level 1 2018-12-17 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
DREDGING ANDREHABILITATION OF 9CSO OUTFALLS
2018-12-17
2019-04-11
2019-04-18
$5,540,000
2020-08-26
$5,570,000 StormwaterManagement - GrayInfrastructure
CSO -AbatementProjects
20 9 CamdenCountyMunicipalUtilitiesAuthority
S340640-24
Upgrade of CamdenCounty WastewaterTreatment Plant ToIncrease Wet WeatherCapacity
$6,500,000 - 2018-05-24
Level 1 2018-10-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Delaware No. 1 WaterPollution Control Facility WetWeather Upgrades - Phase 1
2018-11-28
2019-04-11
2019-06-03
$4,060,000
2019-06-21
$3,785,476 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
Living (Active Review Project) List (Sorted by Color)
Clean Water Projects Updated as of January 14, 2021
New Jersey Water Bank (NJWB)
Page 1 of 15
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type21 793 Camden
CountyMunicipalUtilitiesAuthority
S340640-26
Newton Creek Dredgingand Erosion Control
$28,200,000 - 2018-10-04
Level 2 2019-09-13 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
NEWTON LAKEDREDGING &RECLAMATIONPROJECT
2020-03-26
2020-08-21
2020-09-04
$23,715,000
2020-09-25
$23,711,831 Non-Point Source(NPS) PollutionControls
CW Generic
22 430 CamdenCountyMunicipalUtilitiesAuthority
S340640-28
EmergencyRehabilitation/Replacementof the CCMUA Berlin Twp.Force Main
$7,500,000 - 2020-07-24
Exempt 2020-07-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
BERLIN FORCE MAINREHABILITATION
2020-08-05
2020-08-20
2020-09-04
$3,200,000
2020-09-25
$2,933,555 Emergency Repair Base CWSRF
23 9 CamdenCountyMunicipalUtilitiesAuthority
S345040-01
Camden City andGloucester City Long TermCSO Control Plan
$1,380,000 - 2020-07-02 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Camden City andGloucester City Long TermCSO Control Plan
2020-10-08
$1,250,000
2020-12-11
$1,249,973 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
24 527 CarteretBorough
S340939-10
Roosevelt Pump Stationand Bergen Street PumpStation Upgrades
$6,600,000 - 2020-01-30
Exempt 2020-01-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehabilitation ofRoosevelt Avenue PumpStation
2020-01-30
2020-05-19
2020-06-11
$4,395,000
Rehabilitation BergenStreet Pump Station
2020-06-24
2020-08-18
2020-09-04
$280,000
Engineering Services 2020-06-03
$226,000
2020-10-14
$4,800,000 Sanitary Sewer SystemRehabilitation
CW Generic
25 334 Chatham(MCJM)Borough
S340715-07A
Facility Improvements2018
$7,289,180 - 2019-03-11
Level 1 2019-08-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning and Design Loanfor "Facility Improvements2018"
2019-03-29
$180,000
Facility improvements2018
2019-10-07
2020-01-27
2020-02-18
$2,890,000
2019-04-05
$2,730,000 Sewage TreatmentPlant (STP) -Expansion
CW Generic
26 1026 Clinton Town S340924-07
Town of Clinton System-Wide Customer MeterReplacement
$800,000 - 2019-02-26
Exempt 2019-05-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
System Wide MeterReplacement - Phase II
2019-05-02
2019-06-12
2019-06-20
$250,000
Procurement of WaterMeters through Co-op
2019-06-20
$470,000
2019-06-24
$719,969 Water Efficiency /Water Meters
CW Generic
27 253 Clinton Town S340924-08
WWTP Filter and ResidualsBuilding ImprovementProject
$4,100,000 - 2019-11-26
Exempt 2019-06-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WWTP Filter andResiduals BuildingImprovement
2019-12-18
2020-04-08
2020-04-27
$4,050,000
2020-10-14
$3,889,400 Sewage TreatmentPlant (STP) -Improvement/Upgrade
28 889 CranfordTownship
S340858-04
Stormwater constr. variouslocations to improvedrainage/prevent flooding
$12,000,000 - 2015-03-05
Level 1 2018-05-29 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
CranfordPhase 2B
2018-08-01
2018-12-18
2019-01-03
$2,975,000
2019-06-19
$2,578,383 StormwaterManagement - GrayInfrastructure
CW Generic
29 872 CumberlandCounty
S340438-03
Downe TownshipFortescue Package Plant
$17,000,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning andDesign Contract
2018-04-19
$1,000,000
2018-05-15
$1,000,000 Sewage TreatmentPlant (STP) - New
CW Generic
30 393 DelranTownship
S340794-10
Clay Street Pump Station $2,100,000 - 2019-03-20
Level 1 2019-06-12 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Clay Street PumpStation
2019-08-29
2020-01-03
2020-02-18
$1,540,000
2020-11-12
$1,538,856 Sanitary Sewer SystemRehabilitation
31 284 East Orange(JMEUC) City
S340686-08a
Flood Mitigation FacilitiesProject
$1,245,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$105,593
2020-10-28
$915,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
32 284 East Orange(JMEUC) City
S340686-09A
Capital ImprovementsProjects 2019
$620,504 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects 2019
2019-06-13
$70,000
2019-07-30
$615,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
33 284 Elizabeth(JMEUC) City
S340686-08b
Flood Mitigation FacilitiesProject
$12,920,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$1,263,932
2020-10-28
$9,960,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
34 284 Elizabeth(JMEUC) City
S340686-09B
Capital ImprovementsProjects 2019
$6,505,876 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects2019
2019-06-13
$835,000
2019-07-30
$6,440,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
35 87 Elizabeth City S340942-17
South Street Flood ControlProject
$6,500,000 - 2014-03-04
Level 2 2014-12-30 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
South StreetFlood
2019-01-22
2019-04-04
2019-06-13
$5,295,000
2019-06-17
$5,320,111 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
36 87 Elizabeth City S345070-01
City of Elizabeth CSO LTCP $4,000,001 - 2016-02-25
ContractName
ATAdvActual
ATAwdActual Cert Date
CertAmount
PlanningLTCP
2017-01-18
$940,000
PlanningLTCP
2019-06-14
$975,000
PlanningLTCP
2019-06-14
$405,000
PlanningLTCP
2019-06-14
$345,000
PlanningLTCP
2020-06-04
$200,000
2016-04-05
$3,350,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
37 617 EmersonBorough
S340497-01
Small System AssetManagement Plan
$100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Small System AssetManagement Plan
2017-09-22
$100,000
2018-01-12
$99,966 Sanitary Sewer SystemRehabilitation
CW Generic
38 496 EveshamMunicipalUtilitiesAuthority
S340838-07
2018 Sewer SystemImprovements
$1,600,000 - 2019-02-13
Level 1 2019-03-04 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Locust Avenue PumpStation Upgrades
2019-08-29
2019-12-09
2020-02-21
$1,320,000
2020-09-11
$1,315,162 Sanitary Sewer SystemRehabilitation
CW Generic
39 477 FranklinTownshipSewerageAuthority
S340839-08
Hamilton St. PumpingStation
$4,200,000 - 2018-07-27
Level 1 2018-11-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Hamilton St.Pumping Station
2019-03-14
2019-06-26
2019-08-13
$4,160,000
2020-10-14
$4,044,510 Sanitary Sewer System- New
CW Generic
40 610 Glen RidgeBorough
S340861-04
GR-2017-SSR SanitarySewer Rehabilitation &Sanitary Sewer CollectionSystem AssetManagement Plan
$2,300,000 - 2018-08-10
Exempt 2018-12-18 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
SANITARY SEWERCOLLECTIONREHABILITATION
2019-01-15
2019-03-13
2019-05-28
$1,010,000
Sanitary SewerRehabilitation Phase 2
2019-05-02
2019-06-11
2019-06-13
$1,045,000
AMP -
2019-06-21
$1,856,145 Sanitary Sewer SystemRehabilitation
CW Generic
41 1132 GloucesterCountyImprovementAuthority
S342016-04
Cell 15 Construction $18,500,001 - 2020-01-28
Level 1 2020-05-08 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Cell 15Construction
2020-05-26
2020-08-06
2020-08-19
$10,875,000
GCIA-EngineeringServices
2020-06-04
$140,000
2020-09-23
$8,631,806 Landfill Construction Base CWSRF
42 260 GloucesterCounty UtilitiesAuthority
S340902-15
Combined Heat & Power $11,500,000 - 2015-03-03
Level 1 2015-06-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Biogas ConditioningSystem
2019-12-04
2020-03-30
2020-07-24
$3,485,000
Combined Heat andPower Units
-
SwitchgearEquipment Purchase
2020-10-09
2020-11-17
2020-12-15
$1,265,000
Bio Gas Storage -
2020-09-03
$11,500,000 Energy Efficiency /Renewable Energy
CW Generic
43 912 GloucesterTownship
S340364-11
Redwood Street CulvertReplacement
$950,000 - 2015-03-10
Level 1 2019-02-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Redwood St. CulvertReplacement
2019-08-29
2019-12-03
2020-01-09
$770,000
2020-10-15
$701,564 StormwaterManagement - GrayInfrastructure
CW Generic
Page 2 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type44 912 Gloucester
TownshipS340364-15
Gloucester TownshipStormwater Improvements
$1,450,000 - 2016-03-04
Level 1 2017-03-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lincoln Drive (CES#2542-44)
2018-02-02
2018-06-07
2018-06-18
$472,004
Spring Hill Drive (CES#2542-45)
2018-02-02
2018-06-07
2018-06-18
$255,354
Edgewater Court (CES#2542-46)
2018-02-02
2018-06-07
2018-06-18
$114,526
Block 9801 Lot 1 (CES#2542-47)
2018-02-02
2018-06-07
2018-06-18
$125,209
Pasadena Drive (CES#2542-48)
2018-02-02
2018-06-07
2018-06-18
$187,907
2020-03-20
$927,983 StormwaterManagement - GrayInfrastructure
CW Generic
45 175 HackensackCity
S340923-14
Sewer Separation toSupport Main StreetRedevelopment
$8,000,000 - 2019-12-20
Level 1 2020-02-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer Separation to SupportMain Street Redevelopment(Atlantic Street to MercerStreet)
2020-02-05
2020-03-11
2020-06-03
$1,918,000
Sewer Separation to SupportMain Street Redevelopment(Mercer Street to PassaicStreet)
2020-02-28
2020-04-07
2020-06-03
$3,562,000
2020-06-22
$5,204,010 Combined SewerOverflow (CSO) -TraditionalInfrastructure
46 612 HaddonHeightsBorough
S340877-02
Sanitary Sewer SystemAsset Management Plan
$100,000 - 2020-01-17 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer SystemAsset Management Plan
2019-10-16
$105,000
2020-12-15
$100,000 Sanitary Sewer SystemRehabilitation
CW Generic
47 655 HamburgBorough
S340149-03
Sanitary Sewer SystemAsset Management Plan
$100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer AssetManagement Plan
2019-06-03
$86,000
2019-08-28
$85,000 Sanitary Sewer SystemRehabilitation
48 880 HammontonTown
S340927-09
Stormwater Improvements $4,600,000 $4,600,000 2015-03-06
Level 1 2015-07-28 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
StormwaterRehab
2016-03-23
2016-06-08
2016-06-17
-
2016-11-14
$2,755,872 Sanitary Sewer SystemRehabilitation
CW Generic
49 284 Hillside(JMEUC)Township
S340686-08c
Flood Mitigation FacilitiesProject
$1,815,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$161,728
2020-10-28
$1,355,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
50 284 Hillside(JMEUC)Township
S340686-09C
Capital ImprovementsProjects 2019
$908,430 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects2019
2019-06-13
$110,000
2019-07-30
$900,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
51 129 Hoboken City S340635-07
Resilient GreenInfrastructure for CSOReduction
$5,000,000 $5,000,000 2015-03-06
Level 2 2016-08-31 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Green Infrastructure forCSO Reduction
2016-10-21
2016-10-27
2016-11-10
$4,670,000
2018-06-21
$4,335,696 Combined SewerOverflow (CSO) - GreenInfrastructure
CSO - GreenInfrastructure
52 129 Hoboken City S340635-09
ROW Green Infrastructureadjacent to Water Mains(2018)
$500,000 - 2018-08-17
Level 1 2018-11-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
ROW Gray Infrastructureadjacent to Water Mains
2019-02-27
2019-07-09
2019-08-01
$420,000
2020-06-26
$359,344 StormwaterManagement - GreenInfrastructure
CSO - GreenInfrastructure
53 395 HopatcongBorough
S340488-07
Sanitary Sewer SystemAsset Management Plan
$80,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Hopatcong Sanitary SewerSystem Asset ManagementPlan
2019-06-05
$76,000
2019-12-12
$75,000 Sanitary Sewer SystemRehabilitation
CW Generic
54 307 HowellTownship
S344040-02
Freewood Acres & Route 9Sanitary Sewer Extension
$14,680,000 - 2016-03-04
Level 2 2017-05-03 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Freewood Acres & Route9 Sanitary SewerExtension
2018-06-01
2018-08-13
2018-10-19
$14,680,000
2018-10-26
$12,076,776 Sanitary Sewer System- New
Barnegat Bay
55 284 Irvington(JMEUC)Township
S340686-08d
Flood Mitigation FacilitiesProject
$4,505,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$428,770
2020-10-28
$3,440,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
56 284 Irvington(JMEUC)Township
S340686-09D
Capital ImprovementsProjects 2019
$2,252,347 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects2019
2019-06-13
$285,000
2019-07-30
$2,230,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
57 65 Jersey CityMunicipalUtilitiesAuthority
S340928-15
Phase 3 & 4 SewerImprovements
$41,000,000 $41,000,000 2014-03-03
Level 1 2014-10-08 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Sewer Replacement &Blockage RemovalRepairs
2017-02-27
2017-09-11
2017-09-22
$34,450,000
2020-12-09
$38,918,490 Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
58 65 Jersey CityMunicipalUtilitiesAuthority
S340928-20
Outfall Chambers $7,200,000 - 2014-02-28
Level 1 2015-07-28
ContractName
ATAdvActual
ATAwdActual Cert Date
CertAmount
PumpStations
2017-04-13
2017-08-28 2017-09-08
$1,490,000
2018-02-08
$1,488,384 DecentralizedWastewater (or Septic)SystemRepair/Replacement
CSO -AbatementProjects
59 65 Jersey CityMunicipalUtilitiesAuthority
S340928-21
Sewer Pipe Replacement /Phase V CSO Study
$25,000,000 $12,000,000 2015-03-06
Level 1 2015-08-18 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
Sewer PipeReplacement
2019-11-26
2020-03-30
2020-06-03
$11,515,000
2020-06-30
$10,525,544 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
60 65 Jersey CityMunicipalUtilitiesAuthority
S340928-24
Phase 1/2 SewerRehabilitation
$108,000,000 - 2016-03-04
Level 1 2019-06-13 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
JCMUA Phase 1-2Sewer Rehabilitation
2019-11-14
2020-06-09
2020-06-11
$107,450,000
2020-06-30
$81,500,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
61 65 Jersey CityMunicipalUtilitiesAuthority
S340928-28
Van Winkle Ave. SanitarySewer Rehabilitation
$2,700,000 - 2016-03-02
Level 1 2016-06-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Van Winkle AvenueCombined Sewer and WaterRehabilitation
2018-05-24
2018-08-27
2018-10-19
$2,290,000
2019-02-19
$2,286,447 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
62 65 Jersey CityMunicipalUtilitiesAuthority
S340928-31
54 inch JCMUA/PVSCFORCEMAIN REPAIR
$11,059,600 - 2018-08-31
Level 1 2017-09-18 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Repair of 54" CrossTown Force Main
2018-10-02
2018-12-04
2019-01-10
$7,855,000
2019-02-19
$9,255,147 Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
63 65 Jersey CityMunicipalUtilitiesAuthority
S340928-33
Pine Street SyphonReplacement
$9,000,000 - 2019-06-14
Level 1 2020-06-17 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Pine Street SiphonReplacement
-
Pine Street "EmergencyContract"
2021-01-11
$6,760,000
Pine Street ConstructionMaterials and Pumping
2020-11-30
$1,340,334
2020-12-09
$9,000,000 Sanitary Sewer SystemRehabilitation
CW Generic
64 65 Jersey CityMunicipalUtilitiesAuthority
S340928-34
Sanitary Sewer MainRehabilitation/Lining
$1,300,000 - 2018-11-21
Exempt 2018-12-11 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer MainRehabilitation Project
2019-05-22
2019-08-27
2020-01-09
$1,145,000
2020-09-16
$1,181,180 Sanitary Sewer SystemRehabilitation
CW Generic
65 1105 Kearny Town S340259-12
Redev of recreationalcomplex as a modernartificial turf complex
$21,500,000 - 2015-03-06
Level 2 2018-06-11 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Remediation/Contaminatedsite cleanup
2018-10-03
2019-01-30
2019-02-13
$14,175,000
2019-06-20
$14,090,909 RemedialAction/ContaminatedSite Cleanups(Brownfields)
CW Generic
66 818 LakewoodTownshipMunicipalUtilitiesAuthority
S340465-02
Gravity Sewer LineInstallation
$4,320,000 - 2018-09-11
Level 2 2019-05-08 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
GRAVITY SANITARY SEWERSYSTEM EXTENSION - EASTCOUNTY LINE ROAD TORIDGE AVENUE
2019-06-07
2019-09-30
2019-10-16
$1,690,000
VASSAR - SPRUCESANITARY SEWER
2019-06-07
2019-09-30
2019-10-16
$2,375,000
2019-11-20
$4,063,763 Sanitary Sewer SystemRehabilitation
67 1153 LakewoodTownshipMunicipalUtilitiesAuthority
S340465-03
Administration BuildingAddition (FKA DW)
$1,750,000 - 2018-12-20
Level 1 2018-05-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Additions, Renovations andAlterations to the LakewoodTownship Municipal UtilityAuthority AdministrationBuilding
2018-09-27
2019-01-11
2019-04-24
$1,468,550
2019-05-31
$1,440,000 Water TreatmentPlant/Facilities
CW Generic
Page 3 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type68 244 Lambertville
MunicipalUtilitiesAuthority
S340882-09
WWTP rehab work $1,800,000 - 2019-05-14
Exempt 2019-08-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Repaving of WWTP Area andAccess Road
2019-10-29
2020-01-13
2020-04-01
$251,597
WWTP Roof Replacement 2019-10-29
2020-01-13
2020-04-01
$296,610
Purchase of RectangularClarifier Collectors
2019-10-29
2020-01-13
2020-04-01
$186,793
Rehabilitation of DisinfectionFacilities & DrainageImprovements
2020-01-24
2020-03-30
2020-04-15
$600,000
Lambertville Municipal UtilitiesAuthority S340882-09 P&D
2020-04-01
$75,000
2020-04-01
$1,725,444 Sewage TreatmentPlant (STP) -Improvement/Upgrade
69 649 LambertvilleMunicipalUtilitiesAuthority
S340882-10
Collection systemrehabilitation
$700,000 - 2019-04-12
Exempt 2019-05-06 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Asset Management Plan 2019-06-20
$99,700
Sanitary SewerCollection System Rehab
2019-05-20
2019-06-12
2019-06-13
$585,000
2019-08-21
$550,000 Sanitary Sewer SystemRehabilitation
CW Generic
70 241 Linden RoselleSewerageAuthority
S340299-09
Phase V BuildingImprovements
$2,100,000 - 2019-07-02
Exempt 2019-08-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase V BuildingImprovements
2019-09-05
2019-11-07
2020-02-04
$1,505,000
2020-08-07
$1,434,246 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
71 390 Little EggHarborMunicipalUtilitiesAuthority
S340579-03
Little Egg Harbor SewerMain Replacement
$2,900,000 - 2016-03-04
Level 1 2017-02-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Little Egg Harbor Water andSewer ImprovementsPhase I
2020-03-04
2020-05-15
2020-06-04
$1,800,000
2020-06-25
$1,797,091 Sanitary Sewer SystemRehabilitation
CW Generic
72 226 LoganTownshipMunicipalUtilitiesAuthority
S340123-02
Facility Improvements andEffluent Force MainReplacement Project.
$9,948,000 - 2019-06-25
Level 2 2020-07-01 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Facility Improvements andEffluent Force MainReplacement
2020-08-07
2020-10-13
2020-10-29
$11,795,000
2020-11-18
$9,948,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
73 656 Long BeachTownship
S340023-07
Sewer Main ReplacementProject
$4,600,000 - 2016-03-02
Level 1 2016-07-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2017 Water and Sewer MainReplacement Projects(Project Nos. 1517001-014and S340023-07)
2018-11-01
2019-01-11
2019-02-13
$4,260,000
2020-10-15
$4,023,807 Sanitary Sewer SystemRehabilitation
CW Generic
74 107 Long BranchSewerageAuthority
S340336-08
2018 CapitalImprovements Projects -Wastewater TreatmentPlant
$1,740,700 - 2019-12-20
Level 1 2019-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2018 Capital ImprovementsProjects - WastewaterTreatment Plant
2019-08-13
$110,000
WWTP Hot Water and FinalSettling Tank MechanicalImprovements
2020-01-07
-
2019-08-14
$1,700,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
75 368 Long BranchSewerageAuthority
S340336-09
2018 CapitalImprovements Projects -Collection System
$5,600,000 - 2020-05-22
Level 1 2019-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2018 CapitalImprovements Projects -Collection System
2019-08-13
$310,000
Hoey Avenue PumpStation Force MainReplacement
2020-09-21
2020-10-30
2020-12-02
$2,505,000
2019-08-14
$5,237,000 Sanitary Sewer SystemRehabilitation
CW Generic
76 334 Madison(MCJM)Borough
S340715-07B
Facility Improvements2018
$7,289,180 - 2019-03-12
Level 1 2019-08-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning and Design for"Facility Improvements2018"
2019-03-29
$310,000
Facility Improvements2018
2019-10-07
2020-01-27
2020-02-18
$5,045,000
2019-04-05
$4,770,000 Sewage TreatmentPlant (STP) -Expansion
CW Generic
77 1170 ManchesterTownship
S340650-08
Install automated watermeters (FKA DW)
$3,000,000 - 2018-08-07
Exempt 2016-10-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Installation of AutomatedMeter Reading System &Replacement of SelectedMeters
2018-04-24
2018-06-04
2018-08-22
$2,615,000
2018-08-23
$2,614,425 Water Efficiency /Water Meters
78 284 Maplewood(JMEUC)Township
S340686-08e
Flood Mitigation Project $1,845,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$164,835
2020-10-28
$1,380,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
79 830 MarlboroTownship
S340268-02
Harbor Rd. WastewaterPump Station
$964,250 - 2018-02-07
Level 1 2019-05-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Harbor Road WastewaterPump Station
2019-06-10
2020-06-24
2020-08-21
$910,000
2020-12-03
$907,853 Sanitary Sewer System- New
CW Generic
80 646 Medford LakesBorough
S340319-03
Collection System LiningImprovements
$11,000,000 - 2016-03-04
Level 1 2016-06-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Collection SystemLining Improvements
2020-05-06
2020-08-13
2020-08-21
$6,830,000
2020-10-19
$6,096,325 Sanitary Sewer SystemRehabilitation
CW Generic
81 648 MendhamBorough
S340159-03
Collection SystemImprovements
$3,200,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
P&D Activities - CCTVSewer Lines
2020-07-24
$465,000
2020-08-12
$1,993,300 Sanitary Sewer SystemRehabilitation
82 20 MendhamBorough
S340159-04
WWTP Improvements $3,500,000 - 2020-10-06
Exempt 2020-08-19 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
P&D 2020-06-03
$265,000
WATER RECLAMATIONFACILITY IMPROVEMENTSMLR PIPING REALIGNMENT
-
2020-08-12
$3,081,700 Sewage TreatmentPlant (STP) -Improvement/Upgrade
83 570 MiddlesexBorough
S340698-02
Sanitary Sewer MainImprovements
$2,568,750 - 2017-08-10
Level 1 2018-01-19 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehabilitation ofSanitary Sewer
2018-06-20
2018-08-07
2018-10-19
$1,385,000
2019-06-21
$1,381,868 Sanitary Sewer SystemRehabilitation
CW Generic
84 419 MiddlesexCounty UtilitiesAuthority
S340699-14
Main Truck Sewer RehabPhase II
$11,000,000 - 2014-03-04
Level 1 2015-01-02 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
Main TruckSewer Rehab
2018-04-23
2018-10-17
2019-01-03
$10,970,000
2019-02-21
$10,118,868 DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
85 284 MillburnTownship
S340686-08f
Flood Mitigation Project(JMEUC)
$1,650,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$145,667
2020-10-28
$1,230,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
86 428 MonmouthCountyBayshoreOutfallAuthority
S340325-04
Force Main Assessmentand Rehabilitation
$3,500,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Force Main Assessmentand Rehabilitation
2019-01-03
$1,605,000
2019-02-06
$3,000,000 Sanitary Sewer SystemRehabilitation
CW Generic
87 635 MountArlingtonBorough
S340451-05
Wastewater System AssetManagement Plan
$212,785 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Mount Arlington AssetManagement Plan
2018-12-12
$212,785
2018-12-18
$159,456 Sanitary Sewer SystemRehabilitation
88 134 Mount LaurelTownshipMunicipalUtilitiesAuthority
S340943-06
Sewer SystemImprovement Project(Bundle 1)
$8,000,000 - 2018-11-02
Level 1 2018-12-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Tank Rehabilitation andPrimary Sludge BuildingFloor Drain Replacement
2019-03-13
2019-08-21
2019-10-16
$2,845,000
Warehouse Conversion toVehicle Storage Facility
2019-03-13
2019-04-29
2019-06-03
$395,000
Plant Laboratory 2019-03-13
2019-04-29
2019-06-03
$320,000
Hartford Road WPCF FilterPress Control PanelReplacements
2019-05-01
2019-06-20
2019-06-20
$300,000
Hartford Road WPCF RoofReplacement and LightningProtection
2020-05-18
2020-06-24
2020-08-25
$490,000
Hartford Road WPCFLighting Replacement
2020-08-03
2020-09-30
2020-10-29
$205,000
Hartford Road WPCF PipingHeat Tracing and Insulation
2020-12-03
-
2019-08-21
$7,200,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
Page 4 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type89 1 Musconetcong
SewerageAuthority
S340384-09
Wastewater TreatmentPlant Improvements
$6,000,000 - 2019-08-06
Level 1 2019-12-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Pumps - Procurement 2020-02-04
$170,000
Influent ScreeningFacility
2020-01-09
2020-10-13
2020-10-21
$1,894,247
Wastewater TreatmentPlant Improvements
2019-10-16
$425,000
Tertiary TreatmentReplacement
2020-05-07
2020-07-20
2020-10-21
$3,695,753
2019-11-21
$6,000,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
90 895 New JerseyWater SupplyAuthority
S340421-01
D&R Canal Dredging $56,800,000 - 2017-09-07
Level 2 2017-08-17 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
D + R CanalDredging
2017-10-23
2017-12-20
2018-02-05
$48,555,000
D&R Canal 2017-10-23
-
2018-02-15
$49,548,569 Non-Point Source(NPS) PollutionControls
CW Generic
91 347 New JerseyWater SupplyAuthority
S340421-02
Round Valley ReservoirStructures Refurbishmentand Resource PreservationProject
$86,100,000 - 2019-05-06
Level 1 2018-10-19 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Round Valley ChannelDredging
2019-10-07
2019-05-14
2019-05-28
$1,180,000
North Dam and SouthDam AbutmentGrouting
2018-12-20
2019-04-04
2019-05-08
$5,170,000
Earthen Dam Rehab andAncillary Work
2019-10-07
2019-12-19
2020-01-03
$70,960,000
2020-07-09
$75,000,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
92 284 Newark(JMEUC) City
S340686-08g
Flood Mitigation FacilitiesProject
$2,705,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$250,232
2020-10-28
$2,045,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
93 284 Newark(JMEUC) City
S340686-09E
Capital ImprovementsProjects 2019
$1,363,042 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects2019
2019-06-13
$165,000
2019-07-30
$1,350,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
94 32 Newark City S340815-24
Structural eval & rehab of350 miles of small diametersewers
$21,000,000 - 2015-03-06
Level 1 2018-04-05 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Sewer Rehab -1(A)
2018-05-31
2018-12-20
2019-06-03
$3,740,000
Sewer Rehab -1(B)
2018-12-12
2019-03-12
2019-06-03
$9,445,000
Sewer Rehab. -1(C)
2019-04-16
2020-01-13
2020-02-21
$7,700,000
2019-06-26
$20,000,000 Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
95 21 Newark City S340815-28
South Street and AdamsStreet DrainageImprovements
$6,000,000 - 2019-03-22
Level 1 2019-08-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
South Street and AdamsStreet DrainageImprovements
2019-09-19
2020-02-10
2020-03-02
$4,705,000
2020-06-19
$4,700,474 Combined SewerOverflow (CSO) - GreenInfrastructure
CW Generic
96 49 North BergenMunicipalUtilitiesAuthority
S340652-14
Woodcliff AdditionalImprovements
$28,000,000 - 2016-03-03
Level 2 2017-03-03 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
Woodcliff WWTFUpgrade
2017-05-16
2017-08-03
2017-08-07
$19,900,000
2017-08-29
$19,892,394 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
97 1164 NorthBrunswickTownship
S340888-02
Water Meter Replacement(FKA DW)
$8,000,000 - 2019-01-16
Level 1 2019-02-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water Meter Replacement 2019-03-12
2019-05-14
2019-06-14
$7,000,000
Water Treatment PlantMeter & SCADAIntegration
2019-03-12
2019-06-20
2019-06-20
$690,000
2019-06-21
$5,427,000 Water Efficiency /Water Meters
CW Generic
98 603 North HaledonBorough
S340229-02
Small System AssetManagement Plan
$100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Small System AssetManagement Plan
2017-09-22
$100,000
2018-01-12
$99,966 Sanitary Sewer SystemRehabilitation
CW Generic
99 155 North HudsonSewerAuthority
S340952-30
2017 Adams StreetWastwater Treatment PlantImprovements, PuracSystem Upgrades, Phase 3Physical systemImprovements.
$23,200,000 - 2016-03-04
Exempt 2017-11-16 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
General ConstructionContract
2018-02-06
2018-07-02
2018-08-24
$15,680,000
Air Scours BlowersEquipment
2018-02-06
-
Influent Slide GatesEquipment
2018-02-06
-
Dissolved Air Flotation(DAF)Flo-Filter Processsystem
2018-02-06
2018-10-19
$3,000,000
2018-10-26
$17,500,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
100 155 North HudsonSewerAuthority
S340952-31
Green Infrastructure $547,350 - 2019-02-09
Level 1 2019-03-07 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Green Infrastructure 2020-07-07
2020-12-10
-
Planning andDesign Cost
2020-01-09
$80,000
2 2020-07-07
-
2020-01-09
$547,350 Combined SewerOverflow (CSO) - GreenInfrastructure
101 153 North HudsonSewerAuthority
S340952-33
H6/H7 Long Term ControlPlan Project
$27,000,000 - 2019-07-23
Exempt 2019-07-24 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
H6/H7 Combined SewerOverflow, Long TermControl Plan, Phase I
2019-11-15
2020-08-24
2020-09-17
$26,445,000
2020-10-29
$23,981,208 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
102 144 North HudsonSewerAuthority
S340952-34
2019 Collection SystemImprovements
$1,200,000 - 2019-10-03
Level 1 2020-01-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2019 CollectionSystem Improvements
2020-06-19
2020-09-16
2020-10-08
$1,125,000
2020-10-29
$800,000 Sanitary Sewer SystemRehabilitation
103 1016 North HudsonSewerAuthority
S340952-36
2019 EquipmentPurchases
$900,000 - 2019-10-03
Exempt 2019-10-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
PROCUREMENT OF TRUCKMOUNTED CCTV INSPECTIONEQUIPMENT
2019-11-04
2020-02-21
2020-03-02
$285,000
Procurement of a CombinationSewer Cleaner Truck
2019-11-04
2020-02-21
2020-03-02
$455,000
2020-08-19
$750,000 Equipment Purchase(Clean Water)
104 155 North HudsonSewerAuthority
S345190-01
Combined Sewer LongTerm Control Plan
$6,000,000 - 2015-12-03 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Planning andDesign LTCP
2016-10-27
$3,380,000
2018-10-26
$6,000,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
105 464 NorthwestBergen CountyUtilitiesAuthority
S340700-15
Wastewater Pump StationImprovements
$7,000,000 - 2016-03-04
Level 1 2017-10-17 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Construction Contract No. 1- Wastewater Pump StationImprovements
2017-12-13
2018-05-30
2018-06-18
$6,630,000
2019-02-13
$6,516,744 Sanitary Sewer SystemRehabilitation
CW Generic
106 218 NorthwestBergen CountyUtilitiesAuthority
S340700-16
Wastewater TreatmentPlant Improvements
$4,900,000 - 2016-03-04
Level 1 2017-03-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2016 WastewaterTreatment PlantImprovements
2017-04-05
2018-05-21
2018-06-15
$4,385,000
2019-02-13
$3,900,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
107 464 NorthwestBergen CountyUtilitiesAuthority
S340700-18
Interceptor SystemRehabilitation andPurchase of Equipment
$2,000,000 - 2018-06-13
Exempt 2018-08-02 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Ho-Ho-Kus Trunk SewerEast Rehabilitation
2018-08-02
2018-09-07
2018-10-19
$365,000
Purchase of Equipments 2018-10-29
-
Purchase of Equipment 2018-10-29
-
Purchase of Equipment 2019-03-29
$215,000
Equipment Purchase 2019-03-29
$510,000
2019-02-13
$1,200,000 Sanitary Sewer SystemRehabilitation
108 464 NorthwestBergen CountyUtilitiesAuthority
S340700-19
Interceptor Systemrehabilitation
$8,132,450 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Interceptor SystemRehabilitation
2019-02-13
$105,000
Interceptor SystemRehabilitation
-
2019-02-13
$8,000,000 Sanitary Sewer SystemRehabilitation
CW Generic
Page 5 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type109 117 Ocean County
UtilitiesAuthority
S340372-59
AW1611 Area WideClarifier Rehabilitation
$7,620,000 - 2018-02-14
Exempt 2017-09-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Ocean County UtilitiesAuthority Area WideClarifier Rehab
2018-04-04
2018-08-13
2018-10-19
$7,620,000
2019-06-30
$6,813,604 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
110 455 Ocean CountyUtilitiesAuthority
S340372-60
SD1821 SI-4 InterceptorRehabilitation MH 12-2 toMH 10-6
$870,000 - 2019-02-08
Exempt 2019-02-13 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
InterceptorRehabilitation
2019-04-09
2019-06-20
2019-06-20
$775,000
2019-06-30
$668,003 Sanitary Sewer SystemRehabilitation
111 114 Ocean CountyUtilitiesAuthority
S340372-61
ND1702 NWPCF InfluentScrew PumpImprovements
$5,300,000 - 2019-11-05
Exempt 2019-09-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Screw PumpImprovements
2020-01-08
2020-05-08
2020-05-13
$4,065,000
2020-09-17
$3,562,913 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
112 114 Ocean CountyUtilitiesAuthority
S340372-62
ND1712 NWPCF ClarifierRehabilitation FC-1 and FC-8
$4,300,000 - 2019-09-25
Exempt 2019-09-30 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
FC-1 & FC-8Clarifier Rehab
2019-10-18
2020-02-05
2020-08-21
$2,680,000
2020-09-17
$2,184,069 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
113 514 OceanTownshipSewerAuthority
S340750-12
Interlaken Pump Stationreconstruction
$4,500,000 $4,000,000 2014-02-28
Level 1 2014-05-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Interlaken Pump StationReconstruction
2018-05-31
2018-09-24
2019-02-13
$4,485,000
Bulkhead at InterlakenPump Station
2015-02-24
-
2019-06-28
$3,500,000 DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
114 511 OceanTownshipSewerAuthority
S340750-13
2016 Collection SystemImprovements
$550,000 - 2016-03-04
Level 1 2016-05-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2016 Collection SystemImprovement
2017-01-10
2017-03-27
2017-04-10
$550,000
2017-06-01
$522,805 Sanitary Sewer SystemRehabilitation
CW Generic
115 474 Old BridgeMunicipalUtilitiesAuthority
S340945-14
2015 Sewage PumpStation Upgrades
$3,600,000 - 2015-12-22
Level 1 2016-06-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2015 Sewage PumpStation Upgrades
2017-12-07
2018-07-10
2018-10-19
$3,290,000
2019-06-25
$3,290,000 Sanitary Sewer SystemRehabilitation
CW Generic
116 207 Passaic ValleySewerageCommission
S340689-30
Sump Pump Relocation $3,700,000 $2,500,000 2015-03-05
Level 1 2015-10-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Relocate SumpPumps/InstallGenerators
2016-08-03
2016-12-05
2017-04-10
$1,580,000
2018-01-23
$2,478,251 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
117 207 Passaic ValleySewerageCommission
S340689-32
Plant wide improvment toincrease wet weathertreatment capacity
$10,000,000 - 2015-03-05
Level 1 2017-03-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
B061 Newark Bay CSOOutfall Dechlorination
2017-04-12
2017-08-02
2017-08-07
$8,000,000
2018-01-23
$7,772,364 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
118 191 Passaic ValleySewerageCommission
S340689-37
Substation "M"Replacement andHeadworks ReconstructionProject (increased scopefrom 689-47)
$121,500,000 - 2016-03-04
Level 1 2016-10-12 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Substation "M"Replacement andHeadworksReconstruction Project
2019-02-28
2020-10-07
2020-10-29
$119,065,000
2020-12-29
$120,269,892 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
119 199 Passaic ValleySewerageCommission
S340689-38
Final Clarifier ConcreteRehabilitation Project
$21,500,000 - 2016-03-04
Exempt 2016-05-06 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Final Clarifier ConcreteRehabilitation Project
2016-09-12
2017-05-17
2017-06-05
$20,970,000
2018-01-23
$19,618,381 Sewage TreatmentPlant (STP) - New
CSO -AbatementProjects
120 199 Passaic ValleySewerageCommission
S340689-40
Plant wide Replacement &Relocation of ElectricalSwitchgear and MCCs
$123,300,000 - 2016-03-04
Level 1 2016-10-12 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
PlantReplacement/Relocationof Equipment
2017-05-18
2017-10-23
2017-12-13
$31,995,000
2018-01-23
$13,217,254 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
121 686 Passaic ValleySewerageCommission
S340689-45
Sludge StorageImprovements
$10,210,102 - 2018-10-11
Level 1 2019-02-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sludge StorageImprovements
2019-03-20
2019-05-28
2019-06-20
$6,475,000
2019-11-07
$6,059,402 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
122 191 Passaic ValleySewerageCommission
S340689-48
Crane Procurement $900,410 - 2019-07-30
Exempt 2019-08-13 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
CraneProcurement
2019-11-06
$785,000
2019-11-07
$780,670 Equipment Purchase(Clean Water)
CW Generic
123 199 Passaic ValleySewerageCommission
S345200-01
Combined Sewer OverflowLong Term ControlPlanning
$9,500,000 - 2016-03-04 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Planning andDesign
2016-07-26
$7,547,516
LTCP P&D#2 2020-11-30
$1,270,000
2016-10-06
$8,000,000 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
124 199 Passaic ValleySewerageCommission
S345200-02
Asset Management Plan $2,000,000 - 2016-03-04 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
AssetManagement Plan
2017-07-25
$643,446
2018-01-23
$649,880 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
125 56 Paterson City S340850-03-1
Change Order 2 CSO 029Solids and FloatablesControl
$2,550,000 - 2019-08-21
Undetermined 1998-12-17
ContractName
ATAdvActual
ATAwdActual Cert Date
CertAmount
ChangeOrder
2020-02-04
$2,400,000
2020-07-08
$2,458,630 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CWSupplemental
126 978 PaulsboroBorough
S340164-01
Replace storm sewer alongThomson & Wood Aves.
$2,750,000 - 2015-03-06
Level 1 2015-05-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Storm Sewer & Mainreplacement
2016-10-25
2017-07-06
2018-01-11
$2,385,000
2018-10-23
$2,209,814 StormwaterManagement - GrayInfrastructure
CW Generic
127 168 Perth AmboyCity
S340435-11
Replace pumps, relocateelect equip, to improveresiliency
$6,459,351 - 2015-03-05
Exempt 2015-05-15 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
PumpReplacement
2017-01-23
2017-04-10
2017-04-27
$3,460,000
2019-06-20
$350,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
128 168 Perth AmboyCity
S340435-14
CSO Separation (PulaskiAve / Parker St / State St)
$2,608,000 - 2016-03-04
Level 1 2016-11-04 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer (CSO)Separation Project
2018-12-19
2019-08-14
2019-09-23
$2,000,000
2020-10-21
$2,172,015 Combined SewerOverflow (CSO) - GreenInfrastructure
CSO - GreenInfrastructure
129 168 Perth AmboyCity
S345220-01
CSO Permit Developmentof Long Term Control Plan
$1,000,000 - 2016-03-04
UndeterminedContract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Planning andDesign
2017-06-05
$670,000
2019-06-20
$665,156 Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
130 724 PlumstedTownship
S340607-03
Advanced WW treatment &collection system
$34,000,000 - 2017-03-02
Level 2 2017-08-23 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Plumsted WWTP andCollection System
2017-11-21
2015-10-25
$1,250,000
Plumsted CollectionSystem
2018-11-08
2019-01-11
2019-02-13
$15,670,000
Plumsted WWTP 2018-12-13
2020-06-03
$11,625,000
2019-06-19
$25,000,000 Sanitary Sewer System- New
CW Generic
131 1175 Point PleasantBeach Borough
S340479-04
Water Meter ReplacementProject (FKA DW)
$1,930,000 - 2018-10-11
Exempt 2017-08-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MeterReplacement Project
2019-02-07
2019-03-13
2019-04-24
$1,450,000
2019-05-15
$1,540,650 Equipment Purchase(Clean Water)
CW Generic
132 341 Point PleasantBeach Borough
S344190-02
Little Silver Lake DrainageImprov. Project
$3,150,000 - 2015-03-19
Level 2 2015-12-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Little Silver LakeDrainageImprovements
2017-08-23
2017-11-22
2017-12-18
$3,110,000
2018-02-16
$2,995,000 StormwaterManagement - GrayInfrastructure
Barnegat Bay
133 12 Rahway ValleySewerageAuthority
S340547-14
Replace existing digestertank covers & mixers;replacing gas flares
$9,500,000 - 2015-03-06
Level 1 2015-06-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Digester Replacement& gas flares
2017-03-15
2017-07-12
2017-07-25
$4,880,000
2017-12-19
$4,210,947 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
134 15 Rahway ValleySewerageAuthority
S340547-15
Trucked-in Waste ReceivingStation
$2,588,518 - 2017-03-16
Level 1 2017-03-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Waste Management ofNew Jersey, Inc.
2017-10-04
2017-10-04
2017-12-18
$2,260,000
2018-04-17
$2,356,560 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
135 252 RaritanTownshipMunicipalUtilitiesAuthority
S340485-12
Main Treatment PlantImprovements 2016
$4,900,000 - 2016-02-25
Level 1 2016-08-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Main Treatment PlantImprovements 2016
2018-05-30
2018-08-30
2018-10-19
$4,350,000
2019-05-15
$3,904,852 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
136 447 RockawayValley RegionalSewerAuthority
S340821-06-1
Supplemental Loan for OldJersey Trunk SewerReplacement (S340821-06)
$775,000 - Level 2 2012-12-24 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
SupplementalLoan
2019-06-13
$700,000
2019-06-24
$738,042 Sanitary Sewer SystemRehabilitation
CWSupplemental
Page 6 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type137 327 Rockaway
Valley RegionalSewerAuthority
S340821-07
Rehab & enhancement offour existing final clarifiers
$8,200,000 - 2016-03-03
Level 1 2016-08-09 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Final ClarifiersUpgrade
2016-09-12
2017-07-19
2017-07-25
$7,590,000
2017-09-08
$7,483,999 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
138 284 Roselle Park(JMEUC)Borough
S340686-08h
Flood Mitigation Project(JMEUC)
$905,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$71,257
2020-10-28
$650,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
139 310 Rutgers, TheState Universityof New Jersey
S340500-01
Busch Cogeneration PlantUpgrade
$37,000,000 - 2019-10-25
Exempt 2019-10-18 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Busch CogenerationPlant Upgrade DESIGNBUILD RFP
2019-10-30
2019-12-18
$37,000,000
P&D A/E Agreement 2019-05-28
$370,000
2019-06-17
$37,000,000 Energy Efficiency /Renewable Energy
CW Generic
140 1143 Salem CountyImprovementAuthority
S342022-02
Cell 10 Construction $8,500,000 - 2019-08-20
Level 1 2019-11-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Landfill Expansion - Cell10 Construction
2020-03-04
2020-05-08
2020-05-13
$6,890,000
SCIA P& D Services 2020-02-18
$310,000
2020-02-19
$8,500,000 Landfill Construction CW Generic
141 1177 Ship BottomBorough
S340311-04
Residential Water MeterProject
$2,750,000 - 2019-08-14
Exempt 2019-03-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Residential WaterMeter Project
2019-08-20
2019-10-23
2019-12-18
$600,000
Procurement of MeterPits
2020-10-30
-
Installation of WaterMeters
2020-10-30
-
2020-02-14
$2,400,000 Water Efficiency /Water Meters
CW Generic
142 182 SomersetRaritan ValleySewerAuthority
S340801-07
Stormwater Control Facilityto eliminate sewagedischarge
$34,000,000 - 2016-03-03
Level 2 2016-12-16 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
Storm ControlFacility
2019-01-22
2019-06-19
2019-04-24
$29,025,000
2019-06-25
$33,000,000 Sewage TreatmentPlant (STP) - New
CW Generic
143 181 SomersetRaritan ValleySewerAuthority
S340801-09
WWTP RehabilitationImprovements (SFY2019)
$6,500,000 - 2019-04-11
Level 1 2019-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Plantwide ElectricalRehabilitation Project
2019-06-13
2019-10-02
2019-10-16
$5,640,000
2020-01-17
$5,144,453 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
144 1126 SomervilleBorough
S342013-01-1
Green Seam Phase IIGround Water Treatment
$1,850,000 - 2020-05-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Green Seam Phase IIGround Water Treatment
2020-03-02
$1,850,000
2020-10-27
$808,710 RemedialAction/ContaminatedSite Cleanups(Brownfields)
CW Generic
145 492 SouthMonmouthRegional SewerAuthority
S340377-04A
Pitney Pump StationImprovements
$6,981,600 $1,600,000 2015-03-13
Level 1 2014-05-23 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Pitney Ave PSRehab
2014-09-08
$1,554,869
2014-09-23
$1,532,225 Sanitary Sewer SystemRehabilitation
CW Generic
146 284 South OrangeVillage(JMEUC)Township
S340686-08i
Flood Mitigation FacilitiesProject
$1,305,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$111,408
2020-10-28
$960,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
147 284 South OrangeVillage(JMEUC)Township
S340686-09F
Capital ImprovementsProjects 2019
$650,806 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering planning &Design Capital Projects 2019
2019-06-13
$75,000
2019-07-30
$645,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
148 969 SpotswoodBorough
S340510-01
Roadway, StormwaterManagement and SanitarySewer SystemImprovements
$5,427,000 - 2018-09-28
Level 1 2018-09-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Cottage Streets AreaInfrastructureImprovements
2019-05-02
2019-07-31
2019-09-23
$2,150,000
2019-10-24
$1,987,954 StormwaterManagement - GrayInfrastructure
CW Generic
149 284 Summit(JMEUC) City
S340686-08j
Flood Mitigation Project(JMEUC)
$2,375,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$217,237
2020-10-28
$1,790,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
150 284 Summit(JMEUC) City
S340686-09G
Capital ImprovementsProjects 2019
$1,186,322 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital projects
2019-06-13
$145,000
2019-07-30
$1,175,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
151 1044 Sussex CountyMunicipalUtilitiesAuthority
S342008-04
SCMUA Leachate PumpStation/Force Main Project
$8,400,000 - 2019-09-23
Level 2 2020-05-07 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Contractfor Pump Station & ForceMain
2018-10-19
$660,000
Leachate Pump Station &Force main
2020-06-18
2020-08-11
2020-08-21
$6,735,000
2020-08-27
$7,479,947 Sanitary Sewer System- New
CW Generic
152 451 Toms RiverMunicipalUtilitiesAuthority
S340145-05
Sanitary SewerRehabilitation
$4,500,000 - 2019-04-12
Level 1 2019-09-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer and ManholeRehabilitations
2019-12-31
2020-06-15
2020-06-19
$900,000
Sanitary Sewer Pipe (Digand Replace) RehabilitationProject
2019-12-31
2020-06-15
2020-06-19
$1,370,000
Windsor Ave. EmergencyRepair
2020-05-07
$2,000,000
2020-06-22
$3,100,000 Sanitary Sewer SystemRehabilitation
153 460 Two RiversWaterReclamationAuthority
S340117-10
New Main Pump Station $75,000,000 - 2020-09-18
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Pleasure Bay Crossing &Main PS Replacement P/D
2020-01-09
$2,955,000
Pleasure Bay Crossing &Main PS Replacement
-
2020-04-01
$75,000,000 Sanitary Sewer SystemRehabilitation
154 284 Union (JMEUC)Township
S340686-08k
Flood Mitigation FacilitiesProject
$4,885,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$466,909
2020-10-28
$3,735,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
155 284 Union (JMEUC)Township
S340686-09H
Capital ImprovementsProjects 2019
$2,449,335 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects2019
2019-06-13
$310,000
2019-07-30
$2,425,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
156 1168 UniversityHospital
S340500-03
Univeristy Hospital CoGeneration Plant
$7,800,000 - 2019-10-30
Exempt 2019-10-11 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
University Hospital CoGeneration Plant DesignBuild Auth to ExecDocumentation
-
University Hospital Co-generation Plant P&D
2019-11-27
$890,000
University Hospital CoGeneration Plant DesignBuild Auth to ConstructDocumentation
2021-01-11
$6,525,000
2019-12-04
$7,380,000 Energy Efficiency /Renewable Energy
Base CWSRF
157 387 VernonTownship
S340745-03
Asset Management Plan $110,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Vernon Twp AssetManagement
2018-06-18
$105,000
2018-09-18
$100,000 Sanitary Sewer SystemRehabilitation
CW Generic
158 563 WarrenTownshipSewerageAuthority
S340964-05
Stage I/II, IV CollectionSystem Rehabilitation
$10,800,000 - 2018-09-12
Exempt 2018-11-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WTSA Stage I/IICollection SystemRehab
2018-12-04
2019-01-24
2019-06-13
$1,500,000
WTSA Stage IVCollection SystemRehab
2019-06-26
2019-08-28
2019-10-16
$1,160,000
2020-01-16
$3,000,000 Sanitary Sewer SystemRehabilitation
159 537 West DeptfordTownship
S340947-05
Replacement of PumpStations 4 and 6
$1,415,000 - 2016-03-04
Level 1 2016-12-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Replacement of PS4and PS6
2017-01-30
2018-08-27
2018-10-31
$1,415,000
2018-10-31
$1,400,000 Sanitary Sewer SystemRehabilitation
CW Generic
Page 7 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type160 284 West Orange
(JMEUC)Township
S340686-08l
Flood Mitigation FacilitiesProject
$3,170,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-22
$296,027
2020-10-28
$2,405,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
161 284 West Orange(JMEUC)Township
S340686-09I
Capital ImprovementsProjects 2019
$1,585,429 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Planning &Design Capital Projects2019
2019-06-13
$200,000
2019-07-30
$1,570,000 Sewage TreatmentPlant (STP) -Improvement/Upgrade
162 472 WesternMonmouthUtilitiesAuthority
S340128-05
Route 79 Pump Stationand Force MainReplacement
$7,850,000 - 2016-03-03
Level 1 2017-01-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Route 79 PS and FMreconstruction
2018-10-11
2018-12-04
2019-04-24
$7,830,000
2019-06-28
$6,480,000 Sanitary Sewer SystemRehabilitation
CW Generic
163 330 WesternMonmouthUtilitiesAuthority
S340128-06
Pine Brook SewageTreatment PlantImprovements
$13,100,000 - 2016-03-03
Level 1 2017-01-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Construction Contract No. 1- Raw Sewage Pump StationImprovements
2017-06-06
2017-10-10
2018-02-08
$3,985,000
Construction Contract No. 2- Concrete Equalization TankNo. 3
2018-06-27
2018-11-20
2019-01-03
$9,175,000
2019-06-28
$12,843,750 Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
164 340 Wildwood City S340664-06
2019 CapitalImprovements
$15,713,010 - 2019-10-15
Level 1 2020-02-06 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2019 CapitalImrpovements
2020-02-27
2020-05-22
2020-06-03
$710,000
2019 CapitalImprovement ProgramPhase 2A
-
2020-09-29
$1,395,000 Sanitary Sewer SystemRehabilitation
165 685 WillingboroMunicipalUtilitiesAuthority
S340132-10
Energy SavingsImprovement Program
$18,200,000 -Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Planning andDesign
2020-12-24
$3,540,000
2021-01-07
$18,200,000 SludgeTreatment/DisposalFacilities
166 1150 WillingboroMunicipalUtilitiesAuthority
S340132-11
Water Meter InfrastructureProject
$10,000,000 - 2019-07-19
Exempt 2019-08-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Purchase of WaterMeters
2019-10-11
2020-04-02
2020-09-04
$3,470,000
Replacement ofWater Meters
2020-10-09
2020-11-30
$2,705,000
2020-12-15
$7,950,000 Water Efficiency /Water Meters
167 433 Atlantic CountyUtilitiesAuthority
S340809-29
Replace a portion ofBrigantine Force Main
$4,000,000 - 2015-03-05
Level 1 2016-02-11 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Brigantine FMReplacement
2020-03-31
2020-08-18
2020-09-15
$2,330,000
- Sanitary Sewer SystemRehabilitation
CW Generic
168 93 Bayonne City S340399-31
STORMWATERMANAGEMENTFACILITIES AND FRANCISG. FITZPATRICK PARKIMPROVEMENTS
$1,618,539 - 2019-12-11
Level 2 2019-09-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
STORMWATERMANAGEMENT FACILITIESAND FRANCIS G.FITZPATRICK PARKIMPROVEMENTS ProjectCounty: Hudson
2019-12-13
2020-09-24
2020-10-21
$2,110,000
- StormwaterManagement - GrayInfrastructure
CW Generic
169 529 BurlingtonTownship
S340712-17
Sanitary SewerRehabilitation in VariousLocations
$1,000,000 - 2019-06-17
Exempt 2019-06-20 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Sanitary SewerRehabilitation
2020-03-04
2020-07-30
2020-08-21
$875,000
- Sanitary Sewer SystemRehabilitation
170 38 Camden City S340366-15
Rehabilitation of CombinedSewer Regulator Chambers
$13,330,000 - 2017-03-22
Exempt 2018-08-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehabilitation ofCombined SewerRegulators
2020-07-10
2019-06-03
$4,475,000
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
171 684 FieldsboroBorough
S340522-01
Sewer @ Stormwater AssetManagement plan
$150,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Engineering Servicesfor AMP
2019-06-14
$115,000
- Sanitary Sewer SystemRehabilitation
CW Generic
172 58 HopatcongBorough
S340488-08
Hudson Avenue SanitarySewer Installation
$600,000 - 2019-11-14
Level 2 2020-05-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Hudson Avenue SanitarySewer Installation
2020-08-25
2020-10-26
2020-12-02
$600,000
- Sanitary Sewer System- New
173 1108 Jersey CityMunicipalUtilitiesAuthority
S340928-32
Remote Water MeterReading (AMI) (FKA DW)
$12,300,000 - 2018-08-07
Exempt 2016-09-22 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
Water MeterContract
2019-10-15
2020-04-22
2020-06-04
$12,245,000
- Water Efficiency /Water Meters
174 284 Joint Meetingof Essex &Union Counties
S340686-08
Flood Mitigation FacilitiesProject
$101,231,766 - 2020-06-01
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Wastewater Treatment Plant(Effluent Pumping Station)
-
Planning & Design Stage 1Wastewater Treatment PlantEffluent Pumping Station
2020-10-01
$3,725,000
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
175 852 MantuaTownshipMUA
S340514-02
Barnsboro SewerExtension
$2,250,000 - 2019-06-18
Level 2 2019-07-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Barnsboro Pump StationContract 1 of 2
2019-09-17
2020-09-23
2020-10-08
$818,574
Barnsboro Gravity CollectionSystem/Force Main Bid B1and B2
2020-06-02
2020-09-23
2020-10-08
$1,226,426
- Sanitary Sewer System- New
CW Generic
176 500 Mount LaurelTownshipMunicipalUtilitiesAuthority
S340943-07
Sewer SystemImprovement Project(Bundle 2)
$3,200,000 - 2019-10-02
Level 1 2019-12-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Replacement of Briggs Rdand Library Pump StationForce Main Connections
2020-02-28
2020-05-14
2020-05-28
$1,100,000
- Sanitary Sewer SystemRehabilitation
177 382 NetcongBorough
S340538-01
Sewer System AssetManagement Plan
$100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer System AssetManagement Plan
2020-06-04
$96,000
- Sanitary Sewer SystemRehabilitation
CW AssetManagementPlanDevelopment(Small System )
178 114 Ocean CountyUtilitiesAuthority
S340372-63
ND1811 NWPCF SolidsHandling Facility RoofReplacement
$2,200,000 - 2020-02-13
Exempt 2020-05-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
ND1811 NWPCF SolidsHandling Facility RoofReplacement
2020-05-22
2020-10-02
2020-10-29
$2,185,000
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
179 199 Passaic ValleySewerageCommission
S340689-23
Standby Power GeneratingFacility
$183,500,000 - 2016-03-04
Level 1 2017-05-31 Contract Name
ATAdvActual
ATAwdActual Cert Date Cert Amount
Planning andDesign
2017-07-25
$4,735,000
Site Prep 2018-12-11
2019-04-01
2019-06-18
$7,328,000
EquipmentPurchase
2018-07-05
2019-06-17
2019-06-18
$68,617,000
Installation ofEquipment
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
180 206 Passaic ValleySewerageCommission
S340689-49
PVSC Perimeter Flood Wall,Storm Water CollectionSys. & Pumping Stations(Merged (S340689-41,42,43)
$296,136,901 - 2016-03-04
Exempt 2017-05-31 Contract Name
ATAdvActual
ATAwdActual
CertDate Cert Amount
Perimeter Flood Wall,Storm Water CollectionSystem & PumpingStations
2019-08-01
2020-02-04
2020-02-21
$278,440,000
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
181 688 Passaic ValleySewerageCommission
S340689-54
5th Thickening CentrifugeProject
$15,523,844 - Level 1 2020-10-22 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
EquipmentProcurement
2020-12-15
$5,645,000
Installation -
- SludgeTreatment/DisposalFacilities
CW Generic
182 577 PennsvilleSewerageAuthority
S340870-04
Pumping Station No. 3Force Main Replacement
$1,600,000 - 2020-06-22
Level 1 2020-10-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Pumping Station No. 3Force Main Replacement
2020-10-07
2020-12-14
2021-01-11
$735,000
- Sanitary Sewer SystemRehabilitation
CW Generic
183 558 Princeton S340656-11
Improvements to LindenLane and Spruce Street
$3,925,678 - Level 1 2018-10-09 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Improvements to LindenLane and Spruce Street
2019-02-20
2019-05-14
2019-06-03
$1,875,000
- Sanitary Sewer SystemRehabilitation
Page 8 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type184 578 Red Bank
BoroughS340528-01
White Street Water & SewerImprovements
$1,500,000 - 2019-10-08
Level 1 2019-09-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
White Street Water & SewerImprovements
2020-03-03
2020-04-09
2020-06-03
$430,000
1 of 1 Broad Street SanitarySewer Improvements
-
- Sanitary Sewer SystemRehabilitation
CW Generic
185 164 RiversideSewerageAuthority
S340490-01
Riverside SewerageAuthority Primary DigesterMixing System
$840,000 - 2016-03-04
Exempt 2016-08-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Primary DigesterMixing System
2017-02-27
2017-06-27
2017-07-25
$840,000
- SludgeTreatment/DisposalFacilities
CW Generic
186 526 Scotch PlainsTownship
S340512-01
Sewer Pump StationUpgrades
$2,700,000 - 2019-08-26
Exempt 2019-09-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer PumpStation ImprovementsProject
2019-11-22
2020-02-13
2020-04-15
$2,310,000
- Sanitary Sewer SystemRehabilitation
187 679 Ship BottomBorough
S340311-05
Sewer Main ReplacementProject
$5,000,000 - 2020-03-31
Level 1 2020-06-15 Contract Name
ATAdvActual
ATAwdActual Cert Date
CertAmount
Sewer MainReplacement
2020-06-18
2020-08-11
2020-08-21
$5,000,000
- Sanitary Sewer SystemRehabilitation
CW Generic
188 261 StaffordTownship
S344100-03
Neptune Basin Expansion $5,600,000 $5,600,000 2015-03-23
Level 2 2013-11-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2014 Neptune BasinExpansion
2016-06-16
2016-08-22
2016-09-16
$5,253,349
- StormwaterManagement - GrayInfrastructure
Barnegat Bay
189 315 WillingboroMunicipalUtilitiesAuthority
S340132-09
Water Pollution ControlPlant-Installation ofScreening and Grit RemovalEquipment
$9,000,000 - 2019-12-10
Level 1 2020-01-09 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water Pollution Control Plant-Installation of Screening andGrit Removal Equipment
2020-04-03
2020-09-24
2020-10-29
$6,780,000
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
190 504 WinslowTownship
S340895-10
Various Sanitary SewerSystem Rehab
$1,700,000 - 2017-10-26
Level 1 2018-07-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Asbury Place - Pipe Lining 2019-07-09
2019-10-07
2020-08-25
$76,151
Lehigh Manor Drive - PipeLining
2019-07-09
2019-10-07
2020-08-25
$331,806
Primrose Gate Drive 2019-07-09
2019-10-07
2020-08-25
$326,350
Eastmont Lane - PipeReplacement
2019-07-09
2019-12-11
2020-08-25
$74,017
Evergreen Avenue - PipeReplacement
2019-07-09
2020-08-03
2020-08-25
$130,885
South Cedarbrook Road -Manhole replacement
2019-07-09
2019-12-11
2020-08-25
$159,327
Thousand Oaks Drive -Manhole Replacement
2019-07-09
2019-12-11
2020-08-25
$101,464
- Sanitary Sewer SystemRehabilitation
CW Generic
191 843 LowerTownshipMunicipalUtilitiesAuthority
S340810-05
LTMUA Collection SystemExpansion
$17,100,000 - 2020-12-17
Level 2 2020-09-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
EquipmentProcurement
2020-11-13
2021-01-06
-
Construction ofVacuum System
-
- Sanitary Sewer System- New
CW Generic
192 459 Two RiversWaterReclamationAuthority
S340117-09
Interceptor and PumpStation Improvements
$4,000,000 - 2019-10-01
Exempt 2020-07-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Interceptor RehabContract 169A
2020-08-14
-
Pump StationImprovements
2020-08-18
2020-12-03
-
- Sanitary Sewer SystemRehabilitation
193 437 Atlantic CountyUtilitiesAuthority
S340809-30
Ventnor-MargateForcemain Replacement -Phase 1
$10,100,000 - 2019-05-31
Level 1 2020-02-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Ventnor-Margate Force mainReplacement - Phase 1B
2020-08-28
-
Emergency - Bader Field -Phase 1A
2020-04-20
-
- Sanitary Sewer SystemRehabilitation
CW Generic
194 501 BerkeleyTownshipSewerAuthority
S340969-14
Bayview Ave. Force MainReplacement
$3,000,000 - 2020-10-19
Level 1 2020-09-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Bayview Ave. Force MainReplacement
2021-01-12
-
- Sanitary Sewer SystemRehabilitation
CW Generic
195 38 Camden City S340366-07
2014 Sanitary/CombinedSewer Rehab /Replacement Project
$59,000,000 - 2016-03-02
Level 1 2018-03-26 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2014 Sanitary/Combined SewerReconstruction Project Contract A
2018-11-29
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
196 1115 Camden City S340366-16
New Auto Meter ReadingEquip for entire City (FKADW)
$1,800,000 - 2018-08-08
Exempt 2018-04-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Advanced MeteringInfrastructure
2018-10-19
-
Furnishing and Delivery ofCold Water Meters
2018-10-19
-
- Water Efficiency /Water Meters
CW Generic
197 272 EveshamMunicipalUtilitiesAuthority
S340838-09
Elmwood WWTP ResiliencyImprovements
$400,000 - 2020-02-18
Exempt 2019-10-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Elmwood WWTP ResiliencyImprovements
2020-10-20
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
198 477 FranklinTownshipSewerageAuthority
S340839-09
Marcy Street Sanitary SewerRehab
$7,500,000 - 2020-06-17
Exempt 2019-10-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Marcy Street SanitarySewer Rehab
2020-10-20
-
- Sanitary Sewer SystemRehabilitation
199 96 Kearny Town S340259-11
Dukes St StormwaterPump Station
$17,000,000 - 2015-03-06
Level 1 2020-09-02 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Stormwater PumpStation
2020-12-10
-
- StormwaterManagement - GrayInfrastructure
CSO -AbatementProjects
200 21 Newark City S340815-25
Green Infrastructure for theSewer System
$475,000 - 2015-03-06
Level 1 2015-07-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer Rehab (GreenInfrastructure)
2018-11-05
-
- StormwaterManagement - GreenInfrastructure
CSO - GreenInfrastructure
201 207 Passaic ValleySewerageCommission
S340689-33
Weatherproof tunnellocations incl HVAC forventilation
$107,000,000 - 2015-03-06
Level 1 2015-10-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WWTPImprovements
2020-12-23
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
202 686 Passaic ValleySewerageCommission
S340689-46
Decant FacilityImprovements Project
$96,000,000 - 2019-08-14
Level 1 2019-10-11 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Decant FacilityImprovements Project
2019-10-24
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
203 248 Passaic ValleySewerageCommission
S340689-50
Improvements to theVehicle MaintenanceBuilding
$7,348,000 - 2019-08-20
Level 1 2020-08-25 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Improvements to the VehicleMaintenance Building
2021-01-07
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
204 558 Princeton S340656-12
Improvements to BankStreet
$1,871,602 - 2019-10-28
Level 1 2019-08-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Improvements toBank Street
2020-04-03
-
- Sanitary Sewer SystemRehabilitation
205 327 RockawayValley RegionalSewerAuthority
S340821-08
Upgrades for compliancewith effleunt limitation forphosphorus w/ addition ofchem storage & feed syst,implement add'tl SCADAimprovements to enhancemonitoring & control
$15,500,000 - 2019-07-11
Level 1 2020-03-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phosphorus removal & plantupgrades, filtration facilities
2020-08-27
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
206 677 Seaside ParkBorough
S340083-04
Phase III A Sanitary SewerReplacement
$4,000,000 - 2020-04-17
Level 1 2020-07-09 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase III Sanitary SewerReplacement
2020-10-22
-
- Sanitary Sewer SystemRehabilitation
207 373 StaffordTownship
S340946-07
Beach Haven West SewerRehab
$5,000,000 - 2020-05-07
Level 1 2020-09-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Beach Haven West SewerRehabiliation
2020-10-22
-
- Sanitary Sewer SystemRehabilitation
208 267 Stony BrookRegional SewerAuthority
S340400-11
Contract 19-2: River RoadWastewater TreatmentPlant UV Disinfection andEffluent Filtration Project
$22,000,000 - 2020-02-25
Level 1 2019-11-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
River Road Wastewater TreatmentPlant UV Disinfection and EffluentFiltration Project
2020-09-11
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
Page 9 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type209 1139 Sussex County
MunicipalUtilitiesAuthority
S342008-06
Landfill Life Stage 2Expansion/InfratstructureRelocation Project
$43,000,000 - Level 1 2020-11-23 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Stage 2Expansion
2021-01-13
-
- Landfill Construction CW Generic
210 1171 West DeptfordTownship
S340947-06
Water Meter ReplacementProject (FKA DW)
$3,800,000 - 2019-10-17
Exempt 2019-08-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MeterReplacement
2020-10-21
-
- Water Efficiency /Water Meters
211 442 WoodbridgeTownship
S340433-11
Control of Odors andCorrosion in the PortReading Interceptor
$15,300,000 - 2020-06-15
Level 1 2018-11-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Control of Odors and Corrosionin the Port Reading Interceptor
2020-09-01
-
- Sanitary Sewer SystemRehabilitation
CW Generic
212 1120 Atlantic CityMunicipalUtilitiesAuthority
S340439-04
Water Meter and MTUReplacement
$3,066,667 - 2019-10-31
Exempt 2019-12-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water Meter -Automatic Meter Reading (AMR)and Meter Transmission Units(MTU)
-
- Water Efficiency /Water Meters
213 1040 Atlantic CountyUtilitiesAuthority
S342001-03
MSE Berm Construction $36,042,396 - 2020-09-11
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
MSE Berm ConstructionPhase 2
-
MSE Berm ConstructionPhase 3
-
- Landfill Construction CW Generic
214 224 Beach HavenBorough
S344220-01
SFY2018 StormwaterPump and Drainage Project
$2,038,640 - 2020-12-23
Level 1 - StormwaterManagement - GrayInfrastructure
215 234 Bergen CountyUtilitiesAuthority
S340386-16
Plant-wide Improvements $42,000,000 - Level 1 - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
216 264 BerkeleyTownship
S344020-02
Water Quality RetentionBasin at Moorage Park
$905,063 - Level 1 - StormwaterManagement - GrayInfrastructure
Barnegat Bay
217 461 Brick TownshipMunicipalUtilitiesAuthority
S340448-12
Sanitary Sewer ManholeRehabilitation andReplacement
$4,824,000 - Level 1 2018-09-13
- Sanitary Sewer SystemRehabilitation
218 461 Brick TownshipMunicipalUtilitiesAuthority
S340448-13
Sanitary Sewer MainReplacement on CartagenaDrive, Alhama Drive, CadizDrive, Valencia Drive andMonterey Drive
$4,060,000 - 2019-08-20
Level 1 2019-10-11 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Cartagena Drive SanitarySewer Replacement
-
- Sanitary Sewer System- New
219 595 Brigantine City S340827-04
Emergency Generators $3,300,000 - 2015-03-17
Level 1 2014-08-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
EmergencyGenerators
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
220 959 Brigantine City S340827-06
Municipal SystemImprovements
$1,001,066 - 2015-03-17
Level 1 2015-05-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Municipal StormwaterSystem Improvements
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
221 38 Camden City S340366-12
Cooper Street PumpStation
$2,300,000 - 2016-03-01
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Camden Cooper stPump Station
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
222 38 Camden City S340366-14
Rehabilitation of Combinedand Storm Sewer Outfalls
$9,370,000 - 2018-11-20
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Separate Stormwater SewerOutfalls Maintenance andRehabilitation
-
Combined Sewer OutfallsMaintenance and Rehabilitation
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
223 3 CamdenCountyMunicipalUtilitiesAuthority
S340640-19
Camden City Green andGrey Infrastructure Project -Phase 4
$11,500,000 - 2016-03-04
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Camden City Combined SewerReplacement ---Phase 6
-
Installation of StormwaterPlanters For Creation of a GreenStreet
-
Construction Management forGreen and Grey Infrastructure
-
- Combined SewerOverflow (CSO) - GreenInfrastructure
CSO - GreenInfrastructure
224 28 CamdenCountyMunicipalUtilitiesAuthority
S340640-29
Delaware #1 WPCF Pipingand Treatment Upgrades
$11,300,000 - 2020-06-04
Exempt 2020-11-04 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Delaware #1 WPCF Piping andTreatment Upgrades
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
225 430 CamdenCountyMunicipalUtilitiesAuthority
S340640-30
CCMUA Pump StationElectrical Upgrades
$7,500,000 - 2020-06-23
Level 1 2020-08-25 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
CCMUA Pump StationElectrical Upgrades
-
- Sanitary Sewer SystemRehabilitation
Base CWSRF
226 605 Carneys PointSewerageAuthority
S340502-08
LAFAYETTE ROADSANITARY SEWER
$1,057,203 - Level 1 2019-03-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lafayette RoadSanitary sewer
-
- Sanitary Sewer SystemRehabilitation
CW Generic
227 103 Carneys PointSewerageAuthority
S340502-09
UV Disinfection & FilterSystem Improvements
$1,497,445 - Exempt 2019-02-28
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
228 136 Cliffside ParkBorough
S340847-04
Combined SewerSeparation
$5,300,000 - 2015-03-06
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Combined SewerSeparation
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
229 416 CollingswoodBorough
S340291-04
harrison avenue areasanitary sewerimprovements
$800,000 - Level 1 - Sanitary Sewer SystemRehabilitation
230 1135 CumberlandCountyImprovementAuthority
S342015-04
Side Slope Restoration andStorm Water Management
$5,919,704 - Level 1 - Landfill Construction CW Generic
231 537 DeptfordTownshipMunicipalUtilitiesAuthority
S340066-03
Sanitary SewerRehabilitation at CountryClub Estates
$1,000,000 - 2019-12-06
Level 1 2020-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer Rehabilitation atCountry Club Estates
-
- Sanitary Sewer SystemRehabilitation
232 537 DeptfordTownshipMunicipalUtilitiesAuthority
S340066-04
Sanitary SewerRehabilitation at EastWoodbury
$700,000 - 2019-12-06
Level 1 2020-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer Rehabilitationat East Woodbury
-
- Sanitary Sewer SystemRehabilitation
233 894 DunellenBorough
S340916-03
Borough of Dunellen FloodMitigation Project
$2,599,998 - 2018-08-29
Level 1 2018-09-18 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Borough of Dunellen FloodMitigation Project
-
- StormwaterManagement - GrayInfrastructure
CW Generic
234 1116 East OrangeCity
S340843-02
Water Meter ReplacementProject 2017
$6,840,000 - 2018-12-11
Exempt 2016-09-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MeterReplacement
-
- Water Efficiency /Water Meters
CW Generic
235 498 Egg HarborTownshipMunicipalUtilitiesAuthority
S340753-06
FAA Pump StationReconstruction
$1,250,000 - 2014-03-04
Level 1 2014-07-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
FAA Sanitary Sewer Pump StationReplacement Project, Contract No.56
-
- Sanitary Sewer SystemRehabilitation
CW Generic
236 87 Elizabeth City S340942-13
Western InterceptorModifications
$13,146,000 - 2011-03-02
Level 2 2011-10-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Western InterceptorModifications
-
- Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
237 87 Elizabeth City S340942-20
South Second StreetDrainage and Atlantic StreetCSO Tank Project
$10,300,000 - 2020-08-13
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
South Second StreetDrainage
-
Atlantic Street CSOTank
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
238 789 Elizabeth City S340942-21
Lincoln Avenue DrainageImprovements Project
$3,000,000 - Level 2 - StormwaterManagement - GrayInfrastructure
CW Generic
Page 10 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type239 918 Evesham
MunicipalUtilitiesAuthority
S340838-06
Elmwood WWTP StorageBuilding
$2,500,000 - Level 1 2019-03-04
- Sanitary Sewer System- New
CW Generic
240 497 EveshamMunicipalUtilitiesAuthority
S340838-08
Route 70 SewerRehabilitation
$1,000,000 - Exempt 2019-09-06
- Sanitary Sewer SystemRehabilitation
CW Generic
241 272 EveshamMunicipalUtilitiesAuthority
S340838-10
Elmwood Tertiary FilterRehabilitation
$1,500,000 - Exempt 2019-10-29
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
242 610 Glen RidgeBorough
S340861-03
GR-Procurement-SewerCleaning Truck
$445,848 - Exempt 2017-09-07 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Contract Not Submitted - GR-Procurement-Sewer CleaningTruck
-
- Equipment Purchase(Clean Water)
CW Generic
243 692 GloucesterCounty UtilitiesAuthority
S340902-17
Sludge Drying System $10,000,000 - 2016-02-24
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sludge DryingSystem
-
- SludgeTreatment/DisposalFacilities
CW Generic
244 175 HackensackCity
S340923-13
The Long Term ControlPlan and CSO SewerSeparation Efforts (Phase3)
$14,700,000 - 2020-12-24
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Clay Street - Union Street toOutfall
-
Clay Street - Railroad Avenueto Union Street
-
Clay Street - Clay Street Westof Railroad Avenue
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
245 790 HackensackCity
S340923-15
Stormwater InfrastructureImprovements 2020
$1,600,000 - 2020-01-31
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Polifly Park DrainageImprovements
-
Pine Street RoadwayImprovements
-
- StormwaterManagement - GrayInfrastructure
246 545 HamiltonTownshipMunicipalUtilitiesAuthority
S340903-06
2019 Wastewater FacilityUpgrades and Renovations
$2,500,000 - Level 1 2019-12-17
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
OfficeBuilding
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
247 636 HighlandsBorough
S340901-05
Coastal Community WaterQuality Restoration
$5,500,000 - Level 1 2020-10-15
- Sanitary Sewer SystemRehabilitation
CW Generic
248 540 Hillside(JMEUC)Township
S340686-10
North Avenue PumpingStation
$1,300,000 - 2019-12-09
Level 1 2020-09-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Improvements to NorthAvenue Pump Station
-
Street Sweeper EquipmentPurchase
-
- Sanitary Sewer SystemRehabilitation
249 51 Hoboken City S340635-08
Southwest Resiliency Park -Acquisition, Rehabilitation
$6,600,000 - 2016-03-04
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Land Acquisition -Planning and DesignLoan
-
- Combined SewerOverflow (CSO) - GreenInfrastructure
CSO - GreenInfrastructure
250 1109 HudsonCountyImprovementAuthority
S340094-02
Koppers PeninsulaInfrastructure, HudsonCounty
$51,000,000 - Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Koppers PeninsulaInfrastructure, HudsonCounty
-
- RemedialAction/ContaminatedSite Cleanups(Brownfields)
CW Generic
251 142 Jersey City S340928-30
Street Cleaning for CleanWater
$2,711,000 - 2017-05-18
Exempt 2017-09-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Street CleaningEquipment
-
- Equipment Purchase(Clean Water)
CSO -AbatementProjects
252 65 Jersey CityMunicipalUtilitiesAuthority
S340928-16
Sixth Street CombinedSewer Outfall
$9,500,000 - 2015-03-20
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
CSO & Floatables forOutfall 029
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CSO -AbatementProjects
253 65 Jersey CityMunicipalUtilitiesAuthority
S340928-18
Claremount Carteret outfallrep
$5,600,000 - 2015-03-20
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Claremont Carteret TideGate Chamber
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CSO -AbatementProjects
254 43 Jersey CityMunicipalUtilitiesAuthority
S340928-27
Green Infrastructure- MartinLuther King Drive TreeTrenches
$500,000 - 2016-03-04
Level 1 2017-09-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Martin Luther King Drive TreeTrenches Green InfrastructureProject
-
- StormwaterManagement - GreenInfrastructure
CSO - GreenInfrastructure
255 65 Jersey CityMunicipalUtilitiesAuthority
S340928-36
Phase 5-B Sewer $10,800,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 5B Sewer & WaterRehabilitation
-
- Sanitary Sewer SystemRehabilitation
CW Generic
256 43 Jersey CityMunicipalUtilitiesAuthority
S340928-37
Sewer Improvements 2a $50,202,482 - 2019-03-22
Level 1 2020-06-17 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 2A Combined Sewer andWater Main Rehabilitation
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
257 65 Jersey CityMunicipalUtilitiesAuthority
S340928-38
Sewer ImprovementsPhase 5a
$35,273,044 - 2019-03-22
Level 1 2020-11-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 5A Combined Sewer &Water main Rehabilitation
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
258 65 Jersey CityMunicipalUtilitiesAuthority
S340928-39
PHASE 6B SEWER MAINREHABILITATIONPROJECT
$33,000,000 - Level 1 - Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
259 64 Jersey CityMunicipalUtilitiesAuthority
S340928-40
Eastside and WestsidePump Station MechanicalScreens
$3,600,000 - 2020-03-26
Exempt 2019-08-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Bar ScreenFilters
-
- Sanitary Sewer SystemRehabilitation
260 65 Jersey CityMunicipalUtilitiesAuthority
S340928-41
Van Winkle CombinedSewer Outfall
$4,500,000 - 2019-08-06
Level 1 2019-11-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Vanwinkle CSO OutFall
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
261 59 Jersey CityMunicipalUtilitiesAuthority
S340928-43
Phase 7a SewerImprovements
$61,751,143 - Level 1 - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
262 59 Jersey CityMunicipalUtilitiesAuthority
S340928-44
Claremont Carteret PumpStation
$37,000,000 - Level 2 - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
263 1107 Jersey CityMunicipalUtilitiesAuthority
S340928-45
Bayfront Clean Water Sewer $4,520,000 - Level 2 - Sanitary Sewer System- New
BrownfieldRedevelopment(ConduitProjects)
264 59 Jersey CityMunicipalUtilitiesAuthority
S340928-47
Van Horne Street SewerImprovements
$11,400,000 - Level 1 - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
265 356 KearnyMunicipalUtilitiesAuthority
S340259-14
Kearny Point PumpingStation Grit CollectorReplacement Project ANDCentral Avenue &Pennsylvania AvenueSewer Rehabilitation Project
$1,582,000 - 2019-09-18
Level 1 2020-03-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Kearny Point Pumping StationGrit Collector Replacement
-
Central Avenue & PennsylvaniaAvenue Rehabilitation
-
- Sanitary Sewer SystemRehabilitation
266 877 Little EggHarborTownship
S340579-04
Mystic Island DrainageImprovements - Phase 2
$1,714,000 - 2020-11-16
Level 1 ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
-
- StormwaterManagement - GrayInfrastructure
CW Generic
267 656 Long BeachTownship
S340023-09
2020 North Beach SewerMain Replacement
- - 2020-12-24
Level 1 - Sanitary Sewer SystemRehabilitation
CW Generic
268 275 Long HillTownship
S340404-10
Capacity Assurance andSystem RehabilitationProject
$7,500,000 - 2019-04-29
Exempt 2019-12-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WWTP and Pump StationImprovements
-
Sanitary SewerRehabilitation Project
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
Page 11 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type269 717 Manasquan
BoroughS340450-02
Stockton Lake Bulkheadand StormwaterManagement Project
$4,505,800 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Stockton Lake Bulkhead andStormwater Management
-
- StormwaterManagement - GreenInfrastructure
270 384 ManasquanRiver RegionalSewerageAuthority
S340911-03
MRRSA Vehicle Fleet andEquipment Replacement
$660,000 - Exempt 2019-09-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
MRSSA Vehicle Fleet andEquipment Replacement
-
- Equipment Purchase(Clean Water)
CW Generic
271 565 MantuaTownshipMUA
S340514-01
Austin Street Sewer PumpStation
$1,400,000 - Level 1 2020-12-01
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
272 565 MantuaTownshipMUA
S340514-03
Royal Oaks Sewer PumpStation
$1,000,000 - 2020-12-29
Level 1 2020-12-01
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
273 376 MetuchenBorough
S340360-02
Sewage Pump StationReplacement
$4,000,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Jersey Avenue PumpStation Replacement
-
- Sanitary Sewer SystemRehabilitation
274 570 MiddlesexBorough
S340698-03
Middlesex BoroughRehabilitation of SanitarySewers Phase II(Greenbrook Rd. and LouisAve. Pump Stations)
$1,000,000 - 2020-03-16
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehabilitation of Sanitary SewersPhase II (Greenbrook Rd. andLouis Ave. Pump Stations)
-
- Sanitary Sewer SystemRehabilitation
275 419 MiddlesexCounty UtilitiesAuthority
S340699-16
Main Trunk SewerRehabilitation Phase III
$18,100,000 - Level 1 2020-08-25 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Main Trunk SewerRehabilitation Phase III
-
Meter ChamberRehabilitation, Ph. II
-
- Sanitary Sewer SystemRehabilitation
276 46 MiddlesexCounty UtilitiesAuthority
S340699-17
ctp rehabiltation phase 4 $14,000,000 - Exempt 2019-11-04
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
277 29 MontgomeryTownship
S340130-03
Stage II WastewaterTreatment Plant FloodProtection Project
$12,000,000 - Level 2 - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
278 742 MontvilleTownship
S340931-04
Old Lane Sewer Project $2,800,000 - 2020-08-17
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Old Lane SewerProject
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
279 32 Newark City S340815-26
Improvements to thePeddie CSO
$3,300,000 - 2016-03-04
Level 1 2016-10-06 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
CSO Solids/Floatables ControlMeasures Netting Facility AtPeddie Ditch, Site 025
-
Engineering Services -
- Combined SewerOverflow (CSO) - GreenInfrastructure
CSO -AbatementProjects
280 21 Newark City S340815-27
Greenstreet Projects for theCity of Newark
$3,800,000 - 2016-03-04
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Greenstreet Projects forNewark
-
- StormwaterManagement - GreenInfrastructure
CSO - GreenInfrastructure
281 502 NorthBrunswickTownship
S340888-03
Sanitary SewerImprovement Project
- - Level 1 - Sanitary Sewer SystemRehabilitation
CW Generic
282 143 North HudsonSewerAuthority
S340952-35
2019 Adams Street WWTPImprovements
$250,000 - Exempt - Sewage TreatmentPlant (STP) -Improvement/Upgrade
283 966 Northfield City S340508-02
Vactor Truck Purchase $150,000 - Exempt 2020-09-09
- Equipment Purchase(Clean Water)
CW Generic
284 2 OaklandBorough
S340418-06
Oakland Sewer SystemImprovements
$5,720,000 - 2020-10-05
Level 2 - Sanitary Sewer SystemRehabilitation
285 329 Ocean County S344080-09
Barnegat Bay Storm Water -Manufactured TreatmentDevices
$1,300,000 - 2016-03-03
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Barnegat Bay Storm Water -Manufactured TreatmentDevices
-
- StormwaterManagement - GrayInfrastructure
Barnegat Bay
286 325 Ocean County S344080-10
Camera Pipe LineInspection Truck System -Equipment
$250,000 $240,000 2016-03-04
Exempt 2016-05-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Motor Vehicle: Camera PipelineInspection Truck System
-
- Equipment Purchase(Clean Water)
Barnegat Bay
287 325 Ocean County S344080-11
Mechanical Street Sweeper- Equipment
$350,000 $336,000 2016-03-04
Exempt 2017-05-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Motor Vehicle: MechanicalStreet Sweeper
-
- Equipment Purchase(Clean Water)
Barnegat Bay
288 118 Ocean CountyUtilitiesAuthority
S340372-64
CD1008 CWPCF ProcessImprovements
$37,774,000 - Level 1 2020-12-16
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
289 342 Ocean GateBorough
S344180-01
Storm Sewer MTD $2,600,000 - 2015-03-12
Level 1 2011-12-07 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
MTD's - StormSewer
-
- StormwaterManagement - GrayInfrastructure
Barnegat Bay
290 1157 Orange City S340859-04
S-4 (10888779.1) WATERMETER REPLACEMENT
$5,100,000 - 2020-08-14
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
S-4 (10888779.1) WATERMETER REPLACEMENT
-
- Water Efficiency /Water Meters
CW Generic
291 194 Passaic ValleySewerageCommission
S340689-44
Wallington Pump StationRehabilitation Project
$16,100,000 - 2020-04-01
Level 1 2020-06-04 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Wallington Pump StationRehabilitation Project
-
- Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
292 191 Passaic ValleySewerageCommission
S340689-47
Headworks ReconstructionProject
$94,965,434 - 2018-01-23
Level 1 2019-06-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
HeadworksReconstruction
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
293 205 Passaic ValleySewerageCommission
S340689-51
Secondary Bypass andSludge Train RecyclesRerouting Project
$39,087,360 - Level 1 - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
294 195 Passaic ValleySewerageCommission
S340689-52
Advanced Electrical Project $66,477,527 - 2020-11-16
Level 1 2020-10-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Advanced ElectricalProject
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
295 195 Passaic ValleySewerageCommission
S340689-53
Plantwide SCADAImprovements
$16,843,200 - Exempt 2020-12-22
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
296 168 Perth AmboyCity
S340435-19
The Purchasing of a CCTVVideo Pipeline InspectionSystem Project
$400,000 - Exempt 2020-01-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
The Purchasing of a CCTV VideoPipeline Inspection System
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
297 1140 PollutionControlFinancingAuthority ofWarren County
S342026-01
Pollution Control FinancingAuthority Cell 7 Project
$24,000,000 - 2019-10-18
Level 1 - Landfill Construction
298 371 Princeton S340656-08
System-wide SanitarySewer Rehabilitation
$4,300,000 - 2013-03-04
Level 1 2013-05-23 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary SewerRehab
-
- Sanitary Sewer SystemRehabilitation
CW Generic
299 544 RoselleBorough
S340332-02
Cleaning & lining of sanitarysewer
$3,800,000 - 2015-03-05
Level 1 2015-11-09 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary SewerRehab
-
- Sanitary Sewer SystemRehabilitation
CW Generic
300 602 RunnemedeBorough
S340363-06
Sanitary Sewer slip-lining atvarious locations
$1,800,000 - 2015-03-06
Level 1 2015-12-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer slip-lining
-
- Sanitary Sewer SystemRehabilitation
CW Generic
301 378 SomervilleBorough
S340551-01
Somerville Sanitary SewersProject 19-001
$3,700,000 - 2020-08-18
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Somerville Sanitary SewersProject 19-001
-
- Sanitary Sewer SystemRehabilitation
CW Generic
302 588 SouthMonmouthRegional SewerAuthority
S340377-06
Pump Station Upgrades -Brielle and Glimmer Glass
$1,700,000 - 2020-06-22
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Pump Station Upgrades -Brielle and Glimmer Glass
-
- Sanitary Sewer SystemRehabilitation
CW Generic
Page 12 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type303 1159 South Orange
VillageS340103-02
The Township of SouthOrange Village Water Utility -Advanced MeteringInfrastructure (AMI)Implementation Project
$2,670,000 - 2020-09-18
Exempt 2020-11-16
- Water Efficiency /Water Meters
CW Generic
304 451 Toms RiverMunicipalUtilitiesAuthority
S340145-07
Sanitary SewerRehabilitation
$8,500,000 - Level 1 - Sanitary Sewer SystemRehabilitation
CW Generic
305 451 Toms RiverMunicipalUtilitiesAuthority
S340145-08
Equipment Purchase $1,358,400 - 2020-10-09
Exempt 2020-11-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Procurement of one replacementDump Truck Vehicle
-
Procurement of one Utility TruckVehicle with Crane
-
Procurement of one JetVac TruckVehicle
-
Procurement of three replacementportable generators
-
Procurement and installation offour wetwell-mounted grinders forPump Stations 24, 25, 26 and 30
-
- Equipment Purchase(Clean Water)
CW Generic
306 404 TuckertonBorough
S340034-05
Curlew Rd., Kingfisher Rd.and Bass Rd. SanitarySewer SystemRehabilitation
$3,300,000 - 2020-02-12
Level 1 2020-08-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
SFY 2020 Sewer MainReplacement Project
-
- Sanitary Sewer SystemRehabilitation
CW Generic
307 126 Two RiversWaterReclamationAuthority
S340117-08
Plant RAS Improvements $2,400,000 - Exempt 2019-12-10
- Sanitary Sewer SystemRehabilitation
308 471 WesternMonmouthUtilitiesAuthority
S340128-08
Hawkins Road andMillponds ForcemainReplacement
$8,000,000 - 2020-03-12
Level 1 2020-09-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Replacement of Hawkins Roadand Mill Ponds Force Mains
-
- Sanitary Sewer SystemRehabilitation
CW Generic
309 386 WillingboroMunicipalUtilitiesAuthority
S340132-08
Collection SystemResiliency
$1,900,000 $1,800,000 2015-03-18
Level 1 2014-09-02 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Collection System ResiliencyImprovements - Manhole Repair
-
Collection System ResiliencyImprovements - Timber CrossingReplacement
-
- Sanitary Sewer SystemRehabilitation
CW Generic
310 1121 Asbury ParkCity
S340883-08
Sewer Plant $63,000,000 - 2016-03-04
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sewer Plant -
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
311 111 BayshoreRegional SewerAuthority
S340697-07
Power Resiliency Project5182
- - - Flood Resiliency CW Generic
312 234 Bergen CountyUtilitiesAuthority
S340386-15
Power Supply MitigationImprovements
$57,000,000 - Undetermined - Energy Efficiency /Renewable Energy
CW Generic
313 234 Bergen CountyUtilitiesAuthority
S340386-18
Pump Station ResiliencyProject
$2,491,339 - Level 1 - Sanitary Sewer SystemRehabilitation
314 228 Bergen CountyUtilitiesAuthority
S340386-19
Infrastructure ProtectionImprovements
$3,240,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
315 228 Bergen CountyUtilitiesAuthority
S340386-20
Primary Settling TanksImprovements
$9,000,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
316 228 Bergen CountyUtilitiesAuthority
S340386-22
Facility Assessment andImprovements
$5,690,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
317 26 BerkeleyHeightsTownship
S340385-05
STP Upgrade $1,973,289 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
318 945 BerkeleyHeightsTownship
S340385-06
West Side Drainage Project $25,500,000 - - Non-Point Source(NPS) PollutionControls
CW Generic
319 264 BerkeleyTownship
S344020-01
Water Quality RetentionBasin at Veterans Park
$905,063 - - StormwaterManagement - GrayInfrastructure
320 668 Borough ofWenonah
S340531-01
Sanitary Sewer CollectionSystem AssetManagement and SystemImprovements
$1,330,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Sanitary Sewer Collection SystemAsset Management and SystemImprovements
-
- Sanitary Sewer SystemRehabilitation
321 959 Brigantine City S340827-05
Flood Control and PumpStation Improvements
$4,600,000 - 2015-03-17
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Evans Blvd.Stormwater
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
322 3 CamdenCountyMunicipalUtilitiesAuthority
S340640-25
Camden City GreenInfrastructure, Phase 5
$14,300,000 - - StormwaterManagement - GrayInfrastructure
323 8 CamdenCountyMunicipalUtilitiesAuthority
S340640-27
InfrastructureImprovements on South27th Street (CR 609) in theCity of Camden
$4,862,636 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
324 897 CamdenCountyMunicipalUtilitiesAuthority
S340640-31
Newton Lake BankStabilization
- - - Non-Point Source(NPS) PollutionControls
CW Generic
325 872 CumberlandCounty
S340438-01
Downe WastewaterInfrastructure
$16,000,000 - Level 2 - Sanitary Sewer System- New
CW Generic
326 402 DelancoSewerageAuthority
S340956-03
Collection SystemImprovement Project
- - Level 1 - Sanitary Sewer SystemRehabilitation
CW Generic
327 189 DelranTownship
S340794-11
Service Water SystemUpgrades and AerationBlower ReplacementProject
$2,100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Wastewater Treatment PlantService Water System and AerationBlowers Upgrade
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
328 1125 East OrangeCity
S340843-03
The Crossings at BrickChurch
$12,000,000 - - Sanitary Sewer SystemRehabilitation
329 488 FranklinTownshipSewerageAuthority
S340839-06-1
Supplemental Loan-Rodney Ave Pump Station
$1,000,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Supplemental Loan - RodneyAve Pump Station
-
- Sanitary Sewer System- New
CWSupplemental
330 243 Gloucester City S345090-01
City of Gloucester CSOAsset Management Plan
$1,000,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
City of Gloucester CSO AssetManagement Plan
-
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
331 101 GuttenbergTown
S340854-03
Guttenberg CSO $3,500,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
332 612 HaddonHeightsBorough
S340877-03
Sanitary Sewer PumpStation Rehabilitation
$953,580 - - Sanitary Sewer SystemRehabilitation
CW Generic
333 612 HaddonHeightsBorough
S340877-04
Sanitary SewerRehabilitation (CIPP)
$2,052,912 - - Sanitary Sewer SystemRehabilitation
CW Generic
334 612 HaddonHeightsBorough
S340877-05
Sanitary Sewer MainReplacement
$4,974,434 - - Sanitary Sewer SystemRehabilitation
CW Generic
335 698 HammontonTown
S340927-10
Waste Water TreatmentPlant Sludge DryingReplacement (Centerfuge)
- - - SludgeTreatment/DisposalFacilities
CW Generic
336 1124 HardystonMunicipal UtilityAuthority
S340532-01
Water Meter Replacement $486,000 - - Water Efficiency /Water Meters
337 1173 Highland ParkBorough
S340938-03
Replacement of customer-owned large diameter watermeters
$2,400,000 - - Equipment Purchase(Clean Water)
CW Generic
Page 13 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type338 555 Hopewell
TownshipS340282-03
Sanitary Sewer SystemAsset Management Plan -Sewer RehabilitationProjects
$1,640,000 - - Sanitary Sewer SystemRehabilitation
339 65 Jersey CityMunicipalUtilitiesAuthority
S340928-23
3 Pump Stations FloodHardening Improvements
$1,846,000 - 2017-01-31 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Pump Stations PS-1 & PS-2Flood Hardening Improvements
-
Engineering Design Contract -Engineering Construction -Contract No. 1
-
TBD --
- Sanitary Sewer SystemRehabilitation
CSO -AbatementProjects
340 65 Jersey CityMunicipalUtilitiesAuthority
S340928-35
Carteret Phase II $7,774,166 - - Sanitary Sewer SystemRehabilitation
341 59 Jersey CityMunicipalUtilitiesAuthority
S340928-42
-- Phase 6A SewerRehabilitation
$36,000,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
342 59 Jersey CityMunicipalUtilitiesAuthority
S340928-46
Jersey City ClaremontEmergency Repair.
$3,600,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
343 333 LaceyTownship
S344140-02
Yacht Basin Plaza North &South Bulkhead andStormwater Management
$1,559,000 - - StormwaterManagement - GrayInfrastructure
CSO - GreenInfrastructure
344 242 Linden RoselleSewerageAuthority
S340299-08
2019 Capital ImprovementProjects
$17,000,000 - 2020-11-17
Undetermined 2020-01-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Emergency GeneratorSwitchgear Replacement
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
345 390 Little EggHarborMunicipalUtilitiesAuthority
S340579-05
Little Egg Harbor SewerMain Replacement Phase II
- - - Sanitary Sewer SystemRehabilitation
CW Generic
346 656 Long BeachTownship
S340023-08
asset management $120,000 - - Sanitary Sewer SystemRehabilitation
CW Generic
347 385 ManasquanRiver RegionalSewerageAuthority
S340911-04
Mingamahone PumpStation Improvements
$2,388,541 - - Sanitary Sewer SystemRehabilitation
CW Generic
348 1151 MilltownBorough
S340102-01
Milltown Ford AveRedevelopment
$21,000,000 - 2015-03-19
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Milltown Ford AveRedevelopment
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
349 1151 MilltownBorough
S340102-04
Ford Ave Redevelopment $5,500,000 - 2015-03-19
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Ford AveRedevelopment
-
- DecentralizedWastewater (or Septic)SystemRepair/Replacement
CW Generic
350 714 MilltownBorough
S340102-05
Flood Mitigation Boroughof Milltown MunicipalComplex Relocation
$13,726,000 - Undetermined - StormwaterManagement - GrayInfrastructure
CW Generic
351 507 MonroeMunicipalUtilitiesAuthority
S340423-05
Video InspectionEquipment
$300,000 - Exempt - Equipment Purchase(Clean Water)
CW Generic
352 409 MontclairTownship
S340837-05
Montclair Twp -SanitarySewer ManholeRehabilitation
$800,000 - Undetermined - Sanitary Sewer SystemRehabilitation
353 861 Newton Town S340449-04
Memory Park DrainageImprovements
$538,000 - - StormwaterManagement - GrayInfrastructure
CW Generic
354 6 Newton Town S340449-05
Improvements to theWaste Water TreatmentPlant, Digester conversionand primary sludge pumpreplacement.
- - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
355 160 North HudsonSewerAuthority
S340952-37
Madison StreetImprovements
$5,400,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
356 160 North HudsonSewerAuthority
S340952-38
W1234 Outfall EmergencyRepair
$1,351,200 - Undetermined - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
357 599 Northfield City S340508-03
Preparation of an AssetManagement Plan
$180,000 - - Sanitary Sewer SystemRehabilitation
CW Generic
358 312 Northfield City S340508-04
Zion Road Pump StationUpgrade and Preparation ofAsset Management Plan
$720,000 - 2020-07-07
- Sanitary Sewer SystemRehabilitation
CW Generic
359 702 Ocean CountyUtilitiesAuthority
S340372-65
CD1713 CWPCFThickened Sludge Storageand Blend TankRehabilitation
- - 2020-12-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Thickened Sludge Storage andBlend Tank Rehabilitation
-
- Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
360 412 Orange City S340859-03
S-3 (10888772.1)Collection SystemRehabilitation andReplacement
$3,377,600 - - Sanitary Sewer SystemRehabilitation
CW Generic
361 487 ParsippanyTroy HillsTownship
S340886-05
Pump Station No.4Sanitary SewerRedirection Project
$11,733,500 - - Sanitary Sewer System- New
CW Generic
362 195 Passaic ValleySewerageCommission
S340689-55
Improvements to the UtilityTunnel Process PipingProject
$9,288,380 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
363 195 Passaic ValleySewerageCommission
S340689-56
O2 Deck Rehabilitation - - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CSO -AbatementProjects
364 53 Paterson City S340850-05
CSO 023 Elimination-Sewer Separation atSecond Avenue
$1,935,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
365 53 Paterson City S340850-06
21st Avenue SewerReconstruction
$2,161,100 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
366 53 Paterson City S340850-07
West Railway SewerReconstruction
$2,137,200 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CW Generic
367 105 Paterson City S345210-01
Investigation of TributarySewers from AdjacentMunicipalities
$200,000 - - Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
368 106 Perth AmboyCity
S340435-17
Second Street CorridorProject
$4,418,400 - Level 2 - StormwaterManagement - GreenInfrastructure
CSO - GreenInfrastructure
369 363 PhillipsburgTown
S340874-08
Sanitary and Storm SewerInfrastructureImprovements
$2,600,000 - - Sanitary Sewer SystemRehabilitation
CW Generic
370 225 PhillipsburgTown
S340874-09
Wastewater TreatmentPlant Odor ControlManagement
$3,123,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
CW Generic
371 914 PlainfieldMunicipalUtilitiesAuthority
S340240-06
Transfer StationImprovement
$11,675,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Transfer StationImprovement
-
- StormwaterManagement - GrayInfrastructure
CW Generic
372 371 Princeton S340656-09
Linden Lane Improvements $1,821,582 - - Sanitary Sewer SystemRehabilitation
373 891 Ridgefield ParkVillage
S340688-05
Village of Ridgefield ParkSkymark Project -- CleanWater
$30,211,486 - - StormwaterManagement - GrayInfrastructure
374 100 Ridgefield ParkVillage
S345230-01
Planning for Long TermControl Plan CSO
$800,002 - 2016-03-03
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
TBD -
- Combined SewerOverflow (CSO) -TraditionalInfrastructure
CSO -AbatementProjects
375 628 Rochelle ParkTownship
S340310-02
Sewer Pumping Station - - - Flood Resiliency CW Generic
Page 14 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
Color RankProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan Closing
Amount Project Type Loan Type376 887 Tuckerton
BoroughS340034-04
Dredging of TuckertonWaterways (Clean Water)
$7,750,000 - - Non-Point Source(NPS) PollutionControls
377 31 WarrenTownshipSewerageAuthority
S340964-06
Contract 56 WastewaterTreatment PlantImprovements
$4,550,000 - - Sewage TreatmentPlant (STP) -Improvement/Upgrade
378 888 WestWildwoodBorough
S340626-05
Storm SewerImprovements to AvenuesP, Q, R, S & Mueller Avenue
$1,890,000 - 2016-03-03
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Construction -Construction Managementand Inspection
-
Construction -Construction Managementand Inspection
-
- StormwaterManagement - GrayInfrastructure
CW Generic
379 725 WoodbineBorough
S340370-02
Sanitary Sewer SystemPhase 1
$6,542,000 - - Sanitary Sewer System- New
CW Generic
380 442 WoodbridgeTownship
S340433-12
Segment Five KeasbeyInterceptor Phase 1 and 2
$28,919,899 - - Sanitary Sewer SystemRehabilitation
CW Generic
Page 15 of 15
Clean Water Projects - Living (Active Review Project) List - Sorted by Color
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
1 603.14900 Passaic ValleyWaterCommission
1605002-014
Levine Reservoir WaterStorageImprovements -Phase 1
$26,100,000 - 2016-03-04
Level 2 2018-08-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
CH2M/HMM -Levine ReservoirWater StorageImprovements
-
- Cover OpenFinishedReservoir
DW Generic
2 407.90139 Newark City 0714001-020
Phase-2 Lead ServiceLine Replacement(LSLR) Project
$17,500,000 - 2019-05-29
Level 1 2018-06-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Newark LeadService LineReplacementPhase 2(A)
2019-06-07
2019-12-23
2020-02-04
$3,365,000
Newark LeadService LineReplacementPhase 2(B)
2019-06-07
2019-08-29
2019-11-04
$4,745,000
Newark LeadService LineReplacementPhase 2(C)
2019-06-07
2019-08-29
2019-11-04
$4,230,000
2019-11-07
$13,500,000 Lead ServiceLinesReplacement(LSLR)
3 403.91000 Trenton City 1111001-011
Lead Service linereplacement
$20,340,000 - 2019-02-13
Level 1 2018-08-16
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
TrentonLSLR Phase1A
2019-10-30
2019-12-17
2019-12-18
$10,280,000
TrentonLSLR Phase1B
2019-02-14
2019-05-28
2019-11-15
$9,934,000
2019-11-20
$15,000,000 Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
4 402.80139 Newark City 0714001-019
Phase-1 Lead ServiceLine Replacement(LSLR) Project
$12,500,000 - 2018-05-04
Level 1 2018-06-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Newark LeadService LineReplacementPhase 1(A)
2018-07-12
2018-12-18
2019-01-03
$4,350,987
Newark LeadService LineReplacementPhase 1(B)
2018-10-19
2018-12-18
2019-01-03
$4,511,769
Newark LeadService LineReplacementPhase 1(C)
2018-10-19
2018-12-18
2019-01-03
$3,312,244
2019-05-20
$12,296,528 Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
5 357.94274 Newark City 0714001-021
Phase 3-10 LeadService LineReplacement (LSLR)Project
$145,000,000 - 2019-09-22
Level 1 2018-06-29
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
NewarkLSLR Phase5A
2019-10-29
2020-03-10
2020-10-08
$5,264,344
NewarkLSLR Phase5B
2019-10-29
2020-03-11
2020-10-08
$1,680,796
NewarkLSLR Phase6
2019-10-29
2020-03-03
2020-10-08
$8,824,058
NewarkLSLR Phase7
2019-10-29
2020-02-21
2020-10-08
$8,405,787
NewarkLSLR Phase8
2019-10-29
2020-03-03
2020-10-08
$7,927,644
NewarkLSLR Phase9
2019-10-29
2020-03-16
2020-10-08
$7,887,371
NewarkLSLR Phase10A
2020-08-14
2020-12-03
-
NewarkLSLR Phase10B
2020-08-14
2020-11-12
-
2020-10-20
$40,000,000 Lead ServiceLinesReplacement(LSLR)
Affordability -Public only
6 353.10121 Passaic ValleyWaterCommission
1605002-002
Lead Service LineReplacement in MainSystem
$26,500,000 - Level 1 2020-12-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lead Service LineReplacement
-
- Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
7 353.10121 Passaic ValleyWaterCommission
1605002-026
PVWC Lead ServiceLine Replacement
$1,978,000 - - Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
8 350.55000 NewBrunswickCity
1214001-005
Water Treatment PlantImprovements
$15,500,000 - 2016-03-04
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Contract 511-16W -Pretreatment SystemUpgrades
-
- WaterTreatmentPlant/Facilities
DW Generic
9 340.30134 Orange City 0717001-011
Orange Twp |PFAS inWell 8 Drinking WaterSystem
$1,550,000 - Level 1 - WellConstruction /Replacement
Affordability -Public only
10 340.30134 Orange City 0717001-013
Orange Twp | Well 5Rehabilitation Project
$700,000 - Level 1 ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well 5Rahabilitation
-
- WellConstruction /Replacement
Affordability -Public only
11 340.30134 Orange City 0717001-015
Orange Twp |PFAS inWell 7 Drinking WaterSystem
$1,440,000 - - WaterTreatmentPlant/Facilities
Affordability -Public only
12 332.94274 Newark City 0714001-022
PROCESS ANDOPERATIONALUPGRADES AT THEPEQUANNOCKWATER TREATMENTPLANT
- - - WaterTreatmentPlant/Facilities
Base DWSRF- Public
13 320.00105 North ShoreWaterAssociation
1904004-001
Existing Well RequiresReplacement
$500,000 - 2015-03-18
Level 1 ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
WellReplacement
-
- Surface waterintake
DW Generic
14 305.47315 BloomfieldTownship
0702001-003
Lead Service LineReplacement
$1,098,395 - 2018-12-13
Level 1 2019-05-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Bloomfield LeadService LineReplacement
2019-05-06
2019-07-29
2020-06-03
$330,000
2020-06-26
$284,747 Lead ServiceLinesReplacement(LSLR)
15 302.90470 NJ AmericanWaterCompany,Incorporated
1345001-017
Oak Street TreatmentPlant Improvements
$10,100,000 - 2016-03-04
Level 1 2017-04-18
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Oak StreetTreatmentPlant
2017-07-10
2017-10-10
2017-10-23
$4,735,000
2018-02-22
$7,413,000 WaterTreatmentPlant/Facilities
DW Generic
16 300.09835 BurlingtonCity
0305001-002
Rehabilitation of DualMedia Filters
$3,600,000 - 2019-01-22
Level 1 2018-11-29
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
FilterRehabilitation
2019-09-19
2019-11-19
2020-03-02
$1,165,000
2020-06-26
$1,012,911 Water Efficiency/ Water Meters
Updated as of January 14, 2021Drinking Water Projects
New Jersey Water Bank (NJWB)
Living (Active Review Project) List (Sorted by Rank Pts.)
Page 1 of 9
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
17 287.17000 Trenton City 1111001-005
5-year Lead ServiceLine Replacement &Verification Project
$239,000,000 - 2020-09-28
Level 1 2020-10-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lead Service LineReplacement ProjectContracts 2A
-
Lead Service LineReplacement ProjectContracts 2B
-
Lead Service LineReplacement ProjectContracts 2C
-
Lead Service LineReplacement &Verification Project3A
-
Lead Service LineReplacement &Verification Project 3B
-
Lead Service LineReplacement &Verification Project3C
-
- Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
18 270.47315 BloomfieldTownship
0702001-004
InterconnectionProject
$2,600,000 - 2020-10-15
Level 1 2020-01-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
InterconnectionProject
-
- Pump Stations
19 265.47144 MerchantvillePennsaukenWaterCommission
0424001-002
Woodbine PFNA plant $5,646,000 - - WaterTreatmentPlant/Facilities
Base DWSRF- Public
20 265.35129 BellevilleTownship
0701001-008
Belleville Lead ServiceLine Replacement
$3,568,752 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lead Service LineReplacementProgram, Phase 1
-
- Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
21 265.30134 Orange City 0717001-014
Orange Twp |Relocation of theexisting transmissionmain under the GlenAvenue Bridge for thestabilization of thepipe
$2,000,000 - 2020-08-14
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Relocation ofTransmissionMain
-
- Water Mains Affordability -Public only
22 265.03144 National ParkBorough
0812001-005
Addition of PFOSTreatment at ExisitingWater Plant
$1,526,500 - 2020-11-17
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water TreatmentFacility Upgrades forPFNA
-
- WaterTreatmentPlant/Facilities
Nano-Eligible
23 265.00055 ButtonwoodMobile HomePark
0301001-001
Buttonwood system $318,000 - - WaterTreatmentPlant/Facilities
Nano-Eligible
24 250.67215 Old BridgeMunicipalUtilitiesAuthority
1209002-014
Perrine Road CarbonAbsorber Facility
$1,750,000 - 2015-10-19
Level 1 2016-07-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Perrine RoadCarbon AdsorberFacility
2016-11-21
-
- Other (InCompliancewith SDWA)
DW Generic
25 250.20726 MoorestownTownship
0322001-001
North Church StreetWater Treatment PlantUpgrade
$24,625,000 - 2018-06-15
Level 1 2018-09-26
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
N. ChurchStreet WaterTreatmentPlant Upgrade
2018-10-25
2019-01-11
2020-04-15
$24,625,000
2020-06-23
$20,880,000 WaterTreatmentPlant/Facilities
26 250.09653 WaldwickBorough
0264001-003
Water TreatmentSystems
$3,550,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WaterTreatmentSystems
-
- WaterTreatmentPlant/Facilities
Nano-Eligible
27 250.04060 Ho-Ho-KusBorough
0228001-002
Ho-Ho-Kus WaterTreatment System
$2,110,000 - Undetermined - WaterTreatmentPlant/Facilities
Nano-Eligible
28 235.86898 BrickTownshipMunicipalUtilitiesAuthority
1506001-011
Granular ActivatedCarbon (GAC)Treatment Addition
$20,890,000 - 2018-04-02
Level 1 2018-08-07
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
GranularActivatedCarbon (GAC)TreatmentAddition
2018-12-12
2019-02-19
2020-03-02
$16,900,000
2020-06-29
$17,094,937 WaterTreatmentPlant/Facilities
DW Generic
29 235.75000 East OrangeCity
0705001-014
Water SystemImprovement andResiliency Project2017
$33,000,000 - 2016-03-04
Level 1 2016-09-29
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
White OakRidgePumpingStationGenerator
2020-01-07
2020-12-02
-
Water SystemDistributionImprovements
2019-05-28
2019-10-07
2020-03-02
$15,910,000
WORPSDisinfection
-
2020-06-25
$23,100,000 Other (InCompliancewith SDWA)
DW Generic
30 227.94274 Newark City 0714001-017
Water DistributionSystem Upgrades
$2,000,000 - 2011-03-07
Level 1 2011-07-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water DistributionSystem Upgrades
-
- Water Mains DW Generic
31 227.85000 Newark City 0714001-008
Cleaning and lining ofwater mains,upgrading 4 inchmains to 6 & 8 inchmains, replace old firehydrants
$34,196,000 - -
32 225.10800 BerkeleyTownshipMunicipalUtilitiesAuthority
1505004-010
Berkeley TownshipMUA Phase VII WaterMain Installation
$8,000,000 - Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase VII WaterMain Installation
-
- Water Mains
33 208.72153 North JerseyDistrict WaterSupplyCommission
1613001-032
Rehabilitation ofTreatment Facility
$3,600,000 - 2015-03-06
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
RehabTreatmentFacility
-
- WaterTreatmentPlant/Facilities
DW Generic
34 200.09550 EastGreenwichTownship
0803001-004
Installation of filtrationsystem for PFCremoval at #3 Well
$2,600,000 - 2020-10-16
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Planning andDesignAllowance
2018-03-02
$310,000
2018-07-25
$2,280,200 WaterTreatmentPlant/Facilities
Nano-Eligible
35 197.85000 Newark City 0714001-011
Rehabilitation of thebasculate gate at theCharlotteburghReservoir with alarmand control systems
$3,140,000 - -
Page 2 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
36 197.62004 Jersey CityMunicipalUtilitiesAuthority
0906001-017
Boonton PlantCentrifuge
$1,740,240 - 2019-05-29
Exempt 2018-02-09 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WaterTreatment PlantResidualsHandlingImprovements
2018-10-29
2019-06-12
2020-03-02
$1,730,000
2020-06-30
$1,458,905 WaterTreatmentPlant/Facilities
DW Generic
37 195.25349 BridgetonCity
0601001-006
Well 14/15Rehabilitation
$6,810,000 - - WellConstruction /Replacement
38 191.15430 NJ AmericanWaterCompany,Incorporated
2004002-012
NJ American WaterLead Service LineReplacement ProgramPWSID 2004002
$20,000,000 - 2017-06-13
Level 1 2020-11-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
NJAW Lead ServiceLine ReplacementProgram
2020-12-08
2020-12-15
-
- Lead ServiceLinesReplacement(LSLR)
DW Generic
39 190.02964 UpperDeerfieldTownship
0613004-002
Seabrook WaterTower Replacement(Upper Deerfield)
$2,000,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Seabrook WaterTowerReplacement
-
- Storage Tanks Nano-Eligible
40 187.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-027
PHASE 6B WATERMAINREHABILITATIONPROJECT
$8,500,000 - Level 1 - Water Mains DW Generic
41 187.61996 Jersey CityMunicipalUtilitiesAuthority
0906001-029
Phase 6A WaterRehabilitation
$19,000,000 - - Water Mains Base DWSRF- Public
42 180.02650 WoodbineBorough
0516001-001
WTP Upgrade andwater main extension
$5,000,000 - 2020-06-09
Exempt 2017-07-26 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WATERTREATMENTPLAT SYSTEMUPGRADES
2020-12-07
-
WATER MAINEXTENSIONS
-
Woodbine AssetManagementPlan
2020-06-03
$101,000
Planning andDesign of WTPUpgrades andWater MainExtensions
2020-06-03
$204,000
2020-06-26
$5,000,000 WaterTreatmentPlant/Facilities
Nano-Eligible
43 177.73000 Newark City 0714001-018
Replacement of WaterDistribution Mains
$5,150,000 - 2016-03-04
Level 1 2016-07-20
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Contract09-WS2016
2018-04-23
2018-07-10
2018-08-24
$5,150,000
2018-11-27
$4,698,840 Water Mains DW Generic
44 175.95000 Atlantic CityMunicipalUtilitiesAuthority
0102001-007
Water MainReplacement Program
$1,620,000 - - Water Mains DW Generic
45 172.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-019
Route 139 Water MainReplacement Project
$6,700,000 - 2018-03-08
Level 1 2018-04-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
RT 139 WaterMainReplacementProject
2018-04-20
2019-05-20
2019-06-18
$6,670,000
2019-06-28
$5,280,963 Water Mains DW Generic
46 170.94333 WildwoodCity
0514001-006
2019 CapitalImprovements(Drinking Water)
$6,183,204 - 2020-02-13
Level 1 2020-02-06 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2019 CapitalImprovement
2020-02-27
2020-05-22
2020-06-04
$165,000
2019 CapitalImprovements
2020-03-02
$125,000
2019 CapitalImprovementsPhase 2A
-
2020-06-30
$1,924,000 Water Mains
47 170.24215 Little EggHarborMunicipalUtilitiesAuthority
1516001-005
Little Egg HarborWater ImprovementsPhases I
$1,450,000 - 2016-03-04
Level 1 2017-02-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Little EggHarbor Waterand SewerImprovementsPhase I
2020-03-04
2020-05-15
2020-06-03
$1,050,000
Planning andDesignAgreement
2020-03-02
$80,000
2020-06-25
$1,095,374 Water Mains DW Generic
48 170.07222 LowerTownshipMunicipalUtilitiesAuthority
0505002-004
Del Haven Water MainExpansion /Wildwood Water UtilityInterconnect
$10,260,000 - Level 2 - Water MainExtensions
Base DWSRF- Public
49 170.01700 Seaside ParkBorough
1527001-004
Well 10 TreatmentFacility
$1,500,000 - 2016-09-15
Level 1 2018-11-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well 10 TreatmentPlant Upgrade PhaseII
-
- WellConstruction /Replacement
Nano-Eligible
50 170.00150 North JerseyDistrict WaterSupplyCommission
1613001-026
Low Lift Gas Pump $12,900,000 - 2013-03-04
Exempt 2013-07-11
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Low Lift GasPump
-
- Pump Stations DW Generic
51 170.00150 North JerseyDistrict WaterSupplyCommission
1613001-031
Purchase and InstallNew DewateringSystem
$3,800,000 - 2015-03-06
Level 1 ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Upgrade toRTF
-
- WaterTreatmentPlant/Facilities
DW Generic
52 168.35449 NJ AmericanWaterCompany,Incorporated
1345001-021
Swimming River WTP2nd Clearwell
$26,345,000 - 2017-06-13
Level 1 2017-09-21
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
SwimmingRiver WTPImprovement
2018-12-19
2019-04-24
2020-06-03
$26,345,000
2020-06-29
$24,103,961 WaterTreatmentPlant/Facilities
DW Generic
53 160.86898 BrickTownshipMunicipalUtilitiesAuthority
1506001-014
Water MainReplacement onCartagena Drive,Alhama Drive, CadizDrive, Valencia Driveand Monterey Drive
$3,600,000 - 2019-08-20
Level 1 2019-10-11 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Cartagena DriveWater MainReplacement
-
- Water Mains
54 160.24136 Passaic ValleyWaterCommission
0231001-002
Lead Service LineReplacement in LodiSystem
$7,400,000 - Level 1 2020-12-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lead Service LineReplacement
-
- Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
55 155.45500 WildwoodCity
0514001-004
Wildwood Boardwalkwater mainreplacement
$2,494,096 - - Water Mains
56 155.21083 ManchesterTownship
1518005-002
Repaint and repair oneMG elevated storagefacility
$5,500,000 - 2016-03-02
Exempt 2016-10-13
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Repaint andRepair 1 MGStorage Tank
2017-01-31
2017-07-17
2017-07-25
$1,600,000
2017-12-18
$1,399,860 Storage Tanks DW Generic
Page 3 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
57 155.07224 HopatcongBorough
1912001-001
Hudson AvenueWater MainInstallation
$1,000,000 - 2018-05-01
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Hudson AvenueWater MainInstallation
-
- Water MainExtensions
Nano-Eligible
58 155.06025 PaulsboroBorough
0814001-003
Water MainReplacement(Thomson, Wood,Eliz. and CommerceSt.)
$2,800,000 - 2015-03-06
Level 1 2015-05-20
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement
2016-10-25
2017-07-06
2018-01-11
$670,000
2018-10-23
$635,400 Water Mains Nano-Eligible
59 155.05006 ClementonBorough
0411001-001
Rehab of GibbsboroWater Main (WhiteHorse Pike & WhiteHorse Rd.)
$500,000 - 2015-03-06
Exempt 2015-08-24
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
water mainrehab
-
- Water Mains Nano-Eligible
60 155.02201 SussexBorough
1921001-007
Sussex Borough MainStreet Water MainReplacement Project
$595,772 - - Water Mains Nano-Eligible
61 152.33376 MiddlesexWaterCompany
1225001-029
CJO Plant Upgrade -DBP RemovalTreatment
$72,000,000 - 2018-01-26
Level 1 2018-08-03
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
OzonationFacility
2018-10-03
2019-04-01
2020-06-03
$67,071,216
Procurementof OzoneSystem
2018-10-03
2019-04-01
2020-06-03
$4,463,784
- WaterTreatmentPlant/Facilities
DW Generic
62 150.12052 FreeholdBorough
1315001-002
Water PlantDevelopment
$6,440,000 - Level 2 2019-08-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water TreatmentPlant Development
-
- WaterTreatmentPlant/Facilities
DW Generic
63 150.04931 Salem City 1712001-004
Salem City WaterMeter
$1,900,000 - Exempt 2019-01-25 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Salem City WaterMeter Replacement
-
- Water Efficiency/ Water Meters
64 145.03382 HamburgBorough
1909001-002
Water Storage TankRehabilitation
$1,100,000 - 2019-07-02
Exempt 2019-06-04 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water StorageTank Rehab
-
- Storage Tanks Nano-Eligible
65 140.05400 HightstownBorough
1104001-009
Water Tank Painting &Repairs
$950,000 - Exempt 2020-04-23
- Storage Tanks Nano-Eligible
66 140.01978 MountArlingtonBorough
1426005-003
Altenbrand,Windemere, McGregorand Lee Water MainExtension
$2,020,000 - - Water MainExtensions
Nano-Eligible
67 137.64290 Jersey CityMunicipalUtilitiesAuthority
0906001-016
Large ValveReplacementProgram- Phase 2
$7,321,200 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Large ValveReplacement
-
- Water Mains DW Generic
68 137.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-012
Water MainReplacement
$18,000,000 - 2015-03-20
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement
-
- Water Mains DW Generic
69 137.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-025
Phase 1 & 2 WaterMain ReplacementProject
$32,000,000 - 2019-04-29
Level 1 2019-06-13
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
Phase 1 & 2Water MmainRehabilitation
2019-11-14
2020-06-09
2020-06-11
$31,925,000
2020-06-30
$25,000,000 Water Mains
70 137.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-026
5-B Water Project $7,320,000 - Level 1 - Water Mains DW Generic
71 137.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-032
Van Horne StreetWater Improvements
$4,200,000 - Level 1 - Water Mains Base DWSRF- Public
72 135.52328 Perth AmboyCity
1216001-010
The Painting of theBackwash Tank andStand Pipe Project
$1,651,532 - - Storage Tanks Base DWSRF- Public
73 135.35000 WillingboroMunicipalUtilitiesAuthority
0338001-011
Well 6 WaterTreatment PlantUpgrade
$10,621,600 - 2016-03-04
Level 1 2020-01-09
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
N/A -N/A -N/A -WillingboroWell No. 6
-
- WaterTreatmentPlant/Facilities
DW Generic
74 132.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-009
Burma Road AreaWater SystemImprovements
$5,000,000 - 2018-02-28
Level 1 2018-08-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Burma RoadWater SystemImprovements
2019-07-30
2020-03-03
2020-06-03
$5,000,000
2020-06-30
$2,770,000 Water Mains DW Generic
75 132.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-030
Phase 7a WaterImprovements
$29,985,841 - Level 1 - Water Mains Base DWSRF- Public
76 132.57342 Jersey CityMunicipalUtilitiesAuthority
0906001-018
Tonnele AvenueWater MainReplacement andRelining
$7,442,800 - 2018-05-14
Level 1 2018-08-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Tonnele AvenueWater MainReplacement andRelining
2020-06-18
-
- Water Mains DW Generic
77 132.47000 Jersey CityMunicipalUtilitiesAuthority
0906001-006
Transmission MainInstall
$19,000,000 - 2011-03-04
Level 1 2011-03-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
TransmissionMain Install
-
- Water MainExtensions
DW Generic
78 131.74985 NJ AmericanWaterCompany,Incorporated
0712001-016
NJ American WaterLead Service LineReplacement ProgramPWSID 0712001
$6,576,000 - 2017-06-16
- Lead ServiceLinesReplacement(LSLR)
DW Generic
79 130.21200 ManchesterTownship
1518005-004
MANCHESTERTOWNSHIP 1.0MGELEVATED TANK
$6,135,130 - - Storage Tanks
80 126.33355 MiddlesexWaterCompany
1225001-028
RENEW 2018 -Woodbridge Twp.
$11,200,000 - 2017-05-03
Level 1 2018-01-02 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
RENEW 2018 -PipelineRehabilitation
2018-04-06
2018-06-18
2018-08-25
$9,215,000
2018-09-12
$8,656,747 Water Mains DW Generic
81 125.67215 Old BridgeMunicipalUtilitiesAuthority
1209002-005
Laurence HarborWater SystemUpgrade, Phase 1
$2,500,000 - 2019-09-26
Level 1 2020-03-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Laurence HarborWater SystemImprovements -Phase 1
2020-05-29
-
- Other (InCompliancewith SDWA)
82 125.54379 Hoboken City 0905001-002
Water Main Upgrades(2018)
$8,000,000 - 2018-08-17
Level 1 2018-10-25
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainUpgrades
2019-02-27
2019-07-09
2020-06-04
$6,820,000
2020-06-26
$6,196,314 Water Mains DW Generic
83 125.26146 WallTownship
1352003-001
Route 138 Water MainImprovements
$1,800,000 - 2015-03-05
Level 1 2015-05-20
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainImprovements
2018-07-23
2018-11-14
2019-06-20
$1,230,000
2019-12-12
$1,316,909 Water MainExtensions
DW Generic
Page 4 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
84 125.26146 WallTownship
1352003-002
Route 34 Water MainImprovements
$3,700,000 - 2015-03-06
Level 1 2015-05-20
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainImprovements
2018-07-23
2018-11-14
2019-01-03
$2,885,000
2019-12-12
$3,128,728 Water MainExtensions
DW Generic
85 125.22000 HackettstownMunicipalUtilitiesAuthority
2108001-001
Construction of NewWater Storage Tank w/related waterdistribution lines
- - - Storage Tanks Base DWSRF- Public
86 125.12500 Clinton Town 1005001-010
West Main StreetWater MainReplacement Project -Asset ManagementPlanning
$2,640,000 - 2018-07-20
Level 1 2018-08-29 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
West mainStreet WaterMainReplacement -Phase 1
2018-10-29
2019-03-05
2020-05-21
$440,000
West MainStreet WaterMainReplacement -Phase II
2020-04-30
2020-06-04
2020-06-17
$1,705,000
2020-06-30
$1,448,187 Water Mains DW Generic
87 125.12500 Clinton Town 1005001-011
2017-TOC-WMR-CTWP-Glen EaglesDrive, Muirfield Lane,and Heather Hill Way
$1,265,807 - 2018-07-20
Level 1 2018-10-25 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Glen Eagles Drive,Muirfield Laneand Heather HillWay Water MainReplacement
2018-10-31
2019-03-05
2020-05-21
$970,000
2020-06-30
$966,537 Water Mains DW Generic
88 125.12028 ManchesterUtilitiesAuthority
1603001-001
Heights TankRehabilitation
$500,000 - Exempt 2020-11-16
- Storage Tanks
89 125.08300 SpotswoodBorough
1224001-001
Cleaning and lining ofapproximaty 3,600 LFof water mains
$3,443,914 - 2018-09-10
Level 1 2018-09-27
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
SpotswoodWater Main
2019-05-02
2019-07-31
2020-06-04
$820,000
2020-06-29
$730,010 Water Mains Nano-Eligible
90 125.07733 PointPleasantBeachBorough
1525001-002
Ocean Avenue WaterMain Replacement
- - - Water Mains Nano-Eligible
91 125.07681 Glen RidgeBorough
0708001-008
GR-2017-LSL-R/FH-RR Lead Service Water-Line Replacement/FireHydrant - Repairs &Replacement & WaterSystem AssetManagement Plan
$2,573,210 - 2018-08-13
Level 1 2019-02-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lead ServiceLine and FireHydrantReplacement
2019-02-28
2019-08-14
2020-05-21
$2,650,000
Water SystemAssetManagementPlan
-
2020-06-23
$2,367,774 Lead ServiceLinesReplacement(LSLR)
DW Generic
92 125.03968 Passaic ValleyWaterCommission
0239001-002
Lead Service LineReplacement in NorthArlington System
$10,500,000 - Level 1 2020-12-14 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Lead Service LineReplacement
-
- Lead ServiceLinesReplacement(LSLR)
Lead LineReplacement
93 125.03300 High BridgeBorough
1014001-003
West Main StreetWater Main Upgrades
$462,000 - - Water Mains Nano-Eligible
94 122.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-022
Hackensack River 36"Aqueductreplacement
$30,211,486 - - Water Mains DW Generic
95 122.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-023
Phase 5A WaterProject
$9,300,000 - Level 1 2020-11-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 5A CombinedSewer and WaterMain Rehabilitation
-
- Water Mains DW Generic
96 122.62000 Jersey CityMunicipalUtilitiesAuthority
0906001-024
Phase 2A Water $11,640,000 - Level 1 2020-06-17 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 2ACombined Sewer &Water
-
- Water Mains DW Generic
97 120.36250 Vineland City 0614003-017
2016 WaterDistributionRehabilitation Project
$3,100,000 - 2016-03-03
Level 1 2017-06-02 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
TBD -2016 WaterDistribution SystemRehab
-
- Water Mains DW Generic
98 120.30134 Orange City 0717001-012
Orange Twp |Interconnection andDistribution Project
$1,440,240 - - Interconnection Affordability -Public only
99 120.06285 TuckertonBorough
1532002-007
Curlew Rd. andKingfisher Rd. WaterMain Replacementand Well#3, Well#4Rehabilitation/Repairs.
$1,700,000 - 2020-02-12
Level 1 2020-08-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
SFY 2020 WaterMain ReplacementProject
-
- Water Mains Nano-Eligible
100 117.61666 Jersey CityMunicipalUtilitiesAuthority
0906001-020
Phase 3 and 4 WaterMain ReplacementProject
$6,620,000 - 2018-11-21
Level 1 2019-02-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 3&4 WaterMain Replacement
2019-05-22
2019-10-21
-
- Water Mains DW Generic
101 117.61666 Jersey CityMunicipalUtilitiesAuthority
0906001-021
Phase 5 Water Mains $11,000,000 - 2018-06-04
Level 1 2019-09-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Phase 5 Water MainReplacement Project
2019-11-26
2020-03-30
-
- Water Mains DW Generic
102 115.45200 JacksonTownshipMunicipalUtilitiesAuthority
1511001-013
Six Flags GreatAdventure WaterTreatment PlantReplacement
$20,000,000 - 2016-03-03
Level 2 2017-07-25
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
Six Flags GreatAdventureWaterTreatmentPlantReplacementBid and CMServices
2017-10-30
2018-02-14
2018-04-16
$16,730,000
2018-05-11
$15,603,769 WaterTreatmentPlant/Facilities
DW Generic
103 115.21720 HamiltonTownshipMunicipalUtilitiesAuthority
0112001-004
HTMUA WELL #8REHABILITATION
- - - WaterTreatmentPlant/Facilities
Base DWSRF- Public
104 115.17437 Ship BottomBorough
1528001-003
Water Treatment PlantReconstruction
$10,000,000 - 2020-03-19
Level 1 2020-06-09 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water TreatmentPlantReconstruction
2020-06-12
2020-08-06
-
- WaterTreatmentPlant/Facilities
Base DWSRF- Public
105 115.16964 South OrangeVillage
0719001-012
South OrangeNewsteadWatersphereEmergency Repairs
$640,000 - Exempt 2018-12-19 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
NewsteadEmergencyRepairs
2020-08-19
$720,000
2020-10-21
$640,000 Other (InCompliancewith SDWA)
106 115.08130 BerkeleyTownshipMunicipalUtilitiesAuthority
1505004-009
Installation of newWell 4 with WM toconnect to WTP
$2,500,000 - 2015-03-18
Level 2 2013-10-11
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well No. 4 -Phase II
2017-06-14
2017-10-10
2017-10-23
$2,375,000
2017-12-07
$1,799,146 WellConstruction /Replacement
Nano-Eligible
Page 5 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
107 115.01828 AllentownBorough
1302001-004
Water Treatment PlantImprovements
$2,328,960 - Level 1 ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
AllentownBorough
-
- WaterTreatmentPlant/Facilities
Nano-Eligible
108 115.00150 North JerseyDistrict WaterSupplyCommission
1613001-034
Security, IT and SafetyProjects
$1,600,000 - 2015-03-06
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Security, IT andSafety Projects
-
- WaterTreatmentPlant/Facilities
DW Generic
109 112.47000 Jersey CityMunicipalUtilitiesAuthority
0906001-015
Van Winkle Ave. WaterMain Replacement
$3,589,266 - 2017-07-12
Level 1 2017-09-27 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Van Winkle Ave.Water MainReplacement
2018-05-24
2018-08-27
2018-10-31
$3,120,000
2019-02-19
$3,116,740 Water Mains DW Generic
110 110.86898 BrickTownshipMunicipalUtilitiesAuthority
1506001-008
Undersized WaterMain ReplacementCedar Park East andWest
$6,550,000 - 2018-03-28
Level 1 2017-07-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Cedar Park WaterMain Replacement
2019-03-21
-
- Water Mains DW Generic
111 110.50005 Hoboken City 0905001-001
Washington St. WaterMain / GreenInfrastructureDrainage Improv.
$8,500,000 $8,500,000 2015-03-06
Level 2 2016-08-31 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WashingtonStreet WaterMainReplacement &GreenInfrastructureDrainageImprovement
2016-10-21
2016-10-27
2016-11-10
$7,940,000
2018-06-21
$7,200,000 Water Mains DW Generic
112 107.65932 Jersey CityMunicipalUtilitiesAuthority
0906001-028
Dam SecurityImprovements
$1,700,000 - 2019-08-06
Exempt 2020-02-12 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
BOONTON DAM ANDPARSIPPANY DIKESECURITYIMPROVEMENTS
-
- SecurityMeasures
Base DWSRF- Public
113 105.24215 Little EggHarborMunicipalUtilitiesAuthority
1516001-007
Little Egg HarborWater ImprovementsPhase II
- - - Water Mains Base DWSRF- Public
114 105.23992 MiddlesexWaterCompany
1225001-027
RENEW 2019 -Carteret
$11,200,000 - 2018-07-20
Level 1 2018-12-18
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
RENEW 2019Carteret
-
- Water Mains
115 105.16964 South OrangeVillage
0719001-008
Well 17 Air Stripper $425,000 - Undetermined - WaterTreatmentPlant/Facilities
116 105.12350 Red BankBorough
1340001-003
White Street WaterMain
$562,350 - - Water Mains
117 105.05567 HightstownBorough
1104001-010
2017 Water MainImprovements
$1,775,678 - 2018-06-28
Level 1 2018-07-10 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
First Avenue andForman AvenueWater Main Extension
2018-09-25
2018-11-20
-
Stockton StreetWatermainReplacement
2019-03-13
2019-06-18
-
- Water Mains Nano-Eligible
118 105.00100 Oak RidgeSeniorHousingCommunity
1414008-001
Oakridge SeniorCommunity WaterLines
$530,300 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Oakridge SeniorCommunity WaterLines
-
- Water Mains Nano-Eligible
119 102.33376 MiddlesexWaterCompany
1225001-025
Western TransmissionMain
$57,000,000 - 2016-03-03
Level 2 2017-09-21
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
WesternTransmissionMain (A)
2017-12-12
2018-03-06
2018-05-14
$13,740,000
WesternTransmissionMain (B)
2017-12-12
2018-03-06
2018-05-14
$17,865,000
WesternTransmissionMain (C)
2017-12-12
2018-03-06
2018-05-14
$17,990,000
2018-08-01
$43,474,714 Water Mains DW Generic
120 100.43200 EveshamMunicipalUtilitiesAuthority
0313001-001
Wells 13 TreatmentImprovements
$2,600,000 - 2012-03-02
Level 1 2012-07-23
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
ASR WellTreatment
2019-05-13
2019-06-26
2019-06-27
$1,845,000
2019-06-28
$2,280,200 WaterTreatmentPlant/Facilities
DW Generic
121 100.20726 MoorestownTownship
0322001-002
Hartford Road WaterTreatment PlantUpgrade
$15,240,000 - 2018-06-15
Level 1 2018-09-26 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Hartford RoadWTP Upgrade
2018-10-25
2019-01-11
-
- WaterTreatmentPlant/Facilities
122 100.18651 PointPleasantBorough
1524001-002
Water Treatment PlantFilter Replacement
$2,112,000 - - WaterTreatmentPlant/Facilities
DW Generic
123 96.76240 Atlantic CityMunicipalUtilitiesAuthority
0102001-010
Asset ManagementPlan - ProfessionalConsulting Services InCompliance With TheNew Jersey WaterQuality AccountabilityAct
$150,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Atlantic City MUAAsset ManagementPlan
-
- Other (InCompliancewith SDWA)
DW Generic
124 96.00000 BrickTownshipMunicipalUtilitiesAuthority
1506001-009
Breton Woods WaterMain Replacement -Phase I
$5,928,760 - 2017-01-03
Level 1 2017-07-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Breton woodsWater MainReplacement
2017-08-17
2019-01-11
2018-01-11
$3,275,000
2019-05-31
$3,000,000 Water Mains DW Generic
125 95.45500 WildwoodCity
0514001-005
Well #39Redevelopment
$378,000 - - WellConstruction /Replacement
126 95.45061 BloomfieldTownship
0702001-001
Cleaning and Lining ofwater mains
$1,700,000 - - Water Mains
127 95.07052 MilltownBorough
1212001-002
Ford AveRedevelopment
$1,606,000 - 2015-03-20
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Ford AveRedevelopment
-
- Water Mains Nano-Eligible
128 95.05006 ClementonBorough
0411001-002
Rehab of well 9including slip lining toimprove conveyance
$1,400,000 - 2015-03-06
Level 1 2015-09-25
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well 9Rehab
-
- Water Mains Nano-Eligible
129 95.04389 FlemingtonBorough
1009001-009
Additional Water Tankand Improvements
$4,500,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
300,000 GallonWater StorageTank
-
- Storage Tanks Nano-Eligible
130 91.30134 Orange City 0717001-006
asset managementplan
$7,200,000 - - Other (InCompliancewith SDWA)
Nano-Eligible
131 91.30134 Orange City 0717001-016
Orange Twp | WaterSystem HydraulicModel, GIS, AMP
$936,600 - - Other (InCompliancewith SDWA)
Affordability -Public only
Page 6 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
132 90.86898 BrickTownshipMunicipalUtilitiesAuthority
1506001-013
Water Main StreamCrossingsReplacements atRoute 70 (16"Diameter), at theBeaver Dam Creek atMidstreams Road (16"Diameter), and Five12" Diameter StreamCrossings in theTownship of Brick
$4,188,419 - 2018-12-12
Level 1 2018-10-16 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water SystemRehab/Replacement
-
- Water Mains DW Generic
133 90.63000 Bayonne City 0901001-006
AqueductReplacement
$12,000,000 - 2016-03-02
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
AqueductReplacement ProjectCM Services
-
Phase 2 AqueductReplacement Project
-
- Water Mains DW Generic
134 90.52000 Hoboken City 0905001-003
Water Main UpgradesPhase II
$5,200,000 - Level 1 - Water Mains Base DWSRF- Public
135 90.36908 MonroeMunicipalUtilitiesAuthority
0811002-001
Tank Painting $2,300,000 - 2018-08-01
Exempt 2018-10-05 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Knights of ColumbusElevated WaterStorage Tank
-
- Storage Tanks DW Generic
136 90.30590 DeptfordTownshipMunicipalUtilitiesAuthority
0802001-002
Water MainReplacement at EastWoodbury
$1,550,000 - 2019-12-06
Level 1 2020-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement at EastWoodbury
-
- Water Mains
137 90.30590 DeptfordTownshipMunicipalUtilitiesAuthority
0802001-003
Water MainReplacement atCountry Club Estates
$1,200,000 - 2019-12-06
Level 1 2020-06-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement atCountry Club Estates
-
- Water Mains
138 90.24244 GlassboroBorough
0806001-001
2.0 mg elevated towerrepainting
$3,250,000 - - Storage Tanks Base DWSRF- Public
139 90.11583 WallingtonBorough
0265001-002
Wallington AvenueWater Main
$2,600,000 - Level 1 2020-08-11
- Water Mains
140 90.05762 Ship BottomBorough
1528001-004
Water MainReplacement Project
$4,100,000 - 2020-03-31
Level 1 2020-06-15 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement
2020-06-18
2020-08-11
-
- Water Mains Base DWSRF- Public
141 90.02654 LakehurstBorough
1513001-002
Water MainReplacement ProjectPhase I
$1,200,000 - 2017-09-07
Level 1 2018-02-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement onPoplar Street, MyrtleStreet and WillowStreet
2018-11-28
2019-02-05
-
- Water MainExtensions
Nano-Eligible
142 90.00356 HopewellTownship
1106001-001
Water SystemImprovements
$1,285,000 - - Water Mains
143 81.03753 Seaside ParkBorough
1527001-003
Water AssetManagement Plan
$70,200 - - Other (InCompliancewith SDWA)
DW AssetManagementPlanDevelopment
144 80.52328 Perth AmboyCity
1216001-005
THE INSTALLATIONOF A NEW STANDBYGENERATOR AT THERUNYON WATERTREATMENT PLANT
$1,100,000 - Exempt 2020-05-05
- EmergencyGenerator
Base DWSRF- Public
145 80.52328 Perth AmboyCity
1216001-500
Install New Stand-byGenerator for RunyonWater Treat. Plant
$2,750,000 - 2015-03-13
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Install Generator@ Runyon WTP
-
- Aquifer Storageand RecoveryWell
DW Generic
146 80.16964 South OrangeVillage
0719001-009
Scotland Road WaterMains
$4,100,000 - Level 1 2020-11-04 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Scotland RoadWater MainReplacement
-
- Water Mains
147 75.27190 East WindsorMunicipalUtilitiesAuthority
1101002-005
Twin Rivers (Hsection) Water MainReplacement Project
$2,000,000 - 2019-08-01
Level 1 2018-08-03 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement -Huntington Drive
2019-05-29
2019-08-06
-
- Water Mains DW Generic
148 75.21333 Little EggHarborMunicipalUtilitiesAuthority
1516001-006
Water Storage TankPainting andUpgrades
$2,659,837 - - Storage Tanks DW Generic
149 75.21248 WestDeptfordTownship
0820001-004
Jessup Road WaterStorage Tank Repairand Repainting
$3,300,000 - 2020-06-22
Exempt 2019-10-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Jessup Road WaterStorage Tank Repairand Repainting
-
- Storage Tanks
150 75.12711 MantuaTownshipMUA
0810004-004
Centre CityWater/SewerInfrastructureImprovements
$4,750,000 - - Water Mains DW Generic
151 75.12500 Clinton Town 1005001-006
Lebanon BoroughWater MainReplacements - Phase2-5
$4,300,000 - 2015-03-12
Level 1 2015-04-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement
-
- Water Mains DW Generic
152 75.12500 Clinton Town 1005001-012
WQAAImplementation -Water InfrastructureAudit and Upgrades
$3,500,000 - 2019-05-28
Exempt 2019-07-18 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WQAA WaterValve Exercising
2019-08-02
2019-12-09
-
- Other (InCompliancewith SDWA)
153 75.11000 NorthBrunswickTownship
1215001-007
Water MainReplacement
- - - Water Mains Base DWSRF- Public
154 75.09962 Long BeachTownship
1517001-015
Water MainReplacement Project
$4,159,201 - 2016-03-03
Level 1 2016-07-20 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
2017 Water andSewer MainReplacement Projects
2018-11-01
2019-01-11
-
- Water Mains DW Generic
155 75.07000 MilltownBorough
1212001-005
Water Storage TankRehabilitation
$1,800,000 - 2016-03-04
Exempt 2015-12-23
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water StorageTankRehabilitation
2018-05-30
2018-09-07
2019-01-03
$1,645,000
2019-04-10
$1,450,000 Storage Tanks Nano-Eligible
156 75.02000 AllentownBorough
1302001-002
Elevated Water TankImprovements
$549,100 - 2018-08-13
Exempt 2018-08-28
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
AllentownBorough
2018-10-03
2019-06-24
-
- Storage Tanks Nano-Eligible
157 75.01329 FarmingdaleBorough
1314001-002
Painting and repairs towater tower and othermisc systemimprovements
$907,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Walnut StreetWaterSphere
-
- Storage Tanks
Page 7 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
158 75.00882 RooseveltBorough
1341001-007
Homestead, Cedarand Elm Water MainsProject.
$600,000 - 2019-06-06
Level 1 2019-09-23 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Homestead, Cedarand Elm Water MainsProject
2019-10-02
2019-12-27
-
- Water Mains
159 75.00055 WoodlandHeightsHomeownersAssociation
1615022-001
WellRehabilitation/SystemImprovements
$560,000 - - WellConstruction /Replacement
Nano-Eligible
160 72.10000 NJ AmericanWaterCompany,Incorporated
2004002-013
RM WTP EmergencyGenerator
$16,000,000 - 2017-02-27
Level 1 2017-06-02
ContractName
ATAdvActual
ATAwdActual
CertDate Cert Amount
RaritanMillstone WTPEmergencyGenerator
2017-07-24
2017-11-06
2017-12-13
$14,585,000
2018-02-22
$13,948,660 EmergencyGenerator
DW Generic
161 65.55254 JacksonTownshipMunicipalUtilitiesAuthority
1511001-012
Western Water MainExtension
$11,000,000 - 2016-03-03
Level 2 2017-07-25
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
WesternWater MainExtension
2017-11-28
2018-02-14
2018-04-12
$7,735,000
2018-05-11
$6,312,365 Water MainExtensions
DW Generic
162 65.16964 South OrangeVillage
0719001-005
Crest Drive Standpipe $3,140,000 - Undetermined - Storage Tanks
163 65.16964 South OrangeVillage
0719001-006
Repair or ReplaceNewstead Shere
$1,950,000 - - Storage Tanks
164 65.12052 FreeholdBorough
1315001-003
Replacement of WellNo. 3
$2,152,400 - Level 2 2019-08-05
- WaterTreatmentPlant/Facilities
DW Generic
165 65.12028 ManchesterUtilitiesAuthority
1603001-003
High Service PumpStation Replacement
$2,000,000 - - Pump Stations
166 65.03300 High BridgeBorough
1014001-004
High Bridge WaterSystem: Bunnvale Welland West Main StreetWater Main Upgrades
$1,477,872 - - WellConstruction /Replacement
Nano-Eligible
167 60.29480 MarlboroTownship
1328002-003
Beacon Hill storgetank Rehab
$1,714,000 - 2018-08-14
Exempt 2018-12-18 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Beacon Hill WaterStorage TankRehabilitation
2019-04-09
2019-08-21
-
- WaterTreatmentPlant/Facilities
DW Generic
168 60.12959 OaklandBorough
0220001-004
Iroquois PumpingStation - Rehabilitation
$3,133,000 - 2015-03-06
Level 1 2015-11-06
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehab ofPS
-
- Water Efficiency/ Water Meters
DW Generic
169 60.12500 Clinton Town 1005001-013
Foster WheelerBooster Pump StationModifications - AssetManagementPlanning
$3,000,000 - 2019-10-15
Exempt 2020-01-21 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Foster WheelerBooster PumpStationImprovements
2020-06-12
-
Fox Fire BoosterPump StationImprovements
2020-06-12
-
Foster Wheeler andFox Fire BoosterPump StationsImprovements
-
- Pump Stations
170 60.11117 BrigantineCity
0103001-501
Installation ofGenerators at well
$2,900,000 - 2015-03-19
Level 1 2014-08-28
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
InstallGenerators
-
- EnergyEfficiency /RenewableEnergy
DW Generic
171 60.11117 BrigantineCity
0103001-501
Installation ofGenerators at well
$2,900,000 - 2015-03-19
Level 1 2014-08-28
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
InstallGenerators
-
- EnergyEfficiency /RenewableEnergy
DW Generic
172 60.04800 BrielleBorough
1308001-004
Brielle Drinking WaterStorage Tank Project
$2,460,000 - 2018-09-20
Level 1 2018-09-26 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Brielle DrinkingWater StorageTank
2019-02-11
2019-04-11
-
- Storage Tanks Nano-Eligible
173 60.04060 Ho-Ho-KusBorough
0228001-001
Water Tank Upgrade $928,000 - - Storage Tanks DWSupplemental
174 60.02357 Borough ofWenonah
0819001-001
Water System AssetManagement Planand SystemImprovements - WaterTank Rehabilitation
$2,000,000 - - Storage Tanks Base DWSRF- Public
175 55.39147 WinslowTownship
0436007-010
Well #2 Filter PlantUpgrade
$3,100,000 - 2020-10-14
Level 1 2020-03-13 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well #2 FilterPlant Upgrade
-
- WaterTreatmentPlant/Facilities
176 51.05187 MountArlingtonBorough
1426005-001
Mount ArlingtonAsset ManagementPlan
$250,285 - ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
AssetManagementPlan
2018-12-12
$250,285
2018-12-18
$165,836 Water Mains Nano-Eligible
177 50.16964 South OrangeVillage
0719001-002
Well 17 EmergencyPower
$85,000 - Undetermined - EmergencyGenerator
178 50.04774 BrielleBorough
1308001-005
Old Bridge RoadElevated WaterStorage Tank
$3,600,000 - 2019-03-27
Level 1 2019-07-22 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
OLD BRIDGE ROADELEVATED WATERTANK
2019-08-29
2020-06-30
-
- Storage Tanks DW Generic
179 45.36250 Vineland City 0614003-016
Well 17 TreatmentFacility
$9,000,000 - 2016-02-11
Level 2Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Ion ExchangeEquipment Purchase
-
Radium TreatmentEquipment Purchase
-
City of Vineland No17 Treatment FacilityConstructionContract (Volume I){and Volume II [Book1 of 2]}?
-
- WaterTreatmentPlant/Facilities
DW Generic
180 45.12959 OaklandBorough
0220001-003
Well 9 - DieselGenerator
$3,133,000 - 2015-03-06
Level 1 2015-11-06
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well 9Generator
-
- Water Efficiency/ Water Meters
DW Generic
181 45.01500 HamptonBorough
1013001-001
New back up well 5 toaddress firm capacityrequirements
$1,800,000 - 2012-03-02
Level 2 2012-11-16
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Back up Well5 (New)
2017-06-20
2018-06-18
2018-08-25
$940,000
2018-12-21
$930,445 WellConstruction /Replacement
DW Generic
182 40.14245 Highland ParkBorough
1207001-001
2018-19 WaterSystemImprovements
$3,320,000 - - Water Efficiency/ Water Meters
DW Generic
183 40.07224 HopatcongBorough
1912001-005
Hopatcong BoroughWater MeterReplacement Project
$778,000 - - Other (InCompliancewith SDWA)
184 40.03900 High BridgeBorough
1014001-002
Improvements to theHigh Bridge WaterSystem
$1,076,758 - - Water Efficiency/ Water Meters
DW Generic
Page 8 of 9
Drinking Water Projects - Living (Active Review Project) List - Sorted by Rank
ColorRank
PointsProject
SponsorProject
Number Project Name
ProjectPriority List
Cost
ProjectEligibility
Cost
LoanAppDate Env Rev Lvl
EDDActualDate Contracts
ShortTermLoan
ClosingDate
Short TermLoan
ClosingAmount Project Type Loan Type
185 40.01963 HardystonMunicipalUtilityAuthority
1911006-001
Water MeterReplacement
$477,400 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MeterReplacements
-
- Water Efficiency/ Water Meters
186 36.35000 WillingboroMunicipalUtilitiesAuthority
0338001-005
Energy SavingsImprovementProgram (DW)
- - - WaterTreatmentPlant/Facilities
DW Planning& Design
187 36.03342 NetcongBorough
1428001-001
Water SystemAssmentManagement Plan
- - - Other (InCompliancewith SDWA)
Small System("Nano") <=10,000customers
188 35.16964 South OrangeVillage
0719001-004
Farrell Field (WaltonAve & Audley St.)InterconnectionRehab.
$150,000 - 2016-03-04
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Farrell FieldInterconnectionRehabilitation
-
- Interconnection DW Generic
189 35.16964 South OrangeVillage
0719001-007
Replace PressureReducing Valves
$272,000 - - Water Mains
190 31.20065 Little EggHarborMunicipalUtilitiesAuthority
1516001-003
Water Treatment Plantat Mathistown Road
$5,525,000 $4,600,000 2014-03-03
Level 2 2015-09-30 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
WaterTreatment Plantat MathistownRoad
2019-02-19
2019-05-30
2019-06-13
$5,525,000
2019-06-17
$4,750,000 WaterTreatmentPlant/Facilities
DW Generic
191 30.14000 South RiverBorough
1223001-003
Rehabilitation ofBorough Wells
$1,300,000 - Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehabilitation ofBorough Wells
-
- WellConstruction /Replacement
Base DWSRF- Public
192 30.14000 South RiverBorough
1223001-003
Rehabilitation ofBorough Wells
$1,300,000 - 2019-11-12
Level 1Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Rehabilitation ofBorough Wells
-
- WellConstruction /Replacement
Base DWSRF- Public
193 30.03051 National ParkBorough
0812001-004
Replacement of Wells5 & 6
$1,700,000 - 2017-11-07
Level 1 2018-01-18
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Replacementof Wells 5 & 6
2018-06-08
2018-07-30
2018-08-24
$1,470,000
2018-08-29
$1,495,000 WellConstruction /Replacement
Nano-Eligible
194 30.02600 Ocean GateBorough
1521001-003
Well WaterConstruction/Drillinga new well
$720,000 - Level 1 2019-06-28 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well WaterConstruction
-
- WellConstruction /Replacement
195 25.12959 OaklandBorough
0220001-002
Replace 4600 WaterMeters
$3,133,000 - 2015-03-06
Level 1 2015-11-06 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MeterReplacement
-
- Water Efficiency/ Water Meters
DW Generic
196 25.12500 Clinton Town 1005001-007
Replace Water Meters $4,277,804 - 2015-03-13
Level 1 2015-04-24 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Water MainReplacement
-
- Water Mains DW Generic
197 20.16964 South OrangeVillage
0719001-001
Well 17 Rehabilitation $250,000 - 2016-03-04
Exempt 2017-06-30
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
Well 17Rehabilitation
-
- EquipmentPurchase(Drinking Water)
DW Generic
198 16.35129 BellevilleTownship
0701001-007
Township of BellevilleAsset ManagementPlan
$220,000 - - Other (InCompliancewith SDWA)
DW AssetManagementPlanDevelopment
199 16.07224 HopatcongBorough
1912001-004
Small System AssetManagement
$100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
HopatcongAssetManagmentPlan
2018-06-26
$100,000
2018-12-19
$100,000 Other (InCompliancewith SDWA)
200 16.03382 HamburgBorough
1909001-001
Small System AssetManagement
$85,000 - UndeterminedContract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Hamburg AssetManagementPlan
2018-10-31
$85,000
2018-12-14
$85,000 Other (InCompliancewith SDWA)
201 16.02229 MountArlingtonBorough
1426005-002
Windemere,Altenbrand, NorthGlen and Park WaterMain Extension
$1,202,100 - - Water MainExtensions
202 16.02000 AllentownBorough
1302001-001
Asset ManagementPlan
- - - Other (InCompliancewith SDWA)
Small System("Nano") <=10,000customers
203 15.29480 MarlboroTownship
1328002-004
New Stand-by Well 5A(Tennent RdTreatment Plant &Booster PumpStation)
$1,385,000 - 2018-04-13
Level 1 ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
New stand-byWell-5A
-
- WellConstruction /Replacement
DW Generic
204 15.12959 OaklandBorough
0220001-001
Construct new Well10A as backup forWell 10
$3,133,000 - 2015-03-06
Level 1 2015-11-06
ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
New Well10A
-
- Water Efficiency/ Water Meters
DW Generic
205 15.03165 HarveyCedarsBorough
1509001-002
Installation of a WaterMonitoring Well
$1,100,000 - 2016-02-22
Level 2 2017-08-01 Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
Owen, Little &Associates, Inc.
-
2017 Test/Production Well
-
- WellConstruction /Replacement
Nano-Eligible
206 1.12729 RidgefieldPark Village
0238001-002
Village of RidgefieldPark Skymark Project -- Drinking Water
$1,752,308 - - Water MainExtensions
207 1.08257 SpotswoodBorough
1224001-002
SPOTSWOOD WATERMASTER PLAN
$85,265 - - Water Mains DW Generic
208 1.03900 High BridgeBorough
1014001-001
Asset ManagementPlan for the HighBridge Water System
$100,000 -Contract Name
ATAdvActual
ATAwdActual
CertDate
CertAmount
High BridgeBorough AMP
2018-06-18
$70,000
2019-05-10
$100,000 Water Efficiency/ Water Meters
DW Generic
209 1.02600 PenningtonBorough
1108001-004
Asset ManagementPlan for PenningtonWater Utility '
$360,000 - - Water Mains
210 1.02552 Sea GirtBorough
1344001-005
Sea Girt BoroughCMMS
$100,000 - Exempt - Other (InCompliancewith SDWA)
Nano-Eligible
211 1.01963 HardystonMunicipalUtilityAuthority
1911006-003
Asset ManagementPlan
$100,000 - ContractName
ATAdvActual
ATAwdActual
CertDate
CertAmount
AssetManagementPlan
2018-09-18
$84,840
2018-09-12
$84,840 Other (InCompliancewith SDWA)