list of documents for up-gradation of firms … for upgradation of firms.pdf · 3. for upgradation,...

18
1 LIST OF DOCUMENTS FOR UP-GRADATION OF FIRMS (CONSTRUCTORS/OPERATORS) Sr.No Documents to be submitted along with duly filled Application form in CAPITAL letters 01. Previous Original Registration Certificate. 02. Following documents are required in support of newly employed engineer:- i) Copy of appointment letter duly signed by employer and engineer employed. ii) Detailed CV duly signed by Engineer(s) in original. iii) Copy of valid PEC Renewal card of Engineer(s). iv) Statement or Certificate from employer’s bank regarding transaction of salary into engineer’s account. v) NTN of Engineer(s), if applicable. In case of existing engineer, following papers will be required:- i) Bank statement/Certificate as evidence regarding salary paid to Engineer(s) Employed. ii) NTN of Engineer(s), if applicable. In case of Engineer Owner / Shareholder / Partner. i) Undertaking by Engineer Owner / Shareholder / partner (APPENDIX 'A'). ii) Detailed CV duly signed by Engineer(s) in original. iii) Copy of valid PEC Renewal card of Engineer(s). iv) NTN of Engineers, if applicable. 03. List of works executed by the firm duly signed by CEO / shareholder / partner along with work order and certificate of performance / satisfactory completion of works (as per specimen) from the employer for last two years. 04. List of works in progress duly signed by CEO / shareholder / partner along with certificate of performance / satisfactory completion of works (as per specimen) from the employer. 05. Original paid Challan of requisite fee. 06. Affidavit from CEO / Chairman / Managing Partner or Director as per APPENDIX 'B' . I undertake that above mentioned information/documents provided by the undersigned are correct to the best of my knowledge and belief and nothing has been concealed. Dated: __________________ Signature______________________ (CEO/Chairman/Managing Partner or Director) Note: - Please provide additional documents in support as per miscellaneous checklist against any change, if applicable.

Upload: others

Post on 25-Mar-2020

37 views

Category:

Documents


0 download

TRANSCRIPT

1

LIST OF DOCUMENTS FOR UP-GRADATION OF FIRMS

(CONSTRUCTORS/OPERATORS)

Sr.No Documents to be submitted along with duly filled Application form in CAPITAL letters

01. Previous Original Registration Certificate.

02. Following documents are required in support of newly employed engineer:- i) Copy of appointment letter duly signed by employer and engineer employed. ii) Detailed CV duly signed by Engineer(s) in original. iii) Copy of valid PEC Renewal card of Engineer(s). iv) Statement or Certificate from employer’s bank regarding transaction of salary into

engineer’s account. v) NTN of Engineer(s), if applicable.

In case of existing engineer, following papers will be required:- i) Bank statement/Certificate as evidence regarding salary paid to Engineer(s) Employed. ii) NTN of Engineer(s), if applicable.

In case of Engineer Owner / Shareholder / Partner. i) Undertaking by Engineer Owner / Shareholder / partner (APPENDIX 'A'). ii) Detailed CV duly signed by Engineer(s) in original. iii) Copy of valid PEC Renewal card of Engineer(s). iv) NTN of Engineers, if applicable.

03. List of works executed by the firm duly signed by CEO / shareholder / partner along with work order and certificate of performance / satisfactory completion of works (as per specimen) from the employer for last two years.

04. List of works in progress duly signed by CEO / shareholder / partner along with certificate of performance / satisfactory completion of works (as per specimen) from the employer.

05. Original paid Challan of requisite fee.

06. Affidavit from CEO / Chairman / Managing Partner or Director as per APPENDIX 'B' .

I undertake that above mentioned information/documents provided by the undersigned are correct to

the best of my knowledge and belief and nothing has been concealed.

Dated: __________________ Signature______________________

(CEO/Chairman/Managing Partner or Director)

Note: - Please provide additional documents in support as per miscellaneous checklist against any

change, if applicable.

2

MISCELLANEOUS CHECK LIST (FOR UP-GRADATION) (IF APPLICABLE)

01. For change in ownership of firm

i) Sole Proprietor i) Affidavit of sole proprietor ii) Transfer deed with attestation of first class magistrate (in case of change of sole proprietor)

ii) Partnership Concern i) Duly attested copy of partnership deed ii) Form C/ H issued by respective Registrar of firms iii) Form D And Dissolution deed (in case of cancellation/change in partnership)

iii) Private Limited i) Certificate of incorporation ii) Article of Association(AOA) iii) Memorandum of Association(MOA) iv) Form 29 v) Form A

iv) Public Limited Co. / Public Limited Co. i) SECP Documents ii) Stock Exchange Documents

v) Statutory Body i) Copy of notification issued by competent authority

vi) In case of death of owner/shareholder/partner i) Death certificate of owner/shareholder/partner ii) Power of attorney attested by 1st class Magistrate iii) Transfer deed with list of heirs attested by 1st class Magistrate iv) No objection certificate from heirs v) Succession certificate

vii) Readable copy of Identity Card of Owner/Shareholder(s)/partner in each above mentioned case

02. Change in name of firm/address i) Request from owner/ shareholder/partner ii) Affidavit for change in name of firm/status iii) Newspaper clipping for change in name of firm iv) Documentary evidence in support issued by Registrar of firms/SECP(as the case may be)

04. For addition of specialization codes i) Request for addition of code on official letter head ii) Detailed CV of engineer(s) showing experience relevant to the desired codes supported by experience

certificates iii) Documentary evidence of Firms experience/work done relevant to desired codes iv) Original PEC Licence

05. For consideration of works in private Sector i) Copy of Contract/agreement between Prime Constructor and Sub-constructor. ii) Performance Certificate from Consultant engaged with Constructor duly verified by employer or client. iii) Evidence of payments through cheques, bank statement and amount deducted as Income Tax thereof. iv) Amount of work awarded to sub-constructor within its limit specified in license.

06. For issuance of duplicate licence i) Request from owner/ shareholder/partner ii) Affidavit for lost of licence of firm iii) Copy of FIR iv) Newspaper clipping

07. For down gradation of firm i) Request on official letter head with desired category mentioned on it ii) Original PEC licence iii) Application on prescribed PEC form

08. For closure of firm i) Request from owner/shareholder/partner ii) Affidavit for closure of firm iii) Original PEC Licence iv) Payment of all outstanding dues

3

Category: C or O Licence No. _________________ Valid upto 31/12/20____ (Attach Original Previous Licence) 1- Name of the Firm: ________________________________________2-NTN:

3- Name of CEO: ________________________________________________________________

4- Mailing Address: ______________________________________________________________

______________________________________________________________ Engr. Owner/Shareholder: Courier service availability: (Tick the appropriate box) (Tick the appropriate box)

Mob: ___________________ Tele: _____________ Fax: ____________ E-mail: _______________

5- Type of Ownership Individual Sole-Proprietorship Partnership Private Ltd Co. Public Ltd Co SMC (Pvt) Ltd Co Statutory Body

Others ____________________ (Tick the appropriate box)

Any Change, be described (Supported by legal Documents) ___________________________________

6- Detail of Engineers employed by the firm:

Sr. Name of Engineer PEC Reg. No.

Renewed upto

Year of birth Year of graduation

Employed Since

1

2

3

4

Add separate sheet (if required)

7- Major works executed after previous Up-gradation:

Year of Award

Value of Work (Rs)

%age of Completion

Deptt / Org Description of Work

1

2

3

4

Add separate sheet (if required)

8- Code(s) of specialization required: ______________________________________________

_________________________________________________

Application form for Up-gradation as Constructor/Operator

From C/O ___ to C/O _____ (To be filled in CAPITAL letters)

(Attach copy of Work Order, agreement and Performance Certificate duly verified by Concerned Department)

FOR OFFICE USE ONLY

Application

Tracking No.

Receiving Date

YES NO YES NO

PAKISTAN ENGINEERING COUNCIL Ataturk Avenue (East), Sector G-5/2, Islamabad

UAN: 111-111-732 Fax: 051-2780346

E-mail: [email protected] URL: http://www.pec.org.pk

(Supported with documents and employment of relevant Engineer(s)) :

4

9- UNDERTAKING I undertake that;

a) the information given above and documents/papers attached herewith are correct and accurate to the best of my knowledge and belief and nothing has been concealed.

b) I will abide by the provisions of PEC Act 1976 and Construction & Operation of Engineering Works Bye-Laws 1987.

c) I shall be responsible if any information, document or paper submitted by me is found incorrect or forged.

d) I will inform the council if any of above mentioned engineer(s) leaves the firm. e) I will inform the council about any event taking place after grant of licence, which render our firm

ineligible for continuation of licence, reduction in the category, suspension or cancellation of the licence as per Bye-laws 8(2).

Company/Firm’s Seal

Signature: _________________________

Name: _________________________

Mobile No: _________________________

Date: _______________

CNIC No.

(CEO/ Chairman/ Managing Partner or Director)

PENALTIES VIZ-À-VIZ THE NATURE OF MISCONDUCT Besides provisions stated in the PEC Construction & Operation of Engineering Works Bye-laws 1987, following penalties will be imposed.

Nature of misconduct Penalty to be Imposed

1.

In case, a firm has executed work without having PEC license and desires initial registration with PEC in any higher category other than C-6 category

Rs.250/- per day per PCP.

2. In case a firm submits an incorrect/fake affidavit of engineer to PEC.

(i) Suspension of licence for 03 months on 1st occurrence (ii) Suspension of licence for 09 months on 2nd occurrence (iii) De-registration of firm on 3rd occurrence).

3. In case a firm submits fake/tampered PEC Licence to any employee or PEC.

(i) Suspension of licence for six months on 1st occurrence. (ii) Suspension of licence for one year on 2nd occurrence. (iii) De-registration on 3rd occurrence.

4.

In case a firm submits fake/forged/incorrect work order(s) or performance certificate / report to PEC.

(i) Suspension of licence for six months on 1st occurrence. (ii) Suspension of licence for one year on 2nd occurrence. (iii) De-registration on 3rd occurrence

5. Any other misconduct. As decided by the Enrolment Committee, on case to case basis under the provisions of PEC Act and Byelaws

I fully understand the above mentioned penalties viz-à-viz the nature of misconduct. I shall be liable to punitive action taken by PEC in event of misconduct committed by me or the firm. Company/Firm’s Seal

Signature: _________________________

Name: _________________________

Mobile No: _________________________

Date: _______________ CNIC No.

(CEO/ Chairman/ Managing Partner or Director)

- -

- -

5

[For official use only]

DECISION OF ENROLMENT COMMITTEE ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________

CONVENER ENROLMENT COMMITTEE

Prescribed fee of Rs. ……………………………………………. has been received and credited

vide Receipt No. ……………………………. Dated ………….………………

Bank Draft No. ………………….. Dated ……………… Amount Rs .………………..

Signature of Signature of Accounts Official: _______________ Internal Auditor:______________________

Date of Approval :

Initial of Scrutiny Official :

Category: ______ Licence No:_________

Licence Serial No: ___________________

Date of Issue _____ Valid Upto:31/12/20__

Initial of Section Incharge:

Registrar

PEC

6

INSTRUCTIONS FOR FILLING IN APPLICATION FORM FOR UPGRADATION OF CONSTRUCTOR/OPERATOR LICENCE

1. Before filling in the application form, please see clause 4 and 8 of the Construction

and Operation of Engineering Works Bye-laws, 1987 2. The annual application fee for all Constructor/Operator category licence, Financial

Limits and PCP’s required for upgradation of licence is mentioned below, the evidence of payment should accompany the application form

3. For upgradation, the applicant for the constructor’s or operator’s licence shall submit application to the Council in the prescribed form. The application for renewal/upgradation shall be submitted to the Council by the 5th day of November of the year based on the constructor’s or operator’s status as on the 31st day of October of the same year. The licence shall stand expired on 31st day of December each year. If the renewal is not submitted by 31st day of March, a surcharge of 2% will be levied.

4. A licensee shall inform the Council of any events taking place after grant of a licence to him or renewal thereof, which render him ineligible for continuation of licence in accordance with the clauses of aforesaid bye-laws. On receipt of such information, the Council may decide to reduce the category of licence or suspend or cancel the licence as it may deem fit.

Constructors’ categories, Fee, Financial Limits and other Associated Parameters

Sr.

# Category

Limit of

Construction Cost

of Project

Minimum Requirement of

Engineers PCPs

Fee (Rs)

(Local

Firms)

Fee (Rs)

(Foreign

Firms)

1 C-A No Limit Two P.Es with 20 years of

Experience each + RE 150 Rs.250,000/- Rs.1,500,000/-

2 C-B Up to Rs.3000 M Two P.Es with 15 years of

Experience each + RE 100 Rs.200,000/- Rs.750,000/-

3 C-1 Up to Rs.1800 M Two P.Es with 10 year of

Experience each + RE 75 Rs.120,000/- Rs.600,000/-

4 C-2 Up to Rs.800 M One P.E + R.Es 30 Rs.100,000/- Rs.400,000/-

5 C-3 Up to Rs.400 M One P.E + R.E 15 Rs.60,000/- Rs.250,000/-

6 C-4 Up to Rs.150 M One P.E + R.E 10 Rs.40,000/- Rs.150,000/-

7 C-5 Up to Rs.50 M One R.E 5 Rs.25,000/- Rs.100,000/-

8 C-6 Up to Rs.20 M One R.E 5 Rs.15,000/- Rs.50,000/-

Operators’ categories, Fee, Financial Limits and other Associated Parameters

Sr.

# Category

Limit of

Operational Cost of

Project

Minimum Requirement of

Engineers PCPs

Fee (Rs)

(Local Firms)

Fee (Rs)

(Foreign

Firms)

1 O-A No Limit Two P.Es with 20 years of

Experience each + REs 120 Rs.250,000/- Rs.1,500,000/-

2 O-B Up to Rs.1500 M Two P.Es with 15 years of

Experience each + REs 75 Rs.200,000/- Rs.750,000/-

3 O-1 Up to Rs.900 M Two P.Es with 10 years of

Experience each + REs 50 Rs.120,000/- Rs.600,000/-

4 O-2 Up to Rs.400 M One P.E + R.Es 30 Rs.60,000/- Rs.400,000/-

5 O-3 Up to Rs.150 M One P.E + R.Es 15 Rs.40,000/- Rs.250,000/-

6 O-4 Up to Rs.75 M One P.E OR R.Es 10 Rs.25,000/- Rs.150,000/-

7 O-5 Up to Rs.30 M One R.E 5 Rs.15,000/- Rs.100,000/-

8 O-6 Up to Rs.15 M One R.E 5 Rs.10,000/- Rs.50,000/-

Note: A late fee @2% per month will be charged after 31st march of the current year subject to maximum of 18% of the annual fee.

7

Fee for up-gradation for constructor/operators firm

Following fee shall be charged for up-gradation of the category of licence-:

a. One step up fee of desired category;

b. two steps up 2 times of desired category;

c. three steps up 3 times of desired category;

d. four steps up 4 times of desired category;

e. five steps up 5 times of desired category;

f. six steps up 6 times of desired category;

I. Fee table for up-gradation (Constructors) (In Rupees)

Category

To→

↓From

C-6 C-5 C-4 C-3 C-2 C-1 C-B C-A

C-6 15,000/- 40,000/- 95,000/- 195,000/- 415,000/- 615,000/- 1,350,000/- 1,765,000/-

C-5 - 25,000/- 65,000/- 145,000/- 505,000/- 420,000/- 1,025,000/- 1,525,000/-

C-4 - - 40,000/- 100,000/- 240,000/- 400,000/- 840,000/- 1,290,000/-

C-3 - - - 60,000/- 160,000/- 300,000/- 660,000/- 1,060,000/-

C-2 - - - - 100,000/- 220,000/- 500,000/- 850,000/-

C-1 - - - - - 120,000/- 320,000/- 620,000/-

C-B - - - - - - 200,000/- 450,000/-

C-A - - - - - - - 250,000/-

II. Fee table for up-gradation (Operators) (In Rupees)

Category

To→

↓From

O-6 O-5 O-4 O-3 O-2 O-1 O-B O-A

O-6 15,000/- 40,000/- 95,000/- 195,000/- 415,000/- 615,000/- 1,350,000/- 1,765,000/-

O-5 - 25,000/- 65,000/- 145,000/- 505,000/- 420,000/- 1,025,000/- 1,525,000/-

O-4 - - 40,000/- 100,000/- 240,000/- 400,000/- 840,000/- 1,290,000/-

O-3 - - - 60,000/- 160,000/- 300,000/- 660,000/- 1,060,000/-

O-2 - - - - 100,000/- 220,000/- 500,000/- 850,000/-

O-1 - - - - - 120,000/- 320,000/- 620,000/-

O-B - - - - - - 200,000/- 450,000/-

O-A - - - - - - - 250,000/-

8

REGISTRATION CATEGORIES, CODE AND SPECIALIZATION

OF CONSTRUCTOR/ OPERATORS

CATEGORY CODE SPECIALIZATION DESCRIPTION

CIVIL

ENGINEERING

CONSTRUCTION

(CE)

CE01 Road and Pavements

Drainage &

Retaining Structure

Signcraft Installation

Construction of road and road

reinstatement, pavement, bus bays, open

car parks and related works such as kerbs,

footways.

Installation of an integrated sign posting

system for complexes, airports, shopping

centres, etc. Also includes setting up of

exhibition stands and road signs.

Airports Taxiways, runways, aprons,

aircraft parking bays, baggage handling

system, track transit system, etc.

CE02 Bridge Structures

Piling

Construction of concrete, masonry, timber

or steel bridges.

Installation of all types of piling sheet piles,

driven precast reinforced and prestressed

concrete piles, bored cast in situ piles and

timber piles etc.

CE03 Marine Structures

Dredging

Underwater Works

Construction of marine structure such as

jetties, ports, wharves, harbours, sea and

river walls offshore construction works etc.

Underwater construction works and

maintenance of underwater construction

works.

CE04 Dams/Water

Retaining Structures

Irrigation & Flood

Control Systems

Construction of water retaining structure

such as dams, reservoirs, aqueducts,

treatment plants, pipe laying works etc.

Earth work/dredging in canal, river and

offshore.

CE05 Offshore Works Offshore construction works including

related works.

CE06 Tunneling and

underpinning

Tunneling and underpinning works.

CE07 Railways Tracks Installation of railway tracks, distressing of

rails and tracks.

CE08 Oil and Gas Pipe

Lines

Installation, maintenance and repair of oil

and gas pipelines.

CE09 Sewerage Works

Water Supply

Sewerage pipelines, disposal works,

sewerage treatment works and allied works.

Installation, maintenance and repair of

water supply pipelines, pumping stations,

tube wells, water treatment works etc.

9

CE10 General Civil

Engineering Works

Slope Protection

System

Concrete Repairs

Soil Investigation and

Stabilization

Landscaping &

Horticulture

Reclamation Works

General Buildings

and Maintenance

Waterproofing

General civil engineering works, including

earthworks, sub-soil drainage, etc.

Slope protection works.

Reinforcement of structures by way of

pressure grouting, guniting, etc.

Services include sampling, investigation

and testing services to determine soil

classifications, strength and composition.

Also includes soil stabilization works such

as micro piling, ground anchoring, sand

drains and ground grouting.

Provision of Landscaping services

including tree planting, turfing, horticulture

etc.

Reclamation works.

General building works, including fixing

partitions, roofing and general maintenance

of buildings.

Water proofing of basement, roofs and

walls.

BC01 Prefabricated

Buildings and Steel

Framed Buildings

and Industrial Plants

Construction of buildings and industrial

plants using prefabricated components and

systems. Construction of steel framed

buildings and industrial plants.

Airports Terminal buildings, Satellite

buildings, cargo terminals, air traffic

control towers, contact piers, passenger

loading bridges.

BC02 Restoration and

Conservation

Building restoration and conservation.

BC03 High Rise Buildings

MECHANICAL

ENGINEERING

(ME)

ME01 HVAC Installation, Commissioning maintenance

and repairs of air conditioning,

refrigeration, cold rooms and ventilation

system.

ME02 Fire Prevention and

Protection System

Installation and maintenance of fire alarms,

prevention and protection systems.

10

ME03

Lifts and Escalators

Compressor

Generators

Installation, commissioning and

maintenance of lifts, escalators, travel

lators and conveyor systems

Installation, maintenance and repair of

centrifugal compressor, reciprocating

compressor, air compressor, skid, rotary

compressor, pipeline valves, blowers,

liquid ring compressor, gas turbine

generator, steam generator, diesel

generator, solar photometric, water turbine

generator and hybrid system.

ME04 Building Automation

System

Building automation, industrial and process

control systems, include installation and

maintenance of microprocessors or

computer based building control systems

and industrial process control systems.

ME05 Workshop, Mill,

Quarry System

Installation, commissioning and

maintenance of workshop, mill and quarry

systems such as cranes, hoist, crushing and

screening plant, asphalt mixing plant, etc.

ME06 Specialized

Fabrication and

Treatment

Medical Equipment

Kitchen and Laundry

Equipment

Heat Recovery

System

Pollution Control

System

Erection, maintenance and repair of exhaust

stocks, tanks, reactors, separators, filters,

scrubbers, dehydrators, evaporators,

pipings, furnaces, grit blasting and painting,

hot and cold insulation, flare system,

bearing and welding.

Installation, commissioning and

maintenance of medical equipment such as:

- Compressed air systems

- Hot water installation

- Sterilizer and autoclave

- Medical gas installation

- Hydrotherapy system

- Dental chair

- Mortuary refrigerator etc.

Installation, commissioning and

maintenance of cooking and kitchen

equipment, laundry equipment, etc.

Installation, commissioning maintenance

and repair of boiler plant, heat exchangers,

absorption chillers, unfired pressure vessels

and hot water systems, etc.

Landfill technology, incinerator, oil

separators.

11

Miscellaneous

Mechanical

Equipment

Chiller for Power

Generation

Specialized Plant

Installation, testing commission,

maintenance and repair of mechanical

based systems such as pumping installation,

sewerage treatment plant installation, water

treatment plant installation, rotary pumps,

reciprocating pumps, centrifugal pumps

and special purpose pumps, etc.

Installation, maintenance and repair of gas

turbine driven chiller, steam turbine driven

chiller and centrifugal chiller.

Erection, maintenance and repair of

compressor station, metering station,

onshore terminal station, co-generation

plant, gas processing plant, petrochemical

plant, oil refinery, aviation re-fuelling and

de-fuelling system, petrol station, heating

ventilation and air-conditioning.

ELECTRICAL

ENGINEERING

(EE)

EE01 Sound System Public address system, audiovisual system,

conference system, intercom system and

MAT.

EE02 Security, Safety

Surveillance System

Installation and maintenance of security,

safety and surveillance systems (security,

alarm, car park security control and card

access control systems. CCTV,

sensor/detection system, vibration

monitoring system, gas protection system,

platform alarm system, aircraft warning

system, fire protection system and earthing

and lighting protection.

EE03 Building Automation

System and Energy

Generation System

Building Automation, industrial and

process control system, included

installation and maintenance of

microprocessors or computer based

building control systems and industrial

process control systems, includes

installation and maintenance of energy

generation systems

EE04 Low Voltage

Installation

General wiring and control system wiring

works not exceeding 1 KV. Installation and

maintenance of low tension overhead lines

and underground cabling not exceeding

1KV. Also includes installation and

maintenance of generating plant and

equipment not exceeding 1 KV.

EE05 High Voltage

Installation

Installation and maintenance of high

voltage equipment and underground

cabling, high-tension overhead line

including transmission tower exceeding

1kV. Also includes installation and

maintenance of generator plant and

equipment exceeding 1KV.

12

EE06 Specialized Lighting

System

Installation and maintenance of street

lighting, stadium floodlighting, traffic

lighting, airfield lighting, high mast

lighting installation, laser system, stage

lighting, special effect lighting,

navigational aid, underwater lighting,

platform lighting, petrochemical plant

lighting, oil refinery plant lighting, etc.

ELECTRONICS

ENGINEERING

EE07 Telecommunication

Installation

Telephone cabling and internal ducting,

radio based communication system, PABX,

microwave system, multiplex and signaling

troposcatter system, satellite system, radar

surveillance system, data communication

equipment, remote subscriber system,

vessels and navigational specialized

system, etc.

EE08 External

Telecommunication

Works

Telecommunication cabling (underground/

overhead), manholes, underground

ducting/pipes.

EE09

IT & Software Engg

EE10 Miscellaneous

Specialized

Installation, commissioning and

maintenance of surgical/operating theater

table and lights, radiography equipment,

radiotherapy equipment, nurse call system,

electronic scoreboard, uninterruptible

power supply (UPS) system, etc.

Any other works* Any work not covered in above

categorization and description relevant to

any engineering discipline.

*Provide herein code(s) (CE11, BC04, ME07, EE11) as applicable and define work.

*Note: Following code will be awarded to C-6/O-6 firm on demand, if they provide agreement

with engineer holding supervisory certificate:-

Code C-6(11)

i) All types of repair / maintenance works

ii) Minor construction works along with allied Electrical, Mechanical, Water supply,

Sanitary, Plumbing works

iii) Minor road works including culverts

Code O-6(11)

i) All types of operational works

ii) Toll collection, operation and management works

13

APPENDIX – ‘A’

UNDERTAKING BY ENGINEER OWNER/SHAREHOLDER/PARTNER (The affidavit would be on Rs.10/- stamp paper duly notarized)

I, Engr. ________________________________ bearing PEC Regn No.___________ am

a. Sole proprietor OR

b. Partner with _____ % share (s) OR

c. Shareholder with ____ % share (s)

of the firm M/s. ___________________________________________________________ to

be registered with PEC as Constructor / Operator in category C/ O._______.

Signature: ________________________________

Name of Engr______________________________

CNIC No: _________________________________

PEC Reg. # _______________________________

Contact No________________________________

Date: ____________________________________

14

APPENDIX – ‘B’

UNDERTAKING FROM CEO / CHAIRMAN / MANAGING PARTNER OR DIRECTOR

(The affidavit would be on minimum Rs. 10/- stamp, issued in the name of undersigned duly notarized with

Notary Public)

I, Mr. ____________________ S/o _______________ adult resident of _____________ do hereby

solemnly affirm on oath as under:-

That I am CEO / chairman / Managing Partner or Director of the firm “M/s.

___________________________________________________________”.

That the name of my firm is not struck off or black-listed from any department.

That there is no litigation in the Court or any other department (i.e. Public / Private) against

the firm

That I on behalf of my firm shall always abide by the rules and regulations of Pakistan

Engineering Council.

That the contents of the above mentioned affidavit are true to the best of my knowledge,

belief and information and nothing has been concealed by me.

DEPONENT

Signature: _________________________

Name_____________________________

CNIC No: _________________________

Dated: ____________________________

15

APPENDIX – ‘C’

The Registrar, PEC, HQ, Islamabad Subject: Registration with PEC as Constructor/Operator in Category C/O. ______. Dear Sir, Please register my firm in accordance with PEC Construction & operation of Engineering Works Bye-laws 1987 with name and style M/s…………………………………………………………………………………………………. If a firm with name requested above is already registered with PEC, either of the following names may be considered as an alternate for registration, which will be acceptable to me.

a. First Choice: M/s ……………….………………………………………………

b. Second Choice: M/s …………………………………………………………….

c. Third Choice: M/s ……………………………………………………………..…

Signature: …………………………….

Name of Owner: …………….………..

CNIC No of Owner: .....……………….

Dated: …………………………………

16

APPENDIX – ‘D’

PERFORMANCE CERTIFICATE (For each major work during last three years)

NAME OF EMPLOYER: __________________________________________________

NAME OF PROJECT: ____________________________________________________

NAME OF CONSULSTANT (IF EMPLOYED): _________________________________

STARTING DATE: _________________

ORIGINAL COMPLETION DATE: _________________

ACTUAL COMPLETION DATE: ___________________

DELAY PERIOD: ______________________________

LIQUIDATED DAMAGES: ________________________

ORIGINAL CONTRACT VALUE: ___________________

VALUE OF WORK DONE UPTO FINAL BILL: _________

PERCENTAGE OF WORK DONE WITH DATE: _______________________________

ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK

Sr. Name of Engineer Date of Birth

PEC Reg. No.

Date of Reg

Renewed upto

Employed From

Employed To

1

2

3

4

QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER

To be filled by contractor

Name of Owner/

Share holder:__________________________

Mobile No: ___________________________

Signature: ____________________________

Date: __________________________________

To be filled by employer

Name & designation

of employer :_______________________

Fax No: ___________________________

Mobile No: _________________________

Date: _____________________________

Company seal/stamp

Official seal/stamp

17

APPENDIX – ‘E’

PERFORMANCE CERTIFICATE (For each major work in hand)

NAME OF EMPLOYER: ____________________________________________________

NAME OF PROJECT: _____________________________________________________

NAME OF CONSULSTANT (IF EMPLOYED): ___________________________________

STARTING DATE: _________________

ORIGINAL COMPLETION DATE: _________________

ACTUAL COMPLETION DATE: ___________________

DELAY PERIOD: ______________________________

LIQUIDATED DAMAGES: ________________________

ORIGINAL CONTRACT VALUE: ___________________

VALUE OF WORK DONE UPTO FINAL BILL: _________

PERCENTAGE OF WORK DONE WITH DATE: __________________________________

ENGINEERS EMPLOYED DURING THE EXECUTION OF THE WORK

Sr. Name of Engineer Date of Birth

PEC Reg. No.

Date of Reg

Renewed upto

Employed From

Employed To

1

2

3

4

QUALITY OF WORK EXECUTED AND REMARKS BY EMPLOYER

To be filled by contractor

Name of Owner/

Share holder:__________________________

Mobile No: ___________________________

Signature: ____________________________

Date: __________________________________

To be filled by employer

Name & designation

of employer :_______________________

Fax No: ___________________________

Mobile No: _________________________

Date: _____________________________

Company seal/stamp

Official seal/stamp

18

APPENDIX – ‘F’

UNDERTAKING OF CHANGE OF NAME/STATUS

(The affidavit would be on Rs.10/- stamp paper and attested by a First Class Magistrate/Oath Commissioner)

It is requested that I/we -------------------------------------------------------------------------------------

Owner/Partner(S) of M/s ------------------------------------------------------------------------------------

Address ---------------------------------------------------------------------------------------------------------

want to change the name/status of my/our firm to state that:

My/our previous firm M/s -----------------------------------------------------------------------------------

Address ---------------------------------------------------------------------------------------------------------

has not been blacklisted by any department and has no liability from any

department/financial institution. If any, such liability is detected by any department/financial

institution at any stage, I shall be responsible for the same.

Reason(s) for change of name/status is --------------------------------------------------------------------

-----------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------------------------------

Name of Contractor:________________________

Name of Partner(s)/Director(s) :_______________

CNIC No. ________________________________

Contact No: ______________________________

Permanent Address: _______________________

________________________________________

Dated: ___________ Signature: __________________________