liquidacion financiera

58
MUNICIPALIDAD DISTRITAL CRNL GREGORIO ALBARRACÍN LANCHIPA CONSORCIO MADAKA LIQUIDACION DE SUPERVISION DE OBRA A.D.S. : N° 106-2012-MDCGAL SUPERVISION DE OBRA : CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L SUPERVISOR : CONSORCIO MADAKA RESIDENTE : ING. JOSE MANUEL SAMANAMUD LOYOLA JEFE DE SUPERVISION : ING. HECTOR CACERES CONTRERAS FECHA : August-13 CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Upload: jesus

Post on 04-Dec-2015

58 views

Category:

Documents


6 download

DESCRIPTION

Ejemplo de una liquidación financiera por contrata - peru

TRANSCRIPT

Page 1: Liquidacion Financiera

CONSORCIO MADAKA

LIQUIDACION DE SUPERVISION DE OBRA

A.D.S. : N° 106-2012-MDCGAL

SUPERVISION DE OBRA :

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

RESIDENTE : ING. JOSE MANUEL SAMANAMUD LOYOLA

JEFE DE SUPERVISION : ING. HECTOR CACERES CONTRERAS

FECHA : August-13

MUNICIPALIDAD DISTRITAL CRNL GREGORIO ALBARRACÍN LANCHIPA

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Page 2: Liquidacion Financiera

DATOS GENERALES DE LA PRESTACION DE CONSULTORIA

SUPERVISION DE OBRA :

A.D.S. : N° 106-2012-MDCGAL

ENTIDAD :

SISTEMA DE EJECUCION : SUMA ALZADA

SUPERVISOR : CONSORCIO MADAKA

JEFE DE SUPERVISION : ING. HECTOR CACERES CONTRERAS

VALOR REFERENCIAL : S/. 79,100.17

VALOR CONTRATADO : S/. 79,100.17

FACTOR DE RELACION : 1

: 1/29/2013

MONTO DE ADELANTO DIRECTO : N.S.

: 120 DC

: 1/29/2013

: 1/30/2013

AMPLIACION DE PLAZO : N.S.

: 5/29/2013

: 12/26/2012

: 12/27/2012

FECHA DE INICIO REAL DE OBRA : 12/27/2012

FECHA CONTRACTUAL DE TERMINO DE OBRA : 4/25/2013

FECHA REAL DE TERMINO DE OBRA : 4/25/2013

: EN PROCESO

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPA

FECHA DE FIRMA DEL CONTRATO DE COSULTORIA

PLAZO DE EJECUCION DE PRESTACION DEL SERVICIO

FECHA DE FIRMA DEL CONTRATO DE CONSULTORIA

FECHA DE INICIO PLAZO CONTRACTUAL DE EJECUCION DE PRESTACION

FECHA DE TERMINO CONTRACTUAL DEL SERVICIO

FECHA DE ENTREGA DE TERRENO AL CONTRATISTA

FECHA DE INICIO CONTRACTUAL DE EJECUCION DE OBRA

FECHA DE RECEPCION DE OBRA OBJETO DE LA PRESTACION

Page 3: Liquidacion Financiera

ACTIVIDADES REALIZADAS DURANTE EL PERIODO VALORIZADO

ITEM DESCRIPCION UND. METRADOACTUAL

01.00.00 OBRAS PROVISIONALES

01.01.00 CASETA DE GUARDIANIA MES 1

01.02.00 CARTEL DE OBRA GIGANTOGRAFIA (7.20M x 3.60M) UND 1

01.03.00 TRANSPORTE DE MATERIALES Y EQUIPOS GLB 0.7

02.00.00

OBRAS PRELIMINARES

02.01.00 TRAZO Y REPLANTEO INICIAL PARA ALCANTARILLADO M 1044.56

02.02.00 TRAZO Y REPLANTEO FINAL PARA ALCANTARILLADO M 1044.56

02.03.00 TRANQUERA T/BARANDA 1.20 x 1.1M PROV P/SEÑALIZ-PROTECCION. UND 10

Page 4: Liquidacion Financiera

ACTIVIDADES REALIZADAS DURANTE EL PERIODO VALORIZADO

METRADO. AVANCE %

TOTAL

4 25.00

1 100.00

1 70.00

6117.2 17.08

6117.2 17.08

30 33.33

Page 5: Liquidacion Financiera

INFORME N° 002-2011-C.E.R

A : CONSORCIO MADAKASupervisor de Obra

DE : ING. JOSE MANUEL SAMANAMUD LOYOLAResidente de Obra

ASUNTO : 0Correpondiente 41487

REFERENCIA : L.P. : N° 106-2012-MDCGALO b r a :

Contratista: V&V CONTRATISTAS GENERALES S.R.L

FECHA : Nvo.CHIMBOTE, 28 DE FEBRERO DEL 2011

Me dirijo a Ud. para remitirle adjunto al presente, el expediente de la Valorización Mensual N° 01 de la Obra de la referencia, correspondiente a los trabajos efectua-

CONTRATISTAS GENERALES SAC.

Los cálculos elaborados tienen como resultado lo siguiente:

A. VALORIZACION CONTRACTUAL (V)Sistema de Desague 128,519.06Sistema de Agua 1,875.00

SUB-TOTAL 130,394.06

AVANCE PROGRAMADO ACUMULADO 4.04%AVANCE REAL ACUMULADO 6.00%

B. REAJUSTE (s)Fórmula Nª 01 #NAME?Fórmula Nª 02 0.00Total Reajuste #NAME?

DEDUCCIOND.R.N.C. 0.00Retención Control de Reajuste 0.00Total Deducción 0.00

SUB-TOTAL #NAME?

MONTO DE LA VALORIZACION BRUTA (VB) #NAME?

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

dos al 28 de Febrero del 2011, por mi representada CONSORCIO CACERES ARAMAYO

Page 6: Liquidacion Financiera

C. AMORTIZACIONAmortización del Adelanto Directo 0.00Amortización del Adelanto de Materiales 0.00Total Amortización 0.00

MONTO DE LA VALORIZACION NETA (VN) #NAME?

D. RETENCIONFiel Cumplimiento (10%) 0.00Total Retención 0.00

E. MONTO A PAGAR AL CONTRATISTAEn Efectivo #NAME?En I.G.V. (19%VN) #NAME?MONTO TOTAL DE LA VALORIZACION CON I.G.V. #NAME?

Atentamente,

Page 7: Liquidacion Financiera

MUNICIPALIDAD PROVINCIAL DE HUAYLASCONSORCIO CHAVIN

ºRESUMEN

A. D. P.No. : N° 106-2012-MDCGALO B R A :

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

ESPECIALIDAD V.R. (C/IGV) CONT.(C/IGV) CONT.(S/IGV) F.R. PLAZO DE EJECUCION (D.N.) : 90

FORMULA UNICA : 474,928.79 474,928.79 399,099.82 1.00 AMPLIACION DE PLAZO (D.N) : 0

PLAZO VIGENTE (D.N.) : 90

TOTAL S/. 474,928.79 474,928.79 399,099.82 1.00 FECHA DE INICIO 12/27/2012

FECHA TERMINO CONTRAC. 3/29/2010

FECHA TERMINO VIGENTE 3/29/2010

CALENDARIO DE AVANCE DE OBRA DEL CONTRATISTAMONTO MES 1 MES 2 MES 3 MES 4 MES 5 MES 6

COD. ESPECIALIDAD S/.

01 FORMULA UNICA 104,315.25 130,394.06 0.00 0.00 0.00 0.00 0.00

COSTO DIRECTO 104,315.25 130,394.06 0.00 0.00 0.00 0.00 0.00

GG. 10% 10,431.53 13,039.41 0.00 0.00 0.00 0.00 0.00

UTIL. 10% 10,431.53 13,039.41 0.00 0.00 0.00 0.00 0.00

SUBTOTAL 125,178.31 156,472.88 0.00 0.00 0.00 0.00 0.00

I.G.V. 19% 23,783.88 29,729.85 0.00 0.00 0.00 0.00 0.00

TOTAL 148,962.19 186,202.73 0.00 0.00 0.00 0.00 0.00

TOTAL*F.R. 148,962.19 186,202.73 0.00 0.00 0.00 0.00 0.00

AVANCE PARCIAL 125.00% 0.00% 0.00% 0.00% 0.00% 0.00%

AVANCE ACUMULADO 125.00% 125.00% 125.00% 125.00% 125.00% 125.00%

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Page 8: Liquidacion Financiera

ING. LUIS MANRIQUE FIGUEROA

COEFICIENTE DE REAJUSTE

A.D.P. : N° 106-2012-MDCGAL

O B R A : CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

CONTRATISTA : CONSORCIO VIAL NORIEGA

SUPERVISOR : CONSORCIO MADAKA

FECHA : August-13

FORMULA : GENERAL AREA GEOGRAFICA: 4 TACNA

K = 0.016*(Mr /Mo ) + 0.051*(Ar /Ao ) + 0.053*(Mr /Mo ) + 0.063*(Dr /Do ) + 0.074*(Cr /Co ) + 0.194*(Mr /Mo ) + 0.549*(Ir/Io) PAG. 01

SIM- COEF. % Io

BO ELEMENTO REPRESENTATIVO INDICE IND.BASE December-12 January-13 February-13 March-13 April-13

LO INCID. INCID. DIC'10 Ir K Ir K Ir K Ir K Ir K

M MADERA NACIONAL PARA ENCOFRADO Y CARPINTE 43 0.016 100.00% 612.14 620.17 619.54 623.52 622.45 622.45

612.14 620.17 0.016 619.54 0.016 623.52 0.016 622.45 0.016 622.45 0.016

A AGREGADO FINO 4 0.051 100.00% 553.38 556.46 553.96 550.78 547.10 547.10

553.38 556.46 0.051 553.96 0.051 550.78 0.051 547.10 0.050 547.10 0.050

M MAQUINARIA Y EQUIPO NACIONAL 48 0.053 100.00% 325.11 321.94 323.59 325.69 326.22 326.22

325.11 321.94 0.052 323.59 0.053 325.69 0.053 326.22 0.053 326.22 0.053

D DÓLAR MAS INFLACION DE MERCADO USA 30 0.063 100.00% 349.36 341.35 345.99 350.99 352.30 352.30

349.36 341.35 0.062 345.99 0.062 350.99 0.063 352.30 0.064 352.30 0.064

C CEMENTO PORTLAND TIPO I 21 0.074 100.00% 423.60 428.12 428.12 428.12 428.12 428.12

423.60 428.12 0.075 428.12 0.075 428.12 0.075 428.12 0.075 428.12 0.075

M MANO DE OBRA 47 0.194 100.00% 470.79 471.44 471.44 471.44 471.44 471.44

470.79 471.44 0.194 471.44 0.194 471.44 0.194 471.44 0.194 471.44 0.194

I INDICE GENERAL DE PRCIOS AL CONSUMIDOR 39 0.549 100.00% 381.48 381.76 381.42 384.88 385.85 385.85

381.48 381.76 0.549 381.42 0.549 384.88 0.554 385.85 0.555 385.85 0.555

COEFICIENTE DE REAJUSTE: K = 1.000 0.999 1.000 1.006 1.007 1.007

indices de enero ind. Febrero ind. Marzo indices de abril indices de abril

Page 9: Liquidacion Financiera

ING. LUIS MANRIQUE FIGUEROA

REINTEGRO POR REAJUSTE(CONTROL DE VALORIZACIONES Y REAJUSTES)

CONTRATO PRINCIPAL

A.D.P : N° 106-2012-MDCGALO B R A :

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

FECHA : August-13

VALORIZACION REINTEGRO REINTEGRO DEDUCCION R.N.C. REINTEGRO

No. MES K-1 BRUTO NETO

PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO AUTORIZADO EFECTIVO MATERIALES AUTORIZADO

FORMULA 01: ESTRUCTURAS

1 #NAME? #NAME? -0.001 0.00 #NAME? #NAME? #NAME?

2 #NAME? #NAME? 0.000 0.00 #NAME? #NAME? #NAME?

3 FEBRERO 16,758.51 0.006 0.00 100.55 0.00 0.00

4 MARZO 17,317.13 0.007 0.00 121.22 121.22 121.22

5 ABRIL 16,758.51 0.007 0.00 117.31 117.31 117.31

TOTAL 0.00 #NAME? 0.00 #NAME? #NAME? #NAME?

REINTEGRO #NAME?

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Page 10: Liquidacion Financiera

CORPORACION EL ROCIO

CUADRO COMPARATIVO DE AVANCE DE OBRA

OBRA:

ADS : N° 106-2012-MDCGALSUPERVISOR : ING. HECTOR CACERES CONTRERASRESIDENTE : #NAME?PLAZO : 75 DIASMONTO CONTRATO : SISTEMA DE DESAGUE 1,414,311.52 (C /IGV)

SISTEMA DE AGUA 1,172,246.51 (C /IGV)

ITEM DESCRIPCION PARCIAL PROGRAMADO ACUMULADO EJECUTADO ACUMULADOS/. Monto % Monto %

ESPECIALIDAD S.DESAGUEOBRAS PROVISIONALES 9,500.00 4,433.33 46.67 5,750.00 60.53OBRAS PRELIMINARES 43,743.19 20,413.49 46.67 5,121.00 11.71MOVIMIENTO DE TIERRAS 155,959.42 11,662.77 7.48 16,653.13 10.68TUBERIAS 141,477.84 6,423.56 4.54 26,134.83 18.47CAMARAS DE INSPECCION 177,077.77 1,907.03 1.08 19,424.05 10.97CONEXIONES DOMICILIARIAS. 152,196.22 0.00 0.00 17,658.00 11.60PRUEBA HIDRAULICA 7,476.59 747.66 10.00 910.87 12.18ROTURA Y REPOSIC. DE PAVIMIENTOS 90,741.92 8,469.24 9.33 4,537.16 5.00ROTURA Y REPOSICION DE VEREDAS 172,624.71 16,111.64 9.33 6,626.21 3.84

S.AGUAOBRAS PROVISIONALES 8,750.00 0.00 0.00 1,500.00 17.14OBRAS PRELIMINARES 28,925.63 0.00 0.00 0.00 0.00MOVIMIENTO DE TIERRAS 105,289.64 0.00 0.00 0.00 0.00TUBERIAS 109,523.13 0.00 0.00 0.00 0.00SUM. INSTALAC/GRIFOS,VALV, ACCSES. 88,540.70 0.00 0.00 0.00 0.00CONEXIONES DOMICILIARIAS. 181,468.93 0.00 0.00 0.00 0.00PRUEBA HIDRAULICA 8,496.46 0.00 0.00 0.00 0.00DESINFECCION DE TUBERIAS 1,808.80 0.00 0.00 0.00 0.00OBRAS ESPECIALES 16,380.38 0.00 0.00 0.00 0.00ROTURA Y REPOSICION DE PAVIMENT. 78,762.51 0.00 0.00 0.00 0.00ROTURA Y REPOSICION DE VEREDAS. 160,118.70 0.00 0.00 0.00 0.00

COSTO DIRECTO 1,738,862.54 70,168.72 104,315.25 GASTOS GENERALES Y UTILIDADES ( 25 % ) 434,715.63 17,542.18 26,078.81 SUBTOTAL 2,173,578.18 87,710.90 130,394.06 I.G.V ( 19% ) 412,979.85 16,665.07 24,774.87 FR 1.00 1.00 1.00

TOTAL PRESUPUESTO 2,586,558.03 104,375.97 155,168.93

AVANCE FISICO ACUMULADO 100% 4.04% 6.00%

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Page 11: Liquidacion Financiera

CORPORACION EL ROCIO

CALENDARIO DE AVANCE DE OBRA FECHADO

L.P.No. : N° 106-2012-MDCGALO B R A : MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y DEAGUE URB. CACERES ARAMAYO-DISTRITO DE NVO.CHIMBOTE

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

RESIDENTE : ING. JOSE MANUEL SAMANAMUD LOYOLA

ESPECIALIDAD : V.R. (C/IGV) CONT.(C/IGV) CONT.(S/IGV) F.R.

S. DESAGUE : 1,414,311.52 1,414,311.52 1,188,497.08 1.00

S.AGUA : 1,172,246.51 1,172,246.51 985,081.10 1.00

TOTAL S/. : 2,586,558.03 2,586,558.03 2,173,578.18 1.00

PLAZO DE EJECUCION (D.N.) : 150

AMPLIACION DE PLAZO (D.N) : 29

PLAZO VIGENTE (D.N.) : 179

FECHA DE INICIO CONTRAC. 2/15/2011

FECHA TERMINO CONTRAC. : 7/14/2011

FECHA TERMINO VIGENTE : 8/12/2011

ITEM DESCRIPCION PARCIAL MESESS/. 15Feb-28Feb 01Mzo-31Mzo 01 Abr-30Abr 01 My-31My 01 Jun-30 Jun 01 Julio-31 Julio 01 Agos-12 Agos

SISTEMA DE DESAGUE01.00.00 OBRAS PROVISIONALES 9,500.00 4,433.33 5,066.6702.00.00 OBRAS PRELIMINARES 43,743.19 20,413.49 23,329.7003.00.00 MOVIMIENTO DE TIERRAS 155,959.42 11,662.77 38,989.86 38,989.86 38,989.86 27,327.0704.00.00 TUBERIAS 141,477.84 6,423.56 34,311.95 33,580.78 33,580.78 33,580.7705.00.00 CAMARAS DE INSPECCION 177,077.77 1,907.03 43,792.70 43,792.68 43,792.68 43,792.6806.00.00 CONEXIONES DOMICILIARIAS. 152,196.22 17,756.23 44,813.33 44,813.33 44,813.3307.00.00 PRUEBA HIDRAULICA 7,476.59 747.66 1,869.14 2,242.98 1,869.15 747.6608.00.00 ROTURA Y REPOSIC. DE PAVIMIENTOS 90,741.92 8,469.24 20,568.17 20,568.17 20,568.17 20,568.1709.00.00 ROTURA Y REPOSICION DE VEREDAS 172,624.71 16,111.64 39,128.26 39,128.26 78,256.55

COSTO DIRECTO 950,797.66 70,168.72 224,812.68 223,116.06 183,613.97 149,513.85 747.66 98,824.72 GASTOS GENERALES Y UTILIDADES ( 25 % 237,699.42 17,542.18 56,203.17 55,779.02 45,903.49 37,378.46 186.92 24,706.18 SUBTOTAL 1,188,497.08 87,710.90 281,015.85 278,895.08 229,517.46 186,892.31 934.57 123,530.90 I.G.V ( 19% ) 225,814.44 16,665.07 53,393.01 52,990.06 43,608.32 35,509.54 177.57 23,470.87 FR 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTAL PRESUPUESTO 1,414,311.52 104,375.97 334,408.86 331,885.14 273,125.78 222,401.85 1,112.14 147,001.77 AVANCE FISICO MENSUAL 7.38% 23.64% 23.47% 19.31% 15.73% 0.08% 10.39%AVANCE FISICO ACUMULADO 100% 7.38% 31.02% 54.49% 73.80% 89.53% 89.61% 100.00%

ITEM DESCRIPCION PARCIAL MESESS/. 15Feb-28Feb 01Mzo-31Mzo 01 Abr-30Abr 01 My-31My 01 Junio-30 Junio 01 Julio-31 Julio 01 Ago-12Ago

SISTEMA DE AGUA01.00.00 OBRAS PROVISIONALES 8,750.00 8,750.0002.00.00 OBRAS PRELIMINARES 28,925.63 28,925.6303.00.00 MOVIMIENTO DE TIERRAS 105,289.64 21,631.93 32,480.18 51,177.5304.00.00 TUBERIAS 109,523.13 11,880.76 48,734.65 48,907.7205.00.00 SUM. INSTALAC/GRIFOS,VALV, ACCSES. 88,540.70 27,430.08 61,110.6206.00.00 CONEXIONES DOMICILIARIAS. 181,468.93 84,685.50 96,783.4307.00.00 PRUEBA HIDRAULICA 8,496.46 2,832.15 5,664.3108.00.00 DESINFECCION DE TUBERIAS 1,808.80 1,205.87 402.93 200.0009.00.00 OBRAS ESPECIALES 16,380.38 7,300.37 9,080.0110.00.00 ROTURA Y REPOSICION DE PAVIMENT. 78,762.51 9,845.31 19,690.63 49,226.5711.00.00 ROTURA Y REPOSICION DE VEREDAS. 160,118.70 80,059.35 80,059.35

COSTO DIRECTO 788,064.88 - - 81,033.63 304,418.78 273,126.55 200.00 129,285.92 GASTOS GENERALES Y UTILIDADES ( 25 % 197,016.22 - - 20,258.41 76,104.70 68,281.64 50.00 32,321.48 SUBTOTAL 985,081.10 - - 101,292.04 380,523.48 341,408.19 250.00 161,607.40 I.G.V ( 19% ) 187,165.41 - - 19,245.49 72,299.46 64,867.56 47.50 30,705.41 FR 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTAL PRESUPUESTO 1,172,246.51 - - 120,537.52 452,822.94 406,275.74 297.50 192,312.81 AVANCE FISICO MENSUAL 0.00% 0.00% 10.28% 38.63% 34.66% 0.03% 16.41%AVANCE FISICO ACUMULADO 100% 0.00% 0.00% 10.28% 48.91% 83.57% 83.59% 100%

RESUMEN

FORMULA DESCRIPCION PARCIAL MESESS/. 15Feb-28Feb 01Mzo-31Mzo 01 Abr-30Abr 01 My-31My 01 Junio-30 Junio 01 Julio-31 Julio 01 Ago-12Ago

1 SISTEMA DE DESAGUE 950,797.66 70,168.72 224,812.68 223,116.06 183,613.97 149,513.85 747.66 98,824.722 SISTEMA DE AGUA 788,064.88 0.00 0.00 81,033.63 304,418.78 273,126.55 200.00 129,285.92

COSTO DIRECTO 1,738,862.54 70,168.72 224,812.68 304,149.69 488,032.75 422,640.40 947.66 228,110.64 GASTOS GENERALES Y UTILIDADES ( 25 % 434,715.64 17,542.18 56,203.17 76,037.42 122,008.19 105,660.10 236.92 57,027.66 SUBTOTAL 2,173,578.18 87,710.90 281,015.85 380,187.11 610,040.94 528,300.50 1,184.58 285,138.30 I.G.V ( 19% ) 412,979.85 16,665.07 53,393.01 72,235.55 115,907.78 100,377.10 225.07 54,176.28 FR 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 TOTAL PRESUPUESTO 2,586,558.03 104,375.97 334,408.86 452,422.66 725,948.72 628,677.60 1,409.64 339,314.58 AVANCE FISICO MENSUAL 4.04% 12.93% 17.49% 28.07% 24.31% 0.05% 13.12%AVANCE FISICO ACUMULADO 100% 4.04% 16.96% 34.46% 62.52% 86.83% 87% 100%

Page 12: Liquidacion Financiera

CORPORACION EL ROCIO

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y DEAGUE URB. CACERES ARAMAYO-DISTRITO DE NVO.CHIMBOTE

Page 13: Liquidacion Financiera

CRONOGRAMA VALORIZADO DE OBRA

FORMULA : MEJORAMIENTO DEL SISTEMA DE DESAGUE

: Distrito: NUEVO CHIMBOTE, Provincia: DEL SANTA, Region : ANCASH

FECHA : FEB - 2011

ITEM DESCRIPCION 60 DIAS CALENDARIOS

PARCIAL 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA

01.00.00 OBRAS PROVISIONALES. 7,250.00 7,250.00

02.00.00 OBRAS PRELIMINARES. 2,924.76 2,924.76 2,924.76 2,924.76 2,924.76 2,924.76 17,548.56

03.00.00 MOVIMIENTO DE TIERRAS.

03.01.01 EXCAVACION DE ZANJA, C/MAQ. EN TERRENO SUELTO, HASTA 1.50 M. PROF./PROM. 1,385.23 3,116.78 3,116.78 3,116.78 3,116.78 13,852.34

03.01.02 EXCAVACION DE ZANJA, C/MAQ. EN TERRENO SUELTO, HASTA 1.20 M. PROF./PROM. 903.62 1,626.52 1,626.52 1,626.52 1,626.52 1,626.52 9,036.21

03.02.01 NIVELACION Y REFINE DE FONDO DE ZANJA 135.52 487.88 487.88 487.88 487.88 487.88 135.52 2,710.45

03.03.01 CONFORMACION DE CAMA DE APOYO, CON MATERIAL DE PRESTAMO, H= 10 CM. 1,119.23 1,119.23 1,119.23 1,119.23 1,119.23 621.79 6,217.93

03.04.01 RELLENO DE ZANJA CON MATERIAL DE PRESTAMO C/MAQ. SOBRE CLAVE DE TUBERIA. 2,112.18 7,603.83 7,603.83 7,603.83 7,603.83 7,603.83 2,112.18 42,243.52

03.04.02 RELLENO DE ZANJA CON MATERIAL PROPIO C/MAQ. HASTA 0.80 M DE PROF./PROM. 273.65 1,641.91 1,641.91 1,641.91 1,641.91 1,641.91 638.52 9,121.73

03.04.03 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ. HASTA 0.50 M DE PROF./PROM. 470.88 1,059.48 1,059.48 1,059.48 1,059.48 4,708.80

03.05.01 ELIMINACION DE MATERIAL EXEDENTE DIST. PROM. 15 KM. CARGUIO C/MAQ. 3,269.67 7,356.76 7,356.76 7,356.76 7,356.76 32,696.70

04.00.00 TUBERIAS.

04.01.00 SUMINISTRO E INSTALACION DE TUBERIA 9,629.35 9,629.35 9,629.35 9,629.35 9,629.35 48,146.74

04.02.00 ALINEAMIENTO Y AJUSTE DE TUBERIA 326.82 326.82 326.82 326.82 326.82 181.57 1,815.69

04.03.00 DESVIO DE AGUAS SERVIDAS 318.78 819.73 819.73 819.73 819.73 819.73 136.62 4,554.06

05.00.00 CAMARAS DE INSPECCION

05.01.00 ENCOFRADO Y DESENCOFRADO DE CAMARAS DE INSPECCION 1,253.30 1,879.95 1,879.95 1,879.95 1,879.95 1,879.95 1,879.95 12,532.97

05.02.00 CONCRETO PARA CAMARAS DE INSPECCION 1,712.14 5,136.42 5,136.42 5,136.42 5,136.42 5,136.42 5,136.42 1,712.14 34,242.77

05.03.00 ACERO DE REFUERZO PARA CAMARAS DE NSPECCION 640.56 960.83 960.83 960.83 960.83 960.83 960.83 6,405.56

05.04.00 MARCO Y TAPA 2,553.33 2,553.33 2,553.33 2,553.33 10,213.32

05.06.00 ENCOFRADO Y DESENCOFRADO DE BUZONETAS

05.07.00 CONCRETO PARA BUZONETAS

05.08.00 ACERO DE REFUERZO PARA BUZONETAS

05.05.00 DADOS DE EMPALME 734.09 734.09 734.09 734.09 734.09 3,670.45

06.00.00 CONEXIONES DOMICILIARIAS 2,783.92 15,659.57 15,659.57 15,659.57 15,659.57 4,175.88 69,598.08

07.00.00 PRUEBAS HIDRAULICAS 443.05 886.11 886.11 886.11 443.05 3,544.42

07.00.01 PRUEBAS HIDRAULICAS

08.00.00 LOSA DE CONCRETO 2,599.34 2,599.34 2,599.34 7,798.03

COSTO DIRECTO 16,523.91 33,932.10 54,581.60 58,882.92 65,523.34 65,005.90 36,486.29 16,972.27 347,908.33

GASTOS GENERALES (15%) 2,478.59 5,089.82 8,187.24 8,832.44 9,828.50 9,750.89 5,472.94 2,545.84 52,186.25

UTILIDADES (10%) 1,652.39 3,393.21 5,458.16 5,888.29 6,552.33 6,500.59 3,648.63 1,697.23 34,790.83

SUB TOTAL 20,654.89 42,415.13 68,227.00 73,603.65 81,904.17 81,257.38 45,607.87 21,215.33 434,885.41

I.G.V. (19%) 3,924.43 8,058.87 12,963.13 13,984.69 15,561.79 15,438.90 8,665.49 4,030.91 82,628.23

TOTAL PRESUPUESTO 24,579.32 50,474.00 81,190.12 87,588.34 97,465.96 96,696.28 54,273.36 25,246.25 517,513.64

AVANCE FISICO PARCIAL(%) 4.75 9.75 15.69 16.92 18.83 18.68 10.49 4.88 100.00

AVANCE FISICO ACUMULADO(%) 4.75 14.50 30.19 47.12 65.95 84.63 95.12 100.00

OJO PEGAR CALENDARIO PRESENTADO PARA FIRMA DE CONTRATO

PROYECTO

: MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y DESAGUE DEL A.H. HUP LUIS FELIPE DE LAS CASAS EN EL DISTRITO DE NUEVO CHIMBOTE.

UBICACIÓN

Page 14: Liquidacion Financiera

CRONOGRAMA VALORIZADO DE OBRA

FORMULA : MEJORAMIENTO DEL SISTEMA DE AGUA

: Distrito: NUEVO CHIMBOTE, Provincia: DEL SANTA, Region : ANCASH

FECHA : SEPTIEMBRE - 2010

ITEM DESCRIPCION 15 DIAS CALENDARIOS

PARCIAL 9 SEMANA 10 SEMANA

01.00.00 OBRAS PRELIMINARES. 1,541.20 660.51 2,201.71 02.00.00 MOVIMIENTO DE TIERRAS.

02.01.00 EXCAVACION DE ZANJA. 1,498.67 999.12 2,497.79 02.02.00 NIVELACION Y REFINE. 206.32 137.55 343.87 02.03.00 RELLENO DE ZANJA. 463.54 695.31 1,158.85 02.04.00 ELIMINACION DE MATERIAL EXCEDENTE. 1.62 2.42 4.04 03.00.00 SUMINIST. E INST. DE HIDRANTES, VALV., MACROMEDIDORES Y ACC.

03.01.00 VALVULAS COMPUERTA E HIDRANTES

03.01.01 SUMIN. E INST. DE VALV. F°F°D° DN 160MM P/TUB. ISSO4422 124.48 497.92 622.40 03.01.02 SUMIN. E INST. DE VALV. F°F°D° DN 110MM P/TUB. ISSO4422 967.68 3,870.72 4,838.40 03.01.03 SUMIN. E INST. DE GRIFO CONTRA INCENDIO TIPO POSTE DE 2 BOCAS 827.26 3,309.02 4,136.28 03.02.00 VALVULAS DE AIRE

03.02.01 ENCOFRADO Y DESENC. DE DADOS DE CAMARA DE INSPECCION 87.42 349.70 437.12 03.02.02 CONCRETO F'c=140kg/cm2, PARA MEDIAS CAÑAS 12.57 50.26 62.83 03.02.03 CONCRETO F'c=175kg/cm2, PARA CAMARAS DE INSPECCION 57.90 231.61 289.51 03.02.04 CONCRETO F'c=210kg/cm2, PARA TECHO DE CAMARAS DE INSPECCION 19.85 79.38 99.23 03.02.05 ACERO DE REFUERZO Fy=4,200kg/cm2, PARA CAMARAS DE INSPECCION 123.19 123.19 246.37 03.02.06 SUMINISTRO DE MARCO DE F°F° Y TAPA DE C°A° PARA CAMARA DE INSPECCION 197.35 197.35 394.69 03.02.07 SUMINISTRO E INSTALACION DE VALVULA VENTOSA COMBINADA DN 63 1,222.00 1,222.00 03.03.00 MACROMEDIDOR ELECTROMAGNETICO

03.03.01 ENCOFRADO Y DESENC. DE BUZONETA 86.61 346.44 433.05 03.03.02 CONCRETO F'c=175kg/cm2, PARA BUZONETA 28.96 115.83 144.79 03.03.03 ACERO DE REFUERZO Fy=4,200kg/cm2, PARA BUZONETA 32.17 128.68 160.85 03.03.04 SUMINISTRO DE MARCO DE F°F° Y TAPA DE C°A° PARA BUZONETA 78.94 315.75 394.69 03.03.05 SUM. E INST. DE MACROMEDIDOR ELECTROMAGNETICO A BATERIA DN200, PN16 11,990.25 11,990.25 03.04.00 ACCESORIOS

03.04.01 SUMINISTRO E INSTALACION DE TEE 110/110MM PVC ISO4422 148.69 223.03 371.72 03.04.02 SUMINISTRO E INSTALACION DE UNION CORREDIZA PVC 110MM ISO4422 466.26 699.38 1,165.64 03.04.03 SUMINISTRO E INSTALACION DE UNION CORREDIZA PVC 160MM ISO4422 44.57 66.85 111.42 04.00.00 CONEXIONES DOMICILIARIAS

04.01.00 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM L=3.00M 12,008.80 18,013.20 30,022.00 04.02.00 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM L=4.00M 6,625.80 9,938.70 16,564.50 04.03.00 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM L=10.00M 803.90 1,205.86 2,009.76 04.04.00 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM L=11.00M 271.96 407.94 679.90 05.00.00 PRUEBA HIDRAULICA

05.01.00 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 110MM 659.93 989.90 1,649.83 06.00.00 DESINFECCION DE TUBERIAS

06.01.00 DESINFECCION DE TUBERIAS PVC ISO4422 DN 110MM 191.59 287.39 478.98 07.00.00 OBRAS ESPECIALES

07.01.00 DADOS DE ANCLAJE

07.01.01 ENCOFRADO Y DESENC. DE DADOS DE ANCLAJE A ACCESORIOS 298.77 448.15 746.92 07.01.02 CONCRETO F'c=140kg/cm2, PARA DADOS DE ANCLAJE

07.02.00 CAJAS DE VALVULA 305.02 457.53 762.55 07.02.01 CAJA PARA VALVULA DN 110MM 469.50 1,878.00 2,347.50 08.00.00 LOSA DE CONCRETO f'c=140kg/cm2 PARA CONFINAMIENTO

DE MARCO Y TAPA DE CAJA DE AGUA. PULIDO Y BRUÑADO

08.01.01 LOSA DE CONCRETO f'c=140kg/cm2 PARA CONFINAMIENTO

DE MARCO Y TAPA DE CAJA DE AGUA. PULIDO Y BRUÑADO 2,924.26 4,386.40 7,310.66COSTO DIRECTO 31,574.77 64,325.33 95,900.10

GASTOS GENERALES (15%) 4,736.21 9,648.80 14,385.01

UTILIDADES (10%) 3,157.48 6,432.53 9,590.01

PROYECTO

: MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE Y DESAGUE DEL A.H. HUP LUIS FELIPE DE LAS CASAS EN EL DISTRITO DE NUEVO CHIMBOTE.

UBICACIÓN

Page 15: Liquidacion Financiera

SUB TOTAL 39,468.46 80,406.67 119,875.12

I.G.V. (19%) 7,499.01 15,277.27 22,776.27

TOTAL PRESUPUESTO 46,967.46 95,683.94 142,651.40

AVANCE FISICO PARCIAL(%) 32.92 67.08 100.00

AVANCE FISICO ACUMULADO(%) 32.92 100.00

OJO PEGAR CALENDARIO PRESENTADO PARA FIRMA DE CONTRATO

Page 16: Liquidacion Financiera

7,250.00 7,250.00 - 7,250.00 -

17,548.56 11,699.04 5,849.52 11,699.04 5,849.52

- - - -

13,852.34 10,735.56 3,116.78 47,152.93 73,434.75

9,036.21 5,783.17 3,253.04

2,710.45 1,599.17 1,111.28

6,217.93 3,357.68 2,860.25

42,243.52 17,319.84 24,923.68

9,121.73 3,557.47 5,564.26

4,708.80 1,530.36 3,178.44

32,696.70 3,269.67 29,427.03

- - -

48,146.74 28,888.04 19,258.70 32,646.49 21,870.00

1,815.69 980.47 835.22

4,554.06 2,777.98 1,776.08

- - -

12,532.97 6,893.13 5,639.84 29,739.85 37,325.22

34,242.77 17,121.39 17,121.39

6,405.56 3,523.06 2,882.50

10,213.32 - 10,213.32

- - -

- - -

- - -

3,670.45 2,202.27 1,468.18

69,598.08 34,103.06 35,495.02 34,103.06 35,495.02

3,544.42 1,329.16 2,215.26 1,329.16 2,215.26

- - -

7,798.03 - 7,798.03 - 7,798.03

163,920.53 183,987.80 347,908.33

Page 17: Liquidacion Financiera

2,201.71

4,004.55

27,121.24

49,276.16

1,649.83

478.98

3,856.97

7,310.66

95,900.10

Page 18: Liquidacion Financiera

CONSORCIO CHAVINSUBREGION PACIFICO-GRA

0A.D.P. No. : N° 106-2012-MDCGAL

O B R A : CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

RESIDENTE : #NAME?

FECHA : 41487

FORMULA 01 : SISTEMA DE AGUA

PRESUPUESTO AVANCE AVANCE AVANCE % SALDO

ITEM DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO AVANCE

UNIDAD METRADO P.UNITARIO P.TOTAL METRADO MONTO METRADO MONTO METRADO MONTO ACUM. METRADO01 OBRAS PROVISIONALES

01.01 CASETA DE GUARDIANIA MES 3.00 750.00 2,250.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.0001.02 CARTEL DE OBRA GIGANTOGRAFIA (7.20M x 3.60M) UND 1.00 1,500.00 1,500.00 0.00 0.00 1.00 1500.00 1.00 1500.00 100.00 0.0001.03 TRANSPORTE DE MATERIALES Y EQUIPOS GLB 1.00 5,000.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0002 OBRAS PRELIMINARES

02.01 TRAZO Y REPLANTEO INICIAL PARA AGUA POTABLE M 5,367.50 0.78 4,186.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5367.5002.02 TRAZO Y REPLANTEO FINAL PARA AGUA POTABLE M 5,367.50 0.65 3,488.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5367.5002.03 TRANQUERA T/BARANDA 1.20 x 1.1M PROV P/SEÑALIZ-PROTECCION. UND 20.00 28.01 560.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.0002.04 CONO DE FIBRA DE VIDRIO FOSFORECENTE UND 10.00 38.00 380.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.0002.05 SEÑALIZACION P/LIMITE SEGURIDAD DE OBRA M 10,735.00 1.80 19,323.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10735.0002.06 PUENTE DE MADERA PROVISIONAL, PASE PEATONAL SOBRE ZANJA UND 10.00 98.69 986.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.0003 MOVIMIENTO DE TIERRAS

03.01 EXCAVACION DE ZANJA

03.01.01 EXC. ZANJA, C/MAQ., EN TERRENO SUELTO, HASTA 1.20M DE PROF/PROM. M3 4,626.53 6.65 30,766.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4626.5303.01.02 EXC.ZANJA, C/MAQ., EN TERRENO SUELTO, HASTA 1.50M DE PROF/PROM. M3 740.07 6.65 4,921.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 740.0703.01.03 EXC. ZANJA, MANUAL, EN TERRENO SUELTO, HASTA 0.80M DE PROF/PROM.M3 702.81 16.85 11,842.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 702.8103.02 NIVELACION Y REFINE

03.02.01 NIVELACION Y REFINE DE FONDO DE ZANJA M2 4,294.00 1.87 8,029.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4294.0003.03 CONFORMACION DE CAMA DE APOYO 0.00 0.00 0.00 0.00 0.00 0.0003.03.01 CONFORMACION DE CAMA DE APOYO, CON MATERIAL PROPIO, H=10CM M3 220.28 16.07 3,539.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 220.2803.04 RELLENO DE ZANJA

03.04.01 RELLENO DE ZANJA CON MAT. PROPIO, C/MAQ. SOBRE CLAVE DE TUBERIA M3 1,908.84 7.41 14,144.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1908.8403.04.02 RELLENO DE ZANJA CON MAT.PROPIO, C/MAQ., HASTA 0.80M DE PROF/PROM3 3,876.89 7.95 30,821.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3876.8903.05 ELIMINACION DE MATERIAL EXCEDENTE

03.05.01 ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 15KM, CARGUIO C/M M3 69.74 17.55 1,223.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.7404 TUBERIAS

04.01 SUMINISTRO E INSTALACION DE TUBERIA

04.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4422 DN 63 MM C-7.5 M 1,587.00 5.48 8,696.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1587.0004.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4422 DN 110 MM C-7.5 M 3,232.30 18.05 58,343.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3232.3004.01.03 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4422 DN 250 MM C-7.5 M 548.20 72.76 39,887.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 548.2004.02 ALINEAMIENTO Y AJUSTE 0.00 0.00 0.00 0.00 0.00 0.0004.02.01 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 63MM M 1,587.00 0.40 634.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1587.0004.02.02 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 110MM M 3,232.30 0.50 1,616.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3232.3004.02.03 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4422 DN 250MM M 548.20 0.63 345.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 548.2005 SUM. E INST.DE HID., VALV., MACROMEDIDORES Y ACC.

05.01 HIDRANTES Y VALVULAS COMPUERTA

05.01.01 SUM. E INSTALAC. DE GRIFO CONTRA INCENDIO TIPO POSTE DE 2 BOCAS UND 7.00 1,034.07 7,238.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.0005.01.02 SUMINISTRO E INSTALACION DE VALVULA FºFºDº DN 250MM P/TUB. ISO4422 UND 1.00 1,715.36 1,715.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0005.01.03 SUMINISTRO E INSTALACION DE VALVULA FºFºDº DN 110MM P/TUB. ISO4422 UND 35.00 345.60 12,096.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35.0005.01.04 SUMINISTRO E INSTALACION DE VALVULA FºFºDº DN 63MM P/TUB. ISO4422 UND 17.00 223.48 3,799.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.0005.02 MACROMEDIDOR ELECTROMAGNETICO

05.02.01 ENCOFRADO Y DESENCOFRADO DE BUZONETA M2 12.72 68.09 866.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.7205.02.02 CONCRETO F'c=175KG/CM2 PARA BUZONETAS M3 1.04 278.45 289.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0405.02.03 ACERO DE REFUERZO Fy=4,200KG/CM2 PARA BUZONETA KG 41.78 7.70 321.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.7805.02.04 SUMINISTRO DE MARCO DE F°F° Y TAPA DE C°A° PARA BUZONETAS UND 2.00 394.69 789.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0005.02.05 SUM. E INSTALAC.DE MACROMEDIDOR ELECTROMAG. BATERIA DN250, PN1 UND 2.00 14,769.04 29,538.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0005.03 ACCESORIOS

05.03.01 SUMINISTRO E INSTALACION DE CODO 110MM/90° PVC ISO4422 UND 14.00 95.91 1,342.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.0005.03.02 SUMINISTRO E INSTALACION DE CODO 63MM/90° PVC ISO4422 UND 176.00 36.45 6,415.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 176.00

Page 19: Liquidacion Financiera

CONSORCIO CHAVIN05.03.03 SUMINISTRO E INSTALACION DE CODO 250MM/45° PVC ISO4422 UND 2.00 607.26 1,214.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0005.03.04 SUMINISTRO E INSTALACION DE CODO 250MM/22.5º PVC ISO4422 UND 1.00 607.26 607.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0005.03.05 SUMINISTRO E INSTALACION DE CODO 110MM/22.5º PVC ISO4422 UND 1.00 83.78 83.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0005.03.06 SUMINISTRO E INSTALACION DE TEE 200/200MM PVC ISO4422 UND 1.00 363.85 363.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0005.03.07 SUMINISTRO E INSTALACION DE TEE 110/110MM PVC ISO4422 UND 33.00 92.93 3,066.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.0005.03.08 SUMINISTRO E INSTALACION DE TEE 63/63MM PVC ISO4422 UND 12.00 39.55 474.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.0005.03.09 SUMINISTRO E INSTALACION DE TEE 250/110MM PVC ISO4422 UND 8.00 1,509.27 12,074.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.0005.03.10 SUMINISTRO E INSTALACION DE TEE 250/63MM PVC ISO4422 UND 2.00 1,461.17 2,922.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0005.03.11 SUMINISTRO E INSTALACION DE TEE 110/63MM PVC ISO4422 UND 14.00 99.47 1,392.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.0005.03.12 SUMINISTRO E INSTALACION DE CRUZ 110/110MM PVC ISO442 UND 1.00 139.40 139.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0005.03.13 SUMINISTRO E INSTALACION DE REDUCCION 250/200MM PVC ISO4422 UND 1.00 191.34 191.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.0005.03.14 SUMINISTRO E INSTALACION DE UNION MECANICA PVC-AC DC 250MM UND 3.00 532.79 1,598.37 0.00 0.00 0 0.00 0.00 0.00 0.00 3.0006 CONEXIONES DOMICILIARIAS

06.01 CONEX. DOMICIL. DN 21MM, ABR. 63/21MM, L=2.00M UND 199.00 293.50 58,406.50 0.00 0.00 0 0.00 0.00 0.00 0.00 199.0006.02 CONEX. DOMICIL. DN 21MM, ABR. 63/21MM, L=5.00M UND 36.00 301.49 10,853.64 0.00 0.00 0 0.00 0.00 0.00 0.00 36.0006.03 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM, L=3.00M UND 168.00 305.14 51,263.52 0.00 0.00 0 0.00 0.00 0.00 0.00 168.0006.04 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM, L=4.00M UND 92.00 310.59 28,574.28 0.00 0.00 0 0.00 0.00 0.00 0.00 92.0006.05 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM, L=6.00M UND 17.00 322.46 5,481.82 0.00 0.00 0 0.00 0.00 0.00 0.00 17.0006.06 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM, L=10.00M UND 9.00 344.67 3,102.03 0.00 0.00 0 0.00 0.00 0.00 0.00 9.0006.07 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM, L=12.00M UND 50.00 359.01 17,950.50 0.00 0.00 0 0.00 0.00 0.00 0.00 50.0006.08 CONEX. DOMICIL. DN 21MM, ABR. 110/21MM, L=14.00M UND 16.00 364.79 5,836.64 0.00 0.00 0 0.00 0.00 0.00 0.00 16.00

07 PRUEBAS HIDRAULICAS

07.01 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 63MM M 1,587.00 0.88 1,396.56 0.00 0.00 0 0.00 0.00 0.00 0.00 1587.0007.02 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 110MM M 3,232.30 1.24 4,008.05 0.00 0.00 0 0.00 0.00 0.00 0.00 3232.3007.03 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4422 DN 250MM M 548.20 5.64 3,091.85 0.00 0.00 0 0.00 0.00 0.00 0.00 548.2008 DESINFECCION DE TUBERIAS

08.01 DESINFECCION DE TUBERIAS PVC ISO4422 DN 63MM M 1,587.00 0.22 349.14 0.00 0.00 0 0.00 0.00 0.00 0.00 1587.0008.02 DESINFECCION DE TUBERIAS PVC ISO4422 DN 110MM M 3,232.30 0.36 1,163.63 0.00 0.00 0 0.00 0.00 0.00 0.00 3232.3008.03 DESINFECCION DE TUBERIAS PVC ISO4422 DN 250MM M 548.20 0.54 296.03 0.00 0.00 0 0.00 0.00 0.00 0.00 548.2009 OBRAS ESPECIALES

09.01 DADOS DE ANCLAJE

09.01.01 ENCOFRADO Y DESENCOFRADO DE DADOS DE ANCLAJE M2 206.08 22.02 4,537.88 0.00 0.00 0 0.00 0.00 0.00 0.00 206.0809.01.02 CONCRETO F'c=140KG/CM2 PARA DADOS DE ANCLAJE M3 17.22 207.24 3,568.67 0.00 0.00 0 0.00 0.00 0.00 0.00 17.2209.02 CAJA DE VALVULA

09.02.01 CAJA PARA VALVULA UND 53.00 156.11 8,273.83 0.00 0.00 0 0.00 0.00 0.00 0.00 53.0010 ROTURA Y REPOSICION DE PAVIMENTO

10.01 ROTURA y REPOSICION DE PAVIMENTO FLEXIBLE EN FRIO M2 1,746.01 45.11 78,762.51 0.00 0.00 0 0.00 0.00 0.00 0.00 1746.0111 ROTURA Y REPOSICION DE VEREDAS

11.01 ROTURA Y REPOSICION DE VEREDA CONCRETO f'c=140 kg/cm² M2 2,430.46 65.88 160,118.70 0.00 0.00 0 0.00 0.00 0.00 0.00 2430.46

COSTO DIRECTO (A) 788,064.88 0.00 1,500.00 0.19% 1,500.00 0.19% 64,851.47GASTOS GENERALES + UTILIDADES 25% (B) 197,016.22 0.00 375.00 375.00

FR = 1.00000TOTAL (A+B)*FR 985,081.10 0.00 1,875.00 1,875.00

Page 20: Liquidacion Financiera

CORPORACION EL ROCIOSUBREGION PACIFICO-GRA

0A.D.P. No. : N° 106-2012-MDCGAL

O B R A :CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

RESIDENTE : #NAME?

FECHA : 41487

FORMULA 01 : SISTEMA DE DESAGUE

PRESUPUESTO AVANCE AVANCE AVANCE % SALDOITEM DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO AVANCE

UNIDAD METRADO P.UNITARIO P.TOTAL METRADO MONTO METRADO MONTO METRADO MONTO ACUM. METRADO MONTO01 OBRAS PROVISIONALES

01.01 CASETA DE GUARDIANIA MES 4.00 750.00 3,000.00 0.00 0.00 1.00 750.00 1.00 750.00 25.00 3.00 2250.0001.02 CARTEL DE OBRA GIGANTOGRAFIA (7.20M x 3.60M) UND 1.00 1,500.00 1,500.00 0.00 0.00 1.00 1500.00 1.00 1500.00 100.00 0.00 0.0001.03 TRANSPORTE DE MATERIALES Y EQUIPOS GLB 1.00 5,000.00 5,000.00 0.00 0.00 0.70 3500.00 0.70 3500.00 70.00 0.30 1500.0002 OBRAS PRELIMINARES

02.01 TRAZO Y REPLANTEO INICIAL PARA ALCANTARILLADO M 6,117.20 0.99 6,056.03 0.00 0.00 1044.56 1034.11 1044.56 1034.11 17.08 5072.64 5021.9102.02 TRAZO Y REPLANTEO FINAL PARA ALCANTARILLADO M 6,117.20 0.78 4,771.42 0.00 0.00 1044.56 814.76 1044.56 814.76 17.08 5072.64 3956.6602.03 TRANQUERA T/BARANDA 1.20 x 1.1M PROV P/SEÑALIZ-PROTECCION. UND 30.00 28.01 840.30 0.00 0.00 10.00 280.10 10.00 280.10 33.33 20.00 560.2002.04 CONO DE FIBRA DE VIDRIO FOSFORECENTE UND 20.00 38.00 760.00 0.00 0.00 5.00 190.00 5.00 190.00 25.00 15.00 570.0002.05 SEÑALIZACION P/LIMITE SEGURIDAD DE OBRA M 12,234.40 1.80 22,021.92 0.00 0.00 850.00 1530.00 850.00 1530.00 6.95 11384.40 20491.9202.06 PUENTE DE MADERA PROVISIONAL, PASE PEATONAL SOBRE ZANJA UND 20.00 98.69 1,973.80 0.00 0.00 3.00 296.07 3.00 296.07 15.00 17.00 1677.7302.07 DEMOLICION DE BUZONES EXISTENTES M3 115.80 63.21 7,319.72 0.00 0.00 15.44 975.96 15.44 975.96 13.33 100.36 6343.7603 MOVIMIENTO DE TIERRAS

03.01 EXCAVACION DE ZANJA

03.01.01 EXCAVACION DE ZANJA, C/MAQ., EN TERRENO SUELTO, HASTA 1.50M DE PROF/PROM. M3 4,181.88 6.65 27,809.50 0.00 0.00 399.30 2655.32 399.30 2655.32 9.55 3782.58 25154.1903.01.02 EXCAVACION DE ZANJA, C/MAQ., EN TERRENO SUELTO, HASTA 2.00M DE PROF/PROM. M3 2,779.92 7.30 20,293.42 0.00 0.00 464.44 3390.41 464.44 3390.41 16.71 2315.48 16903.0103.01.03 EXCAVACION DE ZANJA, C/MAQ., EN TERRENO SUELTO, HASTA 2.50M DE PROF/PROM. M3 1,235.09 9.13 11,276.37 0.00 0.00 41.65 380.27 41.65 380.27 3.37 1193.44 10896.1003.01.04 EXCAVACION DE ZANJA, C/MAQ., EN TERRENO SUELTO, HASTA 3.00M DE PROF/PROM. M3 199.11 10.34 2,058.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 199.11 2058.8003.02 NIVELACION Y REFINE

03.02.01 NIVELACION Y REFINE DE FONDO DE ZANJA M2 3,083.52 1.87 5,766.18 0.00 0.00 352.13 658.48 352.13 658.48 11.42 2731.39 5107.7003.03 CONFORMACION DE CAMA DE APOYO

03.03.01 CONFORMACION DE CAMA DE APOYO, CON MATERIAL PROPIO, H=10CM M3 308.35 16.07 4,955.18 0.00 0.00 35.21 565.87 35.21 565.87 11.42 273.14 4389.3103.04 RELLENO DE ZANJA

03.04.01 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ. SOBRE CLAVE DE TUBERIA M3 2,339.77 7.41 17,337.70 0.00 0.00 273.68 2028.00 273.68 2028.00 11.70 2066.09 15309.6903.04.02 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ., HASTA 1.00M DE PROF/PROM. M3 1,434.21 9.40 13,481.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1434.21 13481.5703.04.03 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ., HASTA 1.50M DE PROF/PROM. M3 2,989.21 11.58 34,615.05 0.00 0.00 212.63 2462.24 212.63 2462.24 7.11 2776.58 32152.8103.04.04 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ., HASTA 2.00M DE PROF/PROM. M3 1,000.89 12.80 12,811.39 0.00 0.00 292.23 3740.58 292.23 3740.58 29.20 708.66 9070.8103.04.05 RELLENO DE ZANJA CON MATERIAL PROPIO, C/MAQ., HASTA 2.50M DE PROF/PROM M3 169.46 15.22 2,579.18 0.00 0.00 27.50 418.53 27.50 418.53 16.23 141.96 2160.6503.05 ELIMINACION DE MATERIAL EXCEDENTE

03.05.01 ELIMINACION DE MATERIAL EXCEDENTE, DIST. PROM. 15KM, CARGUIO C/MAQ M3 169.52 17.55 2,975.08 0.00 0.00 20.14 353.43 20.14 353.43 11.88 149.38 2621.6504 TUBERIAS

04.01 SUMINISTRO E INSTALACION DE TUBERIA

04.01.01 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN 160 MM S-20 M 858.90 23.79 20,433.23 0.00 0.00 312.68 7438.66 312.68 7438.66 36.40 546.22 12994.5704.01.02 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO4435 DN 200 MM S-20 M 2,820.80 35.84 101,097.47 0.00 0.00 419.20 15024.13 419.20 15024.13 14.86 2401.60 86073.3404.02 ALINEAMIENTO Y AJUSTE

04.02.01 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435 DN 160 MM ML 3,296.40 0.58 1,911.91 0.00 0.00 312.68 181.35 312.68 181.35 9.49 2983.72 1730.5604.02.02 ALINEAMIENTO Y AJUSTE DE TUBERIA PVC ISO 4435 DN 200 MM ML 2,820.80 0.68 1,918.14 0.00 0.00 419.20 285.06 419.20 285.06 14.86 2401.60 1633.0904.03 DESVIO DE AGUAS SERVIDAS

04.03.01 DESVIO DE AGUAS SERVIDAS HASTA Q=60L/S C/MOTOBOMBA 12HP 6" (Incluye manguera y accesorios) M 3,679.70 4.38 16,117.09 0.00 0.00 731.88 3205.63 731.88 3205.63 19.89 2947.82 12911.4505 CAMARAS Y BUZONETAS DE INSPECCION

05.01 ENCOFRADO Y DESENCOFRADO DE CAMARAS DE INSPECCION

05.01.01 ENCOFRADO Y DESENCOFRADO DE CAMARA DE INSPECCION M2 1,059.18 34.61 36,658.22 0.00 0.00 177.25 6134.68 177.25 6134.68 16.73 881.93 30523.5405.02 CONCRETO PARA CAMARAS DE INSPECCION

05.02.01 CONCRETO F'c=140KG/CM2 PARA MEDIAS CAÑAS M3 19.80 209.43 4,146.71 0.00 0.00 3.60 753.95 3.60 753.95 18.18 16.20 3392.77

Page 21: Liquidacion Financiera

CORPORACION EL ROCIOSUBREGION PACIFICO-GRA

0A.D.P. No. : N° 106-2012-MDCGAL

O B R A :CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

RESIDENTE : #NAME?

FECHA : 41487

FORMULA 01 : SISTEMA DE DESAGUE

PRESUPUESTO AVANCE AVANCE AVANCE % SALDOITEM DESCRIPCION REFERENCIAL ANTERIOR ACTUAL ACUMULADO AVANCE

UNIDAD METRADO P.UNITARIO P.TOTAL METRADO MONTO METRADO MONTO METRADO MONTO ACUM. METRADO MONTO05.02.02 CONCRETO F'c=175KG/CM2 PARA CAMARAS DE INSPECCION M3 76.41 281.08 21,477.32 0.00 0.00 12.74 3581.67 12.74 3581.67 16.68 63.67 17895.6505.02.03 CONCRETO F'c=210KG/CM2 PARA TECHO DE CAMARA DE INSPECCION M3 19.59 330.78 6,479.98 0.00 0.00 3.56 1178.43 3.56 1178.43 18.19 16.03 5301.5505.03 ACERO DE REFUERZO PARA CAMARAS DE NSPECCION

05.03.01 ACERO DE REFUERZO Fy=4,200KG/CM2 PARA TECHOS DE CAMARAS DE INSPECCION KG 1,765.50 9.21 16,260.26 0.00 0.00 321.00 2956.41 321.00 2956.41 18.18 1444.50 13303.8505.04 MARCO Y TAPA PARA CAMARAS DE INSPECCION

05.04.01 SUMINISTRO DE MARCO DE F°F° Y TAPA DE C°A° PARA CAMARA DE INSPECCION UND 66.00 394.69 26,049.54 0.00 0.00 12.00 4736.28 12.00 4736.28 18.18 54.00 21313.2605.05 ENCOFRADO Y DESENCOFRADO DE BUZONETAS

05.05.01 ENCOFRADO Y DESENCOFRADO DE BUZONETA M2 267.43 68.09 18,209.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 267.43 18209.3105.06 CONCRETO PARA BUZONETAS

05.06.01 CONCRETO F'c=140KG/CM2 PARA MEDIAS CAÑAS BUZONETAS M3 5.30 201.87 1,069.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.30 1069.9105.06.02 CONCRETO F'c=175KG/CM2 PARA BUZONETAS M3 19.50 278.45 5,429.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.50 5429.7805.07 ACERO DE REFUERZO PARA BUZONETAS

05.07.01 ACERO DE REFUERZO Fy=4,200KG/CM2 PARA BUZONETA KG 1,181.26 7.70 9,095.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1181.26 9095.7005.08 MARCO Y TAPA PARA BUZONETAS

05.08.01 SUMINISTRO DE MARCO DE F°F° Y TAPA DE C°A° PARA BUZONETAS UND 53.00 394.69 20,918.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.00 20918.5705.09 DADOS DE EMPALME

05.09.01 ENCOFRADO Y DESENCOFRADO DE DADOS DE EMPALME M2 196.50 19.95 3,920.18 0.00 0.00 1.50 29.93 1.50 29.93 0.76 195.00 3890.2505.09.02 CONCRETO F'c=140KG/CM2 PARA DADOS DE EMPALME M3 32.73 224.94 7,362.29 0.00 0.00 0.23 52.70 0.23 52.70 0.72 32.50 7309.5806 CONEXIONES DOMICILIARIAS

06.01 CONEX. DOMIC. DN 160/160MM ISO4435 S-20, L= 2.00M UND 118.00 202.14 23,852.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 118.00 23852.5206.02 CONEX. DOMIC. DN 200/160MM ISO4435 S-20, L= 3.50M UND 203.00 263.00 53,389.00 0.00 0.00 27.00 7101.00 27.00 7101.00 13.30 176.00 46288.0006.03 CONEX. DOMIC. DN 200/160MM ISO4435 S-20, L= 7.00M UND 213.00 351.90 74,954.70 0.00 0.00 30.00 10557.00 30.00 10557.00 14.08 183.00 64397.7007 PRUEBAS HIDRAULICAS

07.01 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4435 DN 160MM M 3,296.40 1.13 3,724.93 0.00 0.00 312.68 353.33 312.68 353.33 9.49 2983.72 3371.6007.02 PRUEBA HIDRAULICA DE TUBERIA PVC ISO4435 DN 200MM M 2,820.80 1.33 3,751.66 0.00 0.00 419.20 557.54 419.20 557.54 14.86 2401.60 3194.1308 ROTURA Y REPOSICION DE PAVIMENTO

08.01 ROTURA y REPOSICION DE PAVIMENTO FLEXIBLE EN FRIO M2 2,011.57 45.11 90,741.92 0.00 0.00 100.58 4537.16 100.58 4537.16 5.00 1910.99 86204.7609 ROTURA Y REPOSICION DE VEREDAS

09.01 ROTURA Y REPOSICION DE VEREDA CONCRETO f'c=140 kg/cm² M2 2,620.29 65.88 172,624.71 0.00 0.00 100.58 6626.21 100.58 6626.21 3.84 2519.71 165998.49

COSTO DIRECTO (A) 950,797.66 0.00 102,815.25 10.81% 102,815.25 10.81% 847,982.41GASTOS GENERALES + UTILIDADES 25% (B) 237,699.42 0.00 25,703.81 25,703.81 211,995.60

FR = 1.00000TOTAL (A+B)*FR 1,188,497.08 0.00 128,519.06 128,519.06 1,059,978.01

Page 22: Liquidacion Financiera

CORPORACION EL ROCIO

9500.00 5750.00 5750.00

1848.87

43743.19 5121.00

9037.76

16653.13

155959.42

0.00

32212.79

26134.83

141477.84

3205.63

177077.77 19341.42 19424.05

Page 23: Liquidacion Financiera

CORPORACION EL ROCIO

29.93

152196.22 17658.00

7476.59 910.87

90741.92 4537.16

172624.71 6626.21

950797.66 71426.40 102,815.25

Page 24: Liquidacion Financiera

CORPORACION EL ROCIO

0.00

0.00

0.00

0.00

0.00

0.00

Page 25: Liquidacion Financiera

CORPORACION EL ROCIO

0.00

0.00

0.00

Page 26: Liquidacion Financiera

CONTROL DE VALORIZACIONES

SUPERV. OBRA : CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA MONTO DE CONTRATO C/IGV S/. 79,100.17

A.D.S. : N° 106-2012-MDCGAL MONTO DE CONTRATO S/IGV S/. 67,034.04

LUGAR : JUNTA VECINAL VILLA SAN FRANCISCO PLAZO DE EJECUCCION CONTRAC. 120 DCENTIDAD : MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPA FECHA CONTRACT. INICIO 1/30/2013CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L FECHA TERMINO CONTRAC. 5/29/2013

SUPERVISOR : CONSORCIO MADAKA FECHA TERMINO VIGENTE 5/29/2013

JEFE DE SUPERVISION : ING. HECTOR CACERES CONTRERAS PLAZO DE EJECUCCION VIGENTE 120 DC

FECHA : Aug-13

VALORIZACION CONTRACTUAL AMORTIZACIONES (D) RETENCIONES (E) VALORIZACION PAGADA S/.SIAF

Comprob. de PagoVALORIZAC.

Nº Monto S/.NETA Penalidades Efectivo IGV TOTAL Nº

N(VN) PAGADOMES A B C=A+B VN=C-D VN-E 0.18*Vn (S/.)

FEBRERO 16,758.51 16,758.51 16,758.51 3,955.01 12,803.50 3,016.53 15,820.03 0122 CP00645-CP00647 3/19/2013MARZO 17,317.13 17,317.13 17,317.13 3,955.01 13,362.12 3,117.08 16,479.20 0122 CP01078-CP01080 4/10/2013ABRIL 16,758.51 16,758.51 16,758.51 0.00 16,758.51 3,016.53 19,775.04 0122 CP01640 5/16/2013MAYO 16,199.89 16,199.89 16,199.89 0.00 16,199.89 2,915.98 19,115.87 0122

TOTAL 67,034.04 0.00 67,034.04 0.00 0.00 67,034.04 7,910.02 0.00 59,124.02 12,066.13 71,190.14

Reajuste Concedido

Total Reajustado Adelanto.

DirectoS/IGV

Adelanto. Mater.S/IGV

Fiel Cumplimien

toS/IGV

Fecha de

Cobranza

Page 27: Liquidacion Financiera

COEFICIENTE DE REAJUSTE

A. D. P.No. : N° 106-2012-MDCGAL

O B R A : CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

CONTRATISTA : V&V CONTRATISTAS GENERALES S.R.L

SUPERVISOR : CONSORCIO MADAKA

FECHA : 41487

FORMULA 01 : S.DESAGUE

K = 0.210*(Mr /Mo ) + 0.167*(Tr /To ) + 0.142*(CAr /CAo ) + 0.055*(AMr /AMo ) + 0.140*(Mr /Mo ) + 0.286*(Ir /Io )

SIM- COEF. % SEPT'10

BO ELEMENTO REPRESENTATIVO INDICE Io ENERO'2011 FEB'2011 MZO'2011

LO INCID. INCID. IND.BASE K Ir K Ir K Ir K

M MANO DE OBRA (INC. LEYES SOC.) 47 0.210 100.00% 430.83 427.68 427.68 397.23

430.83 0.210 427.68 0.208 427.68 0.208 397.23 0.194

T TUBERIA PVC 73 0.167 100.00% 365.25 382.66 382.66 338.21

365.25 0.167 382.66 0.175 382.66 0.175 0.00 0.000

CA AGREGADO GRUESO 5 0.142 27.465% 210.97 211.97 211.97 507.48

CEMENTO PORTLAND TIPOV 23 0.142 72.535% 371.32 371.32 371.32 523.85

327.28 0.142 327.55 0.142 327.55 0.142 519.35 0.225

AM ACERO DE CONSTRUCCION CORRUGADO 3 0.055 61.818% 507.48 528.61 528.61 507.48MARCO Y TAPA DE FIERRO FUNDIDO 50 0.055 38.182% 633.95 633.55 633.55 523.85

555.77 0.055 568.68 0.056 568.68 0.056 519.35 0.225

M MAQUINARIA Y EQUIPO IMPORTADO 49 0.140 100.00% 239.56 238.94 238.94 347.34

239.56 0.140 238.94 0.140 238.94 0.140 347.34 0.280

I IND. GRAL. PRECIOS AL CONSUM. 39 0.286 100.00% 354.51 356.05 356.05 347.34

354.51 0.286 356.05 0.287 356.05 0.287 347.34 0.280

COEFICIENTE DE REAJUSTE: K = 1.000 1.008 1.008 1.111

Page 28: Liquidacion Financiera

COEFICIENTE DE REAJUSTE

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

AREA GEOGRAFICA:

ABR'2011

Ir K Ir

397.23

397.23 0.194

338.21

0.00 0.000

513.17

526.89

523.12 0.227

513.17

526.89

523.12 0.227

347.34

347.34 0.280

347.34

347.34 0.280

1.208

Page 29: Liquidacion Financiera

LIQUIDACION DE CONTRATO DE SUPERVISION DE OBRA

SUPERVISION DE OBRA :

UBICACIÓN : MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPAA.D.S. : N° 106-2012-MDCGALM.CONTRATO : S/. 79,100.17SISTEMA : SUMA ALZADAENTIDAD : MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPASUPERVISOR : CONSORCIO MADAKAFECHA : Aug-13

I.- AUTORIZADO Y PAGADODEBE HABER

1.1 AUTORIZADO1.1.1 Contrato Principal S/. 67,034.041.1.2 Reajuste del Contrato Principal S/. 0.001.1.3 IGV S/. 12,066.13

1.2 PAGADO1.2.1 Contrato Principal S/. 0.00 67,034.041.2.2 Reajuste del Contrato Principal S/. 0.00 0.001.1.3 IGV S/. 0.00 12,066.13

79,100.17 79,100.17

SALDO A FAVOR DEL CONTRATISTA 0.00En Efectivo 0.00En IGV S/. 0.00

II.- ADELANTOS

2.1 CONCEDIDOS2.1.1 Efectivo S/. 0.002.1.2 Materiales S/. 0.00

2.2 AMORTIZADOS2.2.1 Efectivo S/. 0.002.2.2 Materiales S/. 0.00

S/. 0.00 0.00

SALDO A FAVOR DEL CONTRATISTA S/. 0.00 0.00

III RETENCIONES

3.1 RETENIDOS3.1.1 Fiel Cumplimiento S/. 7,910.02

3.2 DEVUELTOS3.2.1 Devuelto

S/. 0.00 0.00

7,910.02 0.00

SALDO A FAVOR DEL CONTRATISTA S/. 7,910.02

IV PENALIDADES

4.1.0 RETENIDO4.1.1 Penalidad por Mora S/. 0.00

0.00SALDO A CARGO DEL CONTRATISTA S/. 0.00

V INTERESES

5.1.0 AUTORIZADO5.1.1 Valorizaciones S/.5.1.2 I.G.V S/. 0.00

5.2.0 PAGADO

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Page 30: Liquidacion Financiera

5.2.1 Valorizaciones S/.5.2.1 I.G.V S/. 0.00

0.00 0.00

SALDO A FAVOR DEL CONTRATISTA 0.00En Efectivo S/. 0.00En IGV S/. 0.00

VI MAYORES GASTOS GENERALES

6.1.0 AUTORIZADO5.1.1 M.G.G. Ampliacion de Plazo S/. 0.005.1.2 I.G.V S/. 0.00

6.2.0 PAGADO5.2.1 M.G.G. Ampliacion de Plazo S/. 0.005.2.1 I.G.V S/. 0.00

0.00 0.00

SALDO A FAVOR DEL CONTRATISTA 0.00En Efectivo S/. 0.00En IGV S/. 0.00

RESUMEN DE SALDOS

ITEM CONCEPTO A CARGO DELCONTRATISTA

I.- AUTORIZADO Y PAGADO S/. 0.00

II.- ADELANTOS S/. 0.00

III.- RETENCIONES S/. 7,910.02

IV.- PENALIDADES S/. 0.00V.- INTERESES S/. 0.00

VI. MAYORES GASTOS GENERALES S/. 0.00

TOTAL 7,910.02 0.00

SALDO A FAVOR DE LA SUPERVISION S/. 7,910.02

COSTO FINAL DE SUPERVISIONCONTRATO PRINCIPAL S/. 67,034.04REAJUSTES S/. 0.00INTERESES S/. 0.00MAYORES GASTOS GENERALES S/. 0.00IGV S/. 12,066.13

TOTAL S/. 79,100.17

A FAVOR DEL CONTRATISTA

Page 31: Liquidacion Financiera

RESUMEN DE VALORIZACIONES

SUPERVISION DE OBRA

A.D.S. N° 106-2012-MDCGALENTIDAD MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPASUPERVISION CONSORCIO MADAKAJEFE DE SUPERVISION ING. HECTOR CACERES CONTRERASMONTO CONTRATADO S/. 79,100.17 (C/IGV)

S/. 67,034.04 (S/IGV)

DESCRIPCIONVAL. Nº 01 VAL. Nº 02 VAL. Nº 03 VAL. Nº 04 VALORIZACION

February-13 March-13 April-13 May-13 ACUMULADA

A.- CONTRATO PRINCIPAL

Contrato Principal 16,758.51 17,317.13 16,758.51 16,199.89 67,034.04

Avance % 25.00% 25.83% 25.00% 24.17% 100%

Sub total (A) 16,758.51 17,317.13 16,758.51 16,199.89 67,034.04

B.- REAJUSTES0.00 0.00 0.00 0.00 0.00

Sub total (B) 0.00 0.00 0.00 0.00 0.00

VALORIZACION BRUTA(VB)= A+B 16,758.51 17,317.13 16,758.51 16,199.89 67,034.04

C.-AMORTIZACIONES ADELANTO DIRECTO 0.00 0.00 0.00 0.00 0.00Sub total (C) 0.00 0.00 0.00 0.00 0.00

VALORIZACION NETA(VN)= VB-C 16,758.51 17,317.13 16,758.51 16,199.89 67,034.04

D.- RETENCIONES

FIEL CUMPLIMIENTO (10%) 3,634.96 3,634.96 7,269.92

Sub total (D) 3,634.96 3,634.96 0.00 0.00 7,269.92

E.- PENALIDADESMORA EN TERMINO DE EJECUCION 0.00

Sub total (E) 0.00 0.00 0.00 0.00 0.00

F.- MONTO A PAGAREN EFECTIVO(VN-D) 13,123.55 13,682.17 16,758.51 16,199.89 59,764.12IGV 18 %(VN) 3,016.53 3,117.08 3,016.53 2,915.98 12,066.12

TOTAL 16,140.08 16,799.25 19,775.04 19,115.87 71,830.24

CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

Page 32: Liquidacion Financiera

CALENDARIO VALORIZADO DE AVANCE DE OBRA(RESUMEN)

OBRA CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

ENTIDAD MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN RESIDENTE ING. JOSE SAMANAMUD LOYOLA REGION TACNA

A.D.P. N° 003-2012-MDCGAL SUPERVISOR CONSORCIO MADAKA DEPARTAMENTO TACNA

SISTEMA SUMA ALZADA JEFE DE SUPERVISION ING. HECTOR CACERES CONTRERAS PROVINCIA TACNA

CONTRATISTA: V&V CONTRATISTAS GENERALES S.R.L MONTO CONTRACTUAL C/IGV S/. 1,318,336.20 DISTRITO CORONEL GREGORIO ALABARRACIN LANCHIPA

ACTA DE ENTREGA DE TERRENO: ###

FECHA INICIO PLAZO EJECUCION OBRA ###

FECHA DE TERMINO DE OBRA 41389: -280Ad de mmmm del yyyy

PLAZO DE EJECUCION 120 DC

ITEM D E S C R I P C I O NA V A N C E S

TOTALDICIEMBRE ENERO FEBRERO MARZO ABRIL

27 31 1 31 1 28 1 31 1 25

01 OBRAS PROVISIONALES 19,794.58 7,153.96 12,640.62 0.00 0.00 0.00 19,794.5802 TRABAJOS PRELIMINARES 51,567.59 0.00 47,367.58 1,842.37 1,994.24 363.40 51,567.5903 SEGURIDAD Y SALUD 24,540.15 864.48 6,916.06 6,246.58 6,915.86 3,597.17 24,540.1504 VEREDAS DE PIEDRA LAVADA 379,767.02 0.00 38,568.19 97,410.33 240,346.64 3,441.86 379,767.0205 OTROS 1,501.70 0.00 0.00 143.91 1,357.79 0.00 1,501.7006 BERMAS DE ADOQUINES DE CONCRETO 374,472.58 0.00 0.00 0.00 49,483.02 324,989.56 374,472.5807 JARDINERAS 22,965.00 0.00 0.00 0.00 0.00 22,965.00 22,965.0008 VARIOS 37,588.20 0.00 0.00 12,372.79 25,215.41 0.00 37,588.2009 MITIGACION DE IMPACTO AMBIENTAL 5,600.00 0.00 0.00 850.77 2,670.77 2,078.46 5,600.00

COSTO DIRECTO 917,796.82 8,018.44 105,492.45 118,866.75 327,983.73 357,435.45 917,797.01GASTOS GENERALES 11.73% 107,657.57 940.56 12,374.26 13,943.07 38,472.49 41,927.18 107,657.59UTILIDAD 10.00% 91,779.68 801.84 10,549.25 11,886.68 32,798.37 35,743.55 91,779.70SUB TOTAL 1,117,234.07 9,760.84 128,415.96 144,696.50 399,254.59 435,106.18 1,117,234.30FACTOR 1.00000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000

SUB TOTAL 1,117,234.07 9,760.84 128,415.96 144,696.50 399,254.59 435,106.18 1,117,234.30

T O T A L P R E S U P U E S T O 1,318,336.20 11,517.79 151,530.83 170,741.87 471,120.42 513,425.29 1,318,336.47AVANCE PROGRAMADO MENSUAL 0.87% 11.49% 12.95% 35.74% 38.94%

AVANCE PROGRAMADO ACUMULADO 0.87% 12.37% 25.32% 61.06% 100.00%

PRESUPUESTO Nuevos Soles

Page 33: Liquidacion Financiera

COMPARATIVO DE AVANCE DE OBRA

OBRA CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPAENTIDAD MUNICIPALIDAD DISTRITAL CORONEL GREGORIO ALBARRACIN LANCHIPASUPERVISOR CONSORCIO MADAKABASE S/. 1,318,336.20CONTRATO S/. 1,318,336.20JEFE DE SUPERVISI ING. HECTOR CACERES CONTRERASRESIDENTE ING. JOSE SAMANAMUD LOYOLA

PARTIDA DESCRIPCION UND PPTO

VALORIZACIONES EJECUTADAS VALORIZACIONES PROGRAMADAS

Nº 01 Nº 02 Nº03 Nº 04 Nº05 ENERO FEBRERO MARZO ABRIL MAYO

Jan-13 Feb-13 Mar-13 Apr-13 May-13 DEL 15 AL 31 DEL 1 AL 28 DEL 1 AL 31 DEL 1 AL 30 DEL 1 AL 14

01 OBRAS PROVISIONALES01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m U 680.28 - 680.28 - - - 680.28 - - - -

01.02 ALMACEN Y CASETA DE GUARDIANIA M2 4,614.30 2,307.15 2,307.15 - - - 4,614.30 - - - -

01.03 MOVILIZACION DE EQUIPOS Y HERRAMIENTAS GLB 8,500.00 1,700.00 2,550.00 2,125.00 1,275.00 850.00 1,859.38 6,640.62 - - -

01.04 SEÑALIZACION DESVIO EN VIAS GLB 6,000.00 600.00 1,800.00 1,500.00 1,500.00 600.00 - 6,000.00 - - -

02 TRABAJOS PRELIMINARES02.01 DEMOLICION DE VEREDAS Y BERMAS EXISTENTES E=.10M C/MARTILLO M2 26,091.13 2,880.48 10,492.20 12,258.71 459.74 - - 26,091.13 - - -

02.02 ACARREO DE MATERIAL EXC. MANUAL HASTA 30 M M3 4,246.26 468.74 2,406.52 1,302.45 68.55 - - 4,246.26 - - -

02.03 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE M3 4,279.93 472.48 1,248.62 2,010.86 - 547.97 - 4,279.93 - - -

02.04 LIMPIEZA DE TERRENO MANUAL M2 4,075.73 128.57 1,553.90 1,850.92 364.49 21.32 - 4,075.73 - - -

02.05 MANTENIMIENTO DE TRANSITO (CIERRE DE CALLES) U 1,514.52 126.21 504.84 504.84 252.42 126.21 - 338.79 385.51 426.82 363.40

02.06 TRAZO NIVELES Y REPLANTEO CON EQUIPO M2 8,238.18 259.87 3,140.86 3,741.22 736.74 43.09 - 8,238.18 - - -

02.07 CONTROL TOPOGRAFICO CON EQUIPO M2 3,121.84 - 1,190.22 1,417.73 377.67 16.33 - 97.56 1,456.86 1,567.42 -

03 SEGURIDAD Y SALUD03.01 ELABORACION DE PLAN DE SEGURIDAD GLB 8,000.00 - 8,000.00 - - - 281.82 2,254.55 2,036.36 2,254.55 1,172.72

03.02 EQUIPOS DE PROTECCION INDIVIDUAL U 8,263.50 - 5,509.00 2,754.50 - - 291.10 2,328.80 2,103.44 2,328.80 1,211.36

03.03 EQUIPOS DE PROTECCION COLECTIVA GLB 1,175.00 - 352.50 352.50 235.00 235.00 41.39 331.14 299.09 331.14 172.24

03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB 3,248.14 - 974.44 974.44 649.63 649.63 114.42 915.38 826.80 915.38 476.16

03.05 CAPACITACION SOBRE SALUD Y SEGURIDAD GLB 3,400.00 - 1,020.00 1,020.00 680.00 680.00 119.77 958.38 865.45 958.18 498.22

03.06 RECURSOS DE RESPUESTAS DE EMERGENCIA GLB 453.51 - 136.05 136.05 90.70 90.70 15.98 127.81 115.44 127.81 66.47

04 VEREDAS DE PIEDRA LAVADA04.01 MOVIMIENTO DE TIERRAS04.01.01 CORTE O EXCAVACION EN TERRENO SUELTO M3 30,807.46 - 12,393.15 13,432.47 2,498.87 401.58 - 30,807.46 - - -

04.01.02 CONFORMACION DE SUBRRASANTE-NIVELACION Y COMPACTADO M2 24,798.66 - 10,325.60 10,420.88 1,837.00 539.69 - 7,049.08 17,749.58 - -

04.01.03 EXCAVACION PARA SARDINEL SUMERGIDO (UÑA) M3 3,795.49 - 1,674.60 1,483.41 342.33 42.52 - 711.65 3,083.84 - -

04.01.04 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE M3 13,466.56 - 5,431.95 5,804.81 1,105.76 215.72 - - 13,466.56 - -

04.01.05 TERRAPLEN DE VEREDA E=0.10 m. M2 31,447.57 - 12,734.68 13,902.70 2,329.53 355.95 - - 31,251.02 196.55 -

04.02 CONCRETO SIMPLE04.02.01 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VEREDAS M2 39,507.48 - 17,826.15 18,532.58 - 141.37 - - 11,146.75 28,360.73 -

04.02.02 SARDINEL SUMERGIDO EN VEREDAS CONCRETO F'C=175 KG/CM2 M3 34,315.39 - 16,607.65 15,138.07 - 111.97 - - 3,523.46 30,791.93 -

04.02.03 SARDINEL SUMERGIDO EN MARTILLOS - CONCRETO F'C=175 KG/CM2 M3 4,142.88 - 451.57 - 3,276.50 301.92 - - 397.03 3,745.85 -

04.02.04 ENCOFRADO Y DESENCOFRADO DE MARTILLOS M2 4,487.28 - 487.61 - 3,548.31 328.39 - - 430.03 4,057.25 -

04.02.05 SARDINEL SUMERGIDO EN RAMPAS DE CONCRETO- CONCRETO F'C=140 KG M3 178.53 - 52.51 52.51 52.51 7.88 - - 18.33 160.20 -

04.02.06 VEREDA DE PIEDRA LAVADA Y RAMPAS COLOREADO C/BRUÑAS F'C=175Kg/ M2 165,064.89 - 67,512.20 84,859.58 - 817.47 - - 15,308.44 149,756.45 -

04.02.07 MARTILLO DE PIEDRA LAVADA F'C=140 Kg/cm2 E=4" M2 17,116.78 - 1,862.69 - 13,534.57 1,250.60 - - 1,035.29 16,081.49 -

04.02.08 JUNTAS DE DILATACION RELLENAS CON MEZCLA ASFALTICA EN VEREDAS M 4,731.67 - - - 3,843.00 660.65 - - - 3,726.19 1,005.48

04.02.09 PINTURA TRAFICO LINEAL EN BORDE DE VEREDA A= 0.15 M M 5,906.38 - - - - 5,491.44 - - - 3,470.00 2,436.38

05 OTROS05.01 CURADO DE VEREDAS CON ADITIVOS M2 1,501.70 - 614.20 772.02 - 3.17 - - 143.91 1,357.79 -

06 BERMAS DE ADOQUINES DE CONCRETO06.01 MOVIMIENTO DE TIERRAS06.01.01 CORTE EN BERMAS C/EQUIPO M3 6,937.76 - 2,146.63 4,204.17 250.49 - - - - 6,937.76 -

06.01.02 PERFILADO ,NIVELADO Y COMPACTADO DE SUB-RASANTE EN BERMAS M2 9,100.00 - - 5,170.82 3,487.84 - - - - 9,100.00 -

06.01.03 EXCAVACION DE ZANJA PARA SARDINEL(UÑA) M3 1,888.56 - - 444.37 1,332.00 -0.27 - - - 1,888.56 -

06.01.04 ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE M3 11,674.44 - - 6,802.11 4,298.18 -0.09 - - - 10,020.56 1,653.88

06.01.05 TERRAPLEN DE BERMAS E=0.15 M M2 31,768.03 - - 8,240.18 15,278.74 6,708.40 - - - 15,486.91 16,281.12

06.02 ADOQUINADO EN BERMAS06.02.01 LIMPIEZA DE TERRENO MANUAL M2 4,672.97 - - 1,212.11 2,247.45 986.78 - - - - 4,672.97

06.02.02 SARDINEL: CONCRETO F'C=175KG/CM2 M3 19,211.90 - - - 18,070.63 -2.79 - - - 2,401.49 16,810.41

06.02.03 ENCOFRADO Y DESENCOFRADO PARA SARDINEL DE EMPOTRAMIENTO HAS M2 19,031.67 - - - 17,899.72 - - - - 3,647.74 15,383.93

Page 34: Liquidacion Financiera

PARTIDA DESCRIPCION UND PPTO

VALORIZACIONES EJECUTADAS VALORIZACIONES PROGRAMADAS

Nº 01 Nº 02 Nº03 Nº 04 Nº05 ENERO FEBRERO MARZO ABRIL MAYO

Jan-13 Feb-13 Mar-13 Apr-13 May-13 DEL 15 AL 31 DEL 1 AL 28 DEL 1 AL 31 DEL 1 AL 30 DEL 1 AL 14

06.02.04 SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO EN BERMAS M2 264,555.91 - - - 145,505.75 106,219.61 - - - - 264,555.91

06.02.05 PINTURA TRAFICO LINEAL EN SARDINEL LATERAL A= 0.15 M M 5,631.34 - - - - 5,305.56 - - - - 5,631.34

07 JARDINERAS07.01 JARDINERA PREFABRICADA INC/TIERRA Y ARBOLES U 22,965.00 - - - 6,889.50 14,467.95 - - - - 22,965.00

08 VARIOS08.01 REUBICACION DE CAJA DE MEDIDOR U 16,592.37 - 9,031.29 6,300.90 980.14 140.02 - - 5,461.66 11,130.71 -

08.02 REUBICACION DE CAJA DE REGISTRO U 20,995.83 - 11,428.11 7,973.10 1,151.67 354.36 - - 6,911.13 14,084.70 -

09 MITIGACION DE IMPACTO AMBIENTAL09.01 MITIGACION DE IMPACTO AMBIENTAL GLB 5,600.00 560.00 1,680.00 1,680.00 560.00 1,120.00 - - 850.77 2,670.77 2,078.46

COSTO DIRECTO 917,796.82 9,503.50 216,127.17 238,376.01 257,010.43 149,830.10 8,018.44 105,492.45 118,866.75 327,983.73 357,435.45

GASTOS GENERALES (11.73%) 107,657.57 1,114.76 25,351.72 27,961.51 30,147.32 17,575.07 940.56 12,374.26 13,943.07 38,472.49 41,927.18

UTILIDADES (10%) 91,779.68 950.35 21612.72 23837.60 25701.04 14983.01 801.84 10549.25 11886.68 32798.37 35743.55

SUB TOTAL 1,117,234.07 11,568.61 263,091.61 290,175.12 312,858.79 182,388.18 9,760.84 128,415.96 144,696.50 399,254.59 435,106.18

FACTOR DE RELACION 1.00000 1.00 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000

SUB TOTAL 1,117,234.07 11,568.61 263,091.61 290,175.12 312,858.79 182,388.18 9,760.84 128,415.96 144,696.50 399,254.59 435,106.18

IGV (18%) 201,102.13 2082.35 47356.49 52231.52 56314.58 32829.87 1756.95 23114.87 26045.37 71865.83 78319.11

PRESUPUESTO TOTAL 1,318,336.20 13,650.96 310,448.10 342,406.64 369,173.37 215,218.05 11,517.79 151,530.83 170,741.87 471,120.42 513,425.29

AVANCE PARCIAL 1.04% 23.55% 25.97% 28.00% 16.32% 0.87% 11.49% 12.95% 35.74% 38.94%AVANCE ACUMULADO 1.04% 24.58% 50.56% 78.56% 94.88% 0.87% 12.37% 25.32% 61.06% 100.00%

Page 35: Liquidacion Financiera

VAL DESCRIPCION

AVANCES(S/IGV)AVANCE ACUMULADO%

PROGRAMADO EJECUTADO

MES ACUMULADO MES ACUMULADO PROGRAMADOEJECUTADO

OBRAS PROVISIONALES 7,153.96 7,153.96 4,607.15 4,607.15 0.78% 0.50%

TRABAJOS PRELIMINARES 0.00 0.00 4,336.35 4,336.35 0.00% 0.47%

Dec-12 SEGURIDAD Y SALUD 864.48 864.48 0.00 0.00 0.09% 0.00%

VEREDAS DE PIEDRA LAVADA 0.00 0.00 0.00 0.00 0.00% 0.00%

OTROS 0.00 0.00 0.00 0.00 0.00% 0.00%

BERMAS DE ADOQUINES DE CON 0.00 0.00 0.00 0.00 0.00% 0.00%

JARDINERAS 0.00 0.00 0.00 0.00 0.00% 0.00%

VARIOS 0.00 0.00 0.00 0.00 0.00% 0.00%

MITIGACION DE IMPACTO AMBIE 0.00 0.00 560.00 560.00 0.00% 0.06%

8,018.44 8,018.44 9,503.50 9,503.50 0.87% 1.04%

OBRAS PROVISIONALES 12,640.62 19,794.58 7,337.43 11,944.58 2.16% 1.30%

TRABAJOS PRELIMINARES 47,367.58 47,367.58 20,537.16 24,873.51 5.16% 2.71%

SEGURIDAD Y SALUD 6,916.06 7,780.54 15,991.99 15,991.99 0.85% 1.74%

VEREDAS DE PIEDRA LAVADA 38,568.19 38,568.19 147,360.36 147,360.36 4.20% 16.06%

Jan-13 OTROS 0.00 0.00 614.20 614.20 0.00% 0.07%

BERMAS DE ADOQUINES DE CON 0.00 0.00 2,146.63 2,146.63 0.00% 0.23%

JARDINERAS 0.00 0.00 0.00 0.00 0.00% 0.00%

VARIOS 0.00 0.00 20,459.40 20,459.40 0.00% 2.23%

MITIGACION DE IMPACTO AMBIE 0.00 0.00 1,680.00 2,240.00 0.00% 0.24%

105,492.45 113,510.89 216,127.17 225,630.67 12.37% 24.58%

OBRAS PROVISIONALES 0.00 19,794.58 3,625.00 15,569.58 2.16% 1.70%

TRABAJOS PRELIMINARES 1,842.37 49,209.95 23,086.73 47,960.24 5.36% 5.23%

Feb-13 SEGURIDAD Y SALUD 6,246.58 14,027.12 5,237.49 21,229.48 1.53% 2.31%

VEREDAS DE PIEDRA LAVADA 97,410.33 135,978.52 163,627.01 310,987.37 14.82% 33.88%

OTROS 143.91 143.91 772.02 1,386.22 0.02% 0.15%

BERMAS DE ADOQUINES DE CON 0.00 0.00 26,073.76 28,220.39 0.00% 3.07%

JARDINERAS 0.00 0.00 0.00 0.00 0.00% 0.00%

VARIOS 12,372.79 12,372.79 14,274.00 34,733.40 1.35% 3.78%

MITIGACION DE IMPACTO AMBIE 850.77 850.77 1,680.00 3,920.00 0.09% 0.43%

118,866.75 232,377.64 238,376.01 464,006.68 25.32% 50.56%

OBRAS PROVISIONALES 0.00 19,794.58 2,775.00 18,344.58 2.16% 2.00%

TRABAJOS PRELIMINARES 1,994.24 51,204.19 2,259.61 50,219.85 5.58% 5.47%

Mar-13 SEGURIDAD Y SALUD 6,915.86 20,942.98 1,655.33 22,884.81 2.28% 2.49%

VEREDAS DE PIEDRA LAVADA 240,346.64 376,325.16 32,368.38 343,355.75 41.00% 37.41%

OTROS 1,357.79 1,501.70 0.00 1,386.22 0.16% 0.15%

BERMAS DE ADOQUINES DE CON 49,483.02 49,483.02 208,370.80 236,591.19 5.39% 25.78%

JARDINERAS 0.00 0.00 6,889.50 6,889.50 0.00% 0.75%

VARIOS 25,215.41 37,588.20 2,131.81 36,865.21 4.10% 4.02%

MITIGACION DE IMPACTO AMBIE 2,670.77 3,521.54 560.00 4,480.00 0.38% 0.49%

327,983.73 560,361.37 257,010.43 721,017.11 61.06% 78.56%

OBRAS PROVISIONALES 0.00 19,794.58 1,450.00 19,794.58 2.16% 2.16%

TRABAJOS PRELIMINARES 363.40 51,567.59 754.92 50,974.77 5.62% 5.55%

Apr-13 SEGURIDAD Y SALUD 3,597.17 24,540.15 1,655.33 24,540.14 2.67% 2.67%

VEREDAS DE PIEDRA LAVADA 3,441.86 379,767.02 10,667.15 354,022.90 41.38% 38.57%

OTROS 0.00 1,501.70 3.17 1,389.39 0.16% 0.15%

BERMAS DE ADOQUINES DE CON 324,989.56 374,472.58 119,217.20 355,808.39 40.80% 38.77%

JARDINERAS 22,965.00 22,965.00 14,467.95 21,357.45 2.50% 2.33%

VARIOS 0.00 37,588.20 494.38 37,359.59 4.10% 4.07%

MITIGACION DE IMPACTO AMBIE 2,078.46 5,600.00 1,120.00 5,600.00 0.61% 0.61%

357,435.45 917,796.82 149,830.10 870,847.21 100.00% 94.88%

Page 36: Liquidacion Financiera

RESUMEN COMPARATIVO MENSUAL

OBRA CONSTRUCCION DE VEREDAS Y BERMAS EN LA JUNTA VECINAL VILLA SAN FRANCISCO, DISTRITO CORONEL GREGORIO ALBARRACÍN LANCHIPA

ENTIDAD MUNICIPALIDAD DISTRITAL CORONEL RESIDENTE ING. JOSE SAMANAMUD LOYOLA

A.D.P. N° 003-2012-MDCGAL SUPERVISOR CONSORCIO MADAKA REGION TACNA

SISTEMA SUMA ALZADA JEFE DE SUPERVISION ING. HECTOR CACERES CONTRERAS DEPARTAMENTO TACNA

CONTRATISTA: CONSORCIO VIAL NORIEGA MONTO CONTRACTUAL C/IGV S/. 1,318,336.20 PROVINCIA TACNA

ACTA DE ENTREGA DE TERRENO: ### DISTRITO CORONEL GREGORIO ALABARRACIN LANCHIPA

FECHA INICIO DE OBRA ###

FECHA DE TERMINO DE OBRA ###

PLAZO DE EJECUCION : 120 días calendarios

ITEM D E S C R I P C I O N

A V A N C E S

DICIEMBRE 2012 ENERO 2013 FEBRERO 2013 MARZO 2013 ABRIL 2013

PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO PROGRAMADO EJECUTADO

DEL 27 AL 31 DEL 1 AL 31 DEL 1 AL 28 DEL 1 AL 31 DEL 1 AL 25

01 OBRAS PROVISIONALES 19,794.58 7,153.96 4,607.15 12,640.62 7,337.43 0.00 3,625.00 0.00 2,775.00 0.00 1,450.0002 TRABAJOS PRELIMINARES 51,567.59 0.00 4,336.35 47,367.58 20,537.16 1,842.37 23,086.73 1,994.24 2,259.61 363.40 754.9203 SEGURIDAD Y SALUD 24,540.15 864.48 0.00 6,916.06 15,991.99 6,246.58 5,237.49 6,915.86 1,655.33 3,597.17 1,655.3304 VEREDAS DE PIEDRA LAVADA 379,767.02 0.00 0.00 38,568.19 147,360.36 97,410.33 163,627.01 240,346.64 32,368.38 3,441.86 10,667.1505 OTROS 1,501.70 0.00 0.00 0.00 614.20 143.91 772.02 1,357.79 0.00 0.00 3.1706 BERMAS DE ADOQUINES DE CONCRETO 374,472.58 0.00 0.00 0.00 2,146.63 0.00 26,073.76 49,483.02 208,370.80 324,989.56 119,217.2007 JARDINERAS 22,965.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,889.50 22,965.00 14,467.9508 VARIOS 37,588.20 0.00 0.00 0.00 20,459.40 12,372.79 14,274.00 25,215.41 2,131.81 0.00 494.3809 MITIGACION DE IMPACTO AMBIENTAL 5,600.00 0.00 560.00 0.00 1,680.00 850.77 1,680.00 2,670.77 560.00 2,078.46 1,120.00

COSTO DIRECTO 917,796.82 8,018.44 9,503.50 105,492.45 216,127.17 118,866.75 238,376.01 327,983.73 257,010.43 357,435.45 149,830.10GASTOS GENERALES 11.73% 107,657.57 940.56 1,114.76 12,374.26 25,351.72 13,943.07 27,961.51 38,472.49 30,147.32 41,927.18 17,575.07UTILIDAD 10.00% 91,779.68 801.84 950.35 10,549.25 21,612.72 11,886.68 23,837.60 32,798.37 25,701.04 35,743.55 14,983.01SUB TOTAL 1,117,234.07 9,760.84 11,568.61 128,415.96 263,091.61 144,696.50 290,175.12 399,254.59 312,858.79 435,106.18 182,388.18FACTOR 1.00000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000 1.000000SUB TOTAL 1,117,234.07 9,760.84 11,568.61 128,415.96 263,091.61 144,696.50 290,175.12 399,254.59 312,858.79 435,106.18 182,388.18T O T A L P R E S U P U E S T O 1,318,336.20 11,517.79 13,650.96 151,530.83 310,448.10 170,741.87 342,406.64 471,120.42 369,173.37 513,425.29 215,218.05AVANCE PROGRAMADO MENSUAL 0.87% 11.49% 12.95% 35.74% 38.94%AVANCE PROGRAMADO ACUMULADO 0.87% 12.37% 25.32% 61.06% 100.00%AVANCE EJECUTADO MENSUAL 1.04% 23.55% 25.97% 28.00% 16.32%AVANCE EJECUTADO ACUMULADO 1.04% 24.58% 50.56% 78.56% 94.88%

PRESUPUESTO Nuevos Soles

Page 37: Liquidacion Financiera

ENSAYOS DE DENSIDAD DE CAMPO

LADO DESCRIPCION FECHA MATERIAL LABORATORIO

01 0+104 DERECHA CALLE LOS OLIVOS 1/8/2013 95.10% Sub rasante-Vereda V & V02 0+268 IZQUIERDA CALLE LOS OLIVOS 1/8/2013 97.90% Sub rasante-Vereda V & V03 0+187 DERECHA CALLE JUAN PABLO II 1/15/2013 97.80% Sub rasante-Vereda V & V04 0+040 IZQUIERDA CALLE JUAN PABLO II 1/16/2013 97.60% Sub rasante-Vereda V & V05 0+104 DERECHA CALLE SAN LUCAS 1/17/2013 97.10% Sub rasante-Vereda V & V06 0+090 DERECHA CALLE A. LEGUIA 1/18/2013 95.90% Sub rasante-Vereda V & V07 0+110 IZQUIERDA CALLE A. LEGUIA 1/19/2013 97.70% Sub rasante-Vereda V & V08 0+120 DERECHA CALLE LOS OLIVOS 1/10/2013 95.70% Base Granular-Vereda V & V09 0+268 IZQUIERDA CALLE LOS OLIVOS 1/14/2013 95.70% Base Granular-Vereda V & V10 0+205 IZQUIERDA CALLE JUAN PABLO 1/21/2013 96.30% Base Granular-Vereda V & V11 0+040 IZQUIERDA CALLE SAN LUCAS 1/21/2013 97.50% Base Granular-Vereda V & V12 0+117 IZQUIERDA CALLE A. LEGUIA 1/21/2013 97.20% Base Granular-Vereda V & V13 0+145 DERECHA CALLE A. LEGUIA 1/21/2013 98.80% Base Granular-Vereda V & V14 0+110 DERECHA CALLE LOS ALAMOS 1/24/2013 98.80% Base Granular-Vereda V & V15 0+189 DERECHA CALLE LOS ALAMOS 1/24/2013 98.90% Base Granular-Vereda V & V16 0+018 DERECHA CALLE LOS OLIVOS 1/10/2013 95.10% Base Granular-Vereda V & V17 0+020 IZQUIERDA CALLE LOS OLIVOS 1/10/2013 95.30% Base Granular-Vereda V & V18 0+100 DERECHA CALLE LOS OLIVOS 1/11/2013 100.70% Base Granular-Vereda V & V19 0+100 IZQUIERDA CALLE LOS OLIVOS 1/11/2013 99.10% Base Granular-Vereda V & V20 0+142 IZQUIERDA CALLE A. LEGUIA 1/21/2013 96.00% Base Granular-Vereda V & V21 0+200 DERECHA CALLE JUAN PABLO II 1/22/2013 100.40% Base Granular-Vereda V & V22 0+200 IZQUIERDA CALLE JUAN PABLO II 1/22/2013 99.10% Base Granular-Vereda V & V23 0+160 DERECHA CALLE LOS CIPRESES 1/26/2013 96.00% Base Granular-Vereda V & V24 0+065 DERECHA CALLE JUAN PABLO II 1/28/2013 98.50% Base Granular-Vereda V & V25 0+080 IZQUIERDA CALLE JUAN PABLO II 1/23/2013 98.90% Base Granular-Vereda V & V26 0+050 DERECHA CALLE SAN ANDRES 1/31/2013 99.70% Base Granular-Vereda V & V27 0+200 DERECHA CALLE LOS CIPRESES 1/31/2013 99.80% Base Granular-Vereda V & V28 0+055 DERECHA CALLE LOS CIPRESES 2/6/2013 97.60% Sub rasante-Vereda V & V29 0+085 DERECHA CALLE LOS CIPRESES 2/6/2013 97.00% Sub rasante-Vereda V & V30 0+077 DERECHA CALLE IGNACIO CASTRO 2/7/2013 98.00% Sub rasante-Vereda V & V31 0+080 IZQUIERDA CALLE LOS CIPRESES 2/9/2013 97.40% Sub rasante-Vereda V & V32 0+020 IZQUIERDA CALLE IGNACIO CASTRO 2/12/2013 96.00% Sub rasante-Vereda V & V33 0+170 IZQUIERDA CALLE LOS CIPRESES 2/14/2013 101.90% Sub rasante-Vereda V & V34 0+020 DERECHA CALLE A. LEGUIA 2/15/2013 95.20% Sub rasante-Vereda V & V35 0+254 IZQUIERDA CALLE A. LEGUIA 2/16/2013 95.10% Sub rasante-Vereda V & V36 0+018 DERECHA CALLE LOS ALAMOS 2/21/2013 98.00% Sub rasante-Vereda V & V37 0+105 IZQUIERDA CALLE LOS ALAMOS 2/21/2013 98.70% Sub rasante-Vereda V & V38 0+040 IZQUIERDA CALLE JOSE OBRERO 2/6/2013 96.30% Base Granular-Vereda V & V39 0+080 IZQUIERDA CALLE IGNACIO CASTRO 2/6/2013 95.90% Base Granular-Vereda V & V40 0+043 DERECHA CALLE LOS CIPRESES 2/8/2013 96.30% Base Granular-Vereda V & V41 0+080 DERECHA CALLE LOS CIPRESES 2/9/2013 96.30% Base Granular-Vereda V & V42 0+160 DERECHA CALLE IGNACIO CASTRO 2/11/2013 96.60% Base Granular-Vereda V & V43 0+050 DERECHA CALLE IGNACIO CASTRO 2/12/2013 95.30% Base Granular-Vereda V & V44 0+022 IZQUIERDA CALLE IGNACIO CASTRO 2/13/2013 102.70% Base Granular-Vereda V & V45 0+035 DERECHA CALLE LOS CIPRESES 2/14/2013 102.60% Base Granular-Vereda V & V46 0+080 DERECHA CALLE LOS CIPRESES 2/14/2013 95.30% Base Granular-Vereda V & V47 0+150 IZQUIERDA CALLE LOS CIPRESES 2/15/2013 97.50% Base Granular-Vereda V & V48 0+020 DERECHA CALLE A. LEGUIA 2/20/2013 98.10% Base Granular-Vereda V & V49 0+025 IZQUIERDA CALLE A. LEGUIA 2/21/2013 98.40% Base Granular-Vereda V & V50 0+260 IZQUIERDA CALLE LOS CIPRESES 2/21/2013 98.90% Base Granular-Vereda V & V51 0+020 DERECHA CALLE IGNACIO CASTRO 3/1/2013 98.90% Sub rasante-Bermas V & V52 0+100 DERECHA CALLE IGNACIO CASTRO 3/1/2013 98.50% Sub rasante-Bermas V & V53 0+160 DERECHA CALLE IGNACIO CASTRO 3/1/2013 98.30% Sub rasante-Bermas V & V54 0+020 IZQUIERDA CALLE IGNACIO CASTRO 3/4/2013 97.90% Sub rasante-Bermas V & V55 0+080 IZQUIERDA CALLE IGNACIO CASTRO 3/4/2013 97.70% Sub rasante-Bermas V & V56 0+160 IZQUIERDA CALLE IGNACIO CASTRO 3/7/2013 97.20% Sub rasante-Bermas V & V57 0+200 IZQUIERDA CALLE IGNACIO CASTRO 3/7/2013 96.90% Sub rasante-Bermas V & V58 0+030 IZQUIERDA CALLE LOS CIPRESES 3/7/2013 97.50% Sub rasante-Bermas V & V59 0+080 IZQUIERDA CALLE LOS CIPRESES 3/7/2013 97.40% Sub rasante-Bermas V & V60 0+020 DERECHA CALLE LOS ALAMOS 3/15/2013 95.90% Sub rasante-Bermas V & V61 0+080 DERECHA CALLE LOS ALAMOS 3/14/2013 99.10% Sub rasante-Bermas V & V62 0+160 DERECHA CALLE LOS ALAMOS 3/14/2013 96.80% Sub rasante-Bermas V & V63 0+200 DERECHA CALLE LOS ALAMOS 3/15/2013 96.30% Sub rasante-Bermas V & V64 0+030 DERECHA CALLE LOS CIPRESES 3/16/2013 96.70% Sub rasante-Bermas V & V

N° DE PUNTO

PROGRESIVA

% DE COMPACTACION

Page 38: Liquidacion Financiera

LADO DESCRIPCION FECHA MATERIAL LABORATORION° DE

PUNTOPROGRESIVA

% DE COMPACTACION

65 0+085 DERECHA CALLE LOS CIPRESES 3/16/2013 95.50% Sub rasante-Bermas V & V66 0+020 DERECHA CALLE A. LEGUIA 3/18/2013 96.30% Sub rasante-Bermas V & V67 0+020 IZQUIERDA CALLE A. LEGUIA 3/18/2013 96.00% Sub rasante-Bermas V & V68 0+260 IZQUIERDA CALLE LOS CIPRESES 3/18/2013 96.60% Sub rasante-Bermas V & V69 0+020 DERECHA CALLE IGNACIO CASTRO 3/5/2013 101.00% Base Granular-Bermas V & V70 0+090 DERECHA CALLE IGNACIO CASTRO 3/5/2013 100.90% Base Granular-Bermas V & V71 0+160 DERECHA CALLE IGNACIO CASTRO 3/5/2013 101.40% Base Granular-Bermas V & V72 0+020 IZQUIERDA CALLE IGNACIO CASTRO 3/6/2013 101.00% Base Granular-Bermas V & V73 0+050 IZQUIERDA CALLE IGNACIO CASTRO 3/6/2013 102.10% Base Granular-Bermas V & V74 0+040 IZQUIERDA CALLE LOS CIPRESES 3/11/2013 101.30% Base Granular-Bermas V & V75 0+080 IZQUIERDA CALLE LOS CIPRESES 3/11/2013 100.70% Base Granular-Bermas V & V76 0+158 IZQUIERDA CALLE IGNACIO CASTRO 3/14/2013 101.50% Base Granular-Bermas V & V77 0+212 IZQUIERDA CALLE IGNACIO CASTRO 3/15/2013 101.90% Base Granular-Bermas V & V78 0+086 DERECHA CALLE LOS ALAMOS 3/18/2013 100.90% Base Granular-Bermas V & V79 0+152 DERECHA CALLE LOS ALAMOS 3/18/2013 101.70% Base Granular-Bermas V & V80 0+218 DERECHA CALLE LOS ALAMOS 3/18/2013 102.30% Base Granular-Bermas V & V81 0+022 DERECHA CALLE LOS ALAMOS 3/21/2013 101.00% Base Granular-Bermas V & V82 0+036 DERECHA CALLE LOS CIPRESES 3/21/2013 101.50% Base Granular-Bermas V & V83 0+082 DERECHA CALLE LOS CIPRESES 3/22/2013 101.70% Base Granular-Bermas V & V

84 MZA 101 *** CALLE A. LEGUIA 4/2/2013 100.00% Sub rasante-Bermas V & V

85 MZA 100 *** CALLE A. LEGUIA 4/2/2013 100.40% Sub rasante-Bermas V & V

86 MZA 103 *** CALLE A. LEGUIA 4/2/2013 99.90% Sub rasante-Bermas V & V

87 MZA 105 *** CALLE A. LEGUIA 4/2/2013 100.70% Sub rasante-Bermas V & V88 MZA 11 *** CALLE IGNACIO CASTRO 4/5/2013 100.00% Sub rasante-Bermas V & V89 MZA 11 *** CALLE IGNACIO CASTRO 4/5/2013 100.40% Sub rasante-Bermas V & V90 MZA 96 *** CALLE A. LEGUIA 4/3/2013 100.20% Base Granular-Bermas V & V91 MZA 97 *** CALLE A. LEGUIA 3/4/2013 100.40% Base Granular-Bermas V & V

92 MZA 101 *** CALLE A. LEGUIA 4/4/2013 101.40% Base Granular-Bermas V & V

93 MZA 100 *** CALLE A. LEGUIA 4/5/2013 100.80% Base Granular-Bermas V & V

94 MZA 103 *** CALLE A. LEGUIA 4/5/2013 101.00% Base Granular-Bermas V & V

95 MZA 105 *** CALLE A. LEGUIA 4/5/2013 101.10% Base Granular-Bermas V & V96 MZA 1 *** CALLE IGNACIO CASTRO 4/8/2013 100.80% Base Granular-Bermas V & V97 MZA 11 *** CALLE IGNACIO CASTRO 4/8/2013 101.00% Base Granular-Bermas V & V

Page 39: Liquidacion Financiera

ENSAYOS DE COMPRESION DE PROBETAS DE CONCRETO

DESCRIPCION F'C=Kg/cm2 EDAD (dias) AREA LECTURA LAB.

1 VEREDA CALLE SAN LUCAS C 1 175 1/25/2013 2/6/2013 12 176.7 43546 246.43 140.82% UNJBG

2 VEREDA CALLE LOS OLIVOS 175 1/16/2013 2/6/2013 21 181.5 47174 259.98 148.56% UNJBG

3 VEREDA LOS OLIVOS CUADRA 6 175 1/18/2013 2/6/2013 19 181.5 36515 201.24 114.99% UNJBG

4 VEREDA A.B. LEGUIA 175 1/21/2013 2/6/2013 16 181.5 31979 176.24 100.71% UNJBG

5 A.B. LEGUIA CDR. II LADO IZQUIERDO 175 1/22/2013 2/6/2013 15 181.5 45814 252.49 144.28% UNJBG

6 VEREDA A.B. LEGUIA 175 1/23/2013 2/6/2013 14 181.5 42412 233.74 133.57% UNJBG

7 VEREDA CALLE JUAN PABLO II 175 1/24/2013 2/6/2013 13 181.5 32432 178.74 102.14% UNJBG

8 VEREDA CALLE SAN LUCAS C 1 175 1/25/2013 2/6/2013 12 183.9 49442 268.93 153.67% UNJBG

9 VEREDA CALLE JUAN PABLO II 175 1/26/2013 2/6/2013 11 183.9 40597 220.82 126.18% UNJBG

10 VEREDA CRISTOBAL COLON 175 1/28/2013 2/6/2013 9 181.5 35608 196.24 112.14% UNJBG

11 VEREDA CRISTOBAL COLON 175 1/30/2013 2/6/2013 7 176.7 32886 186.10 106.34% UNJBG

12 VEREDA SAN ANDRES 175 1/31/2013 2/6/2013 6 181.5 31979 176.24 100.71% UNJBG

13 VEREDA LOS OLIVOS 175 1/12/2013 2/18/2013 37 181 43546 239.99 137.14% UNJBG

14 VEREDA LOS OLIVOS CUADRA 6 175 1/8/2013 2/18/2013 41 177 31072 175.84 100.48% UNJBG

15 VEREDA LOS OLIVOS 175 1/14/2013 2/18/2013 35 184 34474 187.51 107.15% UNJBG

16 VEREDA LOS OLIVOS DER. 0+080 175 1/15/2013 2/18/2013 34 177 33340 188.67 107.81% UNJBG

17 VEREDA LADO IZQ. 0+090 175 1/16/2013 2/18/2013 33 177 47628 269.53 154.02% UNJBG

18 VEREDA LOS OLIVOS LADO IZQUIERDO 0+320 175 1/19/2013 2/18/2013 30 181 53978 297.48 169.99% UNJBG

19 VEREDA LOS OLIVOS LADO DERECHO 0+140 175 1/17/2013 2/18/2013 32 181 52618 289.99 165.71% UNJBG

20 VEREDA LADO IZQ. LEGUIA0+200 175 1/21/2013 2/18/2013 28 184 43092 234.39 133.94% UNJBG

21 VEREDA LADO DER. PROG. 0+015 SAN ANDRES 175 2/1/2013 2/18/2013 17 181 43772 241.23 137.85% UNJBG

22 VEREDA LADO IZQ. PROG. 0+040 J OBRERO 175 2/7/2013 2/18/2013 11 184 36288 197.38 112.79% UNJBG

23 VEREDA LADO DER. PROG. 0+035 C. SAN ANDRES 175 2/8/2013 2/18/2013 10 177 42638 241.29 137.88% UNJBG

24 VEREDA LADO IZQ. 0+080 IGNACIO CASTRO 175 2/9/2013 2/18/2013 9 181 37876 208.74 119.28% UNJBG

25 VEREDA LOS OLIVOS DER. 0+020 175 1/12/2013 3/6/2013 53 177 66226 374.77 214.16% UNJBG

26 VEREDA A.B. LEGUIA IZQ 0+120 175 1/22/2013 3/6/2013 43 177 52618 297.76 170.15% UNJBG

27 VEREDA A.B. LEGUIA IZQ 0+160 175 1/23/2013 3/6/2013 42 179 51710 288.75 165.00% UNJBG

28 VEREDAS J PABLO II IZQ 0+170 175 1/24/2013 3/6/2013 41 179 44906 250.76 143.29% UNJBG

29 VEREDAS SAN LUCAS IZQ. 0+060 175 1/25/2013 3/6/2013 40 179 66226 369.81 211.32% UNJBG

30 VEREDA LOS CIPRESES DER. 0+160 175 1/26/2013 3/6/2013 39 179 51710 288.75 165.00% UNJBG

31 VEREDA C. COLON IZQ. 0+060 175 1/28/2013 3/6/2013 37 179 58968 329.28 188.16% UNJBG

32 VEREDA SAN ANDRES IZQ. 0+045 175 1/31/2013 3/6/2013 34 179 53071 296.35 169.34% UNJBG

33 VEREDA JOSE OBRERO IZQ. 0+040 175 2/7/2013 3/6/2013 27 177 42412 240.01 137.15% UNJBG

34 VEREDAS IGNACIO CASTRO 0+080 175 2/9/2013 3/6/2013 25 177 44453 251.56 143.75% UNJBG

35 VEREDA LADO IZQ. 0+180 LOS CIPRESES 175 2/18/2013 3/11/2013 21 174 35834 205.51 117.43% UNJBG

36 VEREDA LADO IZQ. 0+020 A.B. LEGUIA 175 2/21/2013 3/11/2013 18 174 43999 252.33 144.19% UNJBG

37 VEREDA LADO DERECHO 0+100 ALAMOS 175 2/25/2013 3/11/2013 14 177 39236 222.04 126.88% UNJBG

38 VEREDA LADO IZQ. PROG +040 OBRERO 175 2/12/2013 3/26/2013 42 177 52618 297.76 170.15% UNJBG

39 VEREDA LADO DER. PROG. +035 C. SAN ANDRES 175 2/12/2013 3/26/2013 42 181 60329 332.46 189.98% UNJBG

40 VEREDA LADO IZQ. 0+080 IGN CASTRO 175 2/12/2013 3/26/2013 42 179 53071 296.35 169.34% UNJBG

41 VEREDAD LADO DER. 0+080 LOS CIPRESES 175 2/12/2013 3/26/2013 42 181 49442 272.47 155.70% UNJBG

42 VEREDA LADO DER. 0+060 IGNACIO CASTRO 175 2/12/2013 3/26/2013 42 174 48082 275.75 157.57% UNJBG

43 VEREDA LADO IZQ. 0+020 IGNACIO CASTRO 175 2/26/2013 3/26/2013 28 170 32659 192.43 109.96% UNJBG

44 VEREDAD LADO IZQ. 0+050 CIPRESES 175 2/26/2013 3/26/2013 28 172 46267 268.95 153.68% UNJBG

45 VEREDAD LADO IZQ. 0+180 LOS CIPRESES 175 2/26/2013 3/26/2013 28 170 36288 213.81 122.18% UNJBG

46 SARDINEL IZQ. 0+040 CIPRESES 175 2/26/2013 3/26/2013 28 174 43772 251.03 143.45% UNJBG

47 VEREDA IZQ. 0+020 J. PABLO 175 3/12/2013 3/26/2013 14 172 35381 205.67 117.52% UNJBG

48 VEREDA IZQ. 0+020 J. PABLO 175 3/12/2013 3/26/2013 14 172 30391 176.66 100.95% UNJBG

49 MARTILLO ESQ. IGNACIO CASTRO CON OLIVOS SARDINEL 0+200 175 3/12/2013 3/26/2013 14 174 34020 195.10 111.49% UNJBG

50 MARTILLO ESQ. CASTRO CON OBRERO 175 3/12/2013 3/26/2013 14 172 34020 197.76 113.00% UNJBG

51 MARTILLO JUAN PABLO II . IGNACIO CASTRO 175 3/19/2013 3/26/2013 7 172 36288 210.94 120.54% UNJBG

52 SARDINEL DER. CIPRESES 0+040 175 3/19/2013 3/26/2013 7 172 30845 179.30 102.46% UNJBG

53 MARTILLO CIPRESES C.I.CASTRO 175 3/19/2013 3/26/2013 7 179 31752 177.31 101.32% UNJBG

54 MARTILLO CIPRESES Y COLON /ALAMOS CON OLIVOS 175 3/19/2013 3/26/2013 7 172 30618 177.98 101.70% UNJBG

55 SARDINEL DER. A. B. LEGUIA 0+020 175 3/19/2013 3/26/2013 7 170 34927 205.79 117.60% UNJBG

56 MARTILLO ALAMOS CON OLIVOS 175 3/19/2013 3/26/2013 7 170 33566 197.77 113.01% UNJBG

57 MARTILLO ALAMOS CON CIPRESES 175 3/19/2013 3/26/2013 7 174 30845 176.89 101.08% UNJBG

58 SARDINEL LADO IZQ 0+200 I CASTRO 175 3/14/2013 4/11/2013 28 174 48535 278.34 159.05% UNJBG

59 SARDINEL LADO DER. 0+120 LOS ALAMOS 175 3/14/2013 4/11/2013 28 172 47174 274.22 156.70% UNJBG

60 MARTILLO ESQ. CASTRO CON OBRERO 175 3/14/2013 4/11/2013 28 172 31752 184.57 105.47% UNJBG

61 SARDINEL LADO DER. 0+040 CIPRESES 175 3/14/2013 4/11/2013 28 174 31752 182.10 104.05% UNJBG

62 MARTILLO CIPRESESNCON I. CASTRO 175 3/14/2013 4/11/2013 28 174 38515 220.88 126.22% UNJBG

63 SARDINEL LADO DER. 0+020 A.B. LEGUIA 175 3/28/2013 4/11/2013 14 174 50576 290.05 165.74% UNJBG

64 MARTILLO ESQ. ALAMO CON CIPRESES 175 3/28/2013 4/11/2013 14 174 33340 191.20 109.26% UNJBG

65 MARTILLO SARDINEL LEGUIA 175 3/28/2013 4/11/2013 14 177 45360 256.69 146.68% UNJBG

66 SARDINEL A.B. LEGUIA IZQ. 175 3/28/2013 4/11/2013 14 172 30164 175.34 100.20% UNJBG

67 MARTILLO SARDINEL LEGUIA DER. 175 4/4/2013 4/11/2013 7 172 26563 154.41 88.23% UNJBG

ITEM

FECHA DE VACIADO

FECHA DE ROTURA

RESISTENCIA

% DE RESISTENCIA

Page 40: Liquidacion Financiera

ENSAYOS DE COMPRESION DE ADOQUINES DE CONCRETO

DESCRIPCION F'C=Kg/cm2 EDAD (dias) AREA LECTURA LAB.

1 ESPECIMEN GRIS N°1 OBRA VILLA SAN FRANCISCO 420 3/11/2013 151.1 98431 651.43 155.10% UNJBG

2 ESPECIMEN GRIS N°1 OBRA VILLA SAN FRANCISCO 420 3/11/2013 151.1 107730 712.97 169.76% UNJBG

3 CALLE LOS CIPRESES LADO DERECHO 420 3/20/2013 149.2 62688 420.16 100.04% UNJBG

4 CALLE LOS CIPRESES LADO IZQUIERDO 420 3/20/2013 149.2 73483 492.51 117.27% UNJBG

5 AV. LOS ALAMOS LADO DERECHO 420 3/20/2013 149.2 73483 492.51 117.27% UNJBG

6 AV. LOS ALAMOS LADO IZQUIERDO 420 3/20/2013 149.2 106142 711.41 169.38% UNJBG

7 ESPECIMEN GRIS N°1 OBRA VILLA SAN FRANCISCO 420 4/11/2013 151.9 98885 650.99 155.00% UNJBG

8 ESPECIMEN GRIS N°1 OBRA VILLA SAN FRANCISCO 420 4/11/2013 151.9 92081 606.19 144.33% UNJBG

ITEM

FECHA DE VACIADO

FECHA DE ROTURA

RESISTENCIA

% DE RESISTENCIA