LiDAR project data preparation
Kwangho Yang
Asset & Works Information Team
• Build, maintain & operate transmissionand distribution assets: South WestInterconnected Network (SWIN)
• 1.1+ million customers• ~264,000 street lights• ~237,800 solar PV installations*• ~570 battery systems*
~102,000km circuit wire
254,920 km2
The
SWIN
~861,000poles & towers
17,047GWhelectricity transported
* As at 31/5/18
About Western Power
Power Generation Retailer
Western Power
Our Customers
What we do
LiDAR project background
573 m
Over 362,000 rural poles
LiDAR
Use LiDAR technology
Pole locations are not accurate
Flight routes are required
Create the route based on pole
locations
Data preparation for LiDAR
Inspection points
Inspection points with GPS coordination
Low quality and human error (ex. wrong pole ID)
Not every pole was inspected
Multiple inspection points for a pole
Recently inspected points is better but not always
Step 1. Multi inspection points
ID: S11Year: 2018
ID: S11Year: 2012
ID: S11
20 metres
Pole
Inspection Point
Step 2. New inspection point + pole(or single inspection point)
ID: S22Year: 2016
ID: S22
ID: S11Year: 2013
20 metres
Pole
Inspection Point
Step 3. Old inspection point + pole
ID: S33Year: 2017
ID: S33
ID: S33Year: 2015
20 metres
Pole
Inspection Point
20 m 50 m 100 m
Re-build bay lines between poles
Look through the map at small scale (ex. 1:100,000)
Find zigzag lines and correct the position
Visual checking Point 1
Left over poles ( > 100 m or never inspected poles) are marked with special symbol if they are located at the end of line
Visual checking Point 2
Questions?