Kojo Agbenor-Efunam

Principal Programme Officer

Oil and Gas

[email protected] OR

[email protected]

Environmental Assessment Guidelines for

Oil and Gas Development in Ghana

Ebenezer Appah-Sampong

Chief Programme Officer

PPME

[email protected]

&

SCOPE OF PRESENTATION

Introduction

Environmental Policy & EIA

Relevant Environmental laws and Guidelines

Environmental Assessment Procedures and Oil and Gas

Development

Conclusions & Way foward

Introduction

Formal EIA system Established – 1994

Components were Policy Framework Legislative Instruments Administrative Procedures Institutional Capacities and Responsibilities Public Consultation

Three Different stages Foundation stage – procedures, legal regime Consolidation stage – capacity building, decentralization, guidelines

development Maturity Stage – application to complex projects, ICT, SEA,

experience sharing

National Environmental Policy 1

99

1

NEP formulated

to

provide the framework for the implementation of

NEAP

ult

imat

e a

im to

improve the surroundings,

living conditions and the quality of life of the entire citizenry,

both present and future.

Po

lic

y s

ee

ks

to ensure reconciliation between economic development and natural resource conservation - to make a high quality environment a key element supporting the country’s economic and social development.

The National Environmental Policy puts emphasis on prevention and sustainable development.

National Environmental Policy

Objectives

integrate environmental considerations in sectoral, structural and socio-economic planning at the national,

regional, district and grassroots levels

guide development in accordance with quality requirements to prevent, reduce, and as far as possible, eliminate pollution and nuisances

National Environmental Policy Principles

use of incentives in addition to regulatory measures

use of most cost-effective means to achieve environmental objective

delegation of decision-making and action to the most appropriate level of government

polluter pays for the cost of preventing and eliminating pollution and nuisances caused by him

public participation in environmental decision-making

international co-operation.

National Environmental Policy & EIA

institute and implement an environmental

quality control programme by requiring prior

environmental impact assessments of all

new investments that would be deemed to

affect the quality of the environment

• Environmental Protection Agency Act 1994, Act 490 (parts 1&II)

• Environmental Assessment Regulations 1999, LI 1652

Legal Backing for Environmental Assessment

EPA Act 1994, 490 – Part 1

Establishment of the Agency

12. Environmental impact assessment.

Environmental Quality Guidelines

Noise

Effluent Discharge Quality

Oil and Gas

Waste Management Guidelines

Health Care Waste

Management Guidelines

Ambient Air Quality

Installation and operation of

communication base stations

Installation and operation of

LPG Refilling Plants

Institutional Arrangements

EPA is the lead Agency in Ghana for environmental

assessment matters

Environmental Assessment and Audit Dept

Relevant Sectoral Departments-Petroleum, Mining, Natural

Resources, etc

Other Regulatory institutions

Scope of Environmental Assessment

Application

Undertakings listed in schedules 1 and 2

Undertakings located in environmentally sensitive areas

All sectors are covered

EPA’s opinion

Integrated definition of Environment: biophysical, social,

institutional, public health issues

EA Procedures

Registration

Screening

Scoping

EIA Study

EIS Review

Decision Making

SCREENING

25 WD INSPECTION

PER REVIEW

DECISION

DRAFT EIS REVIEW

(Committee)

50 WD

EIS FINALISED

DRAFT EIS SUBMISSION

SUBMISSION OF

EA APPLICATION

(Registration Form)

EIA STUDY

SCOPING

(Terms of Reference)

EP DECLINED

EP ISSUED

15 WD

EP ISSUED

EP DECLINED

EIS REVISION

PUBLIC

HEARING

(Panel)

EIA - ENVIRONMENTAL IMPACT ASSESSMNET EA - ENVIRONMENTAL ASSESSMENT

EIS - ENVIRONMENTAL IMPACT STATEMENT EP - ENVIRONMENTAL PERMIT

PER - PRELIMINARY ENVIRONMENTAL REPORT

PEA - PRELIMINARY ENVIRONMENTAL ASSESSMENT

PH - PUBLIC HEARING

WD - WORKING DAYS REQUIRED FOR REVIEW

Proponent Action

EPA Action

Public

EIA Required

EP ISSUED EP DECLINED

PEA Required

Revision Required

Revision Required

Approval

Recommended

Approval

Recommended

No EIA

Required

Public Hearing

Required

PER

SUBMISSION

PUBLIC

HEARING

(Panel)

ADMINISTRATIVE FLOW CHART OF THE EA PROCEDURE

EIA Processes - Screening

Schedule 1 – Initial Assessment

Schedule 2 – Mandatory EIA

Schedule 5 – Environmentally Sensitive

Areas

Screening Decisions

Initial Assessment

Preliminary Environmental Assessment

Environmental Impact Assessment

Strategic Environmental Assessment – Policies, Plans and

Programmes

Oil and Gas Proposals

Schedule 1 Establishment of petroleum products storage facilities

Crude oil and natural gas production facilities

Oil and Gas Proposals

Schedule 2 oil and gas fields development;

construction of off-shore and on-shore pipelines;

construction of oil and gas separation, processing, handling

and storage facilities. d. construction of oil refineries;

construction of product depots for the storage of petrol, gas

or diesel which are located within 3 kilometers of any

commercial, industrial or residential areas.

Levels of Assessment for

Offshore Upstream Activities

• Registration Surveys

• Preliminary Environmental Assessment Drilling of Wells

• Full EIA Petroleum Production

• Full EIA Construction of off-

shore and on-shore

pipelines

• Decommissioning/Abandonment Plan Decommissioning and

Abandonment

Scoping

Extensive Consultation Processes

Secondary and Primary Data Collection

Identification of key issues

Scoping – Ghanaian Context

Notice to be issued by the proponent to

Relevant ministries, depts., Assemblies

Advertise in at lest one national newspaper & local newspaper (if any)

Scoping reports to be made available in the locality for inspection by general public

EPA examines scoping report and comments within 25 working days

Outputs of Scoping

Scoping Report

Draft Terms of Reference -Specific guidelines

on impacts to be studied, how they are to be

measured, evaluated and presented in the EIS

Key Issues

Relevant baseline data to be generated

Comprehensive Consultee Lists

EIA Study for Oil and Gas Projects Based on approved TOR.

Baseline survey and inventory,

Development proposal options,

Detailed description of the project

Potential impact identification, prediction,

Mitigation and alternative considerations

Monitoring Plan

Environmental Management Plan and

Other requirements of the TOR.

Initiate a public information programme

EIS

The findings of the Environmental Impact Assessment are

compiled into an Environmental Impact Statement

Draft EIS

Revised EIS

Final EIS

EIS Review

Technical Review

Public Review

Review Decisions

Environmental Permitting Decision

(EPD)

Issuance of an Environmental Permit with conditions such as:

Submit Annual Environmental Reports every 12 months

Submit Environmental Management Plans within 18 months of

issuance of permit and revised every three years

Submit periodic monitoring reports (frequency to be specified)

Give notice of commencement of operation of the undertaking

and

Obtain Environment Certificate within 24 months of

satisfactory operations and compliance with environmental

permitting conditions

Oil & Gas Experiences Full test of the system (EIA)

West African Gas Pipeline – 2004

Jubilee Field Development and Management - 2008

Gas Utilization Project

Oil Services Terminal Development

Surveys & Exploration (IA & PER)

Servicing Activities

Some Challenges and Lessons Innovative & Extensive Consultations Required at all stages

National and International Capacities for Review

Need for comprehensive sector specific guidelines and standards led to the development of the oil and gas guidelines for the offshore.

Inter-sectoral guidelines

Management of public processes and expectations and competing interest

Setting of permitting conditions

Follow-up mechanisms

Confidence and technical competence

Way Forward

Deepen public consultation processes

Build national technical capacity

Develop additional guidelines and standards

Develop further legislations

Develop monitoring capacity

Deepen international cooperation and collaboration

Improve institutional collaboration