lhc access system 1 edms: 856718 laawg status report – 10th july 2007 p. ninin, l. scibile, t....
TRANSCRIPT
LHC ACCESS SYSTEM
1Edms: 856718
LAAWGStatus Report – 10th July 2007
P. Ninin, L. Scibile, T. Ladzinski
LHC ACCESS SYSTEM
2Edms: 856718
Dash board – 10 July 07
Cable Access Control Access Safety Commis.
Access
Points
Other
Eis
Soft &
IHM
Control
Racks
Soft Hard
Loop
Power
System
LHC1 Tested +W35
4/6 Instal. Test Instal. Dev. Instal. Instal. W33-35
L1.8 Tested 1/1 OK-NC Dev. Installed Dev. Instal. Instal. W33-35
LHC2 >W32 W28-37 W28-37 Dev. W28-33 Design Design
Deliv. W39-41
LHC3 Tested+W32
1/1 Instal. Dev. Constr. Design Design
Instal. TBD
LHC4 OK-NC 5/5 OK-NC OK-NC OK OK Tested OK, NC OK, NC
LHC5 Test, CMS?
4/5 Instal. Test Installed OK Instal. Instal. TBD
LHC6 Test Instal Instal. Dev. Design TBD Design
Deliv. TBD
LHC7 OK-NC 1/1 Instal. Test Test OK V1 Test Test W29-31
LHC8 OK-NC 4/5 OK OK-NC OK OK V1 Test OK, NC OK, NC
CCR OK Completed with NC OK OK Test OK On-going
CCC OK Completed with NC OK OK Test OK On-going
LHC ACCESS SYSTEM
3Edms: 856718
Important points concerning the Exp. Areas.
• COMMON to all:- Access procedure to the non-interlocked area
• LHCB- Test after final installation of fences and shielding wall- Patrol procedure- PZ85 renovation
• ATLAS- SSA: pilot installation in June/July, available in September- Partial commissioning planned W33-35- PX15 Access Point upgrade
• CMS- Installation of the remaining access points (UPX56)- Cabling of the Patrol devices in the cavern- Commissioning planned POSTPONED and to be planned!- PM54 Access Point Design & Installation
• ALICE- W28-W37 installation- W39-W41 commissioning- Work preparation
LHC ACCESS SYSTEM
4Edms: 856718
Actual difficulties
• New LACS SW version acceptance tests on-going
• Planning reshuffling- LHC5 installation postponed due to CMS cabling availability end of
August- LHC7, LHC1, LHC1.8 functional tests preparation
• Summer 2007
- TI8 and TI2 tests preparation• Meeting the 7 October deadline for LHC2 relies on timely (end July)
cabling and manufacturing of grids/doors
• Team Focus on the Non-conformities follow-up- LACS software- Access point ergonomy
LHC ACCESS SYSTEM
5Edms: 856718
Layout of LHCb in UX85 Area
LHC ACCESS SYSTEM
6Edms: 856718
LHC5 - CMS
LHC ACCESS SYSTEM
7Edms: 856718
ATLAS
LHC ACCESS SYSTEM
8Edms: 856718
ATLAS
LHC ACCESS SYSTEM
9Edms: 856718
LHC2- ALICE
LHC ACCESS SYSTEM
10Edms: 856718
ALICE - Access via PX24