cern safety alarm monitoring presented by luigi scibile st division / mo group
TRANSCRIPT
CERN CERN Safety Alarm MonitoringSafety Alarm Monitoring
Presented by Luigi Scibile
ST division / MO group
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
2
IntroductionIntroduction
Safety informationAlarm
systemMonitoring system
CERN
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
3
IntroductionIntroduction
CERN Safety Alarm
Monitoring
= CSAM
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
4
Detectionequipment
BackgroundBackground
Hard-wired network
Computer-based network
What’s next ?
Fire CDIN-00052 B104-R-02
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
5
CSAM MandateCSAM Mandate The CSAM will provide CERN with an integrated safety alarm
system covering acquisition, transmission, logging and display for all the CERN sites, the LHC machine, LHC experiments and experimental areas. The system will be incorporated into the safety, technical, accelerator, and experiment control rooms.
The requirements of the system were defined by the AL3S* working group.
The mandate of the project team covers the system specification, prototyping, tendering, installation and integration of the product in the existing monitoring architecture.
* Safety alarms require the immediate intervention of the fire brigade and are defined at CERN as 'Alarms of Level 3' (AL3S)
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
6
CSAM SpecificationCSAM Specification
For the Fire Brigade Safety alarm acquisition from all CERN safety zones Local monitoring from each safety zone Central monitoring, archiving, display, reporting and configuration Non-interruptible 24h/365d system based on redundant networks Specific human computer interfaces and tools for the alarm handling Real-time monitoring of the correct functioning of all sub-systems.
For the Experiments and the other control rooms A safety alarm gateway to external systems A flexible system architecture for the integration of the LHC and LHC
experiments future alarms. A modular acquisition and local monitoring system based on
standard industrial equipment
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
7
CSAM Specification, cont.CSAM Specification, cont. No common mode of failure
Power supply, Location, server, display, acquisition module,etc.
INB compliant system based on redundant transmission paths.
Availability requirements In order to meet the availability requirements of 99.8% set by the
AL3 Working Group, a Safety Integrity Level (SIL) 2 has been fixed. A supervision and monitors the availability of all sub-systems and
generates performance reports.
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
8
CSAM specificationsCSAM specifications, cont., cont.
Transmission System
Technical Data Interface
Safety Alarm Detection Interface
Safety Alarm Transmission
Redundant
Safety & Technical
Alarm Transmission
Central Alarm Display Human Computer Interface
Supervision
Local Alarm Display
Safety Actions
Reference Database
(Configuration)
Data Exchange Protocol
Event Logging System
Functional diagram
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
9
CSAMsupervision & maintenance
manager
TechnicalData Server
(TDS)
Localsafety alarmscontroller
Safety alarm networks
Safety alarmmonitoringcentre
Safety alarmgateway to
externalsystems
(TDS, experiments,
XCR, etc.)
CERN safetyequipment
x33
Hardwired Path 1
Path 2
TCR consoleSCR console
SCRSCADAx2
Central Alarm Display at SCR
Laser printer 1
PLC 1 PLC 2
Local Alarm Synptic PanelZone x
CSAM specificationsCSAM specifications, cont., cont.
PVSS
PVSS
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
10
Safety alarmMonitoringcentre
Remote XCR console
SCRSCADA
ExperimentsDCS
Experiments
LocalXCR console
Safety alarmgateway to
externalsystems(TDS,
experiments, XCR, etc.)
CSAM-experiments interfaceCSAM-experiments interface
How Data exchange protocol JCOP conventions
For the XCR operators Only Safety Alarms and safety-related information
concerning their experiment. Also analogue values of safety equipment. Possible seamless integration in the experiment DCS
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
11
Localsafety alarmscontroller
Safety alarmMonitoringcentre
CERN safetyequipment
Remote XCR console
SCRSCADA
CSAM animation scenarioCSAM animation scenario
ExperimentsDCS
TechnicalData Server
(TDS)
Experiments
LocalXCR console
Safety alarmgateway to
externalsystems(TDS,
experiments, XCR, etc.)
Warning
Warning
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
17
4 alarms
Future systemFuture system
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
18
B40-5-002
Future systemFuture system
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
19
23:11:15 Fire Detector CDIN-00052 MEY-Z-22-B-0287-R-02 Smoke concentration too high came
23:11:15 Fire Detector CDIN-00052 MEY-Z-22-B-0287-R-02 Smoke concentration too high came
23:11:15 Fire Detector CDIN-00052 PREV-Z-10-B-0112-R-04 Smoke concentration too high came
Fr. 12/05/1999
04:11:15 Fire Detector CDIN-00052 MEY-Z-22-B-0287-R-02 Smoke concentration too high came
05:11:16 Fire Detector CDIN-00052 PREV-Z-10-B-0112-R-04 Smoke concentration too high came
12:12:45 Lift blockage AS-0058 MEY-B-0504-- Lift blocked came
15:14:02 Dead Man HM-Z29 MEY-Z29 Dead Man went
15:16:15 Flooding Det. INOND-863-E-T SPS-B-862-R-05 Flooding Detected came
CERN Safety Alarm System - Messages display
Time Type Identifier Location Description Direction
Comments Old List New List ChronicleSelection Ack All
Fr. 13.05.1999 00:01:20
Ack
SelectedMessage
All Messages
Selection Criteria: Chronicle
15:16:15 Flooding Det. INOND-863-E-T SPS-B-862-R-05 Flooding Detected came15:16:15 Flooding Det. INOND-863-E-T SPS-B-862-R-05 Flooding Detected came
Future systemFuture system
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
21
What has been done ?What has been done ?
Analysis of technical solutions IEC61508 standards Prototype Technical specifications including:
User requirements Functional and safety requirements Product requirements Interface requirements
Approval of the finance committee
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
22
What’s next?What’s next?
Detailed design and testing during year 2001 Pilot installation planned for APRIL 2002 Deployment of product on the CERN site in
accordance with the LHC and LHC experiments schedule
21 March 2001 JCOP presentation - L. Scibile and the CSAM Team
23
Additional informationAdditional information
Papers S. Grau, P. Ninin, R. Nunes, L. Scibile, C. Soler, CERN
Safety Alarm monitoring Project, 3rd ST workshop Chamonix, February 2000.
L.Scibile, P.Ninin, S.Grau, Functional Safety: a Total Quality Approach, 4st WS Chamonix, 2001.
S. Grau, L. Scibile, F. Balda, A. Chouvelon, Application of risk management for control and monitoring systems, 4rd ST workshop Chamonix, February 2001.
Visit the CSAM Homepage: http://nicewww.cern.ch/st/mo/CSAM/CSAM.htm
Just come and see us!