Sustainable Rural Infrastructure Improvement
Project, Bangladesh
Project director Heering, Hero (HH)
Assignment Design and supervision consultancy under the Sustainable Rural
Infrastructure Improvement Project of the ocal !overnment "ngineering
Department of #angladesh
Client !overnment of #angladesh
Financing Agency $sian Development #an%
Partners Desh &podesh imited (#angladesh)' $ssociates for Development
Services imited ($DS) (#angladesh)' SD" *onsult (#angladesh)
Composition of eam Euroconsult Mott MacDonald: Project management adviser + eamleader' Structural + #ridge engineer' Rene-able energy specialist' .ield
supervision engineers (/)' Project director, Project manager
Partner(s):Deputy team leader + Senior road engineer' Rural -ater
supply specialist' Hydrologist' Resettlement specialist' Road safety
speciallst' 0ar%et physical planner' 1 2uality controlengineers' .ield
Supervision "ngineers (34)
Period of Assignment .rom 5une 6736 to 5une 6738
Staff months9 "uroconsult 0ott 0acDonald9 /6' Partner(s)9 3178
Contract value "uroconsult 0ott 0acDonald9 : 3,447,777Partner(s)9 :417,777
Bac!ground #angladesh has made impressive economic and social progress in the past
decade, despite fre;uent natural disasters and eith
around ?8 million people belo- the poverty line, #angladesh has outlined
a vision of becoming a middle income country by 6763, -hich -ould
re;uire it to gro- at @A per year= o achieve this acceleration,
#angladesh -ill need to devise a strategy to absorb its gro-ing labour
force and raise its productivity by enhancing s%ills, and to invest large
amounts in infrastructure= Rural transport infrastructure, -hich consists of
rural roads, inland -ater transport, and rural mar%ets net-or%s, is crucial
for the gro-th of the rural as -ell as national economy= In #angladesh,only 14A of the rural population has access to allB-eather roads
compared to 87A in India and 83A in Pa%istan= Integrated development
of mar%ets and roads has been a cornerstone of the rural infrastructure
development strategy= here are over @,777 hats or baCaars of different
siCes throughout #angladesh= he Planning *ommission selected 6,377 of
them as priority !ro-th *entre 0ar%ets (!*0)= *ontinuation of past
programmes to develop gro-th centres including construction of
-omens corners is critical to providing economic opportunities to rural
populations=
"escription of project Project scope
Euroconsult Mott MacDonald
-
8/13/2019 LGED, LGED BANGLADESH
2/4
Sustainable Rural Infrastructure Improvement Project, Bangladesh 6
he project -ill reduce poverty and raise incomes in three divisions and
63 districts of north-est and south-est #angladesh by fostering economic
gro-th, capacity development, and gender e;uality=
he project -ill enhance rural peoples access to social services, such as
health and education, and to economic opportunities= >idening the access
to mar%ets and livelihood activities -ill increase earnings for the rural
poor, including -omen=
#ased on the lessons learned from previous projects, project areas have
been selected on the basis of high connectivity and poverty concentration=
.ostering gender e;uality in economic opportunities, ensuring sustainable
operation and maintenance, developing climateBresilient infrastructure,
and considering green elements in the design and implementation of the
project are emphasiCed=
Innovative pilot projects -ill be implemented in different project areas,
aiming at introduction of toll roads, road safety improvement, offBgrid
electricity supply e=g= by photoBvoltaic cells in remote gro-th centre
mar%ets (!*0s), and small scale -ater supply systems at !*0s= In all
cases sustainability of service provision -ill be enhanced by the
introduction of the userBpays principle, and the development of
sustainable operation and maintenance (E0) plans= Participation of end
users in planning, construction, and E0 -ill create a sustainable sense
of o-nership among the beneficiaries=
he design and supervision consultant (the current project) collaborates
closely -ith the institutional support and monitoring consultants,contracted by !"D under the same SRIIP project=
Impact and outcome
he impact of the project -ill be reduced poverty in intervention areas=
he %ey performance target -ill be population in project areas living in
poverty falling by 8A from the reference level of /6=4A (6737) by the
end of the project (6738)= he project outcome -ill be -idened access to
economic opportunities and social services for the poor in general and
-omen in particular=
Safeguards and governance
In assisting !"D to implement the project, the consultants -ill remainvigilant and ensure that the various safeguard and governance aspects are
given due attention9
B "nvironment=
B Resettlement=
B Indigenous People=
B !ender and Development+>omen "mpo-erment=
B $ntiB*orruption=
Services provided as%s and activities
-
8/13/2019 LGED, LGED BANGLADESH
3/4
Sustainable Rural Infrastructure Improvement Project, Bangladesh 1
3= Project start up, mobiliCation, and consultancy management=
6= Project management and training+capacity building9
a= Introduction of a project performance management system (PP0S)=
b= $dvise+assist the PD in project financial management and control=
c= $dvise and assist the PD in preparing annual plans of operation and
associated budgets ($P#)=
d= Develop job descriptions and perform training needs assessment for
decentraliCed !"D staff and contractors=
e= Develop training materials, including innovative features, conduct
training, monitor E evaluate training=
1= Subproject preparation9
a= Surveys and investigations, including participatory methods, and
technical, environmental, socioBeconomic, land ac;uisition, resettlement,
and gender topics=
b= Subproject appraisal report9 prepare budget costs for subproject civil
-or%s and related activities' underta%e economic analysis of subprojectsto determine "IRRs' prepare E submit districtB-ise subproject appraisal
reports (S$Rs)=
/= Detailed design9
a= "ngineering=
b= Resettlement=
c= and ac;uisition=
?= ender and a-ard9
a= Prepare+advise on specifications and tender documents=
b= $dvise P0 on contract pac%aging, preB;ualification of
contractors, tender evaluation and contract a-ard=
8= *onstruction9
a= 0onitor+supervise construction -or% through field visits=b= Prepare construction supervision manual=
c= $dvise on establishment of onBsite and laboratory ;uality
control+;uality E ;uantity management of construction -or%s=
d= $ssist P0 in monitoring of environmental mitigation measures=
4= 0aintenance9
a= Prepare procedures for regular road condition surveys and traffic
count=
b= $dvise on road maintenance planning and implementation
procedures=
c= "stablish routine maintenance monitoring system=
d= Recommend maintenance outsourcing system(s)=
e= Prepare a procedure for planning the annual programme of routineand periodic maintenance -or%s=
@= Innovative features, including designs, sustainable E0 manuals,
cost recovery9
a= Sustainable road maintenance=
b= Rene-able energy=
c= Rural -ater supply=
d= Road safety=
F= Reporting
utputs
-
8/13/2019 LGED, LGED BANGLADESH
4/4
Sustainable Rural Infrastructure Improvement Project, Bangladesh /
he project outcome -ill be achieved through the follo-ing outputs9 (i)
road connectivity improved in a sustainable and climateBproof -ay' (ii)
mar%eting facilities upgraded -ith specific provision for -omen' and (iii)
rural infrastructure management, including climateBrelated issues
improved= he -or%s -ill be procured through numerous contracts -ith a
total value of about @? million &SD= angible outputs are9
B he project -ill upgrade 477 %m of upaCila roads and 377 %m of
union roads to bitumen surfaced standard to provide allB-eather,
sustainable, and climateBproof road connectivity from agricultural
production areas and !*0s to other parts of the country=
B *rossBdrainage structures, such as bridges and culverts, -ith a total
length of 1,647 meters -ill be built=
B Infrastructure of F6 !*0s -ill be improved -ith sections for -omen in
?7 mar%ets=
B he project -ill upgrade the capacity of !"D and other localgovernment institutions to manage rural infrastructure= .or !"D, the
institutional capacity of the staff -ill be improved through training
programmes in (i) financial management, (ii) participatory planning, (iii)
construction supervision, (iv) sustainable maintenance and management,
(v) planning and implementation of climateBresilient infrastructure (based
on a climate vulnerability mapping), (vi) ;uality control, (vii) information
technology, (viii) gender and development, and (i