    Sustainable Rural Infrastructure Improvement

    Project, Bangladesh

    Project director Heering, Hero (HH)

    Assignment Design and supervision consultancy under the Sustainable Rural

    Infrastructure Improvement Project of the ocal !overnment "ngineering

    Department of #angladesh

    Client !overnment of #angladesh

    Financing Agency $sian Development #an%

    Partners Desh &podesh imited (#angladesh)' $ssociates for Development

    Services imited ($DS) (#angladesh)' SD" *onsult (#angladesh)

    Composition of eam Euroconsult Mott MacDonald: Project management adviser + eamleader' Structural + #ridge engineer' Rene-able energy specialist' .ield

    supervision engineers (/)' Project director, Project manager

    Partner(s):Deputy team leader + Senior road engineer' Rural -ater

    supply specialist' Hydrologist' Resettlement specialist' Road safety

    speciallst' 0ar%et physical planner' 1 2uality controlengineers' .ield

    Supervision "ngineers (34)

    Period of Assignment .rom 5une 6736 to 5une 6738

    Staff months9 "uroconsult 0ott 0acDonald9 /6' Partner(s)9 3178

    Contract value "uroconsult 0ott 0acDonald9 : 3,447,777Partner(s)9 :417,777

    Bac!ground #angladesh has made impressive economic and social progress in the past

    decade, despite fre;uent natural disasters and eith

    around ?8 million people belo- the poverty line, #angladesh has outlined

    a vision of becoming a middle income country by 6763, -hich -ould

    re;uire it to gro- at @A per year= o achieve this acceleration,

    #angladesh -ill need to devise a strategy to absorb its gro-ing labour

    force and raise its productivity by enhancing s%ills, and to invest large

    amounts in infrastructure= Rural transport infrastructure, -hich consists of

    rural roads, inland -ater transport, and rural mar%ets net-or%s, is crucial

    for the gro-th of the rural as -ell as national economy= In #angladesh,only 14A of the rural population has access to allB-eather roads

    compared to 87A in India and 83A in Pa%istan= Integrated development

    of mar%ets and roads has been a cornerstone of the rural infrastructure

    development strategy= here are over @,777 hats or baCaars of different

    siCes throughout #angladesh= he Planning *ommission selected 6,377 of

    them as priority !ro-th *entre 0ar%ets (!*0)= *ontinuation of past

    programmes to develop gro-th centres including construction of

    -omens corners is critical to providing economic opportunities to rural

    populations=

    "escription of project Project scope

    Euroconsult Mott MacDonald

  • 8/13/2019 LGED, LGED BANGLADESH

    2/4

    Sustainable Rural Infrastructure Improvement Project, Bangladesh 6

    he project -ill reduce poverty and raise incomes in three divisions and

    63 districts of north-est and south-est #angladesh by fostering economic

    gro-th, capacity development, and gender e;uality=

    he project -ill enhance rural peoples access to social services, such as

    health and education, and to economic opportunities= >idening the access

    to mar%ets and livelihood activities -ill increase earnings for the rural

    poor, including -omen=

    #ased on the lessons learned from previous projects, project areas have

    been selected on the basis of high connectivity and poverty concentration=

    .ostering gender e;uality in economic opportunities, ensuring sustainable

    operation and maintenance, developing climateBresilient infrastructure,

    and considering green elements in the design and implementation of the

    project are emphasiCed=

    Innovative pilot projects -ill be implemented in different project areas,

    aiming at introduction of toll roads, road safety improvement, offBgrid

    electricity supply e=g= by photoBvoltaic cells in remote gro-th centre

    mar%ets (!*0s), and small scale -ater supply systems at !*0s= In all

    cases sustainability of service provision -ill be enhanced by the

    introduction of the userBpays principle, and the development of

    sustainable operation and maintenance (E0) plans= Participation of end

    users in planning, construction, and E0 -ill create a sustainable sense

    of o-nership among the beneficiaries=

    he design and supervision consultant (the current project) collaborates

    closely -ith the institutional support and monitoring consultants,contracted by !"D under the same SRIIP project=

    Impact and outcome

    he impact of the project -ill be reduced poverty in intervention areas=

    he %ey performance target -ill be population in project areas living in

    poverty falling by 8A from the reference level of /6=4A (6737) by the

    end of the project (6738)= he project outcome -ill be -idened access to

    economic opportunities and social services for the poor in general and

    -omen in particular=

    Safeguards and governance

    In assisting !"D to implement the project, the consultants -ill remainvigilant and ensure that the various safeguard and governance aspects are

    given due attention9

    B "nvironment=

    B Resettlement=

    B Indigenous People=

    B !ender and Development+>omen "mpo-erment=

    B $ntiB*orruption=

    Services provided as%s and activities

  • 8/13/2019 LGED, LGED BANGLADESH

    3/4

    Sustainable Rural Infrastructure Improvement Project, Bangladesh 1

    3= Project start up, mobiliCation, and consultancy management=

    6= Project management and training+capacity building9

    a= Introduction of a project performance management system (PP0S)=

    b= $dvise+assist the PD in project financial management and control=

    c= $dvise and assist the PD in preparing annual plans of operation and

    associated budgets ($P#)=

    d= Develop job descriptions and perform training needs assessment for

    decentraliCed !"D staff and contractors=

    e= Develop training materials, including innovative features, conduct

    training, monitor E evaluate training=

    1= Subproject preparation9

    a= Surveys and investigations, including participatory methods, and

    technical, environmental, socioBeconomic, land ac;uisition, resettlement,

    and gender topics=

    b= Subproject appraisal report9 prepare budget costs for subproject civil

    -or%s and related activities' underta%e economic analysis of subprojectsto determine "IRRs' prepare E submit districtB-ise subproject appraisal

    reports (S$Rs)=

    /= Detailed design9

    a= "ngineering=

    b= Resettlement=

    c= and ac;uisition=

    ?= ender and a-ard9

    a= Prepare+advise on specifications and tender documents=

    b= $dvise P0 on contract pac%aging, preB;ualification of

    contractors, tender evaluation and contract a-ard=

    8= *onstruction9

    a= 0onitor+supervise construction -or% through field visits=b= Prepare construction supervision manual=

    c= $dvise on establishment of onBsite and laboratory ;uality

    control+;uality E ;uantity management of construction -or%s=

    d= $ssist P0 in monitoring of environmental mitigation measures=

    4= 0aintenance9

    a= Prepare procedures for regular road condition surveys and traffic

    count=

    b= $dvise on road maintenance planning and implementation

    procedures=

    c= "stablish routine maintenance monitoring system=

    d= Recommend maintenance outsourcing system(s)=

    e= Prepare a procedure for planning the annual programme of routineand periodic maintenance -or%s=

    @= Innovative features, including designs, sustainable E0 manuals,

    cost recovery9

    a= Sustainable road maintenance=

    b= Rene-able energy=

    c= Rural -ater supply=

    d= Road safety=

    F= Reporting

    utputs

  • 8/13/2019 LGED, LGED BANGLADESH

    4/4

    Sustainable Rural Infrastructure Improvement Project, Bangladesh /

    he project outcome -ill be achieved through the follo-ing outputs9 (i)

    road connectivity improved in a sustainable and climateBproof -ay' (ii)

    mar%eting facilities upgraded -ith specific provision for -omen' and (iii)

    rural infrastructure management, including climateBrelated issues

    improved= he -or%s -ill be procured through numerous contracts -ith a

    total value of about @? million &SD= angible outputs are9

    B he project -ill upgrade 477 %m of upaCila roads and 377 %m of

    union roads to bitumen surfaced standard to provide allB-eather,

    sustainable, and climateBproof road connectivity from agricultural

    production areas and !*0s to other parts of the country=

    B *rossBdrainage structures, such as bridges and culverts, -ith a total

    length of 1,647 meters -ill be built=

    B Infrastructure of F6 !*0s -ill be improved -ith sections for -omen in

    ?7 mar%ets=

    B he project -ill upgrade the capacity of !"D and other localgovernment institutions to manage rural infrastructure= .or !"D, the

    institutional capacity of the staff -ill be improved through training

    programmes in (i) financial management, (ii) participatory planning, (iii)

    construction supervision, (iv) sustainable maintenance and management,

    (v) planning and implementation of climateBresilient infrastructure (based

    on a climate vulnerability mapping), (vi) ;uality control, (vii) information

    technology, (viii) gender and development, and (i