letter on muslim community hall in palacole 16-12-2013

2
From: To: K.Sasidhar, The Dy.Executive Engineer, Asssistant Engineer, P.H.Sub-Division, Public Health Section, Bhimavarm. Tanuku. Lr.No. /PKL/MPLADS/2014 Dt: -08-2014. Sir, Sub :- Palacole Municipality-Non Completion of minority community hall at palacole under MPLADS 2009-10 grant of Sri.K.Bapiraju,Hon’ble MP(L.S)-Narsapuram. Submission of report- Regarding. Ref :- 1. E.E (PH),Eluru. Agt No:24/2010-11 ---o0o--- Adverting to the subject cited above, I submit that the contractor for the above work has not completed the balance work even after a lapse of 50 months. As per the agreement conditions the contractor was failed to complete the work within the stipulated time. This is submitted for favour of kind information and taking further necessary action. Yours faithfully, Assistant Engineer (PH) Tanuku.

Upload: sasidharkatari91572

Post on 25-Sep-2015

212 views

Category:

Documents


0 download

DESCRIPTION

community hall

TRANSCRIPT

From:To:

K.Sasidhar, The Dy.Executive Engineer,

Asssistant Engineer,P.H.Sub-Division,

Public Health Section,Bhimavarm.

Tanuku.

Lr.No. /PKL/MPLADS/2014 Dt: -08-2014.

Sir,

Sub:- Palacole Municipality-Non Completion of minority community hall at palacole under MPLADS 2009-10 grant of Sri.K.Bapiraju,Honble MP(L.S)-Narsapuram. Submission of report- Regarding.

Ref:- 1. E.E (PH),Eluru. Agt No:24/2010-11

---o0o---

Adverting to the subject cited above, I submit that the contractor for the above work has not completed the balance work even after a lapse of 50 months. As per the agreement conditions the contractor was failed to complete the work within the stipulated time.

This is submitted for favour of kind information and taking further necessary action.

Yours faithfully,

Assistant Engineer (PH)

Tanuku.