legend to daulat ram college - uttipec
TRANSCRIPT
STOP
Roop
Nagar
Roop
Nagar
Kamla
Nagar
Kamla
Nagar
Transformer
Transformer
Towards Maurice Nagar
Towards Maurice Nagar
Towards Shakti Nagar
Chowk
Towards Shakti Nagar
Chowk
3.6M2M
6.7M1.1M
7.8M 1.8M2M
Footpath FootpathShoulder ShoulderCarriageway Carriageway
Median
3.6M 2.4M 7M 1M 7M 0.6M Variable
MedianCarriagewayCarriageway
Buffer FootpathFootpath
Existing Cross Section (GG') - Satyawati Road
Proposed Cross Section (GG') - Satyawati Road
FOOTPATH
BUFFER SPACE
TABLE TOP / RAMPS
MEDIAN AND ISLANDS
BUS STOPS
TOILET BLOCKS
IPT PICK-DROP
VENDOR
UTILITIES
PARALLEL CAR PARKING
0 2m 5m 10m
0 5m 10m 15m
TITLE: REVISION
DHRUPAD CONSULTANTS PVT. LTD.7E, POCKET B, SIDDHARTH EXTENSION,NEW DELHI-14CONTACT: 011-49270513, 9958056935EMAIL: [email protected],[email protected] : www.dhrupadconsultants.com
Delhi DevelopmentAuthority
DATE
DRAWN BYSNEHA
CHKD. BYROHIT
This drawing is a property of DhrupadConsultants Pvt. Ltd and must not becopied or reproduced in any form
Sl.No. CLIENTS:CONSULTANTS: DWG No.
DCPL/DDA/UTTIPEC/TP/BCP/01
PROJECT:
15.102.2021
Walkability Plan
Part - H
Preparation of Walkability plans for various sites/ stretches in Delhi.
Name of the Area: Kamla Nagar
Existing - Satyawati Marg
Proposed - Satyawati Marg
To Nangia Park Chow
k
To D
aula
t Ram
Colle
ge
To Nangia Park Chow
k
To D
aula
t Ram
Colle
ge
Bus stop
Bus stop
Transformer to be shifted
Relocation of toiletblock in buffer space
Carriageway (7M)
Buffer space (0.6M)Footpath (3.5M)
G'
G
G'
G
Part H
Legend
Key Map
Note: All the design consideration are as per IRC 35 :
2015 (guidelines for road marking), IRC 67 : 2012
(guidelines for signages) and IRC 103 : 2012
(Guidelines for pedestrian facilities).
SCALE:
(For Plans)
All Dimensions are in meters unless mentioned otherwise.
(For Sections)