Project SpecificationsBased on lecture slides by Profs. Ayers and Gokirmak
.
![Page 2: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/2.jpg)
Project Specifications
.
• Specifications listthe requirements that the project must meet.
• any competent engineering team should be able to design a device that performs the specified function.
• Specifications listthe requirements
that the project must meet.
• But do NOT state how to build it.
![Page 3: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/3.jpg)
Specifications (warnings)
• Modifying an existingdevice ? : Describe the current device in as much detail as possible.
http://dornob.com/portable-power-pods-usb-batteries-keep-gadgets-going/
• In general, you should NOT specify any components.
![Page 4: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/4.jpg)
Introduction and Overview•State the purpose of the project clearly.
- Why are you building the device?- What will the finished device do?
•Describe the project carefully.- How will the device operate?- What is unusual about the device?
![Page 5: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/5.jpg)
Be Specific! Technical Specifications
Tabular form: All facts and figures needed to undertake the design
project.
![Page 6: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/6.jpg)
Specifications Format (example)
Electrical Parameters
Battery Life 6 months (continuous use)Display:
Number of Characters 30 (minimum)Size 2’ min. height x 1.75’ min. widthIllumination Visible in strong sunlight
![Page 7: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/7.jpg)
Specifications Format (cont.)
Electrical Parameters (cont.)
TransmitterRange 100-1000 feetPhysical path data transmission through walls
![Page 8: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/8.jpg)
Specifications Format (cont.)
Electrical Parameters (cont.)Operating Voltage LevelsCurrent CapabilitiesInput and Output ImpedancesGainsInput/Output PowerPower ConsumptionPrecision…
![Page 9: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/9.jpg)
Specifications Format (cont.)
Mechanical Parameters (sample)Button:
Size 5” x 5’’ (min.)Actuation Force 0.001 N (max.)
Weight: 5000 lbs. (max.)Durability:Should survive 10-ft. drops.
![Page 10: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/10.jpg)
Specifications Format (cont.)
EnvironmentalLocation Basement (6’ underground)Temp. Range -40 to +700 FStorage temp. -273 to 1000 FMoisture?Corrosive liquids?Vibrations?
![Page 11: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/11.jpg)
Specifications Format (cont.)
Software
Execution time 34.5 seconds (max.)Termination/Reset 1 buttonInterrupts Standard ^CMemory 4.5 MBPlatform Windows PC
![Page 12: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/12.jpg)
Priorities
• Priority 1 – The requirement is a “must have” as outlined by policy/law
• Priority 2 – The requirement is needed for improved processing, and the fulfillment of the requirement will create immediate benefits
• Priority 3 – The requirement is a “nice to have” which may include new functionality
![Page 13: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/13.jpg)
Systems Engineering
![Page 14: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/14.jpg)
Verification and Validation
• Verification– Are you building the system right?
• Validation– Are you building the right system?
![Page 15: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/15.jpg)
Let’s Give it a Shot• Manual wind-up battery charger
![Page 16: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/16.jpg)
Let’s Give it a Shot
http://dornob.com/crank-case-rechargeable-wind-up-emergency-batteries/
![Page 17: Lecture 05 Project Specifications JC...Lecture 05 Project Specifications JC Created Date: 9/25/2019 5:12:23 PM](https://reader033.vdocuments.site/reader033/viewer/2022043017/5f3a10566598f4369e39c991/html5/thumbnails/17.jpg)
Don’t paint self into a corner !Keep in mind • Design time• Implementation time• Debugging• First prototype• First functioning unit …
• Work hard, never panic, keep low-expectations & stick to the K.I.S.S. principle• It is better to beat expectations !!!