lease be aware: p (unprocessed...

90
(Unprocessed Collection) -- Please be The information on the following sheets represents a preliminary susvey of this collection. It may well be incomplete, inaccurate, or otherwise out-of-date. This collection may also be, in part or in whole, restricted against access for reason of privacy or other legal issues. This listing is provided to help researchers find potential sources, and to help MASC track unprocessed materials internally. It is strongly suggested that you contact us directly before making any sort of lengthy trip to MASC to view these. Due to the nature of the presentation of each guide, it is possible the origin and location of this collection may be unclear from this page. If you need to identify the source but are unable to do so, look for the filename (minus the suffix - e.g. if you're looking at ua1996-04.pdf, then search for ua1996-04) within the following page: Manuscripts, Archives, and Special Collections Washington State University Libraries m [email protected] 509-335-669 1

Upload: others

Post on 25-May-2020

20 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

(Unprocessed Collection) -- Please be aware:

The information on the following sheets represents a preliminary susvey of this collection. It may well be incomplete, inaccurate, or otherwise out-of-date. This collection may also be, in part or in whole, restricted against access for reason of privacy or other legal issues. This listing is provided to help researchers find potential sources, and to help MASC track unprocessed materials internally. It is strongly suggested that you contact us directly before making any sort of lengthy trip to MASC to view these.

Due to the nature of the presentation of each guide, it is possible the origin and location of this collection may be unclear from this page. If you need to identify the source but are unable to do so, look for the filename (minus the suffix - e.g. if you're looking at ua1996-04.pdf, then search for ua1996-04) within the following page:

Manuscripts, Archives, and Special Collections

Washington State University Libraries [email protected] 509-335-669 1

Page 2: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Compton Union Building Renovation

Bldg. No. 0063

Box No. 1

Builder’s Risk BAIT Committee Regents Budget Grants Public Records Requests 09-293 Public Records Requests 09-192 Public Records Requests 08-35 AMEC Earth & Environmental CO#14187 Brailsford & Dunlavey CO#14034 Social & Economic Sciences Research Center Data Report 01-13 Brightworks Northwest #1 CO#16147 Davis Langdon #1 CO#16144 Kaplan, McLaughlin, Diaz #1 CO#12189 McKinstry/Essention CO#16575 MCS Environmental #1 CO#16190 Steve Goldblatt Third Party Neutral #1 CO#16634 Tim McCarty CO#14111 Reid Middleton #1 CO#12968 Siemens Building Technologies #1 CO#16616 Strata Geotechnical CO#16273 Studio SC CO#17236 Taylor Engineering #1 CO#16170 WSU Police Department Contract #1 Integrus Architecture CO#14280 Integrus Architecture Predesign Study CO#14395#1 Strata Geotechnical Engineering Evaluation Report MCS Environmental, Inc. Lead Based Paint Survey Hoffman Construction Co. Asbestos-Free Certification CO#16590 The Kresge Foundation Green Building Initiative Owen F. Turnbull “Socialization & Architecture” Yost Grube Hall Architecture Services & Activities Facilities Fee Request “Compton Union - A Center for Education & Community Hoffman Construction Company RFQ

4/20/06 3/01-8/08

5/1/01-5/9/06 8/1/01 1/1/05 11/09

7/09 2/08

6/1/01 2/1/01

5/31/05 5/1/05

11/13/95-3/11/97 9/27/06 6/10/05

5/1/06 5/1/01

Undated 5/1/06

3/23/05 6/1/07 6/6/05 5/1/06 6/1/01

10/17/01 11/28/05

7/13/05 8/14/09

6/1/05 Undated

Numbers 99-01 11/99

5/25/05

Page 3: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Compton Union Building Renovation

Bldg. No. 0063

Box No. 1 cont.

Integrus Architecture RFQ MCS Environmental, Inc. Environmental Logic Mercury Containing Components Survey MCS Proposal to Conduct Regulated/Hazardous Materials Good Faith Survey McKinstry Essention SOQ MCS Environmental, Inc. Good Faith Asbestos Survey Kaplan/McLaughlin/Diaz Building Improvement & Expansion Study Integrus Architecture SOQ Architecture Submittals “Firms Not Used #1”

4/19/05 10/14/05

5/1/05 1/27/06 7/13/05 7/12/96 4/26/01

Undated

Compton Union Building Renovation

Bldg. No. 0063

Box No. 2

RFP for Consultant Selection A/E Design Services Selection Miscellaneous 411 Prior to Renovation Post Office Correspondence Email General Correspondence #2 General Correspondence #3 Pfieffer Partners, Inc. /Integrus Architecture 100% Schematic Design - Outline Specifications Pfieffer Partners, Inc. /Integrus Architecture 100% Schematic Design - Project Narratives Hoffman Construction Company GC/CM - Interview Tenant Improvements Integrus Email Correspondence #1 Pfeiffer Partners, Inc. General Correspondence #1

Hoffman Construction Co. #20 Contract CO#16590

Integrus Architecture #2 Contract CO#15398

Integrus Architecture #15 Contract CO#16324

Signage

Hoffman Construction Co. #1

Hoffman Construction Co. #19 Contract CO#16590

11/00 5/01

12/1/95-7/31/97 1/1/06

5/18/05 1/1/05 9/1/05 9/1/05

6/15/05 10/1/08

1/11/05-6/9/05 2/7/05

5/1/09

1/1/05

3/1/09

9/1/08

11/11/05

11/1/08

Page 4: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Compton Union Building Renovation

Bldg. No. 0063

Box No. 3

Hoffman Construction Co. Contract Change Proposals Numbers 325-768

Compton Union Building Renovation

Bldg. No. 0063

Box No. 4

Contract Change Proposals Numbers 035-324

Compton Union Building Renovation

Bldg. No. 0063

Box No. 5

Contract Change Proposals

Integrus General Correspondence #1

Certified Payroll Reports

Rejected Bids

Strata Final Project Binder

Email General Correspondence #1

General Correspondence #2

Integrus Architecture #1 CO#15398

Integrus Architecture #14 CO#16324

Integrus Architecture #13 CO#16324

Integrus Architecture #12 CO#16324

Integrus Architecture #11 CO#16324

Numbers 001-034

2/25/02-8/4/09

9/1/07

5/7/07

9/8/08

12/01/01-5/17/05

11/1/00-12/31/04

2/4/04-12/31/04

3/1/08-6/30/08

7/1/08-2/28/09

11/1/07-2/29/08

10/1/07-10/16/07

Page 5: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Compton Union Building Renovation

Bldg. No. 0063

Box No. 6

Integrus Architecture #10 CO#16324

Integrus Architecture #9 CO#16324

Integrus Architecture #8 CO#16324

Integrus Architecture #7 CO#16324

Integrus Architecture #6 CO#16324

Integrus Architecture #5 CO#16324

Integrus Architecture #4 CO#16324

Integrus Architecture #3 CO#16324

Integrus Architecture #2 CO#16324

8/1/07-9/30/07

6/1/07-7/31/07

2/1/07-5/31/07

9/1/06-1/31/07

6/9/06-8/31/06

4/1/06-5/10/06

2/9/06-3/31/06

1/1/06-2/8/06

10/1/05-12/31/05

Compton Union Building Renovation

Bldg. No. 0063

Box No. 7

Integrus #1 CO#16324

Hoffman Construction Co. #3 CO#16590

Hoffman Construction Co. #2 CO#16590

Hoffman Construction Co. #1 CO#16590

Hoffman Construction Co. GC/CM Procedures #3

Hoffman Construction Co. GC/CM Procedures #2

Hoffman Construction Co. GC/CM Procedures #1

Hoffman Construction Co. #18 CO#16590

Request for Proposals for Hazmat Consultants

Hoffman Construction Co. #17 CO#16590

Hoffman Construction Co. #16 CO#16590

10/5/05

1/1/07-2/28/07

11/1/06-12/31/06

5/9/06-10/31/06

5/18/05

6/21/05

5/3/05

8/1/08-10/31/08

4/18/05

6/1/08

4/1/08-5/31/08

Page 6: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Compton Union Building Renovation

Bldg. No. 0063

Box No. 8

Hoffman Construction Co. #15 CO#16590

Hoffman Construction Co. #14 CO#16590

Hoffman Construction Co. #13 CO#16590

Hoffman Construction Co. #12 CO#16590

Hoffman Construction Co. #11 CO#16590

Hoffman Construction Co. #10 CO#16590

Hoffman Construction Co. #9 CO#16590

Hoffman Construction Co. #8 CO#16590

Hoffman Construction #7 CO#16590

Hoffman Construction #6 CO#16590

Hoffman Construction #5 CO#16590

Hoffman Construction #4 CO#16590

3/1/08

2/1/08

1/1/08-1/31/08

12/1/07-12/31/07

11/1/07-11/30/07

10/1/07-10/31/07

91/1/07-9/30/07

8/1/07-8/31/07

7/1/07-7/31/07

6/1/07-9/25/07

4/1/07-5/31/07

3/1/07-3/31/07

Page 7: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Compton Union Building Renovation

Bldg. No. 0063

Box No. 9

Kaplan/McLaughlin/Diaz Building Improvements, and Expansion Study

Integrus Architecture/HHPA Submittal

Integrus Architecture SOQ AE and Related Services

Hoffman Construction Co. GC/CM RFQ

RFQ for Commissioning Services

Hoffman Construction Preconstruction #1 CO#16440

Brailsford & Dunlavey Preliminary Market Analysis *Updates*

Wilson Road Improvements

Electronic Documents 1-4

RFQ for GC/CM Services

AMEC Earth & Environmental, Inc. Limited Facility Survey

MCS Environmental, Inc. Proposal

Avista Rebates & LEED Incentive

McKinstry Energy Services Proposal Phase 2.4 CHW Loop Connection Final ESP

SESRC (Social & Economic Sciences Research Center) Data Report 01-13 Cub Renovation Survey

Hoffman Construction Company RFQ Bid Package #A2

Integrus Architecture Wayfinding & Environmental Graphics Program

MCS Environmental Inc. Closure Report for Asbestos Abatement Project Supervision (WA Bldg.)

Integrus Structural Investigation

Brailsford & Dunlavey Proposal to Render Professional Consulting Services

7/12/96

Undated

4/7/05

5/25/05

1/31/06

1/13/06

Summer 2001

2007-2008

2006

5/3/05

10/31/01

5/11/05

6/11/08

2/1/06

1/30/06

8/10/06

3/10/06

9/6/01

5/11/00

Page 8: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Education Addition (Cleveland Hall)

Bldg. No. 086A

Box No. 9 cont.

Budget

Builder’s Risk Insurance

EIS

Regents

FAC

Project Planning Committee #1

AMEC Earth & Environmental, Inc. #1

Geo Engineers, Inc. CO#13431

KJM CO#14730

KJM CSI Division Report (Draft) 100% CD Estimation

KJM By Element Report

KJM Constructability Review

Reid Middleton #1 CO#12968

10/1/99

4/7/04

1/1/03

7/22/97

1/13/00-9/15/05

1/8/98

3/17/03

11/1/99

3/1/02

4/28/03

4/28/03

9/12/02

10/1/99

Page 9: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Education Addition (Cleveland Hall)

Bldg. No. 086A

Box No. 10

Stephen F. McAuley Construction Management #1 CO#13339

Stoel Rives LLP #1 CO#12589

Strata Geotechnical Engineering #1 CO#15527

Email General Correspondence

General Correspondence #2

Project Management Minutes

Project Schedule Correspondence

Energy Life Cycle Cost Analysis Correspondence

Schematic Design Report

Roen & Associates #2 Value Engineering Survey

Roen & Associates #1 Value Engineering Study

A/E Consulting Services Selection

Thomas Hacker & Associates #4 General Correspondence

Thomas Hakcer & Associates Structural & Energy Calculations

Thomas Hacker & Associates #5 Contract CO#12801

MW Consulting Engineers Energy Life Cycle Cost Analysis Volume I

MW Consulting Engineers Energy Life Cycle Cost Analysis Volume II

Shea Graham Construction, Inc. #1 General Correspondence

Shea Graham Construction, Inc. #1 Contract CO#15525

Thomas Hacker & Associates Architects PC Predesign Documents

Schematic Design

Strata Final Project Summary Test Report

KJM 100% Construction Document Estimate

8/9/99

3/30/98

3/24/04

1/17/01-6/23/05

9/5/02-6/17/08

8/1/99

10/1/99

7/1/00

Undated

6/1/00

6/27/00

5/97

5/1/01

4/2/03

3/1/05

7/00

7/00

3/1/04-3/20/06

3/1/04-9/30/05

6/22/98

Undated

8/4/04

5/9/03

Page 10: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Education Addition (Cleveland Hall)

Bldg. No. 086A

Box No. 11

Thomas Hacker Architects, Inc. Project Manual Volume I Division 0-14

Thomas Hacker Architects, Inc. Project Manual Volume I Division 15 & 16

Maiani Construction Services, Inc. Test & Balance RPF Final Revision

Design Team Estimate

Contract Change Proposals

Certified Payroll Records

Contract Change Proposals

Rejected Bids

Shea Graham - Project Closeout #1

Thomas Hacker & Associates Architecture PC Education Addition Study

Architectural cost Consultants, LLC 100% Design Development Estimate

Thomas Hacker & Associates Architecture Outline Specification Design Development

Roen & Associates #1 Value Engineering Study

General Correspondence #1

1/23/04

1/23/04

8/25/06

4/1/03

Numbers 062-121

2/1/05

Numbers 001R-061

3/16/04

3/9/06

6/22/98

6/9/00

6/12/00

2/1/00-6/00

7/97-6/30/01

Education Addition (Cleveland Hall)

Bldg. No. 086A

Box No. 12

Thomas Hacker & Associates #3 General Correspondence

Thomas Hacker & Associates #2 General Correspondence

Thomas Hacker & Associates #1 General Correspondence

Thomas Hacker & Associates #4 Contract CO#12801

Thomas Hacker & Associates #3 Contract CO#12801

Thomas Hacker & Associates #2 Contract CO#12801

Thomas Hacker & Associates #1 Contract CO#12801

Steve Pea Good Faith Building Inspection Report (rm. #130A, roof top, and steam tunnel)

12/1/00-4/30/01

11/1/99-11/30/00

10/97-10/31/99

10/1/04-2/28/05

5/1/03-9/30/04

6/1/00-4/30/03

11/18/97-3/31/00

11/5/02

Page 11: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Golf Course Expansion (and Master Plan)

Bldg. No. 365E

Box No. 12 cont.

Builder’s Risk Insurance

EIS #1

Regents

BAIT Committee

Attorney General

Issues and Claims

Public Records Requests 10-32 (1 of 7 folders)

5/23/06

5/6/05

11/23/02-8/28/08

11/1/02-8/28/08

10/2009

6/1/08

1/2010

Golf Course Expansion (and Master Plan)

Bldg. No. 365E

Box No. 13

Public Records Requests 10-32 (6 of 7 folders)

Public Records Requests 8-35

Public Records Requests 8-33

Public Information Requests 7-154

Public Information Requests SEPA 0562 #3

Public Information Requests SEPA 0562 #2

Public Information Requests SEPA 0562 #1 (3 folders)

Public Information Requests 5-33

FTP Site Archive (on CD)

“Creating a Championship Golf Course at WSU” Brochure

1/2010

2/2008

3/2008

9/28/07

3/29/05

3/29/05

3/29/05

2/14/05

6/28/06

Undated

Page 12: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Golf Course Expansion (and Master Plan)

Bldg. No. 365E

Box No. 14

Master Plan Water Resources

Signage

Bakers Tree Servic3e #1 CO#16085

Dahlin Group, Inc. #1 CO#16036

Davis Langdon #1 CO16098

Design West Architects #1 CO#16513

Design West Architects Project Manual Division 0-16

Master Plan Economics Research Association Market & Financial Analysis CO#15633

E3RA #1 CO#16148

E3RA Good Faith Hazardous Materials Survey

Trent School of Golf CO#15074

Lane Powell Attorneys Land Use Issues

HGHB #1 CO#16000

Jim Kolva Associates #1 CO#16207

KPFF Consulting Engineers #1 CO#16084

OB Sports #1 CO#16001

Sparling #1 CO#16220

Strata Geotechnical #1 CO#15958

Taylor Engineering #1 CO#15959

RFQ for Golf Course Designer

“An Environmental Approach to Golf Course Development”

Email General Correspondence #1

General Correspondence #1

John Harbottle Email Correspondence

Kemper Sports General Correspondence #1

John Harbottle Design #1 General Correspondence

John Harbottle Design #1 Contract CO#15415

John Harbottle Design #1 Contract CO#15919

Oliphant Golf Construction #1 General Correspondence

Oliphant Golf Contract #1 CO#16598

Pre-bid Meeting Minutes #1

Courseco, Inc. General Correspondence

Environmental Permits #1

Gathering Pavilion Tent Failure Correspondence

4/1/04

4/1/08

3/22/05

2/18/05

2/28/05-7/2/07

2/1/06-4/16/05

3/26/07

5/1/04

4/1/05

7/7/05

5/1/06

6/28/05

2/8/05

6/29/05

3/30/05

2/1/05

7/11/05

1/24/05

1/25/05

7/1/03

Undated

3/1/04

6/1/03

4/1/04

12/15/05

1/1/04

2/2/04

1/19/05

5/1/06

5/1/06

3/2/06

6/1/06

1/31/06

2/1/09

Page 13: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Tent Failure Correspondence 11/1/08

Golf Course Expansion (and Master Plan)

Bldg. No. 365E

Box No. 15

Wetland Mitigation

Water Reuse

Golf Course Studies

Project Manual John Harbottle Design

Preliminary Expansion Study

Wetland Delineation Report

Golf Course Market Analysis Report City of Pullman

ERA Market Analysis Report

Comfort Station Correspondence

Vet Med Relocation

Master Plan Meeting Minutes

Golf Course

Golf Couse Expansion Theme

Firms

Public Survey

Meetings and Correspondence

Financing

Certified Payroll Reports

Contract Change Proposals Oliphant

Oliphant Responsibility File

Rejected Bids

1/1/06

1996-2008

1995

1/24/06

5/96

1/7/05

10/15/91

6/15/04

10/1/07

6/10/04

4/1/04

6/12/91-10/02

1/1/96-10/31/97

1997

7/18/97

9/7/95-3/13/98

8/7/95-3/13/98

6/1/06

Numbers 001-021

4/06

3/06-5/06

Page 14: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Golf Course Entry Road and Parking

Bldg. No. 365

Box No. 15 cont.

Builder’s Risk Insurance

Regents

BAIT

Public Records Request Numbers 8-33

Public Records Request Numbers 8-33

Strata Geotechnical Engineering & Materials Testing CO#16751

Taylor Engineering, Inc. #1 CO#16052

Roundtop Hill/Jerry Newbrey Trail

Stormwater Permits

General Correspondence #1

John Harbottle Project Manual Design Golf Course Architecture Volume I Divisions 0-16

4/26/06

5/2/05-5/9/06

10/22/04-3/20/08

3/08

2/08

7/1/06

2/25/05

6/1/06

8/1/06

3/23/06

3/1/06

Page 15: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Golf Course Entry Road and Parking

Bldg. No. 365

Box No. 16

John Harbottle Design #1 General Correspondence CO#16599

Motley-Motley, Inc. #1 General Correspondence

Motely-Motley, Inc. Contract CO#16599

Contract Change Proposals Motley-Motley

Rejected Bids

5/1/06

4/19/06-9/28/10

5/9/06

Numbers 001-038

4/13/06

Golf Course Management

Bldg. No. 365

Box No. 16 General Correspondence

CourseCo, Inc. #1 General Correspondence

CourseCo, Inc. #1 Contract CO#16450

10/27/05

6/1/06

6/1/06

Golf Course Pavilion

Bldg. No. 365M

Box No. 16

Bunker Steel Building, Inc.

Coffman Engineering CO#18203

General Correspondence

Furnace

Acoustic Panels

East Concrete Patio

Concrete Polishing

Design Drawings

4/2/09-11/5/09

6/1/09

6/1/09

11/2010

10/2010

8/2010

7/2010

3/2009

Page 16: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Grimes Way Steam Plant (Energy Plant Redevelopment)

Bldg. No. 0840

Box No. 16 cont.

Budget

Builder’s Risk Insurance

EIS

Regents

BAIT Committee

Attorney General

Department of Ecology General Correspondence

Department of Ecology Notice of Construction

Avista Utilities Correspondence

AMEC Earth & Environmental, Inc. #1 Asbestos Abatement CO#15053

Bison Engineering, Inc. #1 CO#16070

E3RA, Inc. #1 CO#15739

Geoengineering, Inc. #1 CO#14495

Bison Engineering NOx, CO, & VOC Emissions Compliance Test

MRW & Associates, Inc. CO#14023

New Generation Services CO#14024

7/1/02

7/3/03

10/2/01

9/6/02-6/29/01

12/6/00-10/27/05

2/1/01

9/9/03

6/12/03

4/1/02

5/1/03

3/14/05

8/13/04

3/29/02

5/10/05

3/1/01

3/1/01

Page 17: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Grimes Way Steam Plant (Energy Plant Redevelopment)

Bldg. No. 0840

Box No. 17

Preston/Gates/Ellis, LLP

Progressive Engineering Group, Inc. CO#17401

Rooney Engineering, Inc. #1 CO14813

Strata Geotechnical Engineering & Materials Testing CO#14278

Strata Geotechnical Engineering Evaluation Final Report

SCM Consultants, Inc. #1 CO#14814

Siemens Energy & Automation

Sonnichsen Engineering, Inc. CO#13953

Susan D. Musselman Inc. #1 CO#14409

Taylor Engineering, INc. C.E. Design Services

Thomas, Dean, & Hoskins Domestic Water System Modeling CO#14592

URS Corporation #1 CO#16262

Valutek CO#13948

Williams Gas Pipeline West Letter Agreement

Wood/Harbinger, Inc. CO#14279

Wood/Harbinger, Inc. Steam System Upgrades #2 CO#14560

RFP for Joint Agreement

RFP for Engineering Consultant Services

Email General Correspondence #1

Trigen Energy Corporation General Correspondence #1

General Correspondence #3

Harris Group Inc. General Correspondence #1

Harris Group Inc. Contract #6 CO14852

Hoffman Construction Company #1 General Correspondence

Hoffman Construction Company #1 Preconstruction Professional Services CO#14889

3/1/01

11/1/07

11/5/02

7/1/01

1/24/03

1/31/03

10/02

3/1/04

1/1/01

1/1/03

1/9/03

7/20/04

12/27/02

Page 18: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Grimes Way Steam Plant (Energy Plant Redevelopment)

Bldg. No. 0840

Box No. 18

General Correspondence #2

RFQ New Energy Plant

Contract Change Proposals

RFQ GC/CM Selection #2

RFQ GC/CM Selection #1

Certified Payroll Reports

Rejected Bids GC/CM RFP

Hoffman Construction Company Interview

Hoffman Constrcution Company SOQ for GC/CM

Lydig SOQ

Wood/Harbinger Steam CO#14560

Harris Group, Inc. #5 CO#14852

Harris Group, Inc. #4 CO#14852

Harris Group, Inc. #3 Contract CO#14852

1/1/01-12/31/03

11/02

Numbers 002-009

10/02

12/02

8/1/03

12/02

12/5/02

11/21/02

11/21/02

4/1/02-5/1/03

1/17/04-7/19/04

10/1/03-1/16/04

7/23/03

Grimes Way Steam Plant (Energy Plant Redevelopment)

Bldg. No. 0840

Box No. 19

Harris Group, Inc. #2 Contract CO#14852

Harris Group, Inc. #1 Contract CO#14852

Hoffman Construction Co. of WA. GC/CM #7

Hoffman Construction Co. of WA. GC/CM #6

Hoffman Construction Co. of WA. GC/CM #5

Hoffman Construction Co. of WA. GC/CM #4

Hoffman Construction Co. of WA. GC/CM #3

Hoffman Construction Co. of WA. GC/CM #2

Hoffman Construction Co. of WA. GC/CM #1

4/1/03-7/22/03

1/13/03-3/30/03

8/1/04-8/1/04

2/11/04-8/1/04

10/1/03-2/10/04

9/1/03-9/30/03

8/1/03-8/31/03

7/1/03-7/31/03

5/1/03-6/30/03

Page 19: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Grimes Way Steam Plant (Energy Plant Replacement Facilities)

Bldg. No. 0840

Box No. 19 cont.

Builder’s Risk Insurance

Regents

BAIT Committee

Hodge and Associates CO#14451

Strata Geotechnical Engineering & Materials Testing CO#14448

Taylor Engineering, Inc. CO#14513

General Correspondence #1

7/12/02

7/1/02

7/1/02-9/5/02

2/1/02

2/1/02

1/28/02

2/1/02

Grimes Way Steam Plant (Energy Plant Replacement Facilities)

Bldg. No. 0840

Box No. 20

Lydig Construction, Inc.

Lydig Construction, Inc. #1 CO#14625

Contract Change Proposals Lydig Construction, Inc.

Responsibility File Lydig Construction, Inc.

Planholders List/ Correspondence

Rejected Bids

Closeout

7/1/02-7/9/03

7/1/02-4/30/03

Numbers 001-015

6/7/02

7/2002

6/7/02

1/1/03

Page 20: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Heald Hall Renewal

Bldg. No. 82

Box No. 20 cont. Budget

Regents

Coffman Engineers, Inc. CO#14615

Project Planning Committee

Project Request Report

Miller/Hull Partnership Preliminary Expanded Options Study

Miller/Hull Partnership Options Phase Document

AMEC (Administration Annex) Cost-Estimate Regulated Material Removal/Disposal

AMEC Limited Facility Survey (2 copies)

Expanded Options Study #2

Column Analysis and Rebar Study

Email General Correspondence #1

General Correspondence #2

Miller/Hull Partnership General Correspondence #1

Miller/Hull Partnership Consultant Selection

Miller/Hull Partnership Predesign Study

Expanded Options Study #1

General Correspondence #1

BAIT Committee

Regents

Project Planning Committee

General Correspondence #1

AMEC Earth & Environmental, Inc. #1 CO#14393

10/92-8/93

12/8/92

6/1/02

92-93

10/1/01

8/95

6/15/92

2/8/02

2/8/02

6/1/95-3/18/69

1993

5/15/97

41/1/92-4/15/03

12/91

1991

9/92

2/10/93-5/31/95

1991

3/29/01-5/10/01

5/01

4/17/02

4/1/01-6/18/02

11/19/01

Heald Hall Renewal

Bldg. No. 82

Box No. 21. Coffman Engineers Structural Review CO#14615

Meeting Minutes

A/E Design Services Selection

LMN Architects General Correspondence #1

Project Request Report

Budget Committee Presentation: Major Capital Projects Request

LMN Architects Predesign Report (electronic copy included)

LMN Architects Biotechnology Life Sciences Facility Predesign Report

AMEC (AD Annex) Limited Facility Survey

AMEC Hazardous Materials Limited Facility Survey (Originals)

A/E Design Services Selection

5/1/02

11/1/02

4/2001

7/1/01

10/1/01

2/5/08

Undated

8/6/01

2/8/02

2/8/02

4/01

Page 21: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

(Holland) Library Renovation

Bldg. No. 0062

Box No. 21 cont.

Budget

Regents

BAIT Committee

Project Planning Committee

Email General correspondence #1

General Correspondence #1

NW Architectural Company General Correspondence #1

NW Architectural Company Contract #1 CO#12862

Phoenix Environmental, Inc. Asbestos & Paint Inspections

Baugh Construction Oregon, Inc. Response to RFQ for GC/CM (x2)

Lydig Construction, Inc. RFQ and Interview (x2)

Garco Construction, Inc.

A/E Design Services Selection

6/1/02-2/9/04

4/18/01

3/29/01-5/10/01

7/9/99

7/1/00-2/5/04

6/1/01

7/19/02

5/1/01-5/31/01

6/26/01

4/19/01

4/19/01

4/19/01

January 2001

(Holland) Library Swing Space

Box No. 21

NW Architecture Company General Corporation #1

NW Architecture Contract #1 CO#15337

11/25/03-2/3/04

10/1/03-2/17/04

(Holland) Library System Master Plan

Box No. 21

Regents

Finance & Audit Committee

LMN Architecture General Correspondence #1

Budget

General Correspondence #1

RFQ for Architectural Planning Services

GC/CM Procedures

9/2003

9/03-10/03

1/1/03-11/17/05

11/1/03-11/25/03

10/1/03-3/15/05

7/1/03

Undated

Page 22: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

(Holland) Library System Master Plan

Box No. 22

LMN Architectural + Resource Planning Group SOQ

LMN Interview Presentation

LMN Project File Study

NAC Predesign Study

OPSIS Architecture/NAC Program Analysis

NAC Submittal (Application)

Installation of Fire Sprinklers & Alarm System (Old Files)

8/22/03

9/19/03

6/21/04

6/02

6/19/01

6/02

8/29/90-3/29/95

Page 23: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Library Road Phase III

Bldg. No. 0062

Box No. 22

Builder’s Risk Insurance

EIS

Stormwater

Regents

Finance and Audit Committee

Issues and Claims

BOLA Architecture + Planning CO#17653

E3RA, Inc. CO#17408

Steven Goldblatt Third Party Neutral CO#17627

Strata Geotechnical Engineering & Materials Testing CO#17162

Strata Geotechnical Engineering Evaluation

Taylor Engineering CO#17547

Tree Associates CO#17849

Whiteshield, Inc. CO#17160

Field Reports

Murrow Hall Bridges

AD Annex (w/ photocopies dated back to the 1970s)

AD Annex Abatement

Schematic Design Brochure

Design Review Comments

General Correspondence

GC/CM Selection #2

GC/CM Selection #1

KPFF Drainage Control Plan Analysis

KPFF Preliminary Design Report

3/6/08-1/22/10

11/1/07-4/7/08

1/1/08-4/7/08

10/19/07-7/2/08

9/6/07-10/9/09

10/1/08-9/17/09

5/1/08-9/6/08

12/1/07-5/20/09

5/1/08

7/1/07-9/14/09

12/6/07

4/10/08-2/23/09

9/1/08-12/14/08

6/1/07-4/3/08

7/1/07-9/27/08

2/1/08-5/5/08

12/1/07-12/8/08

2/1/02-7/15/08

10/1/07

12/1/07-4/22/08

12/1/06-4/6/11

7/19/07

7/2/07

4/2/08

10/12/07

Page 24: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Library Road Phase III

Bldg. No. 0062

Box No. 23

Meeting Minutes

KPFF Consulting Engineering General Correspondence #1

KPFF Consulting Engineering Contract #2 CO#17159

Schedules

RFQ GC/CM

Hoffman Construction Co. General Correspondence #1

Estimates GC/CM

Non-Compliance Reports

Trees

Strata Geotechnical Engineering Evaluation Revised Report Phases 3 & 4 (OBSOLETE)

Graham Construction & Management, Inc. SOQ

Hoffman Construction Co. RFQ for GC/CM

Lydig Construction SOQ for GC/CM Services

Hoffman Construction Co. GC/CM Contract #1 CO#17497

Hoffman Construction Co. Contract #7 CO#17645

Certified Payroll Reports

Rejected Bids

Close Out Items

Hoffman Construction Co. Contract #1 CO#17246 (Preconstruction)

5/1/07-1/14/09

5/1/07-10/4/10

4/15/08-8/20/10

6/1/07

7/19/07

8/1/07-9/29/10

3/28/07-6/12/08

7/1/08

3/1/02

9/25/07

7/24/07

7/24/07

7/24/07

3/1/08-2/28/10

12/1/09-3/25/10

12/1/09-12/17/09

Bid Date 8/13/07

11/1/08-11/21/08

8/1/07-6/28/08

Library Road Phase III

Bldg. No. 0062

Box No. 24

Hoffman Construction Co. Contract #6 CO#17645

Hoffman Construction Co. Contract #5 CO#17645

Hoffman Construction Co. Contract #4 CO#17645

Hoffman Construction Co. Contract #3 CO#17645

Hoffman Construction Co. Contract #2 CO#17645

Hoffman Construction Co. Contract #1 CO#17645

KPFF Consulting Engineers Contract #1 CO#17159

KPFF Consulting Engineers Bid Package #2 Utilities Project Manual

KPFF Consulting Engineers Bid Package #1 Utilities Project Manual

9/1/09-11/30/09

7/1/09-9/1/09

5/1/09-7/31/09

1/1/09-4/30/09

10/1/08-12/31/08

6/1/08-9/30/08

7/1/07-3/15/08

2/14/08

5/14/08

Page 25: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition PBS I Interior Sign Package

(Pre-Public Records Request)

Do not mix with post-request files

Bldg. No. 0076

Johnson Hall Addition, PBS II

Box No. 24 cont. Budget #1

Regents

BAIT Committee

Zimmer Gunsul Frasca Partnership #1 General Correspondence

Zimmer Gunsul Frasca Partnership Contract CO#14432

4/10/98-7/17/03

5/1/01-6/15/05

3/29/01-5/10/01

12/21/01-5/16/02

1/1/02-9/30/02

Johnson Hall Addition, PBS I

Box No. 25 Builder’s Risk Insurance, Interior Sign Package Builder’s Risk Insurance

EIS

Regents

BAIT Committee

Public Records Request

Attorney General

Project Planning Committee

Issues & Claims

Roen Associates Construction Cost Estimate - Design Review Development

Construction Meeting Minutes #1

Zimmer Gunsul Frasca Partnership Predesign Study

WSU Utility Services Good Faith Building Inspection

Roen Associates Construction Cost Estimate - Schematic Design

#0076 Johnson Hall Scoping Study McClellan & Copenhagen, Inc.

Johnson Hall Strategic Master Plan

#0076 McClellan & Copenhagen, Inc. CO#12835

McClellan & Copenhagen, Inc. Statement of Qualifications

Lane Powell Attorneys

Glumac International Commissionary Services CO#15061

Pederson Associates, Inc. CO#14045

SCM Consultants Asbestos Lead Survey CO#14124

5/31/05-6/15

7/23/03-4/26/04

3/17/03

5/19/99-6/14/02

6/15/05-10/15/05

3/05

1/1/02-6/23/03

4/5/00-10/05/01

4/1/05

9/10/02

10/1/99

5/02

3/4/03-3/11/03

4/30/02-9/19/02

12/24/97-4/18/98

5/12/99-3/15/00

1/27/98-7/22/02

10/22/97

10/01/04-10/1/05

3/1/03

4/1/01

6/1/01

Page 26: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition PBS I

Bldg. No. 0076

(Pre-Public Records Request)

Do not mix with post-request files

Box No. 25 (cont.)

Reid Middleton #1 CO#12968

Siemens #1 CO#14520

Strata #1 CO#14422

White Shield, Inc. Site Survey Contract CO#14423

Winston & Cashatt - Patrick Sullivan Third Party Neutral CO#15212

Email General Correspondence

General Correspondence #2

Zimmer Gunsul Frasca Partnership Email Correspondence

Zimmer Gunsul Frasca Partnership Contract CO#14316

Zimmer Gunsul Frasca Partnership General Correspondence #2

CK Doty & Associates Responsibility File Baugh/Skanska GC/CM Preconstruction Services #2 Contract CO#14353

Baugh Construction Oregon, Inc. GC/CM Preconstruction Services #1 CO#14353

Baugh/Skanska Design Development Estimate - Phase I

Certified Payroll Reports

Contract Change Proposal Skanska USA, Inc. CO#15014 (Electrical Final Offer)

Contract Change Proposals

4/1/02

1/1/02-8/21/03

12/1/01-2/28/05

12/1/01-6/17/02

5/1/03-1/14/04

5/1/99-8/5/02

6/1/04-1/18/05

7/1/01-5/2/05

11/11/05-6/29/07

7/1/02-7/2/04

4/11/05

9/1/03-10/10/03

10/21/01-11/4/02

9/9/02

2/1/05-5/10/05

#’s23, 14, 15, 77, 48, 107, 93, 106, 103, 101, 122

Numbers 160-186

Johnson Hall Addition PBS I

Bldg. No. 0076

(Pre-Public Records Request)

Do not mix with post-request files

Box No. 26

Contract Change Proposal Skanska, Inc. CO#15014

Numbers 001-159

Facilities Services

Page 27: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition PBS I

Bldg. No. 0076

(Pre-Public Records Request)

Do not mix with post-request files

Box No. 27

Plant Sciences Programs Document for Dr. Gretchen Bataille, Provost

Zimmer Gunsul Frasca #1 General Correspondence

Rejected Bids GC/CM

Zimmer Gunsul Frasca #8 Contract CO#14316

Zimmer Gunsul Frasca #7 Contract CO#14316 Zimmer Gunsul Frasca #6 Contract CO#14316

Zimmer Gunsul Frasca #4 Contract CO#14316

Zimmer Gunsul Frasca #3 Contract CO#14316

Zimmer Gunsul Frasca #2 Contract CO#14316

Zimmer Gunsul Frasca #1 Contract CO#14316

8/22/97

7/1/99-6/30/02

7/26/01

4/19/05-11/10/05

8/20/04-4/6/05 1/1/04-8/19/04

1/1/03-4/30/03

9/1/02-12/31/02

6/1/02-8/31/02

9/1/01-5/31/02

Page 28: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition, PBS I

Bldg. No. 0076

(Pre-Public Records Request)

Do not mix with post-request files

Box No. 28

General Correspondence #1 Contract CO#14316

Skanska USA Building Inc. #1 General Correspondence

Baugh Construction Oregon, Inc. #1 Contract CO#14353

Zimmer Gunsul Frasca #5 Contract CO#14316

Zimmer Gunsul Frasca #2 Predesign CO#13396 Contract

Zimmer Gunsul Frasca #1 (Pay estimates, Change orders, Extra design services)

Skanska USA Building Inc. #2 Contract CO#15014

McClellan & Copenhagen, Inc. College of Agriculture & Home Economics

Johnson Hall Condition/Needs Assessment a Study of Capital Program Requirements for Plant Sciences

90% Pre-draft copy

Baugh RFQ for GC/CM Services

Lydig Construction, Inc. RFQ

McClellan & Copenhagen, Inc. Strategic Vision Plan

1/15/98-5/31/04

1/1/01-2/24/05

2/1/02-9/1/03

5/1/03-12/31/03

3/1/01-1/14/02

12/1/99-2/28/01

10/21/03-3/24/04

4/6/98

5/25/01

5/25/01

10/6/99

Page 29: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition PBS I

(Post-Public Records Request)

Do not mix with pre-request files

Bldg. No. 0076

Box No. 29

Budget

Builder’s Risk Insurance

EIS

Public Records Request 5-89

Strata Post Records Request

Issues and Claims #2

Issues and Claims #1

Project Planning Committee

McLellan & Copenhagen General Correspondence

Daily Construction Reports

Email General Correspondence

General Correspondence

Zimmer Gunsul Frasca Email General Correspondence

Zimmer Gunsul Frasca General Correspondence

Zimmer Gunsul Frasca Contract CO#14316

Schematic Design System and Material Narrative Description

CK Doty & Associates Interior Sign Package Contract Change Proposal

CK Doty & Associates #1 General Correspondence

CK Doty Associates #1 Contract CO#16145 #1

Skanska USA Building, Inc. Contract CO#15014

Skanska #2 General Correspondence

Skanska Monthly Reports

Skanska Monthly Reports March-April

Skanska General Correspondence #1

Skanska #3 Contract CO#15014

7/1/05

8/3/05

1/6/06

Numbers 5-89

2/27/05-3/31/05

9/22/04-8/22/05

8/22/03-10/7/04

8/1/02

6/1/02

11/1/03-12/17/04

5/1/01-10/01/05

10/10/01-12/11/06

8/1/01-6/3/03

3/10/02

10/31/05-5/31/07

3/27/02

001

4/1/05-8/2/05

6/8/05-10/17/05

4/30/05-10/31/05

1/1/05

May - June

March - April

9/20/02-9/24/02

3/25/04-3/27/05

Page 30: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition PBS I

(Post-Public Records Request)

Do not mix with pre-request files

Bldg. No. 0076

Box No. 30

Skanska USA Building Inc. #1 Contract

Skanska Construction Meeting Minutes

Skanska Contract Change Proposals

Rejected Bids - Interior Sign Package

Baugh/Skanska M.A.C.C Proposal

Report Geotechnical Engineering Evaluation

Strata Statement of Qualifications

A/E Consulting Services Selection

Original Draft Floor Plan

GC/CM Management Procedures

Change Proposal Information

Change Proposal Information

Change Proposal Information

Change Proposal Information

5/1/03-10/20/03

1/04-6/27/05

Numbers 057.2 - 219

4/12/05

12/10/02

4/9/02

1/3/02

5/99

Undated

3/01

6/17/04-2/24/05

7/22/04-11/10/04

9/14/04-12/29/04

9/9/04-11/18/04

Page 31: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Johnson Hall Addition PBS I

(Post-Public Records Request)

Do not mix with pre-request files

Bldg. No. 0076

Box No. 31

Change Proposal Information

Change Proposal Information

Change Proposal Information

Glumac Commissioning Report Sections A-K

Zimmer Gunsul Frasca Partnership Project Specs Bid Package 1

Zimmer Gunsul Frasca Partnership Project Conform Construction Set Volumes 1 & 2

Glumac Commissioning Report Section L (O&M Manual, Control Shop Drawings)

Skanska General Correspondence #1

Wesselman/Pellecchia Associates Environmental Graphic Design Bid Set Specifications

Zimmer Gunsul Frasca Partnership Predesign Study 2nd Draft

RFP GC/CM

3/1/04-4/19/04

1/19/05-4/20/04

5/14/04-7/19/05

June 2005

4/13/03

7/17/03

June 2005

2/1/02-12/31/04

3/21/05

4/28/00

7/5/01

Kimbrough Hall Addition/Remodel

Bldg. No. 0025

Box No. 31

Regents

Budget

Attorney General

Public Information Requests

EIS #1

Disputes Review Board Third Party Agreement Thomas D. Cochran #1 CO#13066

Disputes Review Board Third Party Agreement James A. Fish #1 CO#13066

Rick Fisher, Inc. #1 CO#14844

Disputes Review Board General Correspondence

Robert Fossatti Associates, Inc. P.S. #1 CO#6060

1/8/92-12/14/00

9/1/92-8/4/99

7/15/97-10/4/99

3/1/99-10/5/99

8/30/96

9/17/98-11/30/99

9/23/98-10/1/98

9/23/98-1/19/00

12/1/02-2/12/03

2/99

Page 32: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Kimbrough Hall Addition/Remodel

Bldg. No. 0025

Box No. 32

Hainline & Associates #1 CO#12257

Reid Middleton CO#12968

Rider Hunt Ackroyd CO#12599

Redicheck Firm CO#11621

SCM Consultants, Inc. CO#12436

Strata Geotechnical Engineering & Materials Testing #1 CO#12940 (Per Estimates, CO’s)

Strata #2 Concrete Testing Reports

Wyatt Engineering Contract #1 CO#12165

Project Planning Committee

Construction Field Reports #1

Thompson Vaivoda & Associates Supplemental Instructions

Thompson Vaivoda & Associates #7 General Correspondence

General Correspondence #3

Thomas Vaivoda & Associates #4 Contract (PE’s, CO’s)

Shea Construction, Inc. General Correspondence #2

Shea Construction, Inc. #2 Contract CO#12931 (PE’s, CO’s, Est.)

Mechanical Submittals. Division 15. (1 of 2)

2/5/96-8/12/98

5/14/98-7/26/99

6/23/98-6/23/99

5/5/97-7/16/97

5/14/97-6/24/97

9/25/96-8/10/98

5/1/98-10/25/99

2/1/99-11/16/99

11/9/91-12/21/98

12/2/95-3/18/*96

6/21/98-8/20/99

7/24/98-11/5/99

1/1/99-5/17/00

7/1/99-6/31/00

4/1/99

10/1/99-9/30/00

1998

Kimbrough Hall Addition/Remodel

Bldg. No. 0025

Box No. 33

Mechanical Submittals. Division 15. (2 of 2)

Mechanical Submittals. Division 2-14

Architects Request for information (x3)

Architectural Supplemental Instructions Electrical Submittals Division 16 (x2)

Additional Painting

Thomas Vaivoda RFQ

Fire Alarms

Shea Construction, Inc. #1 Email Correspondence

1998

1998

Undated

Undated

Undated

12/1/98-1/26/00

5/20/98-5/3/99

11/1/99-3/8/00

6/1/99-8/3/99

Page 33: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Kimbrough Hall Addition/Remodel

Bldg. No. 0025

Box No. 34

Shea Construction, Inc. Contract Change Proposal Log

Shea Construction, Inc. Contract Change Proposal

Rick Fisher, Inc. CO#12583

SCM Consultants, Inc. Hazardous Materials Report

Strata Geotechnical Engineering & Materials Testing Final Project CO#12940

Roen Associates Value Engineering Study Addition & Modernization

Glumac International Energy Life Cycle Cost Analysis

Rick Fisher Hi-Fi Audio & Music Production Systems Final Report

Tektoniks Corporation #1 General Correspondence

Tektoniks #1 Contract Pay Estimates & CO’s

Tektoniks Contract Change Proposal

Rejected Bids

Rejected Bid Hazardous Materials

Rejected Bids

Undated

Numbers 001-086

4/7/97-2/12/03

12/2/96

12/29/99

3/21/96

4/1/97-5/16/97

8/97

6/7/97

6/16/97

Numbers 001-002

Bid Opening Date 4/23/98

6/5/97

Bid Opening Date 10/2/97

Kimbrough Hall Addition/Remodel

Bldg. No. 0025

Box No. 35

Project Completion Planning

Punch List Items

Strata Geotechnical Engineering & Materials Testing Concrete Testing Report

General Correspondence #2

General Correspondence #1

Thompson Vaivoda & Associates General Correspondence #6

Thompson Vaivoda & Associates General Correspondence #5

Thompson Vaivoda & Associates General Correspondence #4

Thompson Vaivoda & Associates General Correspondence #3

Thompson Vaivoda & Associates General Correspondence #2

6/1/98-10/3/00

11/1/99-12/27/99

6/1/98-1/31/99

1/1/92-6/30/96

11/20/91-12/31/91

1/1/98-12/31/08

2/1/97-12/31/97

10/1/96-1/31/97

6/1/96-9/30/96

1/1/96-5/31/96

Page 34: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Kimbrough Hall Addition/Remodel

Bldg. No. 0025

Box No. 36

Thompson Vaivoda & Associates General Correspondence #1

Thompson Vaivoda & Associates #3 Contract CO#12151

Thompson Vaivoda & Associates #2 Contract CO#12151

Thompson Vaivoda & Associates #1 Contract CO#12151

Thompson Vaivoda & Associates #1 Contract CO#10971

Shea Construction, Inc. #1 General Correspondence

Shea Construction, Inc. #1 Contract CO#12931

Thomas Vaivoda & Associates, Architecture AIA Addendum One

Hongwest & Associates, Inc. Geotechnical Report

Rider Hunt Ackroyd 100% Construction Document Estimate

SCM Consultants, Inc. Hazardous Materials Safety (Project 4162.010)

1/17/92-12/31/95

9/1/98-2/17/99

1/2/97-7/15/98

11/16/95-12/31/96

3/92-10/8/92

5/1/98-3/31/99

5/1/98-9/30/99

4/8/98

6/20/96-7/16/96

6/27/97

Undated

McCroskey Hall Renovation

Bldg. No. 0019

Box No. 36

Budget

Builder’s Risk Insurance

Regents

FAC Committee

BAIT Committee

Attorney General

Project Planning Committee

Design West Renovation Study

Agra Earth & Environmental, Inc. Limited Facility Survey

Agra Earth & Environmental, Inc. CO#13743

Kovalenko Hale Architects Cost Verification Study #1 CO#13296

McAuley and Associates CO#13339

McAuley and Associates CO#13792

Nixon Consulting, Inc.CO#13706

Reid Middleton #1 CO#12968

ROEN Associates CO#13742

Strata Geotechnical Engineering & Materials Testing CO#13972

Email General Correspondence #1

General Correspondence #1

August 1997

12/31/00-4/4/01

9/3/99-1/15/01

9/9/99-9/21/00

5/99-7/00

3/00

11/18/99

9/1995

5/30/00

6/1/00-11/4/02

7/1/99-12/17/99

8/16/99-10/23/00

8/1/0-10/23/00

6/1/00-9/25/00

3/6/00-10/4/01

7/1/00-8/10/00

11/1/00-6/28/01

3/2/00

2/1/95-10/21/03

Page 35: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

McCroskey Hall Renovation

Bldg. No. 0019

Box No. 37

Garco Construction, Inc. General Correspondence #1

Garco Construction, Inc. Contract #1

Kovalenko Architecture General Correspondence #1

Garco Construction, Inc. Contract Change Proposal

Garco Construction, Inc. Responsibility File

Rejected Bids

Kovalenko Hale Architects Contract #1 CO#13387

Kovalenko Project Specs

Kovalenko Program Docs

Roen Associates 75% Construction Document Estimate

Schematic Design Brochure

Garco Construction Operating & Maintenance Manual (Telecommunications Vol. 4)

Kovalenko Hale Architects Program Documents

McCroskey Hall & Stevens Hall Renovation (Finalist Letters)

McCroskey Hall & Stevens Hall Renovation General Correspondence & Letters of Interest

12/20/00-12/29/03

12/19/00-3/13/02

5/1/97-10/30/01

Numbers 001-041

11/28/00-12/18/00

Bid Opening 11/28/00

1/31/00-3/31/01

10/9/00

12/2000

7/10/00-4/9/01

7/2000

2001

12/2000

8/16/95-8/22/95

5/6/95-7/12/95

Page 36: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Meyer’s Point Challenge Course

Facility ID #1850

Box No. 37

Builder’s Risk Insurance

Quit Claim Deed

Edward R. Meyer Revocable Living Trust

Property Assessment

AHBL Pre-design Document

General Correspondence #1

AHBL

General Correspondence

Predesign Contract CO#17067

1/2/09-5/12/09

September 1996

October 1990

March 2004

October 2007

5/29/07-2/8/09

4/1/07

4/1/07-1/9/08

Meyer’s Point House/Office/Barn

Facility ID #1854, 1852, 1853

Henderson Inlet BAIT Committee

Regents

E3RA, Inc. CO#18031

General Correspondence

Phase 1 Evaluation Mark Travers General Correspondence #1

NW Environmental Solutions, Inc.

General Correspondence #1

Contract #1 CO#17975

Inventory & Analysis

NW Environmental Contract Change Proposals

Responsibility File

Rejected Bids

11/17/05-1/09

February 2009

2/1/09-4/30/09

3/04-2/29/12

8/8/05-3/18/10

12/1/08-12/31/09

1/1/09-10/9/29

Undated

December 2008

Bid Date 12/2/08

Page 37: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Meyer’s Point Septic System

Facility ID #1850

Box No. 38 Specifications General Correspondence

Jim Hunter & Associates

General Correspondence

Contract CO#19042

Rejected Bids

11/22/11

9/1/10-12/11

9/1/10

9/1/10-2/4/11

Bid Date 12/16/11

Meyer’s Point Water System

Facility ID #1850

Box No. 38

Email General Correspondence

General Correspondence

NW Water Systems, Inc.

General Correspondence

Contract CO#18807

Group B Workbook

Specifications

Mark Travers Architect

Contract CO#15859

Drawings

Specifications

Phase II

Demolition

E3RA

Asbestos Abatement 3rd Party Clearance Inspection/Demolition/Debris Waste Report

NVL Labs & Hazmat Services

Asbestos Survey

Puget Sound Clean Air Agency

Regulation III

6/18/08-11/12/08

6/1/10

4/1/10-7/21/11

5/1/10-9/29/11

9/12/11

9/12/11

8/28/05-7/1/12

Undated

4/9/08

11/11/08

4/24/08

9/22/05

Undated

Page 38: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Murrow Hall Renovation & Addition

Bldg. No. 0033E

Box No. 38

Builder’s Risk Insurance

E.I.S. #1

Attorney General Correspondence

BAIT Committee

Budget #1

Regents

Issues and Claims

Warranty Folder

Project Planning Committee Meeting Minutes #5

Coffman Engineers Structural Design Review CO#14519

Design West Architects CO#14012

Design West Architects Value Engineering Su7tdy

Reid Middleton CO#12968

Sony Systems Integration - TV Production System

Stole Rives Attorneys

WPA, Inc. CO#14704

Strata CO#14754

Email General Correspondence

Northwest Architecture Company Email Correspondence

Meeting Minutes #1

Review Comments #1

Murrow Narrative

Murrow Addition Estimate

GC/CM Selection Correspondence

A/E Consulting Services Selection

General Correspondence #1

Northwest Architecture Company General Correspondence #3

Northwest Architecture Company Contract #2 CO#13938

Northwest Architecture Company Contract #1 CO#12863 (Extra Services)

Baugh Skanska Company General Correspondence #2

9/1/02-12/2/03

10/17/01-11/13/01

12/1/00-8/14/02

3/29/01

11/1/99-5/30/02

7/22/97-8/12/02

July 2002

3/18/04

3/13/98-1/9/01

3/1/02-5/15/03

2/1/01-6/1/01

May 2001

12/1/00-9/3/02

7/1/02-8/21/02

3/30/98-5/27/98

8/1/02-12/3/03

10/1/02-2/20/04

2/1/008/2/01

3/1/01-8/7/01

10/1/00-10/22/01

5/29/01-9/5/01

Undated

7/24/01

2/1/02-5/9/05

June 1997

7/97-7/7/04

8/1/04-9/17/04

7/19/02

2/23/98-3/25/03

2/1/04-8/31/07

Page 39: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Murrow Hall Renovation & Addition

Bldg. No. 0033E

Box No. 39

Baugh Skanska Company Contract #4 CO#14705 (Pay App 15-19)

Baugh Skanska Company Preconstruction Contract #1 CO#14563

RFQ for GC/GM Selection

Baugh Skanska, Inc. Contract Change Proposals

Johns Electric, Inc. Satellite Dish Relocate Electrical Operations & Maintenance Manual

Baugh Skanska, Inc. Contract Change Proposals

Northwest Architecture Company/Opsis Architecture Schematic Design Brochure

Northwest Architecture Company Predesign Study

Northwest Architecture Company Project Manual 50% Construction Documents

Planning Committee Meeting Minutes #4

Planning Committee Meeting Minutes #3

Planning Committee Meeting Minutes #2

11/1/03-9/1/04

5/1/02-10/2/02

February 2002

Numbers 112-134

1/31/03

Numbers 001-111

Undated

June 1998

2/11/02

May-June 1998

May-June 1998

2/27/98-2/27/98

Murrow Hall Renovation & Addition

Bldg. No. 0033E

Box No. 40

Planning Committee Meeting Minutes #1

General Correspondence #2

General Correspondence #1Northwest Architecture Company Contract CO#13938

Baugh Skanska, Inc. General Correspondence #1

Baugh Skanska, Inc. Contract #3 CO#14705 (Pay App 10-14)

Baugh Skanska, Inc. Contract #2 CO#14705 (Pay App 5-9)

Baugh Skanska, Inc. Contract #1 CO#14705 (Change Orders 1-10)

Baugh Skanska, Inc. Contract #1 CO#14705 (Pay App 1-4)

Baugh Skanska, Inc. M.A.C.C. Estimate Draft (Rev. 1)

Northwest Architecture Company Project Manual 75% Construction Document Submittal

Northwest Architecture Company Project Manual 95% Construction Document Volume 1 Divisions 0-14

Northwest Architecture Company Project Manual Set No. 28 Volume 2 Divisions 15-16

February 1998

6/1/01-5/28/04

9/10/98-5/31/01

9/25/00-7/18/02

5/1/02-7/31/04

6/1/03-10/31/03

1/1/03-5/31/03

6/1/03-8/4/03

9/1/02-1/31/02

6/19/02

3/18/02

5/1/02

7/16/02

Page 40: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Murrow Hall Renovation & Addition

Bldg. No. 0033E

Box No. 41

Northwest Architecture Company Project Manual 95% Construction Document Volume 1 Divisions 0-14

Northwest Architecture Company Project Manual Set No. 28 Volume 2 Divisions 15-16

5/1/02

7/16/02

Murrow Hall East Renovation

Bldg. No. 0033E

Box No. 41

Regents

Finance and Audit Committee

BJSS Duarte Bryant General Correspondence #1

BJSS Duarte Bryant, Inc. Architectural Predesign Services

BJSS Duarte Bryant, Inc. Contract #1 CO# 15281

BJSS Duarte Bryant, Inc. Predesign Study

Baugh Skanska RFQ for GC/CM

September 2003

September - October 2003

November 2003

8/22/03

11/4/03-2/9/05

June 2004

3/22/02

Museum of Art Building

Bldg. No. 0829

Box No. 41

Regents

BAIT Committee

Finance and Audit Committee

Site Analysis

Project Planning Committee #1

General Correspondence #1

ALSC Architects/OPIS Architecture General Correspondence #1

ALSC Architects/OPIS Architecture Contract #1 CO#13470

DCI Engineers Civil and Structural Engineering Brochure

ALSC Architects/OPIS Architecture Design Services Proposal

ALSC Architects/OPIS Architecture Predesign Study

ALSC Architects/OPIS Architecture Process

H.M. Brandston & Partners, Inc. (Lighting) Design Submittal

James D.Graham & Associates, Inc. (Power, Lighting, and Telecommunication Systems) Design Submittal

Sparling Electrical Engineering, Lighting Design & Technical Consulting

RFQ for Architectural Predesign Study Services

AE Design Services Selection

5/19/99-10/15/99

9/3/99

4/9/99-5/7/99

August 1999

10/1/99

2/1/99-9/17/99

8/5/99-2/2/00

11/22/99

Undated

7/16/99

May 2000

July 1999

Undated

Undated

6/30/99

Undated

6/99

Page 41: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

North Fairway Drive

Bldg. No. _______

Box No. 41

City of Pullman Memorandum of Understanding

City of Pullman Engineering Services Agreement

Strata Geotechnical Engineering & Materials Testing (Lime Stabilization Laboratory Results)

Taylor Engineering, Inc. Pavement Section Design Report

Taylor Engineering, Inc. Alternative Analysis Technical Memorandum

Grants

Collision Reports

Email General Correspondence

General Correspondence

Sanitary Sewer Replacement Specifications

Strata Geotechnical Engineering Evaluation Proposed Outdoor Recreation Center

3/1/03-56/14/03

September 2003

January 2004

March - April 2004

3/2/04

3/19/04

October - November 2003

8/1/02

3/6/97-6/11/02

3/1/04

3/8/13

Page 42: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Old Incinerator Decommission, Demolition, & Related Works

Bldg. No. 0077

Box No. 42

Budget

Builder’s Risk Insurance

Regents

BAIT

E3RA, Inc. #1 CO#16401

USKH, Inc. #1 CO#15928

Department of Health Correspondence #1

General Correspondence #1

IRS Environmental Hazardous Materials Abatement Contract #1 CO#16635

IRS Environmental General Correspondence

Columbia Energy & Environmental Services General Correspondence #1

Columbia Energy & Environmental Services Contract #1 CO#15575

Motley-Motley, Inc. General Correspondence #1

Motley-Motley, Inc. Contract #1 CO#16860

Construction Meeting Minutes

Certified Payroll Reports

SCM Consultants, Inc. and Dade Moeller & Associates, Inc.

Termination of License & Decommission of Old Incinerator

Columbia Energy & Environmental Services, Inc.

Characterization & Decommission Report

Characterization & Decommissioning Plan

Decontamination & Decommissioning Plan

Characterization Plan

Technical & Cost Proposal for Additional Process Demolition

USKA Project Manual “Preliminary”

SCM Consultants, Inc. State of Qualifications

Environmental Checklist

Rejected Bids

Old Incinerator

Hazardous Materials Abatement

March 2004

11/16/06-3/8/07

6/7/06-12/1/06

3/3/05-1/25/07

12/7/05-8/31/06

1/24/05-7/14/05

1/1/04-11/28/05

1/1/03-7/14/05

6/1/06-10/31/06

5/1/06-12/12/06

2/1/03-4/20/06

4/1/04-6/25/05

10/1/06-10/25/07

10/1/06-5/31/07

9/1/03-3/29/04

8/1/06

1/14/04

11/10/05

9/30/04

8/6/04

7/7/04

4/1/04

March 2005

11/19/03

5/18/05

Bid Date 10/17/06

Bid Date 5/4/06

Page 43: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Olympia Avenue Student Housing

Box No. 42

Builder’s Risk Insurance

Phase II Builder’s Risk Insurance

E.I.S.

Regents

FAA Approval

FAC

Stormwater

A-One Geothermal, Inc. CO#17570

Hainline & Associates CO#18089

Hales & Aldrich, Inc. CO#18729

NW Consulting Engineers CO#19136

Steve Goldblatt Third Party Neutral CO#17735

Strata Final Project Binder

Strata CO#17365

Taylor Engineering, Inc. CO#17421

4/29/08-11/9/09

8/13/08-11/9/09

6/1/08

9/19/03-7/6/11

5/15/08

9/19/03-9/3/09

4/1/08-7/29/10

4/1/08-4/8/10

3/1/9-6/26/09

3/1/10-6/21/10

11/1/10-5/31/11

8/1/08-12/28/09

1015/09

11/1/07

12/1/07-3/28/08

Page 44: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Olympia Avenue Student Housing

Box No. 43

TESTCOMM, LLC CO#17770

TESTCOMM, LLC Commissioning Plan

TESTCOMM, LLC Start-up Plan

ALLWEST Testing & Engineering SOQ

Meeting Minutes

Miscellaneous Test Reports & Logs

Email General Correspondence

General Correspondence #1

Mithun General Correspondence #1 CO#17590

Mithun Contract #6 General Correspondence CO#17590

Mithun Contract #1 CO#17313

Mithun Project Manual Volume 1 & 2

GC/CM Selection #1

GC/CM Selection #2

Submittals

Schedules

RFQs

Graham Construction & Management, Inc. Contract #1 CO#17768

Graham Construction & Management, Inc. Contract (Supplemental Boiler Installation) CO#19137

Graham Construction & Management, Inc. Contract #1 (Preconstruction Services) CO#17505

Graham Construction & Management, Inc. Contract #1 GC/CM CO#17637

Graham Construction & Management, Inc. Contract #1 SOQ

7/1/08-7/12/10

10/17/08

6/5/09

Undated

4/1/08

8/1/08-3/31/10

4/1/08-9/1/09

11/1/07-7/6/11

12/1/07-12/23/14

2/1/11-511/11

1/1/08

Undated

Undated

Undated

6/1/08-11/30/09

4/1/08-7/31/08

7/1/08

7/1/08-1/31/10

11/1/10-8/31/11

1/1/08

5/1/03-2/1/10

12/6/07

Page 45: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Olympia Avenue Student Housing

Box No. 44

Graham Construction & Management, Inc. General Correspondence #2

Contract Change Proposal Student Housing (Boiler)

Contract Change Proposal Student Housing

Contract Change Proposal Student Housing Phase II

Certified Payroll Reports

Rejected Bids

Interviews

Public Notices & Advertisements

RFQs

Mandatory Pre-SOQ Meeting

Rationale for Utilizing the GC/CM Process

Preliminary Determination to Utilize the GC/CM Process

Final Determination to Utilize the GC/CM Process

Public Hearing

SOQ Evaluation

GC/CM RFQ

RFP Proposals

Preconstruction Services Proposals

Awards RFP/RFQ/SOQ Communication

GC/CM Selection Committee

GC/CM RFP/Divisions 0, 1 & Proposals

Graham/Mithun Interview Presentation

Graham Construction & Management, Inc. General Correspondence #1

Mithun Contract #4 CO#17590

Mithun Contract #3 CO#17590

Mithun Contract #2 CO#17590

1/1/10-9/9/11

Number 001

Numbers 001-091

Number 095

7/1/09

12/21/07

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

1/8/07

3/1/08-12/31/09

10/9/09-10/22/10

7/1/09-9/15/09

12/1/08-6/5/09

Page 46: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Olympia Avenue Student Housing

Box No. 45

Mithun Contract #1 CO#17590 5/1/08-12/1/08

Power Plant Modernization Addition

Box No. 45

Budget

FAC

Regents

Builder’s Risk Insurance

Project Planning Committee

Asbestos Abatement Survey

Avista Utilities #1 (Power Plant Modernization Predesign)

Power Plant Boiler Installation Report

Email General Correspondence

General Correspondence

Integrus Architecture Construction Progress Meetings #1

Integrus Architecture Addition General Correspondence #1

Integrus Architecture Predesign Project Committee Meetings #1

Integrus Architecture Predesign Study CO#13527 (electronic copy included)

Integrus Architecture Predesign Email Correspondence

Integrus Architecture Predesign General Correspondence

Integrus Architecture Contract #1 CO#13527

Shea Construction, Inc. General Correspondence #1

Shea Construction, Inc. Contract CO#13781

Daily Construction Reports

Shea Construction, Inc. (Pay Applications & Billing Summary) #10

Shea Construction, Inc. (Pay Applications & Billing Summary) #11

Shea Construction, Inc. (Pay Applications & Billing Summary) #12

Shea Construction, Inc. Cost Reports

Boiler Installation Contract Change Proposals

5/1/00

10/1/99-7/5/00

July 2000

8/9/00

10/1/99

2/29/00

3/1/00-6/13/01

August 2000

12/1/99-8/22/00

7/1/00-9/27/01

8/1/00-1/4/01

7/1/00-12/15/00

12/1/99-4/14/00

6/15/00

1/1/00-6/16/00

12/1/99-8/15/00

2/10/99-10/31/01

7/1/00-9/28/01

7/1/00-5/24/01

8/1/00-5/29/01

3/1/01-3/31/01

4/1/01-4/28/01

4/29/01-7/28/01

8/1/00-4/25/01

Number 002

Page 47: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Power Plant Modernization Addition

Box No. 46

Shea Construction, Inc. (Pay Applications & Billing Summary) #9

Shea Construction, Inc. (Pay Applications & Billing Summary) #7

Shea Construction, Inc. (Pay Applications & Billing Summary) #6

Shea Construction, Inc. (Pay Applications & Billing Summary) #4

Shea Construction, Inc. (Pay Applications & Billing Summary) #3

Shea Construction, Inc. (Pay Applications & Billing Summary) #2

Shea Construction, Inc. (Pay Applications & Billing Summary) #1

Contractor Evaluation

General Correspondence #1

1/1/01-2/28/01

11/25/00-12/31/00

10/29/00-11/24/00

10/1/00-10/28/00

8/26/00-9/30/00

7/24/00-8/25/00

7/6/00-7/21/00

7/5/00

9/1/99-12/31/00

Professional Skills Training Center (CVM)

Box No. 46

General Correspondence

1/1/07

Regents Dining Renovation

Box No. 46

Regents

BAIT Committee

Builder’s Risk Insurance

Virgil Hanson’s Email Backup Disk

Kevin Poitra Email Backup Disk

OAC Technical Proposal

Olympic Associates Company #1 CO#15841

AMEC Earth & Environmental, Inc. #1 CO#15480

Thomas Consulting #1 CO#14858

Strata Geotechnical Engineering #1 CO#15821

Email General Correspondence #1

General Correspondence

Final Commissioning Report (OAC, TESTCOMM, & George Bundy Associates)

URS General Correspondence #2

9/19/03-10/11004

6/13/03-9/15/05

9/22/04-8/31/05

9/28/06

9/29/06

9/30/04

11/17/04-11/9/05

4/27/04

12/1/02-1/14/03

10/1/04-7/21/05

5/16/03

11/1/03-11/30/04

September 2005

10/1/03-11/9/13

Page 48: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Regents Dining Renovation

Box No. 47

URS Corporation Contract #3 CO#15247

Lydig Construction General Correspondence #1

Lydig Construction Contract #1 CO#15898

Lydig Construction Contract Change Proposals

Rejected Bids

Lydig Construction Responsibility File Copies

Lydig Construction Responsibility File

URS Corporation Contract #2 CO#15247

URS Corporation Contract #1 CO#15247

10/5/05-5/2/06

9/1/04-10/16/08

9/1/04-11/30/05

Numbers 001-112

9/17/04-10/13/04

9/21/04

9/21/04

12/1/04-10/4/05

10/16/03-11/30/04

Page 49: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Rotunda Dining Center Renovation

Building No. 80

Box No. 48

Regents

BAIT

Builder’s Risk Insurance

Public Records Request #8-35

Public Information Request #7-60

Coffman Engineers, Inc. CO#16951

Creighton Engineering, Inc. CO#16946

Degenkolb Engineers CO#16293

Degenkolb Engineers Seismic Evaluation & Upgrade Concepts

Elevator Consulting Services, Inc. #1 CO#16952

JLR Design Group, Inc. CO#16972

McKinstry Essention CO#16962

Strata CO#16943

Taylor Engineering, Inc. CO#16343

TESTCOMM, LLC CO#16940

TESTCOMM, LLC Technical Proposal

Thomas Consulting CO#14858

Issues and Claims

General Correspondence #1

Lydig Construction, Inc. General Correspondence #1

Lydig Construction, Inc. Contract #2 CO#16922

URS Corporation General Correspondence #1

URS Corporation Contract #3

Lydig Construction, Inc. Responsibility File

IRS Environmental of WA Site Safety & Health Plan Including Asbestos Removal Procedures

Lydig Construction, Inc. Contract Change Proposal-36 Mechanical Redesign

Lydig Construction, Inc. Contract Change Proposals

9/10/14-1/30/07

9/10/03-3/20/08

1/15/07-2/04/08

February 2008

4/13/07

1/1/07-12/17/07

1/1/07-2/6/08

9/1/05-11/30/07

10/5/05

1/1/07-6/20/08

2/1/07-12/31/07

1/1/07-2/29/08

12/1/06-6/28/07

7/1/07-2/29/08

12/1/06-4/11/08

3/20/06

12/1/01

9/1/08-10/2/08

9/2/05-6/4/09

1/1/07-10/16/08

10/1/07-6/18/08

12/14/04-8/28/12

1/1/07-3/9/07

12/13/06

2/12/07

Undated

Numbers 001-103

Page 50: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Rotunda Dining Center Renovation

Building No. 80

Box No. 49

Certified Payroll Reports

Rejected Bids (Original Bid Date 4/1/06)

URS Corporation Contract #2 CO#15848

URS Corporation Contract #1 CO#15848

Lydig Construction, Inc. #1 CO#16922

3/1/07

Rebid Date 12/12/06

10/11/05-12/31/06

1/5/05-10/4/05

12/1/06-9/31/07

Institute for Shock Physics

Building No. 801A

Box No. 49

Budget

Builder’s Risk Insurance

EIS #1

Regents

BAIT Committee

Attorney General Correspondence #1

Architectural Cost Consultants #1 CO#13985

CTA Architects Engineers CO#13831

Hainline & Associates, Inc. CO#12257

The Redicheck Firm #1 CO#14029

Reid Middleton CO#12968

SCM Consultants Asbestos/Lead Survey CO#13662

Strata Geotechnical Engineers #1 CO#14293

A/E Consulting Services Selection

Project Planning Committee

Value Engineering Report

Email General Correspondence

General Correspondence #2

8/97-10/21/02

8/31/01-11/12/03

9/13/01-10/15/01

9/26/97-9/4/01

1/13/00-3/29/01

9/4/01

1/18/01-4/7/01

2/9/00-10/19/01

12/1/00-3/29/02

2/12/01-4/12/01

10/1/99-12/18/01

4/1/00-10/7/01

3/13/99-11/15/02

October 1997

9/9/97-4/8/98

8/2/00

8/11/97-3/6/12

6/1/01-8/17/04

Page 51: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Institute for Shock Physics

Building No. 801A

Box No. 50

Shock Physics:

Controls

Controls Correspondence

Latest Control Specifications

Reviews

Bid Documents

SCM Consultants, Inc. Good Faith Lead and Asbestos Survey

Strata Geotechnical Engineers Test Results

Lydig Construction Inc. #1 Email General Correspondence

Lydig Construction, Inc. #2 General Correspondence Miller/Hull Partnership #4 General Correspondence

Miller/Hull Partnership Code Review Comments

Miller/Hull Partnership Contract #3 CO#12905

Miller/Hull Partnership Request for Information #1

Miller/Hull Partnership Supplemental Information

Lydig Construction, Inc. Schedules

Lydig Construction, Inc. Contract #2 CO#14269

Miller/Hull Partnership Submittals

Field Authorizations #1

Miller/Hull Schematic Design Brochure

Gun Lab Exhaust Modifications

Warranties #1

Responsibility File

Preconstruction Schedule Development

Close out Items

Lydig Construction, Inc. Contract Change Proposals

February-March 2001

October 2002

May 2001

8/1/02-9/26/02

9/6/01-1/10/03

7/1/02-8/28/06 9/1/0-3/21/07

1/8/02

2/1/03-2/22/05

11/1/01-10/4/02

12/1/01

10/1/01-3/7/02

9/1/02-6/60/03

3/1/01-3/1/02

10/1/01-2/11/03

2/4/00

4/1/03-6/30/03

1/20/03-1/8/04

August 2002

9/99/99

11/1/02-7/31/03

Numbers 187-212

Institute for Shock Physics

Building No. 801A

Box No. 51

Lydig Construction, Inc. Contract Change Proposals Numbers 036-186

Page 52: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Institute for Shock Physics

Building No. 801A

Box No. 52

Lydig Construction, Inc. Contract Change Proposals

Miller/Hull Partnership General Correspondence #3

Rejected Bids #1

Miller/Hull Partnership General Correspondence #2

Miller/Hull Partnership General Correspondence #1

General Correspondence #1

Miller/Hull Partnership Project Manual 100% Construction Document Bid Set (Volume 1 & 2)

MW Consulting Engineers Energy Life Cycle Analysis (Volume 1 &2)

Numbers 001-035

4/13/01-8/31/02

Bid Opening 7/9/01

4/1/00-4/30/01

4/27/98-8/24/99

May 1997

6/14/01

9/2000

Institute for Shock Physics

Building No. 801A

Box No. 53

Miller/Hull Partnership Contract #2 CO#12905

Lydig Construction, Inc. Sherwin Williams Paint Specifications

Lydig Construction, Inc. Contract #1 CO#14269

Lydig Construction, Inc. General Correspondence #1

Miller/Hull Partnership Contract #1 CO#12905

Strata Final Project Binder

Miller/Hull Partnership Predesign Document

Code Review

Budget/Budget Estimates

Miller/Hull Partnership 100% Schematic Design A1.1

Miller/Hull Partnership 100% Veneer Support Elevation S8.1

Sign Shop Drawings

75% Schematic Design (Models/Color Renderings/Elevations)

1/1/01-1/31/03

9/10/02

8/6/01-8/31/02

8/6/00-6/30/02

5/13/98-12/31/00

12/6/02

5/28/98

1/28/02

8/23/00

2/7/00

6/14/01

11/18/02

2/10/99

Page 53: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

South Fairway Intramural Field No. 1

Facility ID # 0833

Box No. 54

Regents “Valley Road Multi-use Recreational Fields Phase II”

Determination of Nonsignificance (Non-Facilities Planning Project) #2

Burke/Lee “Comprehensive Physical Planning Process” Correspondence #1

Email General Correspondence (Field No. 2)

General Correspondence

Motley & Motley, Inc. General Correspondence

Determination of Nonsignificance (Non-Facilities Planning Project) #1

February 1998

1/1/90-2/7/93

7/25/91-2/3/93

3/31/97-4/21/99

6/91-5/7/98

7/23/93

4/90-12/31/92

South Fairway Intramural Field No.2

Box No. 54

Budget “Valley Road Multi-use Recreational Fields”

Regents

EIS #2

Program Statement Expansion & Improvements

Project Planning Committee #1

Richard Carothers Associates, Ltd. #1 CO#10891 & 11466

Stoel Rives LLP #1 CO#12589

Strata Geotechnical, Inc. CO#13069

Strata Geotechnical Concrete Test Reports #1

RCA Huitt-Zollars #1 Email Correspondence

General Correspondence #2

Construction Meeting Minutes

RCA/Huitt-Zollars General Correspondence #1

RCA \/Huitt-Zollars Contract CO#12596

Certified Payroll Reports

Goodfellow Bros., Inc. General Correspondence #1

Goodfellow Bros., Inc. Statement of Compliance

Goodfellow Bros., Inc. Contract #1 CO#13023

General Correspondence #1

Goodfellow Bros., Inc. Contract Change Proposals

Rejected Bids

Rejected Bids

RCA/Huitt-Zollars, Inc. Schematic Design Brochure

Strata Final Project Binder

3/1/99

7/20/93

Undated

8/7/97-10/23/97

3/1/97-8/12/98

6/91-12/15/93

5/27/98

9/14/98-12/31/98

9/25/98-1/5/99

10/21/98-1/4/00

7/1/98-2/7/00

9/1/98-3/17/99

4/15/97-8/2/01

4/15/97-9/17/01

10/31/98

7/28/98-11/25/00

9/15/98-4/28/99

7/23/98-1/29/00

3/7/97-6/30/98

CCPs 001-005

7/23/98

6/22/98

3/6/98

12/21/98

Page 54: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

South Fairway Parking & Road Improvements

Facility ID # 0762

Box No. 54

Attorney General

Regents

EIS

Builder’s Risk Insurance

Strata Geotechnical Engineering #1 CO#15686

Strata Geotechnical Engineering Testing & Inspection Reports

7/1/04

6/16/04

6/1/04-7/14/04

6/17/04-10/11/04

7/6/04-11/23/04

8/1/04-11/9/04

South Fairway Parking & Road Improvements

Facility ID # 0762

Box No. 55

Meeting Notes

Daily Construction Reports

Email General Correspondence

General Correspondence #1

“Campus Infrastructure 3-05” KPFF General Correspondence

KPFF Email General Correspondence

KPFF Consulting Engineers #1 Contract CO#15534

KPFF Consulting Engineers #1 Contract CO#15513

Request for Information

Motley & Motley General Correspondence

Motley & Motley Contract #1 CO#15666

Motley & Motley Contract Change Proposals

Motley & Motley Responsibility File

Rejected Bids

3/1/04

7/1/04-11/29/04

4/1/04

6/1/04-8/23/05

6/1/04-7/20/04

3/1/04-2/12/05

4/9/04

3/26/04-10/31/04

8/1/04

6/1/04-11/9/05

6/1/04-4/30/05

CCPs 001-005

6/1/04-4/30/05

6/1/04

Page 55: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Spring Street, Campus Street, Spillman & Kimbrough Parking Lot Project

Box No. 55

Budget #1

Builder’s Risk Insurance

EIS #1

MD & A CO#15083

Strata Geotechnical Engineering & Materials Testing #1 CO#15220

Strata Geotechnical Engineering & Materials Testing #1 CO#15221

Strata Geotechnical Engineering & Materials Testing #1 CO#15222

Strata Geotechnical Engineering & Materials Testing General Correspondence #1

Email General Correspondence #1

Taylor Engineering Contract #1 CO#15965

Taylor Engineering General Correspondence #1

Hereford Contracting & Excavating Responsibility File

General Correspondence #1

Hereford Contracting & Excavating General Correspondence #1

Taylor Engineering Construction Plans Site Demolition & Removal Plan

Hereford Contracting & Excavating, Inc. #1 CO#15218

Hereford Contracting & Excavating, Inc. #1 CO#15215

Hereford Contracting & Excavating, Inc. #1 CO#15216

Hereford Contracting & Excavating, Inc. #1 CO#15217

Hereford Contracting & Excavating, Inc. Contract Change Proposals

CO#15216

CO#15215

CO#15218

Certified Payroll #1

Rejected Bids #1

KPFF Consulting Engineers Drainage Report

KPFF Consulting Engineers Project Manual Bid Set

Taylor Engineering, Inc. Project Manual Division 0-16

Taylor Engineering, Inc. Specifications

KPFF Consulting Engineers Construction Documents

June 2003

10/2/03-8/5/04

3/6/03-9/25/03

6/3/03

8/8/03-5/13/04

8/8/03-5/13/04

7/29/04

8/8/03

2/3/03-7/25/03

1/31/03-3/4/05

1/31/03-3/4/03

August 2003

1/2/03-4/8/05

8/14/03-5/24/04

7/29/03

9/8/03-1/31/05

9/8/03-8/30/04

9/8/03-8/30/04

9/8/03-4/30/04

CCP 001

CCP 002

CCPs 003-005

11/3/03

Bid Opening 8/14/03

4/6/04

5/24/04

July 2003

July 2003

5/24/04

Page 56: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Teaching & Learning Center (aka) Smith Center for Undergraduate Education

Facility ID # 0095

Box No. 56

Budget #1

BAIT Committee #1

EIS

Regents #1

FAC Committee

Project Planning Committee #1

RFQ for PM/CM Consulting Services

Issues & Claims #1

GC/CM Preliminary Determination

GC/CM Mandatory Meeting

GC/CM Final Proposal

KPFF Consulting Engineers CO#12818

Coffman Engineering CO#13308

Disputes Review Board Third Party Agreement CO#13448

EFT Architects, Inc. #1 CO#13183

Hodge & Associates, Inc.

CO#14222

CO#12813

KJM & Associates CO#13232

Stephen F. McCauley Construction Management CO#13339

McAuley & Associates CO#13590

O’Brien Kreitzberg #1 CO#12879

Preston/Gates/Ellis

Redicheck CO#13336

Reid Middleton, Inc. #1 CO#12968

Roen Associates #1 CO#13140

Stoel Rives,LLP Attorneys #1 CO#12589

Strata Geotechnical Engineering & Materials Testing CO#13288

Tomasi-Dobois & Associates CO#13328

WPA, Inc. CO#13867

Email General Correspondence #1

General Correspondence #2

A/E Consulting Services Selection

8/5/96-7/10/02

1/22/99-6/28/01

5/1/99

6/18/97-11/3/03

1/22/99-6/28/01

9/95-1/23/98

January 1998

6/13/02

7/8/98-9/25/98

6/26/98-7/6/98

9/1/98

10/1/00-3/1/01

7/1/99-7/28/99

11/16/99-1/18/02

1/20/99

7/1/99-8/6/99

11/13/97-8/99

5/1/99-10/31/01

8/1/99-4/9/01

4/1/00-5/22/01

3/12/98-3/31/99

September 2000

8/1/99-9/21/99

6/23/98-5/30/03

12/10/98-3/10/99

5/23/97-5/28/98

7/1/99-12/28/01

7/1/99-8/6/99

1/1/01-7/15/02

9/97-2/7/01

7/1/01-2/24/09

May 97

Page 57: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Teaching & Learning Center (aka) Smith Center for Undergraduate Education

Facility ID # 0095

Box No. 56 (cont.)

Yost Grube Hall Architecture

Contract #8 CO#12837

#1 General Correspondence

#1 Email Correspondence

GC/CM Final Determination

GC/CM Interested Firms

Predesign Study

GC/CM Interviews

GC/CM Procedures & Selection

Lydig Construction, Inc.

#2 General Correspondence

Contract #1 CO#13303 (GC/CM Early Releases Bid Package)

Backup Electronic Files (x3)

Lydig Construction, Inc.

Contract #1 CO#13103 (GC/CM Preconstruction Services)

1/1/02-5/31/02

8/97-4/30/04

10/20/98-6/1/99

3/11/98

Undated

July 1996

8/3/98

March 1998

9/1/01-8/28/06

8/1/99-10/31/03

7/00-7/11/02

10/1/98-2/2100

Teaching & Learning Center (aka) Smith Center for Undergraduate Education

Facility ID # 0095

Box No. 57 Lydig Construction, Inc.

Contract #4 CO#13465 (GC/CM Preconstruction Services)

Contract Change Proposals

Contract Change Proposals CO# 13303

Contract Change Proposals CO# 13465

GC/CM Rejected Bids #1

GC/CM Rejected Bids Bid Package #5

8/1/01-10/22/03

CCPs 013-073

CCPs 001-006

CCPs 001-012

Bid Date 9/15/98

August 1999

Page 58: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Teaching & Learning Center (aka) Smith Center for Undergraduate Education

Facility ID # 0095

Box No. 58

Yost Grube Hall Architecture

Schematic Design

Design Program

Preliminary Design Program

Lydig Construction, Inc.

Bidding Documents

GC/CM Qualification Package

General Correspondence #1

Contract #3 CO#13465 (GC/CM)

Contract #2 CO#13465

Contract #1 CO#13465

GC/CM Agreement CO#13465

Yost Grube Hall Architecture

Contract #7 CO#12837

Contract #6 CO#12837

Contract #5 CO#12837

January 1999

9/8/98

12/11/97

10/29/99

August 1999

7/15/98

9/25/98-8/31/01

7/1/00-1/31/01

1/1/00-1/31/01

Undated

11/1/01-12/31/01

2/1/01-10/15/01

7/1/00-1/31/01

Teaching & Learning Center (aka) Smith Center for Undergraduate Education

Facility ID # 0095

Box No. 59

Yost Grube Hall Architecture

General Correspondence #1

Contract #4 CO#12837

Contract #3 CO#12837

Contract #2 CO#12837

Contract #1 CO#12837

9/95-6/30/01

11/1/99-6/30/00

8/1/99-10/31/99

5/1/99-7/31/99

1/12/98-4/30/99

Page 59: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Indoor Tennis Courts

Facility ID # 0827

Box No. 59

Hollingbery Field House

Global Sports Tennis Design Group, LLC. CO#16619

Indoor Tennis Facility

Global Sports Tennis Design Group, LLC. #1 CO#15600

ICA Sports & Building Systems

CO#15601

Sports Usage & Budgeting Report

General Correspondence #1

Certified Payroll Reports

5/1/06-10/1/06

5/28/04-8/1/04

5/1/04-7/30/04

7/30/04

5/1/04-6/21/06

March 2008

Outdoor Tennis Courts

Box No. 59

EIS

Construction Stormwater General Permit

Federal Aviation Administration General Correspondence

Meeting Minutes

E3RA, Inc. #1 CO#16097

Motley-Motley, Inc. CO#16958

Strata Geotechnical Engineering & Materials Testing CO#16683

Taylor Engineering, Inc. CO#16749

Additive Alternative Bid Package Volume 2 Technical Specifications Divisions 2-16

Email General Correspondence

General Correspondence #1

Tennis Court Cracks

Lydig Construction, Inc.

General Correspondence

KPFF Consulting Engineers

General Correspondence

Contract #2 CO#15599

Lydig Construction, Inc.

Contract Change Proposal

Box No. 60

KPFF Construction Engineers

Contract #1 CO#15549

Project Manual Bid Divisions 0-16

3/1/05

7/1/05-5/30/06

1/3/06

11/1/05

4/1/05-5/31/05

1/1/07-2/20/08

6/1/06-6/29/07

8/1/06-11/8/06

3/1/06

12/1/04

5/1/04-4/16/09

6/1/07

8/1/06-4/14/08

5/1/04-6/15/06

6/1/06-12/15/06

CCP 001-022

5/1/04-5/31/06

12/7/05

Page 60: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Town Center

Box No. 60

Budget

Avista Utilities

General Correspondence

Town Center, LLC.

Ground Lease Agreement

Foundation Relocation

Email General Correspondence

Design West Architectural General Correspondence

Brown Construction

General Correspondence

Contract #1 CO#14472

Fypon Molded Millwork Brochure

11/1/01-5/23/03

11/1/02-1/17/03

6/1/01-5/8/03

10/1/03-5/8/03

Undated

2/1/01-9/5/02

11/1/01-12/27/02

9/1/01-3/5/03

8/1/01-8/26/02

5/1/02-6/12/02

Undated

Troy Hall Renovation

Facility ID # 0036

Box No. 60

RFQ for Architectural Predesign Services

Budget

SERA Architecture, Inc.

General Correspondence #1

Contract #1 CO#15618

RFQ

General Correspondence #1

Predesign Report

August 2003

11/1/03-11/1/04

5/1/04-6/23/04

5/1/04-12/28/04

2/6/03

1/1/04-12/27/04

10/12/04

Page 61: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Veterinary Medicine Barn Relocation (F/K/A) Biomedical Science Facility

Facility ID # 0165E

Box No. 60

Regents (Rec 4 Vet Med Research Bldg.)

Regents

Strata CO#16323

BAIT Committee

EIS #1

Builder’s Risk Insurance

Meeting Minutes

Field Authorizations

Permits

General Correspondence #1

KPFF Consulting Engineers

General Correspondence #1

Contract #1 CO#16305

Bid Documents Project Manual Volume 1 & 2

Meeting Minutes #1

Graham Construction

General Correspondence #1

Contract #1 CO#16305

Contract Change Proposals

9/19/03-9/22/03

10/5/05-5/23/05

9/22/05-12/30/05

5/5/05-9/14/06

5/13/05

9/29/05-6/2/06

January 2005

11/28/05

9/16/05

2/25/05-11/8/06

7/15/05-11/9/05

5/18/05-7/15/06

7/19/05

5/18/05

8/1/05-10/26/06

10/5/05-6/5/06

CCPs 020-052

Veterinary Medicine Barn Relocation (F/K/A) Biomedical Science Facility

Facility ID # 0165E

Box No. 61

Graham Construction

Contract Change Proposals

Rejected Bids

Responsibility File

CCPs 001-019

Bid Opening 8/9/05

August 2005

Page 62: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Veterinary Teaching Hospital Security System

Facility ID # 0818

Box No. 61 Builder’s Risk Insurance

Regents

McAuley & Associates CO#13643

Email General Correspondence

General Correspondence

Electronic Technologies Corporation

General Correspondence

Contract CO#13865

Contract Change Proposals

12/15/00

11/1/00

4/1/00-1/3/01

7/1/00

11/1/00-3/19/01

11/1/99-5/16/01

CCPs 001-003

Brelsford Visitors Center Signage

Facility ID # 0843

Box No. 61

Budget

BAIT Committee

Builder’s Risk Insurance

WPA #1 CO#15401

WPA #1 CO#13867

General Correspondence

Tube Art Displays, Inc.

General Correspondence

Contract #1

Responsibilities File

Meeting Minutes

Rejected Bids

8/1/04

October 2006

6/5/05-12/8/06

1/26/04-10/5/06

3/1/01

7/1/04-5/21/09

6/8/05-6/25/10

2/1/05-11/30/06

3/1/04

2/22/05

Page 63: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

WAWAWAI Landing Boat Dock

Box No. 61

Regents

BAIT Committee

EIS

Womer & Associates, Inc. CO#15875

Army Corps of Engineers

General Correspondence

Lease

General Correspondence #1

Knight Construction

General Correspondence #1

Contract CO#16270

Contract Change Proposal

Responsibility File

2/10/06

2/26/06

6/15/05

11/30/04-2/13/06

9/20/04-1/9/06

6/3/05-10/10/08

12/1/04

7/8/05-8/24/10

2/10/06-9/25/06

CCPs 001-004

7/7/05

WAWAWAI Canyon Survey

Box No. 61 General Correspondence #1

Munir Daud & Associates

General Correspondence #1

Contract #1 CO#16476

2/3/06

1/31/06

2/2/06-12/18/06

Wegner Hall Addition

Facility ID # 0045

Box No. 61 NIH Grant Application

March 2003

WHETS

Box No. 61 General Correspondence

KWSU Radio-TV Station

8/31/87-4/22/93

4/22/93

Page 64: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Wilmer Davis Dining Renovation

Facility ID # 0030

Box No. 61

Builder’s Risk Insurance

Regents

Attorney General #1

SCM Consultants #1 CO#14814

WPA #1 Contract CO#14704

RFQ for A/E Design Services

Email General Correspondence #1

General Correspondence #1

SCM

RFQ Environmental Consulting Services

Abatement Specifications & Contract Documents 75% Submittals

Limited Good Faith Asbestos Report

Electronic Files (x3 CDs)

Graphics

WPA Building ID Blade Layout

Email Backup

6/2/03

5/9/02-12/4/02

August 2002

10/23/02-2/12/04

3/20/03-8/6/03

June 2002

3/18/03

6/5/02-3/4/05

10/23/02

2/16/03

1/20/03

6/2/04

Undated

Undated

Wilmer Davis Dining Renovation

Facility ID # 0030

Box No. 62

URS Corporation

Basement Floor Demo Plan - Electrical

Submittal for Architectural Design Services

URS Corporation

Design Development Submittal Volume V

Remodel Bid Set

URS Corporation

Contract #2 CO#14723

Lydig Construction, Inc.

General Correspondence #1

Contract #1 CO#15508

Contract Change Proposal

Responsibility File

Rejected Bids

URS Corporation

Contract #1 CO#14723

D4esign Development Submittal

9/4/03

6/21/02

12/16/02

4/14/03

7/1/03-2/10/05

5/13/03

5/6/03

CCPs 001-086

5/9/03

Bid Opening

8/23/02-6/30/03

12/16/02

Page 65: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Spokane Archives/CALS

Box No. 63

David Evans & Associates #1 CO#13059

Email General Correspondence #1

General Correspondence #1

Integrus Architecture

General Correspondence #1

Contract #1 CO#13092

Design Development

7/15/98-3/10/03

5/5/98-6/11/98

2/12/97-9/27/00

6/3/98-12/15/98

October 1998

Spokane Riverpoint Higher Education Park

Box No. 63 Northwest Architecture Company Predesign Feasibility Study

Northwest Architecture Company Feasibility Study

Grant Application #1

General Correspondence #1

September 2000

10/30/01-1/7/02

June 2000

6/12/00

Spokane Health Sciences Building

Building No. 9010

Box No. 63 Budget

BAIT Committee

Regents

Attorney General Correspondence #1

EIS

National Center for Research Resource Grant Application

Interagency Memorandum of Agreement

Coffman Engineers CO#13255

David Evans & Associates

#1CO#13059

Traffic & Parking Study

Revised Final Report

Final Report

Disputes Review Board Third Party Agreement Co#13435

Integrus Architecture #1

GeoEngineers - Gifford #1 CO#13432

O’Brien Kreitzberg #1 CO#12879

KJM & Associates #1 CO#13181

1/5/00-9/17/02

12/28/98-11/15/01

8/3/98-3/25/02

9/27/99-11/19/99

6/2/99-3/18/03

2/20/99

12/15/98

5/20/99

7/15/98-6/12/03

2/23/99-10/18/01

12/3/99

2/23/99

10/18/99

2/2/01-7/1/01

11/1/99

7/30/98-2/2/99

12/1/98-11/2/01

Page 66: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Spokane Health Science Building

Building No. 9010

Box No. 64

Landau Associates Soils Assessment

MW Consulting Engineers Energy Life Cycle Cost Analysis

Shea Construction, Inc. RFQ

MW Consultants Energy Life Cycle Analysis Volumes I & II

O’Brien Kreitzberg Value Engineering Workshop

KJM Constructability Review 100% Review Documents

HWA Geosciences Geotechnical Report

Trent Ave/Spokane Falls Blvd. Utility Upgrade

O’Brien Kreitzberg Email General Correspondence #1

Email General Correspondence #1

General Correspondence #3

Integrus Architecture

Email General Correspondence

General Correspondence #4

Contract #3 CO#13112\

Meeting Minutes #1

KJM Associates

Email Correspondence #4

Meeting Minutes #4

Value Engineering Study

GC/CM Procedures & Selection

Shea Construction General Correspondence #2

Preconstruction Contract #1 CO#13111

Monthly Reports #1

Bid Package #2A Mass Evacuation

Contract #3 CO#13466

6/21/99

2/16/99

9/10/98

March 1999

January 1999

1/24/00

6/24/99

1/1/03-7/18/03

1/8/99-2/1/99

5/5/98-9/9/99

1/1/01-5/14/03

1/14/99-8/20/99

10/1/99-5/1/06

6/1/01-1/31/03

5/5/98-6/4/99

7/1/99

7/6/99

January 1999

August 1998

1/1/01-1/30/04

12/10/98-5/22/00

4/99-9/99

6/1/02-1/23/04

9/17/99-5/9/01

Page 67: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Spokane Higher Education Park

Box No. 65

Shea Construction

Meeting Minutes #1

Contract Change Proposals CO#13377

Certified Payroll Reports

GC/CM Rejected Bids #1

12/3/98-6/5/01

Numbers 001-047

May 2001

8/31/99-2/21/00

Spokane Health Science Building/Higher Education Park

Building No. 9010

Box No. 65 Shea Construction

M.A.C.C Proposal

Subcontracting Plan

Contingency Plan

50% Design Development Document Review

Pre-construction Plan

General Contractor Qualifications

Integrus Architecture

Schematic Design Project #9575

(Revised) Predesign Study Project#9575.06

General Correspondence #2

General Correspondence #1

December 1999

August 1999

July 1999

May 1999

November 1998

Sept 1998

9/15/97

7/12/96

3/1/99-12/31/00

4/15/98-2/28/99

Spokane Health Science Building/Higher Education Park

Building No. 9010

Box No. 66

Integrus Architecture CO#13112

Contract #2

Contract #1

Shea Construction CO#13466

Contract #2 GC/CM

Contract #1

Integrus Architecture

General Correspondence #3

General Correspondence #2

General Correspondence #1

Shea Construction, Inc. General Correspondence

SRG Partnership Pre-design Report

3/1/00-5/31/01

1/11/97-12/1/00

11/29/99-9/30/00

10/01/00-5/31/02

4/1/99-9/30/99

2/99-3/31/99

3/98-2/28/99

12/23/98-2/31/00

4/21/98

Page 68: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Tri-Cities Bioproducts Science & Engineering (BSEL)

Building No. 9513

Box No. 67

Builder’s Risk Insurance

Budget

BAIT Committee

Regents

EIS

Public Records Request

ALSC Architects CO#17511

Confederated Tribes of the Umatilla Indian Reservation CO#16528

The Estime Group, Inc. #1 CO#16225

Intermountain Materials Testing #1 CO#16530

JUB Engineers, Inc. #1 CO#16225

Pacific Northwest National Laboratory (PNNL)

Shannon & Wilson, Inc. #1 CO#15605

Project Planning Committee

City of Richland #1

Meeting Minutes #1

SRG Partnership Lab Predesign Report

Email General Correspondence

General Correspondence

Lab Predesign Report

GC/CM Procedures #1

GC.CM Procedures #2

Bouten Construction

General Correspondence #1

GC/CM Preconstruction Contract #1 CO#15832

Use of Contingency

SRG Partnership

General Correspondence #1

Contract #1 CO#15241

Contract #5 CO#15593

3/17/06-4/7/08

8/4/03

5/8/03-03/20/04

5/9/03-11/23/04

December 2005

February 2008

3/1/08-4/30/08

5/15/06-12/8/06

7/22/05

3/27/06-4/30/07

4/14/04

6/1/03-4/4/06

5/13/04-7/8/04

August 2003

January 2006

9/16/03-10/5/05

3/5/04

3/8/04

April 2006

September 2002

2/19/04-3/30/04

6/18/03-2/19/04

6/1/04-12/18/14

11/18/04-4/30/06

2/1/07-9/8/07

6/6/04-6/3/09

9/19/03-6/11/04

9/1/07-1/18/09

Page 69: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Tri-Cities Bioproducts Science & Engineering (BSEL)

Building No. 9513

Box No. 68

SRG Partnership Construction Documents Volumes I & II Divisions 1-17

Structural Calculations

Bouten Construction GC/CM Preconstruction Monthly Reports 2-21

SRG Partnership Schematic Design Report

Design West Architecture Project Review

Materials Plan

Energy Solutions Elevations

Bouten Construction Contract #3 Co#16588

Northern, Inc. Statement of Qualifications

SRG Partnership Statement of Qualifications

PNNL Project Submittal

Bouten Contract Change Proposal

12/10/06

November 2005

3/05-1/08

6/9/04

5/8/11

5/8/11

9/26/07

4/15/04

8/6/03

January 2003

Numbers 016-110

Tri-Cities Bioproducts Science & Engineering (BSEL)

Building No. 9513

Box No. 69

Bouten Contract Change Proposal

SRG Partnership 25% CD Report

Bouten 50% CD Estimate

GC/CM Preconstruction Schedule

RFQ for A/E Services #1

RFQ for A/E Services #2

RFQ for A/E Services #1

RFQ for A/E Services #2

Preconstruction Subcontracting Plans

Rejected Bids

Bouten RFQ for GC/CM

BJSS Duarte Bryant RFQ

SRG Partnership

#4 Contract CO#15593

#3 Contract CO#15593

#2 Contract CO#15593

#1 Contract CO#15593

Numbers 001-015

8/8/05

10/25/05

8/4/05

May 2003

May 2003

February 2004

February 2004

10/18/05-12/8/05

2/20/04-5/19/04

3/30/04

6/5/03

12/1/06-8/31/07

1/20/06-11/30/06

5/1/05-1/10/06

6/23/04-4/30/05

Page 70: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Tri-Cities Bioproducts Science & Engineering (BSEL)

Building No. 9513

Box No. 70

Bouten Construction

#2 Contract CO#16588

#1 Contract CO#16588

12/1/06-9/1/07

5/12/06-11/30/06

Tri-Cities Education Center

Building No. 9500

Box No. 70

Budget

Regents

Stoel Rives LLP Attorneys #1 CO#12589

Value Engineering

Project Planning Committee #1

Email General Correspondence #1

General Correspondence #2

SRG Partnership

Email General Correspondence #1

General Correspondence #2

Contract #1 CO#12809

General Correspondence #1

SRG General Correspondence #1

6/1/98

7/22/97-10/17/97

5/23/97

10/1/98

9/97

9/24/97-3/10/00

2/1/98

12/3/97

4/1/98-6/15/98

11/18/97-11/15/98

7/97-1/31/98

9/4/97-3/31/98

Vancouver Clark Center

Bldg. No. 6509

Box No. 70

Project Planning Committee

Budget

Email General Correspondence

General Correspondence

LSW General Correspondence

Zimmer Gunsul Frasca General Correspondence

Tripplett Willman General Correspondence

General Correspondence #1

LSW Design Development Outline Specifications

Pre-Conference Application

Site Plan Application

10/18/99

3/1/99-7/20/04

2/29/00

12/1/02-5/8/07

1/1/03-1/15/03

6/26/00

8/23/04-3/28/06

5/27/98-10/30/00

June 2003

March 2003

Page 71: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Clark Center

Bldg. No. 6509

Box No. 71

LSW Design Development Outline Specifications

Project Manual

Meng Analysis Value Analysis Study

June 2003

March 2004

Vancouver Clark County Development Agreement

Box No. 71 JD White Company CO#13617

Email General Correspondence #1

General Correspondence

2/4/98-4/21/05

3/9/00

10/10/99-5/3/12

Vancouver Classroom Building Plant Growth Chambers

Bldg. No. 6502

Box No. 71 PAE Consulting Engineers CO#13215

General Correspondence

4/9/99-6/30/99

4/1/99-4/21/99

Page 72: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 71

JD White Company Environmental Impact Statement

Design Report & Budget Allocation

Budget

Regents

Finance and Audit Capital Committee

Attorney General Correspondence

Architectural Cost Consultants CO#13028

Arnold Gray Third Party Neutral CO#13257

Colbert Infrared Services CO#14027

KJM & Associates

Email General Correspondence

Contract O’Brien Kreitzberg

Email General Correspondence

Contract CO#12879

Contract CO#13300

Daily Inspection Reports

PAE Consulting Engineers CO#13434

Professional Services Industries #3 Test Reports

Professional Services Industries CO#13287

June 2003

May 1999

11/10/97-7/7/04

4/30/98-8/31/01

11/18/99

Undated

3/30/98-2/1/99

6/1/99-10/1/99

2/8/01-3/30/01

Undated

4/1/99-5/31/99

1/1/99-7/28/00

3/98-11/98

6/1/99-2/28/00

4/14/00-7/27/00

1/1/99-1/24/00

11/1/99-1/24/00

7/1/99-12/18/00

Page 73: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Science Building

Bldg. No. 6507

Box No. 72 The Redicheck Firm CO#13202

Reid Middleton CO#12968

Stoel Rives LLP, Attorneys CO#12589

System Commissioning Consultants CO#13433

Roger K Watts CO#13549

Life Cycle Cost Analysis

Clark County Permits/Fees

Project Planning Committee

Email General Correspondence #3

Geotechnical & Environmental Consultants CO#13811

Geotechnical Resources - Site Reports

General Correspondence Firstenburg Fountain #1

Zimmer Gunsul Frasca Partnership

General Correspondence Firstenburg Fountain

Contract #1 CO#13618 Firstenburg Fountain

General Correspondence #5

Zimmer Gunsul Frasca Partnership

Clarifications

Site Observation Reports

Predesign Study

Zimmer Gunsul Frasca Schematic Design

MEI - Charlton, Inc. - Epoxy Terrazzo Floor Delamination

Zimmer Gunsul Frasca Estimate of Probable Construction Cost

Change Requests

Zimmer Gunsul Frasca Submittals

Requests for Information

Architects Supplemental Instructions

GC/CM Selection May 1998

Zimmer Gunsul Frasca Construction Meeting Meetings #1

4/1/99-4/20/99

6/23/98-11/23/98

3/30/98-5/27/98

8/1/99-8/20/01

12/1/99-11/19/01

3/31/99

6/4/99

7/97-2/98

4/1/00-3/22/02

8/1/00-9/24/00

7/1/99-5/31/00

4/1/99-1/30/07

4/1/99-4/25/00

4/1/00-3/20/01

1/1/07-2/15/15

2/1/00-3/31/00

10/1/99-9/20/00

May 1996

June 1998

4/2/02

6/11/98

12/1/99-9/30/00

5/1/99-2/28/01

6/1/99-11/30/00

7/1/99-10/31/99

May 1998

1/98-10/26/98

Page 74: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 73

Zimmer Gunsul Frasca Email Correspondence #1

Zimmer Gunsul Frasca General Correspondence #6

Zimmer Gunsul Frasca Contract #8 CO#12867

Miscellaneous Permits/Fees

Plaza Improvements

Baugh Construction, Oregon

Field Orders #1

GC/CM Monthly Reports #1

Pre Installation Meeting #1

Meeting Minutes #4

Design Meeting Mintues

Job Diary

Email Correspondence

Contract #2 GC/CM Agreement

PAE Consulting - Energy Study & Life Cycle Cost Analysis

Baugh Construction Oregon

Contract #2 CO#13029

1/16/98-2/7/01

6/1/00-4/30/01

11/1/01-3/18/05

2/4/99-8/10/99

6/1/00-11/27/00

10/1/99-2/17/00

4/1/99-7/13/99

1/1/99-4/12/00

7/1/00-12/31/00

1/99-7/99

7/19/99-7/14/00

11/1/98-7/26/07

7/1/99-5/1/01

3/30/99

6/1/99-11/10/99

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 74

Baugh Construction Oregon

Firstenburg Fountain General Correspondence

Certified Payroll

Contract Change Proposals

Baugh Construction Oregon Close Out Items #1

Schematic Design

7/1/00-4/19/04

11/1/00-11/28/00

Numbers 001-124

9/21/00-5/14/01

9/8/98-9/9/98

Page 75: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 75

Baugh Construction Oregon

Monthly Reports

Monthly Reports

Monthly Reports

Monthly Reports

Monthly Reports

Monthly Reports

Preconstruction Plan

CPM Progress Schedule

CPM Progress Schedule

CPM Progress Schedule

CPM Progress Schedule

CPM Progress Schedule

CPM Progress Schedule

CPM Progress Schedule

10/00-3/01

7/00-9/00

4/00-6/00

1/00-3/00

10/99-12/99

7/99-9/99

8/13/98

2/00

1/00

12/99

11/99

10/99

9/99

8/99

Page 76: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 76

Baugh Construction Oregon CPM Progress Schedule

GC/CM Rejected Bids

Bid Package #1 Earthwork/Underground Utilities

Bid Package #2 Surveying/Staking

Bid Package #3

Bid Package #4

Bid Package #5

Bid Package #6

Bid Package #7

Bid Package #8

Bid Package #9/10

Bid Package 11A Steel Fabrication-Safety Tie Off & Metal

Bid Package 12 Rough Carpentry Wood Structure

Bid Package #13, 31, 32, 33, 35 - Carpentry, Lab Equipment/Darkroom

Bid Package #14 Waterproofing/Joint Sealant

Bid Package #15 Rigid Insulation

Bid Package #16 Metal panels/Sheet Metal/Metal RFQ

Bid Package #17 Membrane Roofing

Bid Package #18 Doors, Frames & Hardware

Bid Package #19 Overhead Section - Doors

Bid Package #20 Aluminum Window - Stone Front/Glazing

Bid Package #21 Aluminum Framed Sky Lights

Bid Package #22 Metal Studs/Drywall Ceiling/Batt Insulation

Bid Package #23 Terrazzo

Bid Package #24 Ceramic Tile

Bid Package #25 Floor Finishes - Carpet/Resilient

Bid Package #26 Special Flooring - Traffic Coatings

Bid Package #27 Painting

Bid Package #28 Special/Furnish/Install

Bid Package #29 Signage

Bid Package #30 Dock Equipment

Bid Package #34 Window Treatment

Bid Package #36 Greenhouse (Design/Build)

Bid Package #38 Mechanical Controls/Underground/Plumbing (HVAC)

Bid Package #39 Fire Protection

Bid Package #40 Electrical

Bid Package #41 Telecom

July 1999

6/25/99

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Undated

Page 77: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 76 (cont.)

ETI - Equipment Field Evaluation Final Report Machine

Revised Space Requirement - Final Draft

Baugh - Consolidated Financial Statements

WSU/ZGF - Response to Value Analysis Study “Best”

ZGF - Foundation Investigation

Baugh/ZGF Case Study

Ventilation Engineering - Atmospheric Air Flow/Exhaust Stem/Air Intake Analysis

M.A.C.C. Proposal Documents - Revision 1 5/18/99

Equipment Rapid Type System

Manufacture Engineer Correspondence

Roger Watts - Contract/Invoice

Equipment Coordination

Equipment Coordination

Equipment Coordination

Equipment Coordination

Equipment Coordination

Jay Wiley (Science)

Equipment for ELSB

Next Equipment Coordination Meeting

Equipment Purchase Process

Undated

2/27/98

Undated

11/18/96

9/15/98

6/28/99

1/31/99

5/18/99

Undated

6/21/00

Undated

6/1/00

5/19/00

3/23/00

3/9/00

5/4/00

Undated

Undated

Undated

April 2000

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 77

O’Brien Kreitzberg

Daily Inspection

Daily Inspection #1

Professional Services Industries

Test Reports #2

Test Reports #1

Email General Correspondence #2

General Correspondence #4

Email General Correspondence #1

General Correspondence #3

General Correspondence #2

General Correspondence #1

Zimmer Gunsul Frasca Partnership General Correspondence #5

1/5/00-3/31/00

7/18/99-12/16/99

8/1/99-9/30/99

10/1/99-10/31/99

4/1/99-3/31/00

1/1/00-12/31/00

12/12/97-3/31/99

5/1/99-12/31/99

12/1/98-4/30/99

2/1/98-11/30/98

1/1/00-5/31/00

Page 78: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 78

Zimmer Gunsul Frasca Partnership

General Correspondence # 4

General Correspondence #3

General Correspondence #2

General Correspondence #1

Contract #6 CO #12867

Contract #5 CO #12867

Contract #4 CO #12867

Contract #3 CO #12867

7/1/99-12/31/99

3/1/99-6/30/99

11/1/98-2/28/99

7/1/97-10/31/98

6/1/00-10/31/01

1/1/00-5/31/00

10/1/99-1/30/00

5/1/99-9/30/99

4/1/99-4/30/99

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 79

Zimmer Gunsul Frasca Partnership

Contract #2 CO#12867

Contract #1 CO#12867

Construction Documents Volume 3 Divisions 15 & 16

Construction Documents Volume 2 Divisions 2 & 14

Construction Documents Volume 1 Divisions 0 & 1

Baugh Construction Oregon

Construction Meeting Minutes #3

Construction Meeting Minutes #2

Construction Meeting Minutes #1

General Correspondence #6

General Correspondence #5

Contract #1 CO#13029

8/1/98-12/31/99

5/18/98-7/31/98

5/3/99

5/3/99

5/3/99

4/1/00-6/30/00

12/1/99-3/30/00

7/1/99-11/30/99

10/1/00-4/5/02

1/1/00-9/30/00

7/1/98-5/19/95

Vancouver Engineering Life Sciences Building

Bldg. No. 6507

Box No. 80

Baugh Construction Oregon

General Correspondence #4

General Correspondence #3

General Correspondence #2

General Correspondence #1

Contract #1 CO#13256

7/1/99-12/31/99

5/1/99-6/30/99

1/1/99-4/30/99

7/1/97-12/31/98

1/22/99-6/30/99

Page 79: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Multimedia Classroom Building

Bldg. No. 6508

Box No. 80 Builder’s Risk Insurance

Predesign Study

Budget

Regents

BAIT Committee

Project Planning Committee

Attorney General

Architectural Cost Consultants CO#13028 #1

Hopper Dennis Jellison PLLC CO#14499 Site Improvement Repairs

James R. McGranahan 3rd Party Neutral CO#14112

Minister & Glaeser Surveying, INc. CO#14581

O’brien Kreitzberg CO#12879

Stoel Rives, LLP (Attorneys) #1 CO#12589

Zimmer Gunsul Frasca Construction Meeting Minutes

Systems Commissioning Consultants, Inc. CO#14500

Email General Correspondence #1

General Correspondence #2

Zimmer Gunsul Frasca

General Correspondence #1

Contract #6 CO#12944

6/1/01

May 1996

11/10/97

5/8/98

5/8/98

7/30/97-2/27/98

1/1/03-9/3/03

8/10/98-1/10/01

3/1/02-11/1/03

4/1/01-8/1/02

5/1/02-8/11/02

March 1998

5/23/97

February 1998

3/1/02-12/1/02

1/5/98

8/1/01

August 1997

7/1/02

Multimedia Classroom Building

Bldg. No. 6508

Box No. 81

Baugh Construction Oregon

General Correspondence #1

Contract #2

Contract #1

Monthly Reports

Monthly Reports

Monthly Reports

Monthly Reports

Monthly Reports

Palouse Empire, Inc.

Claims #2

Claims #1

Rejected GC/CM Bids

Baugh Construction Oregon, Inc. Contract Change Proposal

7/1/98-5/23/03

5/1/02-6/30/03

8/17/98-5/30/01

July-Sept 2002

April - June 2002

January - March 2002

October - December 2001

July - September 2001

1/9/03-8/11/03

9/17/01-12/2/02

Bid Opening 6/25/98

Numbers 001-062

Page 80: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Multimedia Classroom Building

Bldg. No. 6508

Box No. 82

General Correspondence #1

Zimmer Gunsul Frasca Partnership

Contract #5 CO#12944

Contract #4 CO#12944

Contract #3 CO#12944

Contract #2 CO#12944

Contract #1 CO#12944

Baugh Construction Oregon #1 Contract GC/CM CO#14172

JD White Co., Inc. (aka Berger ABAM)

Wetland & Habitat Permit Application TWC Project

Habitat Buffer Mitigation As-built Report

Zimmer Gunsul Frasca Partnership

Foundation Investigation

Schematic Design

Estimate of Probable Construction Cost

Building Improvements (Prepared by Kato & Warren, Inc.)

Project Manual Bid Documents Volume 3 Divisions 15 & 16

7/97-7/31/01

1/1/02-6/30/02

8/31/01-12/31/01

3/1/01-7/31/01

6/1/99-2/28/01

5/18/98-5/31/99

4/1/01-4/30/02

Numbers 00-192

January 2005

September 1998

June 1998

July 1999

March 2001

Multimedia Classroom Building

Bldg. No. 6508

Box No. 83

Zimmer Gunsul Frasca Partnership

Project Manual Bid Documents Volume 2 Divisions 2 to 14

Project Manual Bid Documents Volume 1 Divisions 0 and 1

Baugh Construction Oregon

M.A.C.C Proposal Documents Rev. 1

Interview

PAE Consulting Engineers, Inc. Engineering Life Cycle Cost Analysis

3/26/01

6/9/98

12/5/01

Page 81: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Early Childhood Education Facility

Bldg. No. 6508

Box No. 83

Specifications (CD)

Consulting Value Specialists. Value Engineering Study

Zimmer Gunsul Frasca Partnership. Schematic Design

Zimmer Gunsul Frasca Partnership. Construction Documents

1996-05-23

1995-12

1997-05-01

WSU Vancouver (General)

Box No. 83

Zimmer Gunsul Frasca Partnership. Summary Master Plan

Zimmer Gunsul Frasca Partnership. Bid and Construction Document Set.

Ctr. For NW Anthro. Final Supplemental Environmental Impact Statement.

Hahn & Associates. Phase I Environmental Site Assessment.

1994-05-12

1993-02-24

1997-05-12

Page 82: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Contract # Project Name Contractor/Consultant Content Final Date

Various Budget Ledgers, Vouchers, Authorizations for funding Mar-93

Various Environmental Impact Statement Apr-88

Various Regents Reports Memorandums, Minutes Jun-94

Various Campus/Downtown Pedestrian Corridor Levernier-Shea CCP, Pay Apps Dec-97

Various Process Update General Correspondence #5 Apr-99

Various General Correspondence #4 Dec-91

Facility Services Capital ProjectsContract Administration

BOX - 83Comprehensive Physical Planning

Page 83: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Contract # Project Name Contractor/Consultant Content Final Date

Various Comprehensive Campus Plan Project Reviews Amendment #2 Jan-85

7350 Burke/Lee Associates Payments Nov-94

7350 Burke/Lee Associates Payments May-94

7350 Burke/Lee Associates General Correspondence Jun-92

Various Architect Selection Burke/Lee Associates Advertisement, Evaluation, Interviews Jan-91

7350 Burke/Lee Associates Payments Apr-91

7350 Burke/Lee Associates Payments Dec-89

7350 Burke/Lee Associates Payments Jan-89

7350 Burke/Lee Associates Payments Mar-87

7350 Burke/Lee Associates Ammendments #11 - 16 Jul-85

7350 Burke/Lee Associates Ammendments #17 and 18 Jun-86

7350 Burke/Lee Associates Amendment #10 Apr-87

7350 Burke/Lee Associates Amendment #3-8 Jun-82

7350 Burke/Lee Associates Amendment #2 Apr-86

7350 Burke/Lee Associates Amendment #2 May-83

Contract Administration

BOX - 84Comprehensive Physical Planning

Facility Services Capital Projects

Page 84: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Contract # Project Name Contractor/Consultant Content Final Date

Butch's Cage Area Feb-84

Campus/Downtown Corridor Pittsburgh Testing Lab Concrete Test Results Dec-86

Campus/Downtown Corridor Levernier Construction, Inc. Affirmative Action Reports Oct-86

Campus/Downtown Corridor Levernier Construction, Inc. General Correspondence Jun-87

Campus/Downtown Corridor Levernier Construction, Inc. Contract Change Proposals

Campus/Downtown Corridor Levernier Construction, Inc. Rejected Bids Aug-86

Campus/Downtown Corridor Levernier Construction, Inc. Rejected Bids - 2nd Bid

Planning Process Letters & Responses to Burke's Presentation May-85

Schematic Layouts and Cost Estimates Amendment #10 Jun-86

Site Selection Studies -- B/L Various Amendment Numbers Nov-88

Planning Process Update General Correspondence #4 Feb-94

Planning Process Update General Correspondence #3 Nov-91

Campus Plan General Correspondence #2 Dec-90

Planning Process Update Volumes I & II #2 Dec-90

Campus Planning Various Projects #2 Dec-90

Campus Planning General Correspondence Dec-88

Campus Plan General Correspondence Jun-86

Development Plan for (Spokane/Tri-Cities/Vancouver) May-88

Process Documents Burke/Lee Associates Jun-94

Process Documents (Volume I & II) Burke/Lee Associates Nov-87

Process Documents (Volume III) East Contiguous Resource Lands Jun-86

Process Documents Draft Environmental Impace Statement Sep-85

Agra Earth & Environmental Contract Documents CO #11569 Apr-96

BOX - 85Comprehensive Physical Planning

Facility Services Capital ProjectsContract Administration

Page 85: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Contract # Project Name Contractor/Consultant Content Final Date

Process Documents Marsh Insurance Brokerage Various Documents CO #13842 3-Nov

Landscape Architecture Design Services The Berger Partnership, P.S. Various Projects #2 Jan-02

Landscape Architecture Design Services The Berger Partnership, P.S. Various Projects #1 1-Dec

Various Projects Hainline & Associates CO# 12257 Jul-00

PM/CA Support Services KJM & Associates Various Projects #3 CO# 13232 Jun-01

CPD Guideline Manual KJM & Associates Facilities Procedures Guildlines CO#13705 #1 May-00

KJM & Associates Various Projects #2 CO#13232 Sep-00

Mahan & DeSalvo Construction Codes Oct-93

Various Projects KJM & Associates CO#13232 #1 Oct-99

Various Projects Mahan & DeSalvo Plan Review Services Feb-93

Various Projects McAuley & Associates Code Review CO#13232 #1 Mar-91

Construction Document Review McAuley Construction Mgmt. CO# 13339 Oct-00

Mechanical Plumbing Inspection McAuley & Associates CO#13590 #1 Jan-00

GIS Data Creation Marshall and Associates, Inc. CO# 15982 #1 Feb-05

O'Brien Kreitzberg CO #12879 #3 Jan-99

O'Brien Kreitzberg CO #12879 #2 Feb-99

O'Brien Kreitzberg CO #12879 #1 Feb-99

Various Projects The Redicheck Firm CO# 11621 Apr-98

Various Projects Reid Middleton, Inc. CO# 12968 Apr-00

Robert Fossatti Associates, Inc. General Correspondence Aug-98

Various Projects David M. Scott CO# 13472 #1 Dec-99

Smith & Swenson DEAD FILE Jul-84

Strategic Partnership Support Pederson Associates, Inc. CO# 14045 Jul-02

General Conditions Updates Stoel Rives, LLP (Alan Merkle) CO# 12589 May-98

WPA, Inc. CO# 13867 #3 Nov-02

WPA, Inc. CO# 13867 #2 Dec-01

WPA, Inc. CO# 13867 #1 Jun-01Various Projects - Graphic Design

Facility Services Capital ProjectsContract Administration

BOX - 86Comprehensive Physical Planning

Various Projects - Graphic Design

Various Projects - Graphic Design

Page 86: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Contract # Project Name Contractor/Consultant Content Final Date

Various Projects The Redicheck Firm CO# 11621 Apr-98

Various Projects Reid Middleton, Inc. CO# 12968 Apr-00

Robert Fossatti Associates, Inc. General Correspondence Aug-98

Various Projects David M. Scott CO# 13472 #1 Dec-99

Smith & Swenson DEAD FILE Jul-84

Strategic Partnership Support Pederson Associates, Inc. CO# 14045 Jul-02

General Conditions Updates Stoel Rives, LLP (Alan Merkle) CO# 12589 May-98

WPA, Inc. CO# 13867 #3 Nov-02

WPA, Inc. CO# 13867 #2 Dec-01

WPA, Inc. CO# 13867 #1 Jun-01

Comprehensive Physical Planning

Various Projects - Graphic Design

Various Projects - Graphic Design

Various Projects - Graphic Design

Facility Services Capital ProjectsContract Administration

BOX - 87

Page 87: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Hazardous Waste Facilities: College of Ag/Markley

Bldg. No. 66Q&R

Box No. 87

Builder’s Risk Insurance

EIS

Regents

Daily Inspection Reports

Weekly Observation Reports

Email General Correspondence #1

Strata Geotechnical Engineering & Materials Testing CO#14476

Meeting Minutes

General Correspondence #1

URS General Correspondence #1

Walker Construction, Inc. General Correspondence

Walker Construction, Inc. Contract CO#14468

Contract Change Proposals Walker Construction, Inc.

Contractor Responsibility

Rejected Bids

3/18/02

4/10/03

2/15/02

7/1/02

7/1/02

2/1/02

2/1/02

3/1/02

5/17/01

1/1/02

2/1/02

1/1/02

Numbers 001-014

1/1/02

1/29/02

Hazardous Waste Facilities (Containment Pad): Mt. Vernon

Bldg. No. 4025

Box No. 87

Builder’s Risk Insurance

EIS

Attorney General Correspondence

Daily Inspection Reports

Krazan & Associates Testing & Inspecting CO#15016

Email General Correspondence

General Correspondence

URS General Correspondence

USK Corporation L&I Premium Liability Release Status #1

USK Corporation General Correspondence

USK Corporation Contract CO#14932

Mt. Vernon Research & Extension Unit Responsibility File

Rejected Bids

3/24/03

2/1/03

3/1/03

4/1/03

4/1/03

2/20/03-5/5/03

12/1/02

5/1/02

9/8/03

2/1/03

2/1/03

2/10/03-2/12/03

2/6/03

Page 88: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Hazardous Waste Facilities (Containment Pad): Othello/Roza

Bldg. No. 2315/2115

Box No. 88

EIS

General Correspondence

URS General Correspondence

12/2/02

10/1/02

12/1/02

Hazardous Waste Facilities : Puyallup Research & Extension

Bldg. No. 1000

Box No. 88 EIS #1

Builder’s Risk Insurance (Roza, Othello, & Lind Chemical Sites)

Attorney General Correspondence

General Correspondence

Meeting Minutes

URS General Correspondence

Concord Construction, Inc. #1 General Correspondence

Concord Construction, Inc. Contract CO#14943

Concord Construction, Inc. #1 L&I Premium Liability Release Status

Responsibility File

Contract Change Proposals Concord Construction, Inc.

Rejected Bids

3/24/03

3/1/03

1/28/03-10/13/03

2/1/03

2/1/03

2/25/03-4/5/04

2/25/03-6/30/03

9/8/03-11/12/03

2/17/03-2/24/03

Numbers 001-002

2/13/03

Hazardous Waste Facilities (Modular Unit 3): Tri-Cities/Prosser

Bldg. No. 9550

Box No. 88

Builder’s Risk Insurance

Irrigated Agriculture Research & Extension Center Master Plan

URS Specifications Volume I

General Correspondence

URS Requests for Information

URS General Correspondence

Hughes-Sillers Construction General Correspondence

Hughes-Sillers Construction Contract CO#14502

Prosser Daily Inspection Reports

Hughes-Sillers Construction L&I Premium Liability Release Status

Contract Change Proposal Hughes-Sillers Construction

Hughes-Sillers Construction Responsibility File

Rejected Bids

5/13/02

6/07

6/00

1/1/02

4/02

4/1/02

3/1/02

4/1/02

5/1/02

9/08/03

Numbers 001-012

2/20/02-3/13/02

2/28/02

Page 89: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Hazardous Waste Facilities

Wenatchee Tree Fruit Research Center

Bldg. No. 3043

Box No. 88

Builder’s Risk Insurance

EIS

JARPA Form

Master Plan

Hammond Collier Wade Livingstone (Blanket 348045)

Public Utility District #1 Chelan Country Line Extension Agreement #14941

JPG Valuation Inc. Appraisal

Meeting Minutes

Water Line Extension

Email General Correspondence #1

General Correspondence #1

Whitebird, Inc. General Correspondence

URS Greiner #1 Email Correspondence

URS Greiner #1 General Correspondence

Contract Change Proposal Whitebird, Inc.

Whitebird Responsibility File

Rejected Bids

10/15/01

7/1/01

3/9/14

3/08

1/1/02

3/18/03

1/19/05

8/1/01

10/8/01

7/1/01

8/1/01

9/28/01-6/17/02

9/1/07-5/23/02

9/12/01-8/26/02

Numbers 001-004

8/21/01-/830/01

8/21/01

Hazardous Waste Facilities

Wenatchee Tree Fruit Research Center

Bldg. No. 3043

Box No. 89

URS Greiner Woodwood Cycle Specifications Vol II

Vinod Ghoting Miscellaneous Notebook

6/00

6/11/04

Page 90: lease be aware: P (Unprocessed Collection)ntserver1.wsulibs.wsu.edu/masc/finders/ua-unprocessed/UA2016-05.pdf(Unprocessed Collection) -- Please be aware: The information on the following

Academic Athletic Complex.

Box No. 89

Redevelopment Study. Seiler, Scott

Naramore Bain Brady & Johansen. Design Proposal.

1980

Undated

Compton Union Building.

Box No. 89

Building Program for the Washington State College Union.

Misc. documents.

1948-07-07

1945-1946, 2000

Renewal/Renovation Focus Group. VHS tape. 1997-07-08

Culver House.

Box No. 89

Smith & Rounds Specification for the General Construction of a Residence to be built at the 1800 Block on B

Street for H.E. Culver (Job 1035A).

1928

Plant Growth – Wheat Research Center.

Box No. 89

Tan-Heyamoto Architects. Project Specification for the Plant Growth – Wheat Research Center. Vol. I: Gen.

Construction and Detail Manual.

1996-06

Terrell Mall.

Box No. 89

Granite Replacement. Photographs.

1994