The information on the following sheets represents a preliminary susvey of this collection. It may well be incomplete, inaccurate, or otherwise out-of-date. This collection may also be, in part or in whole, restricted against access for reason of privacy or other legal issues. This listing is provided to help researchers find potential sources, and to help MASC track unprocessed materials internally. It is strongly suggested that you contact us directly before making any sort of lengthy trip to MASC to view these.
Due to the nature of the presentation of each guide, it is possible the origin and location of this collection may be unclear from this page. If you need to identify the source but are unable to do so, look for the filename (minus the suffix - e.g. if you're looking at ua1996-04.pdf, then search for ua1996-04) within the following page:
Manuscripts, Archives, and Special Collections
Washington State University Libraries [email protected] 509-335-669 1
Compton Union Building Renovation
Bldg. No. 0063
Box No. 1
Builder’s Risk BAIT Committee Regents Budget Grants Public Records Requests 09-293 Public Records Requests 09-192 Public Records Requests 08-35 AMEC Earth & Environmental CO#14187 Brailsford & Dunlavey CO#14034 Social & Economic Sciences Research Center Data Report 01-13 Brightworks Northwest #1 CO#16147 Davis Langdon #1 CO#16144 Kaplan, McLaughlin, Diaz #1 CO#12189 McKinstry/Essention CO#16575 MCS Environmental #1 CO#16190 Steve Goldblatt Third Party Neutral #1 CO#16634 Tim McCarty CO#14111 Reid Middleton #1 CO#12968 Siemens Building Technologies #1 CO#16616 Strata Geotechnical CO#16273 Studio SC CO#17236 Taylor Engineering #1 CO#16170 WSU Police Department Contract #1 Integrus Architecture CO#14280 Integrus Architecture Predesign Study CO#14395#1 Strata Geotechnical Engineering Evaluation Report MCS Environmental, Inc. Lead Based Paint Survey Hoffman Construction Co. Asbestos-Free Certification CO#16590 The Kresge Foundation Green Building Initiative Owen F. Turnbull “Socialization & Architecture” Yost Grube Hall Architecture Services & Activities Facilities Fee Request “Compton Union - A Center for Education & Community Hoffman Construction Company RFQ
4/20/06 3/01-8/08
5/1/01-5/9/06 8/1/01 1/1/05 11/09
7/09 2/08
6/1/01 2/1/01
5/31/05 5/1/05
11/13/95-3/11/97 9/27/06 6/10/05
5/1/06 5/1/01
Undated 5/1/06
3/23/05 6/1/07 6/6/05 5/1/06 6/1/01
10/17/01 11/28/05
7/13/05 8/14/09
6/1/05 Undated
Numbers 99-01 11/99
5/25/05
Compton Union Building Renovation
Bldg. No. 0063
Box No. 1 cont.
Integrus Architecture RFQ MCS Environmental, Inc. Environmental Logic Mercury Containing Components Survey MCS Proposal to Conduct Regulated/Hazardous Materials Good Faith Survey McKinstry Essention SOQ MCS Environmental, Inc. Good Faith Asbestos Survey Kaplan/McLaughlin/Diaz Building Improvement & Expansion Study Integrus Architecture SOQ Architecture Submittals “Firms Not Used #1”
4/19/05 10/14/05
5/1/05 1/27/06 7/13/05 7/12/96 4/26/01
Undated
Compton Union Building Renovation
Bldg. No. 0063
Box No. 2
RFP for Consultant Selection A/E Design Services Selection Miscellaneous 411 Prior to Renovation Post Office Correspondence Email General Correspondence #2 General Correspondence #3 Pfieffer Partners, Inc. /Integrus Architecture 100% Schematic Design - Outline Specifications Pfieffer Partners, Inc. /Integrus Architecture 100% Schematic Design - Project Narratives Hoffman Construction Company GC/CM - Interview Tenant Improvements Integrus Email Correspondence #1 Pfeiffer Partners, Inc. General Correspondence #1
Hoffman Construction Co. #20 Contract CO#16590
Integrus Architecture #2 Contract CO#15398
Integrus Architecture #15 Contract CO#16324
Signage
Hoffman Construction Co. #1
Hoffman Construction Co. #19 Contract CO#16590
11/00 5/01
12/1/95-7/31/97 1/1/06
5/18/05 1/1/05 9/1/05 9/1/05
6/15/05 10/1/08
1/11/05-6/9/05 2/7/05
5/1/09
1/1/05
3/1/09
9/1/08
11/11/05
11/1/08
Compton Union Building Renovation
Bldg. No. 0063
Box No. 3
Hoffman Construction Co. Contract Change Proposals Numbers 325-768
Compton Union Building Renovation
Bldg. No. 0063
Box No. 4
Contract Change Proposals Numbers 035-324
Compton Union Building Renovation
Bldg. No. 0063
Box No. 5
Contract Change Proposals
Integrus General Correspondence #1
Certified Payroll Reports
Rejected Bids
Strata Final Project Binder
Email General Correspondence #1
General Correspondence #2
Integrus Architecture #1 CO#15398
Integrus Architecture #14 CO#16324
Integrus Architecture #13 CO#16324
Integrus Architecture #12 CO#16324
Integrus Architecture #11 CO#16324
Numbers 001-034
2/25/02-8/4/09
9/1/07
5/7/07
9/8/08
12/01/01-5/17/05
11/1/00-12/31/04
2/4/04-12/31/04
3/1/08-6/30/08
7/1/08-2/28/09
11/1/07-2/29/08
10/1/07-10/16/07
Compton Union Building Renovation
Bldg. No. 0063
Box No. 6
Integrus Architecture #10 CO#16324
Integrus Architecture #9 CO#16324
Integrus Architecture #8 CO#16324
Integrus Architecture #7 CO#16324
Integrus Architecture #6 CO#16324
Integrus Architecture #5 CO#16324
Integrus Architecture #4 CO#16324
Integrus Architecture #3 CO#16324
Integrus Architecture #2 CO#16324
8/1/07-9/30/07
6/1/07-7/31/07
2/1/07-5/31/07
9/1/06-1/31/07
6/9/06-8/31/06
4/1/06-5/10/06
2/9/06-3/31/06
1/1/06-2/8/06
10/1/05-12/31/05
Compton Union Building Renovation
Bldg. No. 0063
Box No. 7
Integrus #1 CO#16324
Hoffman Construction Co. #3 CO#16590
Hoffman Construction Co. #2 CO#16590
Hoffman Construction Co. #1 CO#16590
Hoffman Construction Co. GC/CM Procedures #3
Hoffman Construction Co. GC/CM Procedures #2
Hoffman Construction Co. GC/CM Procedures #1
Hoffman Construction Co. #18 CO#16590
Request for Proposals for Hazmat Consultants
Hoffman Construction Co. #17 CO#16590
Hoffman Construction Co. #16 CO#16590
10/5/05
1/1/07-2/28/07
11/1/06-12/31/06
5/9/06-10/31/06
5/18/05
6/21/05
5/3/05
8/1/08-10/31/08
4/18/05
6/1/08
4/1/08-5/31/08
Compton Union Building Renovation
Bldg. No. 0063
Box No. 8
Hoffman Construction Co. #15 CO#16590
Hoffman Construction Co. #14 CO#16590
Hoffman Construction Co. #13 CO#16590
Hoffman Construction Co. #12 CO#16590
Hoffman Construction Co. #11 CO#16590
Hoffman Construction Co. #10 CO#16590
Hoffman Construction Co. #9 CO#16590
Hoffman Construction Co. #8 CO#16590
Hoffman Construction #7 CO#16590
Hoffman Construction #6 CO#16590
Hoffman Construction #5 CO#16590
Hoffman Construction #4 CO#16590
3/1/08
2/1/08
1/1/08-1/31/08
12/1/07-12/31/07
11/1/07-11/30/07
10/1/07-10/31/07
91/1/07-9/30/07
8/1/07-8/31/07
7/1/07-7/31/07
6/1/07-9/25/07
4/1/07-5/31/07
3/1/07-3/31/07
Compton Union Building Renovation
Bldg. No. 0063
Box No. 9
Kaplan/McLaughlin/Diaz Building Improvements, and Expansion Study
Integrus Architecture/HHPA Submittal
Integrus Architecture SOQ AE and Related Services
Hoffman Construction Co. GC/CM RFQ
RFQ for Commissioning Services
Hoffman Construction Preconstruction #1 CO#16440
Brailsford & Dunlavey Preliminary Market Analysis *Updates*
Wilson Road Improvements
Electronic Documents 1-4
RFQ for GC/CM Services
AMEC Earth & Environmental, Inc. Limited Facility Survey
MCS Environmental, Inc. Proposal
Avista Rebates & LEED Incentive
McKinstry Energy Services Proposal Phase 2.4 CHW Loop Connection Final ESP
SESRC (Social & Economic Sciences Research Center) Data Report 01-13 Cub Renovation Survey
Hoffman Construction Company RFQ Bid Package #A2
Integrus Architecture Wayfinding & Environmental Graphics Program
MCS Environmental Inc. Closure Report for Asbestos Abatement Project Supervision (WA Bldg.)
Integrus Structural Investigation
Brailsford & Dunlavey Proposal to Render Professional Consulting Services
7/12/96
Undated
4/7/05
5/25/05
1/31/06
1/13/06
Summer 2001
2007-2008
2006
5/3/05
10/31/01
5/11/05
6/11/08
2/1/06
1/30/06
8/10/06
3/10/06
9/6/01
5/11/00
Education Addition (Cleveland Hall)
Bldg. No. 086A
Box No. 9 cont.
Budget
Builder’s Risk Insurance
EIS
Regents
FAC
Project Planning Committee #1
AMEC Earth & Environmental, Inc. #1
Geo Engineers, Inc. CO#13431
KJM CO#14730
KJM CSI Division Report (Draft) 100% CD Estimation
KJM By Element Report
KJM Constructability Review
Reid Middleton #1 CO#12968
10/1/99
4/7/04
1/1/03
7/22/97
1/13/00-9/15/05
1/8/98
3/17/03
11/1/99
3/1/02
4/28/03
4/28/03
9/12/02
10/1/99
Education Addition (Cleveland Hall)
Bldg. No. 086A
Box No. 10
Stephen F. McAuley Construction Management #1 CO#13339
Stoel Rives LLP #1 CO#12589
Strata Geotechnical Engineering #1 CO#15527
Email General Correspondence
General Correspondence #2
Project Management Minutes
Project Schedule Correspondence
Energy Life Cycle Cost Analysis Correspondence
Schematic Design Report
Roen & Associates #2 Value Engineering Survey
Roen & Associates #1 Value Engineering Study
A/E Consulting Services Selection
Thomas Hacker & Associates #4 General Correspondence
Thomas Hakcer & Associates Structural & Energy Calculations
Thomas Hacker & Associates #5 Contract CO#12801
MW Consulting Engineers Energy Life Cycle Cost Analysis Volume I
MW Consulting Engineers Energy Life Cycle Cost Analysis Volume II
Shea Graham Construction, Inc. #1 General Correspondence
Shea Graham Construction, Inc. #1 Contract CO#15525
Thomas Hacker & Associates Architects PC Predesign Documents
Schematic Design
Strata Final Project Summary Test Report
KJM 100% Construction Document Estimate
8/9/99
3/30/98
3/24/04
1/17/01-6/23/05
9/5/02-6/17/08
8/1/99
10/1/99
7/1/00
Undated
6/1/00
6/27/00
5/97
5/1/01
4/2/03
3/1/05
7/00
7/00
3/1/04-3/20/06
3/1/04-9/30/05
6/22/98
Undated
8/4/04
5/9/03
Education Addition (Cleveland Hall)
Bldg. No. 086A
Box No. 11
Thomas Hacker Architects, Inc. Project Manual Volume I Division 0-14
Thomas Hacker Architects, Inc. Project Manual Volume I Division 15 & 16
Maiani Construction Services, Inc. Test & Balance RPF Final Revision
Design Team Estimate
Contract Change Proposals
Certified Payroll Records
Contract Change Proposals
Rejected Bids
Shea Graham - Project Closeout #1
Thomas Hacker & Associates Architecture PC Education Addition Study
Architectural cost Consultants, LLC 100% Design Development Estimate
Thomas Hacker & Associates Architecture Outline Specification Design Development
Roen & Associates #1 Value Engineering Study
General Correspondence #1
1/23/04
1/23/04
8/25/06
4/1/03
Numbers 062-121
2/1/05
Numbers 001R-061
3/16/04
3/9/06
6/22/98
6/9/00
6/12/00
2/1/00-6/00
7/97-6/30/01
Education Addition (Cleveland Hall)
Bldg. No. 086A
Box No. 12
Thomas Hacker & Associates #3 General Correspondence
Thomas Hacker & Associates #2 General Correspondence
Thomas Hacker & Associates #1 General Correspondence
Thomas Hacker & Associates #4 Contract CO#12801
Thomas Hacker & Associates #3 Contract CO#12801
Thomas Hacker & Associates #2 Contract CO#12801
Thomas Hacker & Associates #1 Contract CO#12801
Steve Pea Good Faith Building Inspection Report (rm. #130A, roof top, and steam tunnel)
12/1/00-4/30/01
11/1/99-11/30/00
10/97-10/31/99
10/1/04-2/28/05
5/1/03-9/30/04
6/1/00-4/30/03
11/18/97-3/31/00
11/5/02
Golf Course Expansion (and Master Plan)
Bldg. No. 365E
Box No. 12 cont.
Builder’s Risk Insurance
EIS #1
Regents
BAIT Committee
Attorney General
Issues and Claims
Public Records Requests 10-32 (1 of 7 folders)
5/23/06
5/6/05
11/23/02-8/28/08
11/1/02-8/28/08
10/2009
6/1/08
1/2010
Golf Course Expansion (and Master Plan)
Bldg. No. 365E
Box No. 13
Public Records Requests 10-32 (6 of 7 folders)
Public Records Requests 8-35
Public Records Requests 8-33
Public Information Requests 7-154
Public Information Requests SEPA 0562 #3
Public Information Requests SEPA 0562 #2
Public Information Requests SEPA 0562 #1 (3 folders)
Public Information Requests 5-33
FTP Site Archive (on CD)
“Creating a Championship Golf Course at WSU” Brochure
1/2010
2/2008
3/2008
9/28/07
3/29/05
3/29/05
3/29/05
2/14/05
6/28/06
Undated
Golf Course Expansion (and Master Plan)
Bldg. No. 365E
Box No. 14
Master Plan Water Resources
Signage
Bakers Tree Servic3e #1 CO#16085
Dahlin Group, Inc. #1 CO#16036
Davis Langdon #1 CO16098
Design West Architects #1 CO#16513
Design West Architects Project Manual Division 0-16
Master Plan Economics Research Association Market & Financial Analysis CO#15633
E3RA #1 CO#16148
E3RA Good Faith Hazardous Materials Survey
Trent School of Golf CO#15074
Lane Powell Attorneys Land Use Issues
HGHB #1 CO#16000
Jim Kolva Associates #1 CO#16207
KPFF Consulting Engineers #1 CO#16084
OB Sports #1 CO#16001
Sparling #1 CO#16220
Strata Geotechnical #1 CO#15958
Taylor Engineering #1 CO#15959
RFQ for Golf Course Designer
“An Environmental Approach to Golf Course Development”
Email General Correspondence #1
General Correspondence #1
John Harbottle Email Correspondence
Kemper Sports General Correspondence #1
John Harbottle Design #1 General Correspondence
John Harbottle Design #1 Contract CO#15415
John Harbottle Design #1 Contract CO#15919
Oliphant Golf Construction #1 General Correspondence
Oliphant Golf Contract #1 CO#16598
Pre-bid Meeting Minutes #1
Courseco, Inc. General Correspondence
Environmental Permits #1
Gathering Pavilion Tent Failure Correspondence
4/1/04
4/1/08
3/22/05
2/18/05
2/28/05-7/2/07
2/1/06-4/16/05
3/26/07
5/1/04
4/1/05
7/7/05
5/1/06
6/28/05
2/8/05
6/29/05
3/30/05
2/1/05
7/11/05
1/24/05
1/25/05
7/1/03
Undated
3/1/04
6/1/03
4/1/04
12/15/05
1/1/04
2/2/04
1/19/05
5/1/06
5/1/06
3/2/06
6/1/06
1/31/06
2/1/09
Tent Failure Correspondence 11/1/08
Golf Course Expansion (and Master Plan)
Bldg. No. 365E
Box No. 15
Wetland Mitigation
Water Reuse
Golf Course Studies
Project Manual John Harbottle Design
Preliminary Expansion Study
Wetland Delineation Report
Golf Course Market Analysis Report City of Pullman
ERA Market Analysis Report
Comfort Station Correspondence
Vet Med Relocation
Master Plan Meeting Minutes
Golf Course
Golf Couse Expansion Theme
Firms
Public Survey
Meetings and Correspondence
Financing
Certified Payroll Reports
Contract Change Proposals Oliphant
Oliphant Responsibility File
Rejected Bids
1/1/06
1996-2008
1995
1/24/06
5/96
1/7/05
10/15/91
6/15/04
10/1/07
6/10/04
4/1/04
6/12/91-10/02
1/1/96-10/31/97
1997
7/18/97
9/7/95-3/13/98
8/7/95-3/13/98
6/1/06
Numbers 001-021
4/06
3/06-5/06
Golf Course Entry Road and Parking
Bldg. No. 365
Box No. 15 cont.
Builder’s Risk Insurance
Regents
BAIT
Public Records Request Numbers 8-33
Public Records Request Numbers 8-33
Strata Geotechnical Engineering & Materials Testing CO#16751
Taylor Engineering, Inc. #1 CO#16052
Roundtop Hill/Jerry Newbrey Trail
Stormwater Permits
General Correspondence #1
John Harbottle Project Manual Design Golf Course Architecture Volume I Divisions 0-16
4/26/06
5/2/05-5/9/06
10/22/04-3/20/08
3/08
2/08
7/1/06
2/25/05
6/1/06
8/1/06
3/23/06
3/1/06
Golf Course Entry Road and Parking
Bldg. No. 365
Box No. 16
John Harbottle Design #1 General Correspondence CO#16599
Motley-Motley, Inc. #1 General Correspondence
Motely-Motley, Inc. Contract CO#16599
Contract Change Proposals Motley-Motley
Rejected Bids
5/1/06
4/19/06-9/28/10
5/9/06
Numbers 001-038
4/13/06
Golf Course Management
Bldg. No. 365
Box No. 16 General Correspondence
CourseCo, Inc. #1 General Correspondence
CourseCo, Inc. #1 Contract CO#16450
10/27/05
6/1/06
6/1/06
Golf Course Pavilion
Bldg. No. 365M
Box No. 16
Bunker Steel Building, Inc.
Coffman Engineering CO#18203
General Correspondence
Furnace
Acoustic Panels
East Concrete Patio
Concrete Polishing
Design Drawings
4/2/09-11/5/09
6/1/09
6/1/09
11/2010
10/2010
8/2010
7/2010
3/2009
Grimes Way Steam Plant (Energy Plant Redevelopment)
Bldg. No. 0840
Box No. 16 cont.
Budget
Builder’s Risk Insurance
EIS
Regents
BAIT Committee
Attorney General
Department of Ecology General Correspondence
Department of Ecology Notice of Construction
Avista Utilities Correspondence
AMEC Earth & Environmental, Inc. #1 Asbestos Abatement CO#15053
Bison Engineering, Inc. #1 CO#16070
E3RA, Inc. #1 CO#15739
Geoengineering, Inc. #1 CO#14495
Bison Engineering NOx, CO, & VOC Emissions Compliance Test
MRW & Associates, Inc. CO#14023
New Generation Services CO#14024
7/1/02
7/3/03
10/2/01
9/6/02-6/29/01
12/6/00-10/27/05
2/1/01
9/9/03
6/12/03
4/1/02
5/1/03
3/14/05
8/13/04
3/29/02
5/10/05
3/1/01
3/1/01
Grimes Way Steam Plant (Energy Plant Redevelopment)
Bldg. No. 0840
Box No. 17
Preston/Gates/Ellis, LLP
Progressive Engineering Group, Inc. CO#17401
Rooney Engineering, Inc. #1 CO14813
Strata Geotechnical Engineering & Materials Testing CO#14278
Strata Geotechnical Engineering Evaluation Final Report
SCM Consultants, Inc. #1 CO#14814
Siemens Energy & Automation
Sonnichsen Engineering, Inc. CO#13953
Susan D. Musselman Inc. #1 CO#14409
Taylor Engineering, INc. C.E. Design Services
Thomas, Dean, & Hoskins Domestic Water System Modeling CO#14592
URS Corporation #1 CO#16262
Valutek CO#13948
Williams Gas Pipeline West Letter Agreement
Wood/Harbinger, Inc. CO#14279
Wood/Harbinger, Inc. Steam System Upgrades #2 CO#14560
RFP for Joint Agreement
RFP for Engineering Consultant Services
Email General Correspondence #1
Trigen Energy Corporation General Correspondence #1
General Correspondence #3
Harris Group Inc. General Correspondence #1
Harris Group Inc. Contract #6 CO14852
Hoffman Construction Company #1 General Correspondence
Hoffman Construction Company #1 Preconstruction Professional Services CO#14889
3/1/01
11/1/07
11/5/02
7/1/01
1/24/03
1/31/03
10/02
3/1/04
1/1/01
1/1/03
1/9/03
7/20/04
12/27/02
Grimes Way Steam Plant (Energy Plant Redevelopment)
Bldg. No. 0840
Box No. 18
General Correspondence #2
RFQ New Energy Plant
Contract Change Proposals
RFQ GC/CM Selection #2
RFQ GC/CM Selection #1
Certified Payroll Reports
Rejected Bids GC/CM RFP
Hoffman Construction Company Interview
Hoffman Constrcution Company SOQ for GC/CM
Lydig SOQ
Wood/Harbinger Steam CO#14560
Harris Group, Inc. #5 CO#14852
Harris Group, Inc. #4 CO#14852
Harris Group, Inc. #3 Contract CO#14852
1/1/01-12/31/03
11/02
Numbers 002-009
10/02
12/02
8/1/03
12/02
12/5/02
11/21/02
11/21/02
4/1/02-5/1/03
1/17/04-7/19/04
10/1/03-1/16/04
7/23/03
Grimes Way Steam Plant (Energy Plant Redevelopment)
Bldg. No. 0840
Box No. 19
Harris Group, Inc. #2 Contract CO#14852
Harris Group, Inc. #1 Contract CO#14852
Hoffman Construction Co. of WA. GC/CM #7
Hoffman Construction Co. of WA. GC/CM #6
Hoffman Construction Co. of WA. GC/CM #5
Hoffman Construction Co. of WA. GC/CM #4
Hoffman Construction Co. of WA. GC/CM #3
Hoffman Construction Co. of WA. GC/CM #2
Hoffman Construction Co. of WA. GC/CM #1
4/1/03-7/22/03
1/13/03-3/30/03
8/1/04-8/1/04
2/11/04-8/1/04
10/1/03-2/10/04
9/1/03-9/30/03
8/1/03-8/31/03
7/1/03-7/31/03
5/1/03-6/30/03
Grimes Way Steam Plant (Energy Plant Replacement Facilities)
Bldg. No. 0840
Box No. 19 cont.
Builder’s Risk Insurance
Regents
BAIT Committee
Hodge and Associates CO#14451
Strata Geotechnical Engineering & Materials Testing CO#14448
Taylor Engineering, Inc. CO#14513
General Correspondence #1
7/12/02
7/1/02
7/1/02-9/5/02
2/1/02
2/1/02
1/28/02
2/1/02
Grimes Way Steam Plant (Energy Plant Replacement Facilities)
Bldg. No. 0840
Box No. 20
Lydig Construction, Inc.
Lydig Construction, Inc. #1 CO#14625
Contract Change Proposals Lydig Construction, Inc.
Responsibility File Lydig Construction, Inc.
Planholders List/ Correspondence
Rejected Bids
Closeout
7/1/02-7/9/03
7/1/02-4/30/03
Numbers 001-015
6/7/02
7/2002
6/7/02
1/1/03
Heald Hall Renewal
Bldg. No. 82
Box No. 20 cont. Budget
Regents
Coffman Engineers, Inc. CO#14615
Project Planning Committee
Project Request Report
Miller/Hull Partnership Preliminary Expanded Options Study
Miller/Hull Partnership Options Phase Document
AMEC (Administration Annex) Cost-Estimate Regulated Material Removal/Disposal
AMEC Limited Facility Survey (2 copies)
Expanded Options Study #2
Column Analysis and Rebar Study
Email General Correspondence #1
General Correspondence #2
Miller/Hull Partnership General Correspondence #1
Miller/Hull Partnership Consultant Selection
Miller/Hull Partnership Predesign Study
Expanded Options Study #1
General Correspondence #1
BAIT Committee
Regents
Project Planning Committee
General Correspondence #1
AMEC Earth & Environmental, Inc. #1 CO#14393
10/92-8/93
12/8/92
6/1/02
92-93
10/1/01
8/95
6/15/92
2/8/02
2/8/02
6/1/95-3/18/69
1993
5/15/97
41/1/92-4/15/03
12/91
1991
9/92
2/10/93-5/31/95
1991
3/29/01-5/10/01
5/01
4/17/02
4/1/01-6/18/02
11/19/01
Heald Hall Renewal
Bldg. No. 82
Box No. 21. Coffman Engineers Structural Review CO#14615
Meeting Minutes
A/E Design Services Selection
LMN Architects General Correspondence #1
Project Request Report
Budget Committee Presentation: Major Capital Projects Request
LMN Architects Predesign Report (electronic copy included)
LMN Architects Biotechnology Life Sciences Facility Predesign Report
AMEC (AD Annex) Limited Facility Survey
AMEC Hazardous Materials Limited Facility Survey (Originals)
A/E Design Services Selection
5/1/02
11/1/02
4/2001
7/1/01
10/1/01
2/5/08
Undated
8/6/01
2/8/02
2/8/02
4/01
(Holland) Library Renovation
Bldg. No. 0062
Box No. 21 cont.
Budget
Regents
BAIT Committee
Project Planning Committee
Email General correspondence #1
General Correspondence #1
NW Architectural Company General Correspondence #1
NW Architectural Company Contract #1 CO#12862
Phoenix Environmental, Inc. Asbestos & Paint Inspections
Baugh Construction Oregon, Inc. Response to RFQ for GC/CM (x2)
Lydig Construction, Inc. RFQ and Interview (x2)
Garco Construction, Inc.
A/E Design Services Selection
6/1/02-2/9/04
4/18/01
3/29/01-5/10/01
7/9/99
7/1/00-2/5/04
6/1/01
7/19/02
5/1/01-5/31/01
6/26/01
4/19/01
4/19/01
4/19/01
January 2001
(Holland) Library Swing Space
Box No. 21
NW Architecture Company General Corporation #1
NW Architecture Contract #1 CO#15337
11/25/03-2/3/04
10/1/03-2/17/04
(Holland) Library System Master Plan
Box No. 21
Regents
Finance & Audit Committee
LMN Architecture General Correspondence #1
Budget
General Correspondence #1
RFQ for Architectural Planning Services
GC/CM Procedures
9/2003
9/03-10/03
1/1/03-11/17/05
11/1/03-11/25/03
10/1/03-3/15/05
7/1/03
Undated
(Holland) Library System Master Plan
Box No. 22
LMN Architectural + Resource Planning Group SOQ
LMN Interview Presentation
LMN Project File Study
NAC Predesign Study
OPSIS Architecture/NAC Program Analysis
NAC Submittal (Application)
Installation of Fire Sprinklers & Alarm System (Old Files)
8/22/03
9/19/03
6/21/04
6/02
6/19/01
6/02
8/29/90-3/29/95
Library Road Phase III
Bldg. No. 0062
Box No. 22
Builder’s Risk Insurance
EIS
Stormwater
Regents
Finance and Audit Committee
Issues and Claims
BOLA Architecture + Planning CO#17653
E3RA, Inc. CO#17408
Steven Goldblatt Third Party Neutral CO#17627
Strata Geotechnical Engineering & Materials Testing CO#17162
Strata Geotechnical Engineering Evaluation
Taylor Engineering CO#17547
Tree Associates CO#17849
Whiteshield, Inc. CO#17160
Field Reports
Murrow Hall Bridges
AD Annex (w/ photocopies dated back to the 1970s)
AD Annex Abatement
Schematic Design Brochure
Design Review Comments
General Correspondence
GC/CM Selection #2
GC/CM Selection #1
KPFF Drainage Control Plan Analysis
KPFF Preliminary Design Report
3/6/08-1/22/10
11/1/07-4/7/08
1/1/08-4/7/08
10/19/07-7/2/08
9/6/07-10/9/09
10/1/08-9/17/09
5/1/08-9/6/08
12/1/07-5/20/09
5/1/08
7/1/07-9/14/09
12/6/07
4/10/08-2/23/09
9/1/08-12/14/08
6/1/07-4/3/08
7/1/07-9/27/08
2/1/08-5/5/08
12/1/07-12/8/08
2/1/02-7/15/08
10/1/07
12/1/07-4/22/08
12/1/06-4/6/11
7/19/07
7/2/07
4/2/08
10/12/07
Library Road Phase III
Bldg. No. 0062
Box No. 23
Meeting Minutes
KPFF Consulting Engineering General Correspondence #1
KPFF Consulting Engineering Contract #2 CO#17159
Schedules
RFQ GC/CM
Hoffman Construction Co. General Correspondence #1
Estimates GC/CM
Non-Compliance Reports
Trees
Strata Geotechnical Engineering Evaluation Revised Report Phases 3 & 4 (OBSOLETE)
Graham Construction & Management, Inc. SOQ
Hoffman Construction Co. RFQ for GC/CM
Lydig Construction SOQ for GC/CM Services
Hoffman Construction Co. GC/CM Contract #1 CO#17497
Hoffman Construction Co. Contract #7 CO#17645
Certified Payroll Reports
Rejected Bids
Close Out Items
Hoffman Construction Co. Contract #1 CO#17246 (Preconstruction)
5/1/07-1/14/09
5/1/07-10/4/10
4/15/08-8/20/10
6/1/07
7/19/07
8/1/07-9/29/10
3/28/07-6/12/08
7/1/08
3/1/02
9/25/07
7/24/07
7/24/07
7/24/07
3/1/08-2/28/10
12/1/09-3/25/10
12/1/09-12/17/09
Bid Date 8/13/07
11/1/08-11/21/08
8/1/07-6/28/08
Library Road Phase III
Bldg. No. 0062
Box No. 24
Hoffman Construction Co. Contract #6 CO#17645
Hoffman Construction Co. Contract #5 CO#17645
Hoffman Construction Co. Contract #4 CO#17645
Hoffman Construction Co. Contract #3 CO#17645
Hoffman Construction Co. Contract #2 CO#17645
Hoffman Construction Co. Contract #1 CO#17645
KPFF Consulting Engineers Contract #1 CO#17159
KPFF Consulting Engineers Bid Package #2 Utilities Project Manual
KPFF Consulting Engineers Bid Package #1 Utilities Project Manual
9/1/09-11/30/09
7/1/09-9/1/09
5/1/09-7/31/09
1/1/09-4/30/09
10/1/08-12/31/08
6/1/08-9/30/08
7/1/07-3/15/08
2/14/08
5/14/08
Johnson Hall Addition PBS I Interior Sign Package
(Pre-Public Records Request)
Do not mix with post-request files
Bldg. No. 0076
Johnson Hall Addition, PBS II
Box No. 24 cont. Budget #1
Regents
BAIT Committee
Zimmer Gunsul Frasca Partnership #1 General Correspondence
Zimmer Gunsul Frasca Partnership Contract CO#14432
4/10/98-7/17/03
5/1/01-6/15/05
3/29/01-5/10/01
12/21/01-5/16/02
1/1/02-9/30/02
Johnson Hall Addition, PBS I
Box No. 25 Builder’s Risk Insurance, Interior Sign Package Builder’s Risk Insurance
EIS
Regents
BAIT Committee
Public Records Request
Attorney General
Project Planning Committee
Issues & Claims
Roen Associates Construction Cost Estimate - Design Review Development
Construction Meeting Minutes #1
Zimmer Gunsul Frasca Partnership Predesign Study
WSU Utility Services Good Faith Building Inspection
Roen Associates Construction Cost Estimate - Schematic Design
#0076 Johnson Hall Scoping Study McClellan & Copenhagen, Inc.
Johnson Hall Strategic Master Plan
#0076 McClellan & Copenhagen, Inc. CO#12835
McClellan & Copenhagen, Inc. Statement of Qualifications
Lane Powell Attorneys
Glumac International Commissionary Services CO#15061
Pederson Associates, Inc. CO#14045
SCM Consultants Asbestos Lead Survey CO#14124
5/31/05-6/15
7/23/03-4/26/04
3/17/03
5/19/99-6/14/02
6/15/05-10/15/05
3/05
1/1/02-6/23/03
4/5/00-10/05/01
4/1/05
9/10/02
10/1/99
5/02
3/4/03-3/11/03
4/30/02-9/19/02
12/24/97-4/18/98
5/12/99-3/15/00
1/27/98-7/22/02
10/22/97
10/01/04-10/1/05
3/1/03
4/1/01
6/1/01
Johnson Hall Addition PBS I
Bldg. No. 0076
(Pre-Public Records Request)
Do not mix with post-request files
Box No. 25 (cont.)
Reid Middleton #1 CO#12968
Siemens #1 CO#14520
Strata #1 CO#14422
White Shield, Inc. Site Survey Contract CO#14423
Winston & Cashatt - Patrick Sullivan Third Party Neutral CO#15212
Email General Correspondence
General Correspondence #2
Zimmer Gunsul Frasca Partnership Email Correspondence
Zimmer Gunsul Frasca Partnership Contract CO#14316
Zimmer Gunsul Frasca Partnership General Correspondence #2
CK Doty & Associates Responsibility File Baugh/Skanska GC/CM Preconstruction Services #2 Contract CO#14353
Baugh Construction Oregon, Inc. GC/CM Preconstruction Services #1 CO#14353
Baugh/Skanska Design Development Estimate - Phase I
Certified Payroll Reports
Contract Change Proposal Skanska USA, Inc. CO#15014 (Electrical Final Offer)
Contract Change Proposals
4/1/02
1/1/02-8/21/03
12/1/01-2/28/05
12/1/01-6/17/02
5/1/03-1/14/04
5/1/99-8/5/02
6/1/04-1/18/05
7/1/01-5/2/05
11/11/05-6/29/07
7/1/02-7/2/04
4/11/05
9/1/03-10/10/03
10/21/01-11/4/02
9/9/02
2/1/05-5/10/05
#’s23, 14, 15, 77, 48, 107, 93, 106, 103, 101, 122
Numbers 160-186
Johnson Hall Addition PBS I
Bldg. No. 0076
(Pre-Public Records Request)
Do not mix with post-request files
Box No. 26
Contract Change Proposal Skanska, Inc. CO#15014
Numbers 001-159
Facilities Services
Johnson Hall Addition PBS I
Bldg. No. 0076
(Pre-Public Records Request)
Do not mix with post-request files
Box No. 27
Plant Sciences Programs Document for Dr. Gretchen Bataille, Provost
Zimmer Gunsul Frasca #1 General Correspondence
Rejected Bids GC/CM
Zimmer Gunsul Frasca #8 Contract CO#14316
Zimmer Gunsul Frasca #7 Contract CO#14316 Zimmer Gunsul Frasca #6 Contract CO#14316
Zimmer Gunsul Frasca #4 Contract CO#14316
Zimmer Gunsul Frasca #3 Contract CO#14316
Zimmer Gunsul Frasca #2 Contract CO#14316
Zimmer Gunsul Frasca #1 Contract CO#14316
8/22/97
7/1/99-6/30/02
7/26/01
4/19/05-11/10/05
8/20/04-4/6/05 1/1/04-8/19/04
1/1/03-4/30/03
9/1/02-12/31/02
6/1/02-8/31/02
9/1/01-5/31/02
Johnson Hall Addition, PBS I
Bldg. No. 0076
(Pre-Public Records Request)
Do not mix with post-request files
Box No. 28
General Correspondence #1 Contract CO#14316
Skanska USA Building Inc. #1 General Correspondence
Baugh Construction Oregon, Inc. #1 Contract CO#14353
Zimmer Gunsul Frasca #5 Contract CO#14316
Zimmer Gunsul Frasca #2 Predesign CO#13396 Contract
Zimmer Gunsul Frasca #1 (Pay estimates, Change orders, Extra design services)
Skanska USA Building Inc. #2 Contract CO#15014
McClellan & Copenhagen, Inc. College of Agriculture & Home Economics
Johnson Hall Condition/Needs Assessment a Study of Capital Program Requirements for Plant Sciences
90% Pre-draft copy
Baugh RFQ for GC/CM Services
Lydig Construction, Inc. RFQ
McClellan & Copenhagen, Inc. Strategic Vision Plan
1/15/98-5/31/04
1/1/01-2/24/05
2/1/02-9/1/03
5/1/03-12/31/03
3/1/01-1/14/02
12/1/99-2/28/01
10/21/03-3/24/04
4/6/98
5/25/01
5/25/01
10/6/99
Johnson Hall Addition PBS I
(Post-Public Records Request)
Do not mix with pre-request files
Bldg. No. 0076
Box No. 29
Budget
Builder’s Risk Insurance
EIS
Public Records Request 5-89
Strata Post Records Request
Issues and Claims #2
Issues and Claims #1
Project Planning Committee
McLellan & Copenhagen General Correspondence
Daily Construction Reports
Email General Correspondence
General Correspondence
Zimmer Gunsul Frasca Email General Correspondence
Zimmer Gunsul Frasca General Correspondence
Zimmer Gunsul Frasca Contract CO#14316
Schematic Design System and Material Narrative Description
CK Doty & Associates Interior Sign Package Contract Change Proposal
CK Doty & Associates #1 General Correspondence
CK Doty Associates #1 Contract CO#16145 #1
Skanska USA Building, Inc. Contract CO#15014
Skanska #2 General Correspondence
Skanska Monthly Reports
Skanska Monthly Reports March-April
Skanska General Correspondence #1
Skanska #3 Contract CO#15014
7/1/05
8/3/05
1/6/06
Numbers 5-89
2/27/05-3/31/05
9/22/04-8/22/05
8/22/03-10/7/04
8/1/02
6/1/02
11/1/03-12/17/04
5/1/01-10/01/05
10/10/01-12/11/06
8/1/01-6/3/03
3/10/02
10/31/05-5/31/07
3/27/02
001
4/1/05-8/2/05
6/8/05-10/17/05
4/30/05-10/31/05
1/1/05
May - June
March - April
9/20/02-9/24/02
3/25/04-3/27/05
Johnson Hall Addition PBS I
(Post-Public Records Request)
Do not mix with pre-request files
Bldg. No. 0076
Box No. 30
Skanska USA Building Inc. #1 Contract
Skanska Construction Meeting Minutes
Skanska Contract Change Proposals
Rejected Bids - Interior Sign Package
Baugh/Skanska M.A.C.C Proposal
Report Geotechnical Engineering Evaluation
Strata Statement of Qualifications
A/E Consulting Services Selection
Original Draft Floor Plan
GC/CM Management Procedures
Change Proposal Information
Change Proposal Information
Change Proposal Information
Change Proposal Information
5/1/03-10/20/03
1/04-6/27/05
Numbers 057.2 - 219
4/12/05
12/10/02
4/9/02
1/3/02
5/99
Undated
3/01
6/17/04-2/24/05
7/22/04-11/10/04
9/14/04-12/29/04
9/9/04-11/18/04
Johnson Hall Addition PBS I
(Post-Public Records Request)
Do not mix with pre-request files
Bldg. No. 0076
Box No. 31
Change Proposal Information
Change Proposal Information
Change Proposal Information
Glumac Commissioning Report Sections A-K
Zimmer Gunsul Frasca Partnership Project Specs Bid Package 1
Zimmer Gunsul Frasca Partnership Project Conform Construction Set Volumes 1 & 2
Glumac Commissioning Report Section L (O&M Manual, Control Shop Drawings)
Skanska General Correspondence #1
Wesselman/Pellecchia Associates Environmental Graphic Design Bid Set Specifications
Zimmer Gunsul Frasca Partnership Predesign Study 2nd Draft
RFP GC/CM
3/1/04-4/19/04
1/19/05-4/20/04
5/14/04-7/19/05
June 2005
4/13/03
7/17/03
June 2005
2/1/02-12/31/04
3/21/05
4/28/00
7/5/01
Kimbrough Hall Addition/Remodel
Bldg. No. 0025
Box No. 31
Regents
Budget
Attorney General
Public Information Requests
EIS #1
Disputes Review Board Third Party Agreement Thomas D. Cochran #1 CO#13066
Disputes Review Board Third Party Agreement James A. Fish #1 CO#13066
Rick Fisher, Inc. #1 CO#14844
Disputes Review Board General Correspondence
Robert Fossatti Associates, Inc. P.S. #1 CO#6060
1/8/92-12/14/00
9/1/92-8/4/99
7/15/97-10/4/99
3/1/99-10/5/99
8/30/96
9/17/98-11/30/99
9/23/98-10/1/98
9/23/98-1/19/00
12/1/02-2/12/03
2/99
Kimbrough Hall Addition/Remodel
Bldg. No. 0025
Box No. 32
Hainline & Associates #1 CO#12257
Reid Middleton CO#12968
Rider Hunt Ackroyd CO#12599
Redicheck Firm CO#11621
SCM Consultants, Inc. CO#12436
Strata Geotechnical Engineering & Materials Testing #1 CO#12940 (Per Estimates, CO’s)
Strata #2 Concrete Testing Reports
Wyatt Engineering Contract #1 CO#12165
Project Planning Committee
Construction Field Reports #1
Thompson Vaivoda & Associates Supplemental Instructions
Thompson Vaivoda & Associates #7 General Correspondence
General Correspondence #3
Thomas Vaivoda & Associates #4 Contract (PE’s, CO’s)
Shea Construction, Inc. General Correspondence #2
Shea Construction, Inc. #2 Contract CO#12931 (PE’s, CO’s, Est.)
Mechanical Submittals. Division 15. (1 of 2)
2/5/96-8/12/98
5/14/98-7/26/99
6/23/98-6/23/99
5/5/97-7/16/97
5/14/97-6/24/97
9/25/96-8/10/98
5/1/98-10/25/99
2/1/99-11/16/99
11/9/91-12/21/98
12/2/95-3/18/*96
6/21/98-8/20/99
7/24/98-11/5/99
1/1/99-5/17/00
7/1/99-6/31/00
4/1/99
10/1/99-9/30/00
1998
Kimbrough Hall Addition/Remodel
Bldg. No. 0025
Box No. 33
Mechanical Submittals. Division 15. (2 of 2)
Mechanical Submittals. Division 2-14
Architects Request for information (x3)
Architectural Supplemental Instructions Electrical Submittals Division 16 (x2)
Additional Painting
Thomas Vaivoda RFQ
Fire Alarms
Shea Construction, Inc. #1 Email Correspondence
1998
1998
Undated
Undated
Undated
12/1/98-1/26/00
5/20/98-5/3/99
11/1/99-3/8/00
6/1/99-8/3/99
Kimbrough Hall Addition/Remodel
Bldg. No. 0025
Box No. 34
Shea Construction, Inc. Contract Change Proposal Log
Shea Construction, Inc. Contract Change Proposal
Rick Fisher, Inc. CO#12583
SCM Consultants, Inc. Hazardous Materials Report
Strata Geotechnical Engineering & Materials Testing Final Project CO#12940
Roen Associates Value Engineering Study Addition & Modernization
Glumac International Energy Life Cycle Cost Analysis
Rick Fisher Hi-Fi Audio & Music Production Systems Final Report
Tektoniks Corporation #1 General Correspondence
Tektoniks #1 Contract Pay Estimates & CO’s
Tektoniks Contract Change Proposal
Rejected Bids
Rejected Bid Hazardous Materials
Rejected Bids
Undated
Numbers 001-086
4/7/97-2/12/03
12/2/96
12/29/99
3/21/96
4/1/97-5/16/97
8/97
6/7/97
6/16/97
Numbers 001-002
Bid Opening Date 4/23/98
6/5/97
Bid Opening Date 10/2/97
Kimbrough Hall Addition/Remodel
Bldg. No. 0025
Box No. 35
Project Completion Planning
Punch List Items
Strata Geotechnical Engineering & Materials Testing Concrete Testing Report
General Correspondence #2
General Correspondence #1
Thompson Vaivoda & Associates General Correspondence #6
Thompson Vaivoda & Associates General Correspondence #5
Thompson Vaivoda & Associates General Correspondence #4
Thompson Vaivoda & Associates General Correspondence #3
Thompson Vaivoda & Associates General Correspondence #2
6/1/98-10/3/00
11/1/99-12/27/99
6/1/98-1/31/99
1/1/92-6/30/96
11/20/91-12/31/91
1/1/98-12/31/08
2/1/97-12/31/97
10/1/96-1/31/97
6/1/96-9/30/96
1/1/96-5/31/96
Kimbrough Hall Addition/Remodel
Bldg. No. 0025
Box No. 36
Thompson Vaivoda & Associates General Correspondence #1
Thompson Vaivoda & Associates #3 Contract CO#12151
Thompson Vaivoda & Associates #2 Contract CO#12151
Thompson Vaivoda & Associates #1 Contract CO#12151
Thompson Vaivoda & Associates #1 Contract CO#10971
Shea Construction, Inc. #1 General Correspondence
Shea Construction, Inc. #1 Contract CO#12931
Thomas Vaivoda & Associates, Architecture AIA Addendum One
Hongwest & Associates, Inc. Geotechnical Report
Rider Hunt Ackroyd 100% Construction Document Estimate
SCM Consultants, Inc. Hazardous Materials Safety (Project 4162.010)
1/17/92-12/31/95
9/1/98-2/17/99
1/2/97-7/15/98
11/16/95-12/31/96
3/92-10/8/92
5/1/98-3/31/99
5/1/98-9/30/99
4/8/98
6/20/96-7/16/96
6/27/97
Undated
McCroskey Hall Renovation
Bldg. No. 0019
Box No. 36
Budget
Builder’s Risk Insurance
Regents
FAC Committee
BAIT Committee
Attorney General
Project Planning Committee
Design West Renovation Study
Agra Earth & Environmental, Inc. Limited Facility Survey
Agra Earth & Environmental, Inc. CO#13743
Kovalenko Hale Architects Cost Verification Study #1 CO#13296
McAuley and Associates CO#13339
McAuley and Associates CO#13792
Nixon Consulting, Inc.CO#13706
Reid Middleton #1 CO#12968
ROEN Associates CO#13742
Strata Geotechnical Engineering & Materials Testing CO#13972
Email General Correspondence #1
General Correspondence #1
August 1997
12/31/00-4/4/01
9/3/99-1/15/01
9/9/99-9/21/00
5/99-7/00
3/00
11/18/99
9/1995
5/30/00
6/1/00-11/4/02
7/1/99-12/17/99
8/16/99-10/23/00
8/1/0-10/23/00
6/1/00-9/25/00
3/6/00-10/4/01
7/1/00-8/10/00
11/1/00-6/28/01
3/2/00
2/1/95-10/21/03
McCroskey Hall Renovation
Bldg. No. 0019
Box No. 37
Garco Construction, Inc. General Correspondence #1
Garco Construction, Inc. Contract #1
Kovalenko Architecture General Correspondence #1
Garco Construction, Inc. Contract Change Proposal
Garco Construction, Inc. Responsibility File
Rejected Bids
Kovalenko Hale Architects Contract #1 CO#13387
Kovalenko Project Specs
Kovalenko Program Docs
Roen Associates 75% Construction Document Estimate
Schematic Design Brochure
Garco Construction Operating & Maintenance Manual (Telecommunications Vol. 4)
Kovalenko Hale Architects Program Documents
McCroskey Hall & Stevens Hall Renovation (Finalist Letters)
McCroskey Hall & Stevens Hall Renovation General Correspondence & Letters of Interest
12/20/00-12/29/03
12/19/00-3/13/02
5/1/97-10/30/01
Numbers 001-041
11/28/00-12/18/00
Bid Opening 11/28/00
1/31/00-3/31/01
10/9/00
12/2000
7/10/00-4/9/01
7/2000
2001
12/2000
8/16/95-8/22/95
5/6/95-7/12/95
Meyer’s Point Challenge Course
Facility ID #1850
Box No. 37
Builder’s Risk Insurance
Quit Claim Deed
Edward R. Meyer Revocable Living Trust
Property Assessment
AHBL Pre-design Document
General Correspondence #1
AHBL
General Correspondence
Predesign Contract CO#17067
1/2/09-5/12/09
September 1996
October 1990
March 2004
October 2007
5/29/07-2/8/09
4/1/07
4/1/07-1/9/08
Meyer’s Point House/Office/Barn
Facility ID #1854, 1852, 1853
Henderson Inlet BAIT Committee
Regents
E3RA, Inc. CO#18031
General Correspondence
Phase 1 Evaluation Mark Travers General Correspondence #1
NW Environmental Solutions, Inc.
General Correspondence #1
Contract #1 CO#17975
Inventory & Analysis
NW Environmental Contract Change Proposals
Responsibility File
Rejected Bids
11/17/05-1/09
February 2009
2/1/09-4/30/09
3/04-2/29/12
8/8/05-3/18/10
12/1/08-12/31/09
1/1/09-10/9/29
Undated
December 2008
Bid Date 12/2/08
Meyer’s Point Septic System
Facility ID #1850
Box No. 38 Specifications General Correspondence
Jim Hunter & Associates
General Correspondence
Contract CO#19042
Rejected Bids
11/22/11
9/1/10-12/11
9/1/10
9/1/10-2/4/11
Bid Date 12/16/11
Meyer’s Point Water System
Facility ID #1850
Box No. 38
Email General Correspondence
General Correspondence
NW Water Systems, Inc.
General Correspondence
Contract CO#18807
Group B Workbook
Specifications
Mark Travers Architect
Contract CO#15859
Drawings
Specifications
Phase II
Demolition
E3RA
Asbestos Abatement 3rd Party Clearance Inspection/Demolition/Debris Waste Report
NVL Labs & Hazmat Services
Asbestos Survey
Puget Sound Clean Air Agency
Regulation III
6/18/08-11/12/08
6/1/10
4/1/10-7/21/11
5/1/10-9/29/11
9/12/11
9/12/11
8/28/05-7/1/12
Undated
4/9/08
11/11/08
4/24/08
9/22/05
Undated
Murrow Hall Renovation & Addition
Bldg. No. 0033E
Box No. 38
Builder’s Risk Insurance
E.I.S. #1
Attorney General Correspondence
BAIT Committee
Budget #1
Regents
Issues and Claims
Warranty Folder
Project Planning Committee Meeting Minutes #5
Coffman Engineers Structural Design Review CO#14519
Design West Architects CO#14012
Design West Architects Value Engineering Su7tdy
Reid Middleton CO#12968
Sony Systems Integration - TV Production System
Stole Rives Attorneys
WPA, Inc. CO#14704
Strata CO#14754
Email General Correspondence
Northwest Architecture Company Email Correspondence
Meeting Minutes #1
Review Comments #1
Murrow Narrative
Murrow Addition Estimate
GC/CM Selection Correspondence
A/E Consulting Services Selection
General Correspondence #1
Northwest Architecture Company General Correspondence #3
Northwest Architecture Company Contract #2 CO#13938
Northwest Architecture Company Contract #1 CO#12863 (Extra Services)
Baugh Skanska Company General Correspondence #2
9/1/02-12/2/03
10/17/01-11/13/01
12/1/00-8/14/02
3/29/01
11/1/99-5/30/02
7/22/97-8/12/02
July 2002
3/18/04
3/13/98-1/9/01
3/1/02-5/15/03
2/1/01-6/1/01
May 2001
12/1/00-9/3/02
7/1/02-8/21/02
3/30/98-5/27/98
8/1/02-12/3/03
10/1/02-2/20/04
2/1/008/2/01
3/1/01-8/7/01
10/1/00-10/22/01
5/29/01-9/5/01
Undated
7/24/01
2/1/02-5/9/05
June 1997
7/97-7/7/04
8/1/04-9/17/04
7/19/02
2/23/98-3/25/03
2/1/04-8/31/07
Murrow Hall Renovation & Addition
Bldg. No. 0033E
Box No. 39
Baugh Skanska Company Contract #4 CO#14705 (Pay App 15-19)
Baugh Skanska Company Preconstruction Contract #1 CO#14563
RFQ for GC/GM Selection
Baugh Skanska, Inc. Contract Change Proposals
Johns Electric, Inc. Satellite Dish Relocate Electrical Operations & Maintenance Manual
Baugh Skanska, Inc. Contract Change Proposals
Northwest Architecture Company/Opsis Architecture Schematic Design Brochure
Northwest Architecture Company Predesign Study
Northwest Architecture Company Project Manual 50% Construction Documents
Planning Committee Meeting Minutes #4
Planning Committee Meeting Minutes #3
Planning Committee Meeting Minutes #2
11/1/03-9/1/04
5/1/02-10/2/02
February 2002
Numbers 112-134
1/31/03
Numbers 001-111
Undated
June 1998
2/11/02
May-June 1998
May-June 1998
2/27/98-2/27/98
Murrow Hall Renovation & Addition
Bldg. No. 0033E
Box No. 40
Planning Committee Meeting Minutes #1
General Correspondence #2
General Correspondence #1Northwest Architecture Company Contract CO#13938
Baugh Skanska, Inc. General Correspondence #1
Baugh Skanska, Inc. Contract #3 CO#14705 (Pay App 10-14)
Baugh Skanska, Inc. Contract #2 CO#14705 (Pay App 5-9)
Baugh Skanska, Inc. Contract #1 CO#14705 (Change Orders 1-10)
Baugh Skanska, Inc. Contract #1 CO#14705 (Pay App 1-4)
Baugh Skanska, Inc. M.A.C.C. Estimate Draft (Rev. 1)
Northwest Architecture Company Project Manual 75% Construction Document Submittal
Northwest Architecture Company Project Manual 95% Construction Document Volume 1 Divisions 0-14
Northwest Architecture Company Project Manual Set No. 28 Volume 2 Divisions 15-16
February 1998
6/1/01-5/28/04
9/10/98-5/31/01
9/25/00-7/18/02
5/1/02-7/31/04
6/1/03-10/31/03
1/1/03-5/31/03
6/1/03-8/4/03
9/1/02-1/31/02
6/19/02
3/18/02
5/1/02
7/16/02
Murrow Hall Renovation & Addition
Bldg. No. 0033E
Box No. 41
Northwest Architecture Company Project Manual 95% Construction Document Volume 1 Divisions 0-14
Northwest Architecture Company Project Manual Set No. 28 Volume 2 Divisions 15-16
5/1/02
7/16/02
Murrow Hall East Renovation
Bldg. No. 0033E
Box No. 41
Regents
Finance and Audit Committee
BJSS Duarte Bryant General Correspondence #1
BJSS Duarte Bryant, Inc. Architectural Predesign Services
BJSS Duarte Bryant, Inc. Contract #1 CO# 15281
BJSS Duarte Bryant, Inc. Predesign Study
Baugh Skanska RFQ for GC/CM
September 2003
September - October 2003
November 2003
8/22/03
11/4/03-2/9/05
June 2004
3/22/02
Museum of Art Building
Bldg. No. 0829
Box No. 41
Regents
BAIT Committee
Finance and Audit Committee
Site Analysis
Project Planning Committee #1
General Correspondence #1
ALSC Architects/OPIS Architecture General Correspondence #1
ALSC Architects/OPIS Architecture Contract #1 CO#13470
DCI Engineers Civil and Structural Engineering Brochure
ALSC Architects/OPIS Architecture Design Services Proposal
ALSC Architects/OPIS Architecture Predesign Study
ALSC Architects/OPIS Architecture Process
H.M. Brandston & Partners, Inc. (Lighting) Design Submittal
James D.Graham & Associates, Inc. (Power, Lighting, and Telecommunication Systems) Design Submittal
Sparling Electrical Engineering, Lighting Design & Technical Consulting
RFQ for Architectural Predesign Study Services
AE Design Services Selection
5/19/99-10/15/99
9/3/99
4/9/99-5/7/99
August 1999
10/1/99
2/1/99-9/17/99
8/5/99-2/2/00
11/22/99
Undated
7/16/99
May 2000
July 1999
Undated
Undated
6/30/99
Undated
6/99
North Fairway Drive
Bldg. No. _______
Box No. 41
City of Pullman Memorandum of Understanding
City of Pullman Engineering Services Agreement
Strata Geotechnical Engineering & Materials Testing (Lime Stabilization Laboratory Results)
Taylor Engineering, Inc. Pavement Section Design Report
Taylor Engineering, Inc. Alternative Analysis Technical Memorandum
Grants
Collision Reports
Email General Correspondence
General Correspondence
Sanitary Sewer Replacement Specifications
Strata Geotechnical Engineering Evaluation Proposed Outdoor Recreation Center
3/1/03-56/14/03
September 2003
January 2004
March - April 2004
3/2/04
3/19/04
October - November 2003
8/1/02
3/6/97-6/11/02
3/1/04
3/8/13
Old Incinerator Decommission, Demolition, & Related Works
Bldg. No. 0077
Box No. 42
Budget
Builder’s Risk Insurance
Regents
BAIT
E3RA, Inc. #1 CO#16401
USKH, Inc. #1 CO#15928
Department of Health Correspondence #1
General Correspondence #1
IRS Environmental Hazardous Materials Abatement Contract #1 CO#16635
IRS Environmental General Correspondence
Columbia Energy & Environmental Services General Correspondence #1
Columbia Energy & Environmental Services Contract #1 CO#15575
Motley-Motley, Inc. General Correspondence #1
Motley-Motley, Inc. Contract #1 CO#16860
Construction Meeting Minutes
Certified Payroll Reports
SCM Consultants, Inc. and Dade Moeller & Associates, Inc.
Termination of License & Decommission of Old Incinerator
Columbia Energy & Environmental Services, Inc.
Characterization & Decommission Report
Characterization & Decommissioning Plan
Decontamination & Decommissioning Plan
Characterization Plan
Technical & Cost Proposal for Additional Process Demolition
USKA Project Manual “Preliminary”
SCM Consultants, Inc. State of Qualifications
Environmental Checklist
Rejected Bids
Old Incinerator
Hazardous Materials Abatement
March 2004
11/16/06-3/8/07
6/7/06-12/1/06
3/3/05-1/25/07
12/7/05-8/31/06
1/24/05-7/14/05
1/1/04-11/28/05
1/1/03-7/14/05
6/1/06-10/31/06
5/1/06-12/12/06
2/1/03-4/20/06
4/1/04-6/25/05
10/1/06-10/25/07
10/1/06-5/31/07
9/1/03-3/29/04
8/1/06
1/14/04
11/10/05
9/30/04
8/6/04
7/7/04
4/1/04
March 2005
11/19/03
5/18/05
Bid Date 10/17/06
Bid Date 5/4/06
Olympia Avenue Student Housing
Box No. 42
Builder’s Risk Insurance
Phase II Builder’s Risk Insurance
E.I.S.
Regents
FAA Approval
FAC
Stormwater
A-One Geothermal, Inc. CO#17570
Hainline & Associates CO#18089
Hales & Aldrich, Inc. CO#18729
NW Consulting Engineers CO#19136
Steve Goldblatt Third Party Neutral CO#17735
Strata Final Project Binder
Strata CO#17365
Taylor Engineering, Inc. CO#17421
4/29/08-11/9/09
8/13/08-11/9/09
6/1/08
9/19/03-7/6/11
5/15/08
9/19/03-9/3/09
4/1/08-7/29/10
4/1/08-4/8/10
3/1/9-6/26/09
3/1/10-6/21/10
11/1/10-5/31/11
8/1/08-12/28/09
1015/09
11/1/07
12/1/07-3/28/08
Olympia Avenue Student Housing
Box No. 43
TESTCOMM, LLC CO#17770
TESTCOMM, LLC Commissioning Plan
TESTCOMM, LLC Start-up Plan
ALLWEST Testing & Engineering SOQ
Meeting Minutes
Miscellaneous Test Reports & Logs
Email General Correspondence
General Correspondence #1
Mithun General Correspondence #1 CO#17590
Mithun Contract #6 General Correspondence CO#17590
Mithun Contract #1 CO#17313
Mithun Project Manual Volume 1 & 2
GC/CM Selection #1
GC/CM Selection #2
Submittals
Schedules
RFQs
Graham Construction & Management, Inc. Contract #1 CO#17768
Graham Construction & Management, Inc. Contract (Supplemental Boiler Installation) CO#19137
Graham Construction & Management, Inc. Contract #1 (Preconstruction Services) CO#17505
Graham Construction & Management, Inc. Contract #1 GC/CM CO#17637
Graham Construction & Management, Inc. Contract #1 SOQ
7/1/08-7/12/10
10/17/08
6/5/09
Undated
4/1/08
8/1/08-3/31/10
4/1/08-9/1/09
11/1/07-7/6/11
12/1/07-12/23/14
2/1/11-511/11
1/1/08
Undated
Undated
Undated
6/1/08-11/30/09
4/1/08-7/31/08
7/1/08
7/1/08-1/31/10
11/1/10-8/31/11
1/1/08
5/1/03-2/1/10
12/6/07
Olympia Avenue Student Housing
Box No. 44
Graham Construction & Management, Inc. General Correspondence #2
Contract Change Proposal Student Housing (Boiler)
Contract Change Proposal Student Housing
Contract Change Proposal Student Housing Phase II
Certified Payroll Reports
Rejected Bids
Interviews
Public Notices & Advertisements
RFQs
Mandatory Pre-SOQ Meeting
Rationale for Utilizing the GC/CM Process
Preliminary Determination to Utilize the GC/CM Process
Final Determination to Utilize the GC/CM Process
Public Hearing
SOQ Evaluation
GC/CM RFQ
RFP Proposals
Preconstruction Services Proposals
Awards RFP/RFQ/SOQ Communication
GC/CM Selection Committee
GC/CM RFP/Divisions 0, 1 & Proposals
Graham/Mithun Interview Presentation
Graham Construction & Management, Inc. General Correspondence #1
Mithun Contract #4 CO#17590
Mithun Contract #3 CO#17590
Mithun Contract #2 CO#17590
1/1/10-9/9/11
Number 001
Numbers 001-091
Number 095
7/1/09
12/21/07
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
1/8/07
3/1/08-12/31/09
10/9/09-10/22/10
7/1/09-9/15/09
12/1/08-6/5/09
Olympia Avenue Student Housing
Box No. 45
Mithun Contract #1 CO#17590 5/1/08-12/1/08
Power Plant Modernization Addition
Box No. 45
Budget
FAC
Regents
Builder’s Risk Insurance
Project Planning Committee
Asbestos Abatement Survey
Avista Utilities #1 (Power Plant Modernization Predesign)
Power Plant Boiler Installation Report
Email General Correspondence
General Correspondence
Integrus Architecture Construction Progress Meetings #1
Integrus Architecture Addition General Correspondence #1
Integrus Architecture Predesign Project Committee Meetings #1
Integrus Architecture Predesign Study CO#13527 (electronic copy included)
Integrus Architecture Predesign Email Correspondence
Integrus Architecture Predesign General Correspondence
Integrus Architecture Contract #1 CO#13527
Shea Construction, Inc. General Correspondence #1
Shea Construction, Inc. Contract CO#13781
Daily Construction Reports
Shea Construction, Inc. (Pay Applications & Billing Summary) #10
Shea Construction, Inc. (Pay Applications & Billing Summary) #11
Shea Construction, Inc. (Pay Applications & Billing Summary) #12
Shea Construction, Inc. Cost Reports
Boiler Installation Contract Change Proposals
5/1/00
10/1/99-7/5/00
July 2000
8/9/00
10/1/99
2/29/00
3/1/00-6/13/01
August 2000
12/1/99-8/22/00
7/1/00-9/27/01
8/1/00-1/4/01
7/1/00-12/15/00
12/1/99-4/14/00
6/15/00
1/1/00-6/16/00
12/1/99-8/15/00
2/10/99-10/31/01
7/1/00-9/28/01
7/1/00-5/24/01
8/1/00-5/29/01
3/1/01-3/31/01
4/1/01-4/28/01
4/29/01-7/28/01
8/1/00-4/25/01
Number 002
Power Plant Modernization Addition
Box No. 46
Shea Construction, Inc. (Pay Applications & Billing Summary) #9
Shea Construction, Inc. (Pay Applications & Billing Summary) #7
Shea Construction, Inc. (Pay Applications & Billing Summary) #6
Shea Construction, Inc. (Pay Applications & Billing Summary) #4
Shea Construction, Inc. (Pay Applications & Billing Summary) #3
Shea Construction, Inc. (Pay Applications & Billing Summary) #2
Shea Construction, Inc. (Pay Applications & Billing Summary) #1
Contractor Evaluation
General Correspondence #1
1/1/01-2/28/01
11/25/00-12/31/00
10/29/00-11/24/00
10/1/00-10/28/00
8/26/00-9/30/00
7/24/00-8/25/00
7/6/00-7/21/00
7/5/00
9/1/99-12/31/00
Professional Skills Training Center (CVM)
Box No. 46
General Correspondence
1/1/07
Regents Dining Renovation
Box No. 46
Regents
BAIT Committee
Builder’s Risk Insurance
Virgil Hanson’s Email Backup Disk
Kevin Poitra Email Backup Disk
OAC Technical Proposal
Olympic Associates Company #1 CO#15841
AMEC Earth & Environmental, Inc. #1 CO#15480
Thomas Consulting #1 CO#14858
Strata Geotechnical Engineering #1 CO#15821
Email General Correspondence #1
General Correspondence
Final Commissioning Report (OAC, TESTCOMM, & George Bundy Associates)
URS General Correspondence #2
9/19/03-10/11004
6/13/03-9/15/05
9/22/04-8/31/05
9/28/06
9/29/06
9/30/04
11/17/04-11/9/05
4/27/04
12/1/02-1/14/03
10/1/04-7/21/05
5/16/03
11/1/03-11/30/04
September 2005
10/1/03-11/9/13
Regents Dining Renovation
Box No. 47
URS Corporation Contract #3 CO#15247
Lydig Construction General Correspondence #1
Lydig Construction Contract #1 CO#15898
Lydig Construction Contract Change Proposals
Rejected Bids
Lydig Construction Responsibility File Copies
Lydig Construction Responsibility File
URS Corporation Contract #2 CO#15247
URS Corporation Contract #1 CO#15247
10/5/05-5/2/06
9/1/04-10/16/08
9/1/04-11/30/05
Numbers 001-112
9/17/04-10/13/04
9/21/04
9/21/04
12/1/04-10/4/05
10/16/03-11/30/04
Rotunda Dining Center Renovation
Building No. 80
Box No. 48
Regents
BAIT
Builder’s Risk Insurance
Public Records Request #8-35
Public Information Request #7-60
Coffman Engineers, Inc. CO#16951
Creighton Engineering, Inc. CO#16946
Degenkolb Engineers CO#16293
Degenkolb Engineers Seismic Evaluation & Upgrade Concepts
Elevator Consulting Services, Inc. #1 CO#16952
JLR Design Group, Inc. CO#16972
McKinstry Essention CO#16962
Strata CO#16943
Taylor Engineering, Inc. CO#16343
TESTCOMM, LLC CO#16940
TESTCOMM, LLC Technical Proposal
Thomas Consulting CO#14858
Issues and Claims
General Correspondence #1
Lydig Construction, Inc. General Correspondence #1
Lydig Construction, Inc. Contract #2 CO#16922
URS Corporation General Correspondence #1
URS Corporation Contract #3
Lydig Construction, Inc. Responsibility File
IRS Environmental of WA Site Safety & Health Plan Including Asbestos Removal Procedures
Lydig Construction, Inc. Contract Change Proposal-36 Mechanical Redesign
Lydig Construction, Inc. Contract Change Proposals
9/10/14-1/30/07
9/10/03-3/20/08
1/15/07-2/04/08
February 2008
4/13/07
1/1/07-12/17/07
1/1/07-2/6/08
9/1/05-11/30/07
10/5/05
1/1/07-6/20/08
2/1/07-12/31/07
1/1/07-2/29/08
12/1/06-6/28/07
7/1/07-2/29/08
12/1/06-4/11/08
3/20/06
12/1/01
9/1/08-10/2/08
9/2/05-6/4/09
1/1/07-10/16/08
10/1/07-6/18/08
12/14/04-8/28/12
1/1/07-3/9/07
12/13/06
2/12/07
Undated
Numbers 001-103
Rotunda Dining Center Renovation
Building No. 80
Box No. 49
Certified Payroll Reports
Rejected Bids (Original Bid Date 4/1/06)
URS Corporation Contract #2 CO#15848
URS Corporation Contract #1 CO#15848
Lydig Construction, Inc. #1 CO#16922
3/1/07
Rebid Date 12/12/06
10/11/05-12/31/06
1/5/05-10/4/05
12/1/06-9/31/07
Institute for Shock Physics
Building No. 801A
Box No. 49
Budget
Builder’s Risk Insurance
EIS #1
Regents
BAIT Committee
Attorney General Correspondence #1
Architectural Cost Consultants #1 CO#13985
CTA Architects Engineers CO#13831
Hainline & Associates, Inc. CO#12257
The Redicheck Firm #1 CO#14029
Reid Middleton CO#12968
SCM Consultants Asbestos/Lead Survey CO#13662
Strata Geotechnical Engineers #1 CO#14293
A/E Consulting Services Selection
Project Planning Committee
Value Engineering Report
Email General Correspondence
General Correspondence #2
8/97-10/21/02
8/31/01-11/12/03
9/13/01-10/15/01
9/26/97-9/4/01
1/13/00-3/29/01
9/4/01
1/18/01-4/7/01
2/9/00-10/19/01
12/1/00-3/29/02
2/12/01-4/12/01
10/1/99-12/18/01
4/1/00-10/7/01
3/13/99-11/15/02
October 1997
9/9/97-4/8/98
8/2/00
8/11/97-3/6/12
6/1/01-8/17/04
Institute for Shock Physics
Building No. 801A
Box No. 50
Shock Physics:
Controls
Controls Correspondence
Latest Control Specifications
Reviews
Bid Documents
SCM Consultants, Inc. Good Faith Lead and Asbestos Survey
Strata Geotechnical Engineers Test Results
Lydig Construction Inc. #1 Email General Correspondence
Lydig Construction, Inc. #2 General Correspondence Miller/Hull Partnership #4 General Correspondence
Miller/Hull Partnership Code Review Comments
Miller/Hull Partnership Contract #3 CO#12905
Miller/Hull Partnership Request for Information #1
Miller/Hull Partnership Supplemental Information
Lydig Construction, Inc. Schedules
Lydig Construction, Inc. Contract #2 CO#14269
Miller/Hull Partnership Submittals
Field Authorizations #1
Miller/Hull Schematic Design Brochure
Gun Lab Exhaust Modifications
Warranties #1
Responsibility File
Preconstruction Schedule Development
Close out Items
Lydig Construction, Inc. Contract Change Proposals
February-March 2001
October 2002
May 2001
8/1/02-9/26/02
9/6/01-1/10/03
7/1/02-8/28/06 9/1/0-3/21/07
1/8/02
2/1/03-2/22/05
11/1/01-10/4/02
12/1/01
10/1/01-3/7/02
9/1/02-6/60/03
3/1/01-3/1/02
10/1/01-2/11/03
2/4/00
4/1/03-6/30/03
1/20/03-1/8/04
August 2002
9/99/99
11/1/02-7/31/03
Numbers 187-212
Institute for Shock Physics
Building No. 801A
Box No. 51
Lydig Construction, Inc. Contract Change Proposals Numbers 036-186
Institute for Shock Physics
Building No. 801A
Box No. 52
Lydig Construction, Inc. Contract Change Proposals
Miller/Hull Partnership General Correspondence #3
Rejected Bids #1
Miller/Hull Partnership General Correspondence #2
Miller/Hull Partnership General Correspondence #1
General Correspondence #1
Miller/Hull Partnership Project Manual 100% Construction Document Bid Set (Volume 1 & 2)
MW Consulting Engineers Energy Life Cycle Analysis (Volume 1 &2)
Numbers 001-035
4/13/01-8/31/02
Bid Opening 7/9/01
4/1/00-4/30/01
4/27/98-8/24/99
May 1997
6/14/01
9/2000
Institute for Shock Physics
Building No. 801A
Box No. 53
Miller/Hull Partnership Contract #2 CO#12905
Lydig Construction, Inc. Sherwin Williams Paint Specifications
Lydig Construction, Inc. Contract #1 CO#14269
Lydig Construction, Inc. General Correspondence #1
Miller/Hull Partnership Contract #1 CO#12905
Strata Final Project Binder
Miller/Hull Partnership Predesign Document
Code Review
Budget/Budget Estimates
Miller/Hull Partnership 100% Schematic Design A1.1
Miller/Hull Partnership 100% Veneer Support Elevation S8.1
Sign Shop Drawings
75% Schematic Design (Models/Color Renderings/Elevations)
1/1/01-1/31/03
9/10/02
8/6/01-8/31/02
8/6/00-6/30/02
5/13/98-12/31/00
12/6/02
5/28/98
1/28/02
8/23/00
2/7/00
6/14/01
11/18/02
2/10/99
South Fairway Intramural Field No. 1
Facility ID # 0833
Box No. 54
Regents “Valley Road Multi-use Recreational Fields Phase II”
Determination of Nonsignificance (Non-Facilities Planning Project) #2
Burke/Lee “Comprehensive Physical Planning Process” Correspondence #1
Email General Correspondence (Field No. 2)
General Correspondence
Motley & Motley, Inc. General Correspondence
Determination of Nonsignificance (Non-Facilities Planning Project) #1
February 1998
1/1/90-2/7/93
7/25/91-2/3/93
3/31/97-4/21/99
6/91-5/7/98
7/23/93
4/90-12/31/92
South Fairway Intramural Field No.2
Box No. 54
Budget “Valley Road Multi-use Recreational Fields”
Regents
EIS #2
Program Statement Expansion & Improvements
Project Planning Committee #1
Richard Carothers Associates, Ltd. #1 CO#10891 & 11466
Stoel Rives LLP #1 CO#12589
Strata Geotechnical, Inc. CO#13069
Strata Geotechnical Concrete Test Reports #1
RCA Huitt-Zollars #1 Email Correspondence
General Correspondence #2
Construction Meeting Minutes
RCA/Huitt-Zollars General Correspondence #1
RCA \/Huitt-Zollars Contract CO#12596
Certified Payroll Reports
Goodfellow Bros., Inc. General Correspondence #1
Goodfellow Bros., Inc. Statement of Compliance
Goodfellow Bros., Inc. Contract #1 CO#13023
General Correspondence #1
Goodfellow Bros., Inc. Contract Change Proposals
Rejected Bids
Rejected Bids
RCA/Huitt-Zollars, Inc. Schematic Design Brochure
Strata Final Project Binder
3/1/99
7/20/93
Undated
8/7/97-10/23/97
3/1/97-8/12/98
6/91-12/15/93
5/27/98
9/14/98-12/31/98
9/25/98-1/5/99
10/21/98-1/4/00
7/1/98-2/7/00
9/1/98-3/17/99
4/15/97-8/2/01
4/15/97-9/17/01
10/31/98
7/28/98-11/25/00
9/15/98-4/28/99
7/23/98-1/29/00
3/7/97-6/30/98
CCPs 001-005
7/23/98
6/22/98
3/6/98
12/21/98
South Fairway Parking & Road Improvements
Facility ID # 0762
Box No. 54
Attorney General
Regents
EIS
Builder’s Risk Insurance
Strata Geotechnical Engineering #1 CO#15686
Strata Geotechnical Engineering Testing & Inspection Reports
7/1/04
6/16/04
6/1/04-7/14/04
6/17/04-10/11/04
7/6/04-11/23/04
8/1/04-11/9/04
South Fairway Parking & Road Improvements
Facility ID # 0762
Box No. 55
Meeting Notes
Daily Construction Reports
Email General Correspondence
General Correspondence #1
“Campus Infrastructure 3-05” KPFF General Correspondence
KPFF Email General Correspondence
KPFF Consulting Engineers #1 Contract CO#15534
KPFF Consulting Engineers #1 Contract CO#15513
Request for Information
Motley & Motley General Correspondence
Motley & Motley Contract #1 CO#15666
Motley & Motley Contract Change Proposals
Motley & Motley Responsibility File
Rejected Bids
3/1/04
7/1/04-11/29/04
4/1/04
6/1/04-8/23/05
6/1/04-7/20/04
3/1/04-2/12/05
4/9/04
3/26/04-10/31/04
8/1/04
6/1/04-11/9/05
6/1/04-4/30/05
CCPs 001-005
6/1/04-4/30/05
6/1/04
Spring Street, Campus Street, Spillman & Kimbrough Parking Lot Project
Box No. 55
Budget #1
Builder’s Risk Insurance
EIS #1
MD & A CO#15083
Strata Geotechnical Engineering & Materials Testing #1 CO#15220
Strata Geotechnical Engineering & Materials Testing #1 CO#15221
Strata Geotechnical Engineering & Materials Testing #1 CO#15222
Strata Geotechnical Engineering & Materials Testing General Correspondence #1
Email General Correspondence #1
Taylor Engineering Contract #1 CO#15965
Taylor Engineering General Correspondence #1
Hereford Contracting & Excavating Responsibility File
General Correspondence #1
Hereford Contracting & Excavating General Correspondence #1
Taylor Engineering Construction Plans Site Demolition & Removal Plan
Hereford Contracting & Excavating, Inc. #1 CO#15218
Hereford Contracting & Excavating, Inc. #1 CO#15215
Hereford Contracting & Excavating, Inc. #1 CO#15216
Hereford Contracting & Excavating, Inc. #1 CO#15217
Hereford Contracting & Excavating, Inc. Contract Change Proposals
CO#15216
CO#15215
CO#15218
Certified Payroll #1
Rejected Bids #1
KPFF Consulting Engineers Drainage Report
KPFF Consulting Engineers Project Manual Bid Set
Taylor Engineering, Inc. Project Manual Division 0-16
Taylor Engineering, Inc. Specifications
KPFF Consulting Engineers Construction Documents
June 2003
10/2/03-8/5/04
3/6/03-9/25/03
6/3/03
8/8/03-5/13/04
8/8/03-5/13/04
7/29/04
8/8/03
2/3/03-7/25/03
1/31/03-3/4/05
1/31/03-3/4/03
August 2003
1/2/03-4/8/05
8/14/03-5/24/04
7/29/03
9/8/03-1/31/05
9/8/03-8/30/04
9/8/03-8/30/04
9/8/03-4/30/04
CCP 001
CCP 002
CCPs 003-005
11/3/03
Bid Opening 8/14/03
4/6/04
5/24/04
July 2003
July 2003
5/24/04
Teaching & Learning Center (aka) Smith Center for Undergraduate Education
Facility ID # 0095
Box No. 56
Budget #1
BAIT Committee #1
EIS
Regents #1
FAC Committee
Project Planning Committee #1
RFQ for PM/CM Consulting Services
Issues & Claims #1
GC/CM Preliminary Determination
GC/CM Mandatory Meeting
GC/CM Final Proposal
KPFF Consulting Engineers CO#12818
Coffman Engineering CO#13308
Disputes Review Board Third Party Agreement CO#13448
EFT Architects, Inc. #1 CO#13183
Hodge & Associates, Inc.
CO#14222
CO#12813
KJM & Associates CO#13232
Stephen F. McCauley Construction Management CO#13339
McAuley & Associates CO#13590
O’Brien Kreitzberg #1 CO#12879
Preston/Gates/Ellis
Redicheck CO#13336
Reid Middleton, Inc. #1 CO#12968
Roen Associates #1 CO#13140
Stoel Rives,LLP Attorneys #1 CO#12589
Strata Geotechnical Engineering & Materials Testing CO#13288
Tomasi-Dobois & Associates CO#13328
WPA, Inc. CO#13867
Email General Correspondence #1
General Correspondence #2
A/E Consulting Services Selection
8/5/96-7/10/02
1/22/99-6/28/01
5/1/99
6/18/97-11/3/03
1/22/99-6/28/01
9/95-1/23/98
January 1998
6/13/02
7/8/98-9/25/98
6/26/98-7/6/98
9/1/98
10/1/00-3/1/01
7/1/99-7/28/99
11/16/99-1/18/02
1/20/99
7/1/99-8/6/99
11/13/97-8/99
5/1/99-10/31/01
8/1/99-4/9/01
4/1/00-5/22/01
3/12/98-3/31/99
September 2000
8/1/99-9/21/99
6/23/98-5/30/03
12/10/98-3/10/99
5/23/97-5/28/98
7/1/99-12/28/01
7/1/99-8/6/99
1/1/01-7/15/02
9/97-2/7/01
7/1/01-2/24/09
May 97
Teaching & Learning Center (aka) Smith Center for Undergraduate Education
Facility ID # 0095
Box No. 56 (cont.)
Yost Grube Hall Architecture
Contract #8 CO#12837
#1 General Correspondence
#1 Email Correspondence
GC/CM Final Determination
GC/CM Interested Firms
Predesign Study
GC/CM Interviews
GC/CM Procedures & Selection
Lydig Construction, Inc.
#2 General Correspondence
Contract #1 CO#13303 (GC/CM Early Releases Bid Package)
Backup Electronic Files (x3)
Lydig Construction, Inc.
Contract #1 CO#13103 (GC/CM Preconstruction Services)
1/1/02-5/31/02
8/97-4/30/04
10/20/98-6/1/99
3/11/98
Undated
July 1996
8/3/98
March 1998
9/1/01-8/28/06
8/1/99-10/31/03
7/00-7/11/02
10/1/98-2/2100
Teaching & Learning Center (aka) Smith Center for Undergraduate Education
Facility ID # 0095
Box No. 57 Lydig Construction, Inc.
Contract #4 CO#13465 (GC/CM Preconstruction Services)
Contract Change Proposals
Contract Change Proposals CO# 13303
Contract Change Proposals CO# 13465
GC/CM Rejected Bids #1
GC/CM Rejected Bids Bid Package #5
8/1/01-10/22/03
CCPs 013-073
CCPs 001-006
CCPs 001-012
Bid Date 9/15/98
August 1999
Teaching & Learning Center (aka) Smith Center for Undergraduate Education
Facility ID # 0095
Box No. 58
Yost Grube Hall Architecture
Schematic Design
Design Program
Preliminary Design Program
Lydig Construction, Inc.
Bidding Documents
GC/CM Qualification Package
General Correspondence #1
Contract #3 CO#13465 (GC/CM)
Contract #2 CO#13465
Contract #1 CO#13465
GC/CM Agreement CO#13465
Yost Grube Hall Architecture
Contract #7 CO#12837
Contract #6 CO#12837
Contract #5 CO#12837
January 1999
9/8/98
12/11/97
10/29/99
August 1999
7/15/98
9/25/98-8/31/01
7/1/00-1/31/01
1/1/00-1/31/01
Undated
11/1/01-12/31/01
2/1/01-10/15/01
7/1/00-1/31/01
Teaching & Learning Center (aka) Smith Center for Undergraduate Education
Facility ID # 0095
Box No. 59
Yost Grube Hall Architecture
General Correspondence #1
Contract #4 CO#12837
Contract #3 CO#12837
Contract #2 CO#12837
Contract #1 CO#12837
9/95-6/30/01
11/1/99-6/30/00
8/1/99-10/31/99
5/1/99-7/31/99
1/12/98-4/30/99
Indoor Tennis Courts
Facility ID # 0827
Box No. 59
Hollingbery Field House
Global Sports Tennis Design Group, LLC. CO#16619
Indoor Tennis Facility
Global Sports Tennis Design Group, LLC. #1 CO#15600
ICA Sports & Building Systems
CO#15601
Sports Usage & Budgeting Report
General Correspondence #1
Certified Payroll Reports
5/1/06-10/1/06
5/28/04-8/1/04
5/1/04-7/30/04
7/30/04
5/1/04-6/21/06
March 2008
Outdoor Tennis Courts
Box No. 59
EIS
Construction Stormwater General Permit
Federal Aviation Administration General Correspondence
Meeting Minutes
E3RA, Inc. #1 CO#16097
Motley-Motley, Inc. CO#16958
Strata Geotechnical Engineering & Materials Testing CO#16683
Taylor Engineering, Inc. CO#16749
Additive Alternative Bid Package Volume 2 Technical Specifications Divisions 2-16
Email General Correspondence
General Correspondence #1
Tennis Court Cracks
Lydig Construction, Inc.
General Correspondence
KPFF Consulting Engineers
General Correspondence
Contract #2 CO#15599
Lydig Construction, Inc.
Contract Change Proposal
Box No. 60
KPFF Construction Engineers
Contract #1 CO#15549
Project Manual Bid Divisions 0-16
3/1/05
7/1/05-5/30/06
1/3/06
11/1/05
4/1/05-5/31/05
1/1/07-2/20/08
6/1/06-6/29/07
8/1/06-11/8/06
3/1/06
12/1/04
5/1/04-4/16/09
6/1/07
8/1/06-4/14/08
5/1/04-6/15/06
6/1/06-12/15/06
CCP 001-022
5/1/04-5/31/06
12/7/05
Town Center
Box No. 60
Budget
Avista Utilities
General Correspondence
Town Center, LLC.
Ground Lease Agreement
Foundation Relocation
Email General Correspondence
Design West Architectural General Correspondence
Brown Construction
General Correspondence
Contract #1 CO#14472
Fypon Molded Millwork Brochure
11/1/01-5/23/03
11/1/02-1/17/03
6/1/01-5/8/03
10/1/03-5/8/03
Undated
2/1/01-9/5/02
11/1/01-12/27/02
9/1/01-3/5/03
8/1/01-8/26/02
5/1/02-6/12/02
Undated
Troy Hall Renovation
Facility ID # 0036
Box No. 60
RFQ for Architectural Predesign Services
Budget
SERA Architecture, Inc.
General Correspondence #1
Contract #1 CO#15618
RFQ
General Correspondence #1
Predesign Report
August 2003
11/1/03-11/1/04
5/1/04-6/23/04
5/1/04-12/28/04
2/6/03
1/1/04-12/27/04
10/12/04
Veterinary Medicine Barn Relocation (F/K/A) Biomedical Science Facility
Facility ID # 0165E
Box No. 60
Regents (Rec 4 Vet Med Research Bldg.)
Regents
Strata CO#16323
BAIT Committee
EIS #1
Builder’s Risk Insurance
Meeting Minutes
Field Authorizations
Permits
General Correspondence #1
KPFF Consulting Engineers
General Correspondence #1
Contract #1 CO#16305
Bid Documents Project Manual Volume 1 & 2
Meeting Minutes #1
Graham Construction
General Correspondence #1
Contract #1 CO#16305
Contract Change Proposals
9/19/03-9/22/03
10/5/05-5/23/05
9/22/05-12/30/05
5/5/05-9/14/06
5/13/05
9/29/05-6/2/06
January 2005
11/28/05
9/16/05
2/25/05-11/8/06
7/15/05-11/9/05
5/18/05-7/15/06
7/19/05
5/18/05
8/1/05-10/26/06
10/5/05-6/5/06
CCPs 020-052
Veterinary Medicine Barn Relocation (F/K/A) Biomedical Science Facility
Facility ID # 0165E
Box No. 61
Graham Construction
Contract Change Proposals
Rejected Bids
Responsibility File
CCPs 001-019
Bid Opening 8/9/05
August 2005
Veterinary Teaching Hospital Security System
Facility ID # 0818
Box No. 61 Builder’s Risk Insurance
Regents
McAuley & Associates CO#13643
Email General Correspondence
General Correspondence
Electronic Technologies Corporation
General Correspondence
Contract CO#13865
Contract Change Proposals
12/15/00
11/1/00
4/1/00-1/3/01
7/1/00
11/1/00-3/19/01
11/1/99-5/16/01
CCPs 001-003
Brelsford Visitors Center Signage
Facility ID # 0843
Box No. 61
Budget
BAIT Committee
Builder’s Risk Insurance
WPA #1 CO#15401
WPA #1 CO#13867
General Correspondence
Tube Art Displays, Inc.
General Correspondence
Contract #1
Responsibilities File
Meeting Minutes
Rejected Bids
8/1/04
October 2006
6/5/05-12/8/06
1/26/04-10/5/06
3/1/01
7/1/04-5/21/09
6/8/05-6/25/10
2/1/05-11/30/06
3/1/04
2/22/05
WAWAWAI Landing Boat Dock
Box No. 61
Regents
BAIT Committee
EIS
Womer & Associates, Inc. CO#15875
Army Corps of Engineers
General Correspondence
Lease
General Correspondence #1
Knight Construction
General Correspondence #1
Contract CO#16270
Contract Change Proposal
Responsibility File
2/10/06
2/26/06
6/15/05
11/30/04-2/13/06
9/20/04-1/9/06
6/3/05-10/10/08
12/1/04
7/8/05-8/24/10
2/10/06-9/25/06
CCPs 001-004
7/7/05
WAWAWAI Canyon Survey
Box No. 61 General Correspondence #1
Munir Daud & Associates
General Correspondence #1
Contract #1 CO#16476
2/3/06
1/31/06
2/2/06-12/18/06
Wegner Hall Addition
Facility ID # 0045
Box No. 61 NIH Grant Application
March 2003
WHETS
Box No. 61 General Correspondence
KWSU Radio-TV Station
8/31/87-4/22/93
4/22/93
Wilmer Davis Dining Renovation
Facility ID # 0030
Box No. 61
Builder’s Risk Insurance
Regents
Attorney General #1
SCM Consultants #1 CO#14814
WPA #1 Contract CO#14704
RFQ for A/E Design Services
Email General Correspondence #1
General Correspondence #1
SCM
RFQ Environmental Consulting Services
Abatement Specifications & Contract Documents 75% Submittals
Limited Good Faith Asbestos Report
Electronic Files (x3 CDs)
Graphics
WPA Building ID Blade Layout
Email Backup
6/2/03
5/9/02-12/4/02
August 2002
10/23/02-2/12/04
3/20/03-8/6/03
June 2002
3/18/03
6/5/02-3/4/05
10/23/02
2/16/03
1/20/03
6/2/04
Undated
Undated
Wilmer Davis Dining Renovation
Facility ID # 0030
Box No. 62
URS Corporation
Basement Floor Demo Plan - Electrical
Submittal for Architectural Design Services
URS Corporation
Design Development Submittal Volume V
Remodel Bid Set
URS Corporation
Contract #2 CO#14723
Lydig Construction, Inc.
General Correspondence #1
Contract #1 CO#15508
Contract Change Proposal
Responsibility File
Rejected Bids
URS Corporation
Contract #1 CO#14723
D4esign Development Submittal
9/4/03
6/21/02
12/16/02
4/14/03
7/1/03-2/10/05
5/13/03
5/6/03
CCPs 001-086
5/9/03
Bid Opening
8/23/02-6/30/03
12/16/02
Spokane Archives/CALS
Box No. 63
David Evans & Associates #1 CO#13059
Email General Correspondence #1
General Correspondence #1
Integrus Architecture
General Correspondence #1
Contract #1 CO#13092
Design Development
7/15/98-3/10/03
5/5/98-6/11/98
2/12/97-9/27/00
6/3/98-12/15/98
October 1998
Spokane Riverpoint Higher Education Park
Box No. 63 Northwest Architecture Company Predesign Feasibility Study
Northwest Architecture Company Feasibility Study
Grant Application #1
General Correspondence #1
September 2000
10/30/01-1/7/02
June 2000
6/12/00
Spokane Health Sciences Building
Building No. 9010
Box No. 63 Budget
BAIT Committee
Regents
Attorney General Correspondence #1
EIS
National Center for Research Resource Grant Application
Interagency Memorandum of Agreement
Coffman Engineers CO#13255
David Evans & Associates
#1CO#13059
Traffic & Parking Study
Revised Final Report
Final Report
Disputes Review Board Third Party Agreement Co#13435
Integrus Architecture #1
GeoEngineers - Gifford #1 CO#13432
O’Brien Kreitzberg #1 CO#12879
KJM & Associates #1 CO#13181
1/5/00-9/17/02
12/28/98-11/15/01
8/3/98-3/25/02
9/27/99-11/19/99
6/2/99-3/18/03
2/20/99
12/15/98
5/20/99
7/15/98-6/12/03
2/23/99-10/18/01
12/3/99
2/23/99
10/18/99
2/2/01-7/1/01
11/1/99
7/30/98-2/2/99
12/1/98-11/2/01
Spokane Health Science Building
Building No. 9010
Box No. 64
Landau Associates Soils Assessment
MW Consulting Engineers Energy Life Cycle Cost Analysis
Shea Construction, Inc. RFQ
MW Consultants Energy Life Cycle Analysis Volumes I & II
O’Brien Kreitzberg Value Engineering Workshop
KJM Constructability Review 100% Review Documents
HWA Geosciences Geotechnical Report
Trent Ave/Spokane Falls Blvd. Utility Upgrade
O’Brien Kreitzberg Email General Correspondence #1
Email General Correspondence #1
General Correspondence #3
Integrus Architecture
Email General Correspondence
General Correspondence #4
Contract #3 CO#13112\
Meeting Minutes #1
KJM Associates
Email Correspondence #4
Meeting Minutes #4
Value Engineering Study
GC/CM Procedures & Selection
Shea Construction General Correspondence #2
Preconstruction Contract #1 CO#13111
Monthly Reports #1
Bid Package #2A Mass Evacuation
Contract #3 CO#13466
6/21/99
2/16/99
9/10/98
March 1999
January 1999
1/24/00
6/24/99
1/1/03-7/18/03
1/8/99-2/1/99
5/5/98-9/9/99
1/1/01-5/14/03
1/14/99-8/20/99
10/1/99-5/1/06
6/1/01-1/31/03
5/5/98-6/4/99
7/1/99
7/6/99
January 1999
August 1998
1/1/01-1/30/04
12/10/98-5/22/00
4/99-9/99
6/1/02-1/23/04
9/17/99-5/9/01
Spokane Higher Education Park
Box No. 65
Shea Construction
Meeting Minutes #1
Contract Change Proposals CO#13377
Certified Payroll Reports
GC/CM Rejected Bids #1
12/3/98-6/5/01
Numbers 001-047
May 2001
8/31/99-2/21/00
Spokane Health Science Building/Higher Education Park
Building No. 9010
Box No. 65 Shea Construction
M.A.C.C Proposal
Subcontracting Plan
Contingency Plan
50% Design Development Document Review
Pre-construction Plan
General Contractor Qualifications
Integrus Architecture
Schematic Design Project #9575
(Revised) Predesign Study Project#9575.06
General Correspondence #2
General Correspondence #1
December 1999
August 1999
July 1999
May 1999
November 1998
Sept 1998
9/15/97
7/12/96
3/1/99-12/31/00
4/15/98-2/28/99
Spokane Health Science Building/Higher Education Park
Building No. 9010
Box No. 66
Integrus Architecture CO#13112
Contract #2
Contract #1
Shea Construction CO#13466
Contract #2 GC/CM
Contract #1
Integrus Architecture
General Correspondence #3
General Correspondence #2
General Correspondence #1
Shea Construction, Inc. General Correspondence
SRG Partnership Pre-design Report
3/1/00-5/31/01
1/11/97-12/1/00
11/29/99-9/30/00
10/01/00-5/31/02
4/1/99-9/30/99
2/99-3/31/99
3/98-2/28/99
12/23/98-2/31/00
4/21/98
Tri-Cities Bioproducts Science & Engineering (BSEL)
Building No. 9513
Box No. 67
Builder’s Risk Insurance
Budget
BAIT Committee
Regents
EIS
Public Records Request
ALSC Architects CO#17511
Confederated Tribes of the Umatilla Indian Reservation CO#16528
The Estime Group, Inc. #1 CO#16225
Intermountain Materials Testing #1 CO#16530
JUB Engineers, Inc. #1 CO#16225
Pacific Northwest National Laboratory (PNNL)
Shannon & Wilson, Inc. #1 CO#15605
Project Planning Committee
City of Richland #1
Meeting Minutes #1
SRG Partnership Lab Predesign Report
Email General Correspondence
General Correspondence
Lab Predesign Report
GC/CM Procedures #1
GC.CM Procedures #2
Bouten Construction
General Correspondence #1
GC/CM Preconstruction Contract #1 CO#15832
Use of Contingency
SRG Partnership
General Correspondence #1
Contract #1 CO#15241
Contract #5 CO#15593
3/17/06-4/7/08
8/4/03
5/8/03-03/20/04
5/9/03-11/23/04
December 2005
February 2008
3/1/08-4/30/08
5/15/06-12/8/06
7/22/05
3/27/06-4/30/07
4/14/04
6/1/03-4/4/06
5/13/04-7/8/04
August 2003
January 2006
9/16/03-10/5/05
3/5/04
3/8/04
April 2006
September 2002
2/19/04-3/30/04
6/18/03-2/19/04
6/1/04-12/18/14
11/18/04-4/30/06
2/1/07-9/8/07
6/6/04-6/3/09
9/19/03-6/11/04
9/1/07-1/18/09
Tri-Cities Bioproducts Science & Engineering (BSEL)
Building No. 9513
Box No. 68
SRG Partnership Construction Documents Volumes I & II Divisions 1-17
Structural Calculations
Bouten Construction GC/CM Preconstruction Monthly Reports 2-21
SRG Partnership Schematic Design Report
Design West Architecture Project Review
Materials Plan
Energy Solutions Elevations
Bouten Construction Contract #3 Co#16588
Northern, Inc. Statement of Qualifications
SRG Partnership Statement of Qualifications
PNNL Project Submittal
Bouten Contract Change Proposal
12/10/06
November 2005
3/05-1/08
6/9/04
5/8/11
5/8/11
9/26/07
4/15/04
8/6/03
January 2003
Numbers 016-110
Tri-Cities Bioproducts Science & Engineering (BSEL)
Building No. 9513
Box No. 69
Bouten Contract Change Proposal
SRG Partnership 25% CD Report
Bouten 50% CD Estimate
GC/CM Preconstruction Schedule
RFQ for A/E Services #1
RFQ for A/E Services #2
RFQ for A/E Services #1
RFQ for A/E Services #2
Preconstruction Subcontracting Plans
Rejected Bids
Bouten RFQ for GC/CM
BJSS Duarte Bryant RFQ
SRG Partnership
#4 Contract CO#15593
#3 Contract CO#15593
#2 Contract CO#15593
#1 Contract CO#15593
Numbers 001-015
8/8/05
10/25/05
8/4/05
May 2003
May 2003
February 2004
February 2004
10/18/05-12/8/05
2/20/04-5/19/04
3/30/04
6/5/03
12/1/06-8/31/07
1/20/06-11/30/06
5/1/05-1/10/06
6/23/04-4/30/05
Tri-Cities Bioproducts Science & Engineering (BSEL)
Building No. 9513
Box No. 70
Bouten Construction
#2 Contract CO#16588
#1 Contract CO#16588
12/1/06-9/1/07
5/12/06-11/30/06
Tri-Cities Education Center
Building No. 9500
Box No. 70
Budget
Regents
Stoel Rives LLP Attorneys #1 CO#12589
Value Engineering
Project Planning Committee #1
Email General Correspondence #1
General Correspondence #2
SRG Partnership
Email General Correspondence #1
General Correspondence #2
Contract #1 CO#12809
General Correspondence #1
SRG General Correspondence #1
6/1/98
7/22/97-10/17/97
5/23/97
10/1/98
9/97
9/24/97-3/10/00
2/1/98
12/3/97
4/1/98-6/15/98
11/18/97-11/15/98
7/97-1/31/98
9/4/97-3/31/98
Vancouver Clark Center
Bldg. No. 6509
Box No. 70
Project Planning Committee
Budget
Email General Correspondence
General Correspondence
LSW General Correspondence
Zimmer Gunsul Frasca General Correspondence
Tripplett Willman General Correspondence
General Correspondence #1
LSW Design Development Outline Specifications
Pre-Conference Application
Site Plan Application
10/18/99
3/1/99-7/20/04
2/29/00
12/1/02-5/8/07
1/1/03-1/15/03
6/26/00
8/23/04-3/28/06
5/27/98-10/30/00
June 2003
March 2003
Vancouver Clark Center
Bldg. No. 6509
Box No. 71
LSW Design Development Outline Specifications
Project Manual
Meng Analysis Value Analysis Study
June 2003
March 2004
Vancouver Clark County Development Agreement
Box No. 71 JD White Company CO#13617
Email General Correspondence #1
General Correspondence
2/4/98-4/21/05
3/9/00
10/10/99-5/3/12
Vancouver Classroom Building Plant Growth Chambers
Bldg. No. 6502
Box No. 71 PAE Consulting Engineers CO#13215
General Correspondence
4/9/99-6/30/99
4/1/99-4/21/99
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 71
JD White Company Environmental Impact Statement
Design Report & Budget Allocation
Budget
Regents
Finance and Audit Capital Committee
Attorney General Correspondence
Architectural Cost Consultants CO#13028
Arnold Gray Third Party Neutral CO#13257
Colbert Infrared Services CO#14027
KJM & Associates
Email General Correspondence
Contract O’Brien Kreitzberg
Email General Correspondence
Contract CO#12879
Contract CO#13300
Daily Inspection Reports
PAE Consulting Engineers CO#13434
Professional Services Industries #3 Test Reports
Professional Services Industries CO#13287
June 2003
May 1999
11/10/97-7/7/04
4/30/98-8/31/01
11/18/99
Undated
3/30/98-2/1/99
6/1/99-10/1/99
2/8/01-3/30/01
Undated
4/1/99-5/31/99
1/1/99-7/28/00
3/98-11/98
6/1/99-2/28/00
4/14/00-7/27/00
1/1/99-1/24/00
11/1/99-1/24/00
7/1/99-12/18/00
Vancouver Engineering Life Science Building
Bldg. No. 6507
Box No. 72 The Redicheck Firm CO#13202
Reid Middleton CO#12968
Stoel Rives LLP, Attorneys CO#12589
System Commissioning Consultants CO#13433
Roger K Watts CO#13549
Life Cycle Cost Analysis
Clark County Permits/Fees
Project Planning Committee
Email General Correspondence #3
Geotechnical & Environmental Consultants CO#13811
Geotechnical Resources - Site Reports
General Correspondence Firstenburg Fountain #1
Zimmer Gunsul Frasca Partnership
General Correspondence Firstenburg Fountain
Contract #1 CO#13618 Firstenburg Fountain
General Correspondence #5
Zimmer Gunsul Frasca Partnership
Clarifications
Site Observation Reports
Predesign Study
Zimmer Gunsul Frasca Schematic Design
MEI - Charlton, Inc. - Epoxy Terrazzo Floor Delamination
Zimmer Gunsul Frasca Estimate of Probable Construction Cost
Change Requests
Zimmer Gunsul Frasca Submittals
Requests for Information
Architects Supplemental Instructions
GC/CM Selection May 1998
Zimmer Gunsul Frasca Construction Meeting Meetings #1
4/1/99-4/20/99
6/23/98-11/23/98
3/30/98-5/27/98
8/1/99-8/20/01
12/1/99-11/19/01
3/31/99
6/4/99
7/97-2/98
4/1/00-3/22/02
8/1/00-9/24/00
7/1/99-5/31/00
4/1/99-1/30/07
4/1/99-4/25/00
4/1/00-3/20/01
1/1/07-2/15/15
2/1/00-3/31/00
10/1/99-9/20/00
May 1996
June 1998
4/2/02
6/11/98
12/1/99-9/30/00
5/1/99-2/28/01
6/1/99-11/30/00
7/1/99-10/31/99
May 1998
1/98-10/26/98
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 73
Zimmer Gunsul Frasca Email Correspondence #1
Zimmer Gunsul Frasca General Correspondence #6
Zimmer Gunsul Frasca Contract #8 CO#12867
Miscellaneous Permits/Fees
Plaza Improvements
Baugh Construction, Oregon
Field Orders #1
GC/CM Monthly Reports #1
Pre Installation Meeting #1
Meeting Minutes #4
Design Meeting Mintues
Job Diary
Email Correspondence
Contract #2 GC/CM Agreement
PAE Consulting - Energy Study & Life Cycle Cost Analysis
Baugh Construction Oregon
Contract #2 CO#13029
1/16/98-2/7/01
6/1/00-4/30/01
11/1/01-3/18/05
2/4/99-8/10/99
6/1/00-11/27/00
10/1/99-2/17/00
4/1/99-7/13/99
1/1/99-4/12/00
7/1/00-12/31/00
1/99-7/99
7/19/99-7/14/00
11/1/98-7/26/07
7/1/99-5/1/01
3/30/99
6/1/99-11/10/99
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 74
Baugh Construction Oregon
Firstenburg Fountain General Correspondence
Certified Payroll
Contract Change Proposals
Baugh Construction Oregon Close Out Items #1
Schematic Design
7/1/00-4/19/04
11/1/00-11/28/00
Numbers 001-124
9/21/00-5/14/01
9/8/98-9/9/98
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 75
Baugh Construction Oregon
Monthly Reports
Monthly Reports
Monthly Reports
Monthly Reports
Monthly Reports
Monthly Reports
Preconstruction Plan
CPM Progress Schedule
CPM Progress Schedule
CPM Progress Schedule
CPM Progress Schedule
CPM Progress Schedule
CPM Progress Schedule
CPM Progress Schedule
10/00-3/01
7/00-9/00
4/00-6/00
1/00-3/00
10/99-12/99
7/99-9/99
8/13/98
2/00
1/00
12/99
11/99
10/99
9/99
8/99
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 76
Baugh Construction Oregon CPM Progress Schedule
GC/CM Rejected Bids
Bid Package #1 Earthwork/Underground Utilities
Bid Package #2 Surveying/Staking
Bid Package #3
Bid Package #4
Bid Package #5
Bid Package #6
Bid Package #7
Bid Package #8
Bid Package #9/10
Bid Package 11A Steel Fabrication-Safety Tie Off & Metal
Bid Package 12 Rough Carpentry Wood Structure
Bid Package #13, 31, 32, 33, 35 - Carpentry, Lab Equipment/Darkroom
Bid Package #14 Waterproofing/Joint Sealant
Bid Package #15 Rigid Insulation
Bid Package #16 Metal panels/Sheet Metal/Metal RFQ
Bid Package #17 Membrane Roofing
Bid Package #18 Doors, Frames & Hardware
Bid Package #19 Overhead Section - Doors
Bid Package #20 Aluminum Window - Stone Front/Glazing
Bid Package #21 Aluminum Framed Sky Lights
Bid Package #22 Metal Studs/Drywall Ceiling/Batt Insulation
Bid Package #23 Terrazzo
Bid Package #24 Ceramic Tile
Bid Package #25 Floor Finishes - Carpet/Resilient
Bid Package #26 Special Flooring - Traffic Coatings
Bid Package #27 Painting
Bid Package #28 Special/Furnish/Install
Bid Package #29 Signage
Bid Package #30 Dock Equipment
Bid Package #34 Window Treatment
Bid Package #36 Greenhouse (Design/Build)
Bid Package #38 Mechanical Controls/Underground/Plumbing (HVAC)
Bid Package #39 Fire Protection
Bid Package #40 Electrical
Bid Package #41 Telecom
July 1999
6/25/99
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Undated
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 76 (cont.)
ETI - Equipment Field Evaluation Final Report Machine
Revised Space Requirement - Final Draft
Baugh - Consolidated Financial Statements
WSU/ZGF - Response to Value Analysis Study “Best”
ZGF - Foundation Investigation
Baugh/ZGF Case Study
Ventilation Engineering - Atmospheric Air Flow/Exhaust Stem/Air Intake Analysis
M.A.C.C. Proposal Documents - Revision 1 5/18/99
Equipment Rapid Type System
Manufacture Engineer Correspondence
Roger Watts - Contract/Invoice
Equipment Coordination
Equipment Coordination
Equipment Coordination
Equipment Coordination
Equipment Coordination
Jay Wiley (Science)
Equipment for ELSB
Next Equipment Coordination Meeting
Equipment Purchase Process
Undated
2/27/98
Undated
11/18/96
9/15/98
6/28/99
1/31/99
5/18/99
Undated
6/21/00
Undated
6/1/00
5/19/00
3/23/00
3/9/00
5/4/00
Undated
Undated
Undated
April 2000
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 77
O’Brien Kreitzberg
Daily Inspection
Daily Inspection #1
Professional Services Industries
Test Reports #2
Test Reports #1
Email General Correspondence #2
General Correspondence #4
Email General Correspondence #1
General Correspondence #3
General Correspondence #2
General Correspondence #1
Zimmer Gunsul Frasca Partnership General Correspondence #5
1/5/00-3/31/00
7/18/99-12/16/99
8/1/99-9/30/99
10/1/99-10/31/99
4/1/99-3/31/00
1/1/00-12/31/00
12/12/97-3/31/99
5/1/99-12/31/99
12/1/98-4/30/99
2/1/98-11/30/98
1/1/00-5/31/00
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 78
Zimmer Gunsul Frasca Partnership
General Correspondence # 4
General Correspondence #3
General Correspondence #2
General Correspondence #1
Contract #6 CO #12867
Contract #5 CO #12867
Contract #4 CO #12867
Contract #3 CO #12867
7/1/99-12/31/99
3/1/99-6/30/99
11/1/98-2/28/99
7/1/97-10/31/98
6/1/00-10/31/01
1/1/00-5/31/00
10/1/99-1/30/00
5/1/99-9/30/99
4/1/99-4/30/99
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 79
Zimmer Gunsul Frasca Partnership
Contract #2 CO#12867
Contract #1 CO#12867
Construction Documents Volume 3 Divisions 15 & 16
Construction Documents Volume 2 Divisions 2 & 14
Construction Documents Volume 1 Divisions 0 & 1
Baugh Construction Oregon
Construction Meeting Minutes #3
Construction Meeting Minutes #2
Construction Meeting Minutes #1
General Correspondence #6
General Correspondence #5
Contract #1 CO#13029
8/1/98-12/31/99
5/18/98-7/31/98
5/3/99
5/3/99
5/3/99
4/1/00-6/30/00
12/1/99-3/30/00
7/1/99-11/30/99
10/1/00-4/5/02
1/1/00-9/30/00
7/1/98-5/19/95
Vancouver Engineering Life Sciences Building
Bldg. No. 6507
Box No. 80
Baugh Construction Oregon
General Correspondence #4
General Correspondence #3
General Correspondence #2
General Correspondence #1
Contract #1 CO#13256
7/1/99-12/31/99
5/1/99-6/30/99
1/1/99-4/30/99
7/1/97-12/31/98
1/22/99-6/30/99
Multimedia Classroom Building
Bldg. No. 6508
Box No. 80 Builder’s Risk Insurance
Predesign Study
Budget
Regents
BAIT Committee
Project Planning Committee
Attorney General
Architectural Cost Consultants CO#13028 #1
Hopper Dennis Jellison PLLC CO#14499 Site Improvement Repairs
James R. McGranahan 3rd Party Neutral CO#14112
Minister & Glaeser Surveying, INc. CO#14581
O’brien Kreitzberg CO#12879
Stoel Rives, LLP (Attorneys) #1 CO#12589
Zimmer Gunsul Frasca Construction Meeting Minutes
Systems Commissioning Consultants, Inc. CO#14500
Email General Correspondence #1
General Correspondence #2
Zimmer Gunsul Frasca
General Correspondence #1
Contract #6 CO#12944
6/1/01
May 1996
11/10/97
5/8/98
5/8/98
7/30/97-2/27/98
1/1/03-9/3/03
8/10/98-1/10/01
3/1/02-11/1/03
4/1/01-8/1/02
5/1/02-8/11/02
March 1998
5/23/97
February 1998
3/1/02-12/1/02
1/5/98
8/1/01
August 1997
7/1/02
Multimedia Classroom Building
Bldg. No. 6508
Box No. 81
Baugh Construction Oregon
General Correspondence #1
Contract #2
Contract #1
Monthly Reports
Monthly Reports
Monthly Reports
Monthly Reports
Monthly Reports
Palouse Empire, Inc.
Claims #2
Claims #1
Rejected GC/CM Bids
Baugh Construction Oregon, Inc. Contract Change Proposal
7/1/98-5/23/03
5/1/02-6/30/03
8/17/98-5/30/01
July-Sept 2002
April - June 2002
January - March 2002
October - December 2001
July - September 2001
1/9/03-8/11/03
9/17/01-12/2/02
Bid Opening 6/25/98
Numbers 001-062
Multimedia Classroom Building
Bldg. No. 6508
Box No. 82
General Correspondence #1
Zimmer Gunsul Frasca Partnership
Contract #5 CO#12944
Contract #4 CO#12944
Contract #3 CO#12944
Contract #2 CO#12944
Contract #1 CO#12944
Baugh Construction Oregon #1 Contract GC/CM CO#14172
JD White Co., Inc. (aka Berger ABAM)
Wetland & Habitat Permit Application TWC Project
Habitat Buffer Mitigation As-built Report
Zimmer Gunsul Frasca Partnership
Foundation Investigation
Schematic Design
Estimate of Probable Construction Cost
Building Improvements (Prepared by Kato & Warren, Inc.)
Project Manual Bid Documents Volume 3 Divisions 15 & 16
7/97-7/31/01
1/1/02-6/30/02
8/31/01-12/31/01
3/1/01-7/31/01
6/1/99-2/28/01
5/18/98-5/31/99
4/1/01-4/30/02
Numbers 00-192
January 2005
September 1998
June 1998
July 1999
March 2001
Multimedia Classroom Building
Bldg. No. 6508
Box No. 83
Zimmer Gunsul Frasca Partnership
Project Manual Bid Documents Volume 2 Divisions 2 to 14
Project Manual Bid Documents Volume 1 Divisions 0 and 1
Baugh Construction Oregon
M.A.C.C Proposal Documents Rev. 1
Interview
PAE Consulting Engineers, Inc. Engineering Life Cycle Cost Analysis
3/26/01
6/9/98
12/5/01
Early Childhood Education Facility
Bldg. No. 6508
Box No. 83
Specifications (CD)
Consulting Value Specialists. Value Engineering Study
Zimmer Gunsul Frasca Partnership. Schematic Design
Zimmer Gunsul Frasca Partnership. Construction Documents
1996-05-23
1995-12
1997-05-01
WSU Vancouver (General)
Box No. 83
Zimmer Gunsul Frasca Partnership. Summary Master Plan
Zimmer Gunsul Frasca Partnership. Bid and Construction Document Set.
Ctr. For NW Anthro. Final Supplemental Environmental Impact Statement.
Hahn & Associates. Phase I Environmental Site Assessment.
1994-05-12
1993-02-24
1997-05-12
Contract # Project Name Contractor/Consultant Content Final Date
Various Budget Ledgers, Vouchers, Authorizations for funding Mar-93
Various Environmental Impact Statement Apr-88
Various Regents Reports Memorandums, Minutes Jun-94
Various Campus/Downtown Pedestrian Corridor Levernier-Shea CCP, Pay Apps Dec-97
Various Process Update General Correspondence #5 Apr-99
Various General Correspondence #4 Dec-91
Facility Services Capital ProjectsContract Administration
BOX - 83Comprehensive Physical Planning
Contract # Project Name Contractor/Consultant Content Final Date
Various Comprehensive Campus Plan Project Reviews Amendment #2 Jan-85
7350 Burke/Lee Associates Payments Nov-94
7350 Burke/Lee Associates Payments May-94
7350 Burke/Lee Associates General Correspondence Jun-92
Various Architect Selection Burke/Lee Associates Advertisement, Evaluation, Interviews Jan-91
7350 Burke/Lee Associates Payments Apr-91
7350 Burke/Lee Associates Payments Dec-89
7350 Burke/Lee Associates Payments Jan-89
7350 Burke/Lee Associates Payments Mar-87
7350 Burke/Lee Associates Ammendments #11 - 16 Jul-85
7350 Burke/Lee Associates Ammendments #17 and 18 Jun-86
7350 Burke/Lee Associates Amendment #10 Apr-87
7350 Burke/Lee Associates Amendment #3-8 Jun-82
7350 Burke/Lee Associates Amendment #2 Apr-86
7350 Burke/Lee Associates Amendment #2 May-83
Contract Administration
BOX - 84Comprehensive Physical Planning
Facility Services Capital Projects
Contract # Project Name Contractor/Consultant Content Final Date
Butch's Cage Area Feb-84
Campus/Downtown Corridor Pittsburgh Testing Lab Concrete Test Results Dec-86
Campus/Downtown Corridor Levernier Construction, Inc. Affirmative Action Reports Oct-86
Campus/Downtown Corridor Levernier Construction, Inc. General Correspondence Jun-87
Campus/Downtown Corridor Levernier Construction, Inc. Contract Change Proposals
Campus/Downtown Corridor Levernier Construction, Inc. Rejected Bids Aug-86
Campus/Downtown Corridor Levernier Construction, Inc. Rejected Bids - 2nd Bid
Planning Process Letters & Responses to Burke's Presentation May-85
Schematic Layouts and Cost Estimates Amendment #10 Jun-86
Site Selection Studies -- B/L Various Amendment Numbers Nov-88
Planning Process Update General Correspondence #4 Feb-94
Planning Process Update General Correspondence #3 Nov-91
Campus Plan General Correspondence #2 Dec-90
Planning Process Update Volumes I & II #2 Dec-90
Campus Planning Various Projects #2 Dec-90
Campus Planning General Correspondence Dec-88
Campus Plan General Correspondence Jun-86
Development Plan for (Spokane/Tri-Cities/Vancouver) May-88
Process Documents Burke/Lee Associates Jun-94
Process Documents (Volume I & II) Burke/Lee Associates Nov-87
Process Documents (Volume III) East Contiguous Resource Lands Jun-86
Process Documents Draft Environmental Impace Statement Sep-85
Agra Earth & Environmental Contract Documents CO #11569 Apr-96
BOX - 85Comprehensive Physical Planning
Facility Services Capital ProjectsContract Administration
Contract # Project Name Contractor/Consultant Content Final Date
Process Documents Marsh Insurance Brokerage Various Documents CO #13842 3-Nov
Landscape Architecture Design Services The Berger Partnership, P.S. Various Projects #2 Jan-02
Landscape Architecture Design Services The Berger Partnership, P.S. Various Projects #1 1-Dec
Various Projects Hainline & Associates CO# 12257 Jul-00
PM/CA Support Services KJM & Associates Various Projects #3 CO# 13232 Jun-01
CPD Guideline Manual KJM & Associates Facilities Procedures Guildlines CO#13705 #1 May-00
KJM & Associates Various Projects #2 CO#13232 Sep-00
Mahan & DeSalvo Construction Codes Oct-93
Various Projects KJM & Associates CO#13232 #1 Oct-99
Various Projects Mahan & DeSalvo Plan Review Services Feb-93
Various Projects McAuley & Associates Code Review CO#13232 #1 Mar-91
Construction Document Review McAuley Construction Mgmt. CO# 13339 Oct-00
Mechanical Plumbing Inspection McAuley & Associates CO#13590 #1 Jan-00
GIS Data Creation Marshall and Associates, Inc. CO# 15982 #1 Feb-05
O'Brien Kreitzberg CO #12879 #3 Jan-99
O'Brien Kreitzberg CO #12879 #2 Feb-99
O'Brien Kreitzberg CO #12879 #1 Feb-99
Various Projects The Redicheck Firm CO# 11621 Apr-98
Various Projects Reid Middleton, Inc. CO# 12968 Apr-00
Robert Fossatti Associates, Inc. General Correspondence Aug-98
Various Projects David M. Scott CO# 13472 #1 Dec-99
Smith & Swenson DEAD FILE Jul-84
Strategic Partnership Support Pederson Associates, Inc. CO# 14045 Jul-02
General Conditions Updates Stoel Rives, LLP (Alan Merkle) CO# 12589 May-98
WPA, Inc. CO# 13867 #3 Nov-02
WPA, Inc. CO# 13867 #2 Dec-01
WPA, Inc. CO# 13867 #1 Jun-01Various Projects - Graphic Design
Facility Services Capital ProjectsContract Administration
BOX - 86Comprehensive Physical Planning
Various Projects - Graphic Design
Various Projects - Graphic Design
Contract # Project Name Contractor/Consultant Content Final Date
Various Projects The Redicheck Firm CO# 11621 Apr-98
Various Projects Reid Middleton, Inc. CO# 12968 Apr-00
Robert Fossatti Associates, Inc. General Correspondence Aug-98
Various Projects David M. Scott CO# 13472 #1 Dec-99
Smith & Swenson DEAD FILE Jul-84
Strategic Partnership Support Pederson Associates, Inc. CO# 14045 Jul-02
General Conditions Updates Stoel Rives, LLP (Alan Merkle) CO# 12589 May-98
WPA, Inc. CO# 13867 #3 Nov-02
WPA, Inc. CO# 13867 #2 Dec-01
WPA, Inc. CO# 13867 #1 Jun-01
Comprehensive Physical Planning
Various Projects - Graphic Design
Various Projects - Graphic Design
Various Projects - Graphic Design
Facility Services Capital ProjectsContract Administration
BOX - 87
Hazardous Waste Facilities: College of Ag/Markley
Bldg. No. 66Q&R
Box No. 87
Builder’s Risk Insurance
EIS
Regents
Daily Inspection Reports
Weekly Observation Reports
Email General Correspondence #1
Strata Geotechnical Engineering & Materials Testing CO#14476
Meeting Minutes
General Correspondence #1
URS General Correspondence #1
Walker Construction, Inc. General Correspondence
Walker Construction, Inc. Contract CO#14468
Contract Change Proposals Walker Construction, Inc.
Contractor Responsibility
Rejected Bids
3/18/02
4/10/03
2/15/02
7/1/02
7/1/02
2/1/02
2/1/02
3/1/02
5/17/01
1/1/02
2/1/02
1/1/02
Numbers 001-014
1/1/02
1/29/02
Hazardous Waste Facilities (Containment Pad): Mt. Vernon
Bldg. No. 4025
Box No. 87
Builder’s Risk Insurance
EIS
Attorney General Correspondence
Daily Inspection Reports
Krazan & Associates Testing & Inspecting CO#15016
Email General Correspondence
General Correspondence
URS General Correspondence
USK Corporation L&I Premium Liability Release Status #1
USK Corporation General Correspondence
USK Corporation Contract CO#14932
Mt. Vernon Research & Extension Unit Responsibility File
Rejected Bids
3/24/03
2/1/03
3/1/03
4/1/03
4/1/03
2/20/03-5/5/03
12/1/02
5/1/02
9/8/03
2/1/03
2/1/03
2/10/03-2/12/03
2/6/03
Hazardous Waste Facilities (Containment Pad): Othello/Roza
Bldg. No. 2315/2115
Box No. 88
EIS
General Correspondence
URS General Correspondence
12/2/02
10/1/02
12/1/02
Hazardous Waste Facilities : Puyallup Research & Extension
Bldg. No. 1000
Box No. 88 EIS #1
Builder’s Risk Insurance (Roza, Othello, & Lind Chemical Sites)
Attorney General Correspondence
General Correspondence
Meeting Minutes
URS General Correspondence
Concord Construction, Inc. #1 General Correspondence
Concord Construction, Inc. Contract CO#14943
Concord Construction, Inc. #1 L&I Premium Liability Release Status
Responsibility File
Contract Change Proposals Concord Construction, Inc.
Rejected Bids
3/24/03
3/1/03
1/28/03-10/13/03
2/1/03
2/1/03
2/25/03-4/5/04
2/25/03-6/30/03
9/8/03-11/12/03
2/17/03-2/24/03
Numbers 001-002
2/13/03
Hazardous Waste Facilities (Modular Unit 3): Tri-Cities/Prosser
Bldg. No. 9550
Box No. 88
Builder’s Risk Insurance
Irrigated Agriculture Research & Extension Center Master Plan
URS Specifications Volume I
General Correspondence
URS Requests for Information
URS General Correspondence
Hughes-Sillers Construction General Correspondence
Hughes-Sillers Construction Contract CO#14502
Prosser Daily Inspection Reports
Hughes-Sillers Construction L&I Premium Liability Release Status
Contract Change Proposal Hughes-Sillers Construction
Hughes-Sillers Construction Responsibility File
Rejected Bids
5/13/02
6/07
6/00
1/1/02
4/02
4/1/02
3/1/02
4/1/02
5/1/02
9/08/03
Numbers 001-012
2/20/02-3/13/02
2/28/02
Hazardous Waste Facilities
Wenatchee Tree Fruit Research Center
Bldg. No. 3043
Box No. 88
Builder’s Risk Insurance
EIS
JARPA Form
Master Plan
Hammond Collier Wade Livingstone (Blanket 348045)
Public Utility District #1 Chelan Country Line Extension Agreement #14941
JPG Valuation Inc. Appraisal
Meeting Minutes
Water Line Extension
Email General Correspondence #1
General Correspondence #1
Whitebird, Inc. General Correspondence
URS Greiner #1 Email Correspondence
URS Greiner #1 General Correspondence
Contract Change Proposal Whitebird, Inc.
Whitebird Responsibility File
Rejected Bids
10/15/01
7/1/01
3/9/14
3/08
1/1/02
3/18/03
1/19/05
8/1/01
10/8/01
7/1/01
8/1/01
9/28/01-6/17/02
9/1/07-5/23/02
9/12/01-8/26/02
Numbers 001-004
8/21/01-/830/01
8/21/01
Hazardous Waste Facilities
Wenatchee Tree Fruit Research Center
Bldg. No. 3043
Box No. 89
URS Greiner Woodwood Cycle Specifications Vol II
Vinod Ghoting Miscellaneous Notebook
6/00
6/11/04
Academic Athletic Complex.
Box No. 89
Redevelopment Study. Seiler, Scott
Naramore Bain Brady & Johansen. Design Proposal.
1980
Undated
Compton Union Building.
Box No. 89
Building Program for the Washington State College Union.
Misc. documents.
1948-07-07
1945-1946, 2000
Renewal/Renovation Focus Group. VHS tape. 1997-07-08
Culver House.
Box No. 89
Smith & Rounds Specification for the General Construction of a Residence to be built at the 1800 Block on B
Street for H.E. Culver (Job 1035A).
1928
Plant Growth – Wheat Research Center.
Box No. 89
Tan-Heyamoto Architects. Project Specification for the Plant Growth – Wheat Research Center. Vol. I: Gen.
Construction and Detail Manual.
1996-06
Terrell Mall.
Box No. 89
Granite Replacement. Photographs.
1994