lc - 280lc#!!280" !"!!! position" civil%engineer" location"sydney,’nsw!...
TRANSCRIPT
LC -‐ 280
www.linkedindustries.com.au
-‐
Position
Civil Engineer
Location Sydney, NSW
Personal Summary
I am a Civil Engineer with experience in Water Resource Project (Dam, Tunnels, Pavement, Bridges, and Powerhouse) and Pilling project for Plaza Building. Throughout the mentioned areas, I was responsible for both Designing and Managing of the design work being implemented on site. My work summary also includes designing and modeling temporary structures needed for construction of structures. I have working experience on number of major software (both technical and office based) like Etabs, SAP2000, DeepXcav, Primavera, and MS Office. Till date, I have experience of two major projects which includes:
Qualifications and Memberships
National University of Sciences and Technology (MCE, NUST) BE Civil Eng.
Major: Design of Earthen Dams and Design of Concrete Structures
Internship: Completed 6 weeks of training for project proposal writing regarding Liquefaction testing and data collection at MCE, NUST.
Bachelor of Engineering: English Proficiency Certificate
Key Skills and Computer Programs
• Advanced Microsoft Office user; Word, PowerPoint and Excel.
• Autocad (2D, Archi.), Revit, Arc GIS, Google Mapper, Etabs, SAP2000, Primavera, Plaxis 2D, DeepXcav, NovoSPT, Strater, Adobe (Illustrator + Photoshop)
www.linkedindustries.com.au
LC -‐ 280
Industry Experience
Job Title Structural Engineer (Design Team)
Dates July 2018 – 2019 Company
Key Responsibilities: • Ensuring construction practices are done as per the standards/codes (ACI, EM, ASTM) • Resolving Design related issues by re-‐analyzing the design structures & construction issues by pre-‐planning of
contingency plan which may include revising structural drawings as per Owner’s Engineer recommendations • Implementing civil drawings in coordination with M&E Team to ensure the designed compliance • Ensuring contractual obligations are met by construction team and incase of additional work suggested by
Owner’s engineer then informing the planning team for Variation Order • Getting approval of material to be used on site by covering the technical aspects of the product • In case of additional structure requested by the client then taking care of Structural Calculation and supervising
CAD operators for drawings/BOQ • Design of supporting structures like pavements, drainage, brackets, retaining wall, bolts to assist in construction
of permanent structures • Search of alternate material choice by traveling (Business Trips) or through internet and then getting approval by
comparison of technical aspects and Time-‐Cost Schedules • Issuance of design calculation along with construction and then as-‐built drawings to Owner's Engineers • Official Correspondence with Owner’s Engineers with comments reply and technical answers until approval • Review and approval of technical reports by supplier as per contract and testing reports • Monitoring of impounding activities from 1st stage till the last stage to observe any abnormalities in the process
It includes both site monitoring and response through correspondence with Owner’s Engineers • Assisting commissioning process by setting up O&M procedures which link to civil part and submission of as-‐built
drawings with final design report for the Client • Site inspections of all Hydropower Units ensuring reinforcement work at site complies with design drawings • Assisting Cost & Planning team with material quantities cross-‐check • Conscientious of HSE of all personnel and properties • Ensure that company's HSE procedures practices are strictly adhered to • Inspection of reinforcement according to Design Drawing and BBS in various structures including Weir, Intake,
Slabs (upto 2 meters), Spillway, Pavement, Girders • Inspection of Pre-‐tensioning of Girders • Inspection of Post-‐tensioning of Tendons • Overseeing Impounding activity through 1st Stage till last stage • Concrete Plugging activities inside diversion tunnel impounding • Pre-‐Tensioning of Bridge Girders in Method Statement of Work • Post-‐tensioning work’s method Statement and Final report of completion addressing issues and remedies
www.linkedindustries.com.au
LC -‐ 280
Job Title Design and Cost Analysis of Soldier Pilling
Dates Jan 2018 -‐ Jun 2018 Company Military College of Engineering
Key Responsibilities: • Design of Solider Piles with legging using DeepXcav and Plaxis2D • Cost Comparison with Secant, Tangent and Sheet Pile
Job Title Modeling and Designing Dates Jan 2016 – Jan 2018 Company Fiverr as Freelancer
Key Responsibilities: • Modeling of Cathedral (Revit 2017) • Modeling Theater outside Attenborough Center for Creative Arts (Revit 2017) • 300Sq ft Mini House (Revit 2017)