lbt q1 2007 engineering review pspi: pepsi installation preparation, includes all of the pier...

6
LBT Q1 2007 LBT Q1 2007 Engineering Review Engineering Review PSPI: PEPSI installation PSPI: PEPSI installation preparation, includes all preparation, includes all of the pier modifications of the pier modifications

Upload: marjory-griffin

Post on 26-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

LBT Q1 2007 Engineering LBT Q1 2007 Engineering ReviewReview

PSPI: PEPSI installation PSPI: PEPSI installation preparation, includes all of preparation, includes all of

the pier modificationsthe pier modifications

Page 2: LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

22

Highlights (Q1/2007)Highlights (Q1/2007)

Install conduit for FOInstall conduit for FO Install LIU at bridge locationInstall LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridgeInstall 36 fiber FO cable computer room to PEPSI bridge

Page 3: LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

33

Open IssuesOpen Issues

TechnicalTechnical Painting floor and wallsPainting floor and walls

ScheduleSchedule Not yetNot yet

FinancialFinancial NoneNone

ResourceResource Identify paint and paint contractorIdentify paint and paint contractor

Page 4: LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

44

Progress (Q1/2007)Progress (Q1/2007)

Fiber optic cable and conduit has been installedFiber optic cable and conduit has been installed LIU is installedLIU is installed

Page 5: LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

55

Planning (Q2/2007)Planning (Q2/2007)

Terminate fibersTerminate fibers Define and install the connection point boxDefine and install the connection point box Install some servicesInstall some services

Page 6: LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications

66

Planning (before 2008)Planning (before 2008)

Install servicesInstall services install E-net, install E-net, install E-stopinstall E-stop install telephoneinstall telephone install cooling water, 47 deginstall cooling water, 47 deg install clean, dry airinstall clean, dry air install power and conduitinstall power and conduit

Move florescence lights up to 4 MMove florescence lights up to 4 M Insulate all pipe carrying liquidsInsulate all pipe carrying liquids Move J box up to 4 MMove J box up to 4 M Epoxy paint entire floorEpoxy paint entire floor Paint walls with epoxy paintPaint walls with epoxy paint Install the support brackets on the telescope galleryInstall the support brackets on the telescope gallery