LBT Q1 2007 Engineering LBT Q1 2007 Engineering ReviewReview
PSPI: PEPSI installation PSPI: PEPSI installation preparation, includes all of preparation, includes all of
the pier modificationsthe pier modifications
22
Highlights (Q1/2007)Highlights (Q1/2007)
Install conduit for FOInstall conduit for FO Install LIU at bridge locationInstall LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridgeInstall 36 fiber FO cable computer room to PEPSI bridge
33
Open IssuesOpen Issues
TechnicalTechnical Painting floor and wallsPainting floor and walls
ScheduleSchedule Not yetNot yet
FinancialFinancial NoneNone
ResourceResource Identify paint and paint contractorIdentify paint and paint contractor
44
Progress (Q1/2007)Progress (Q1/2007)
Fiber optic cable and conduit has been installedFiber optic cable and conduit has been installed LIU is installedLIU is installed
55
Planning (Q2/2007)Planning (Q2/2007)
Terminate fibersTerminate fibers Define and install the connection point boxDefine and install the connection point box Install some servicesInstall some services
66
Planning (before 2008)Planning (before 2008)
Install servicesInstall services install E-net, install E-net, install E-stopinstall E-stop install telephoneinstall telephone install cooling water, 47 deginstall cooling water, 47 deg install clean, dry airinstall clean, dry air install power and conduitinstall power and conduit
Move florescence lights up to 4 MMove florescence lights up to 4 M Insulate all pipe carrying liquidsInsulate all pipe carrying liquids Move J box up to 4 MMove J box up to 4 M Epoxy paint entire floorEpoxy paint entire floor Paint walls with epoxy paintPaint walls with epoxy paint Install the support brackets on the telescope galleryInstall the support brackets on the telescope gallery