Print Preview - PreliminaryApplicationTax Credits, RPP Loans, and/or Tax Exempt Bond Loans
roject Description
oject Name: Laurel Spring - A Congregate Care Community
ddress: 3814 Blue Ridge Road
ty: Raleigh County: Wake Zip:
ensus Tract: 525.04 Block Group: 2024
project in Qualified Census Tract or Difficult to Develop Area? No
e you requesting the basis boost under section II(E)(4) of the QAP? Yes
olitical Jurisdiction: City of Raleigh
risdiction CEO Name:First:Charles Last:Meeker
Title: Mayor
risdiction Address: 222 W. Hargett Street Suite 209
risdiction City: Raleigh Zip:
risdiction Phone:
te Latitude:
te Longitude:
oject Type: New Construction
Is this project a previously awarded tax creditdevelopment?
w Construction/Adaptive Reuse:his project a follow-on (Phase II, etc) to a previously-awarded tax credit development project? No
If yes, list names of previous phase(s):
ehab:
umber of residents holding Section 8uchers:
l the project meet Energy Star standards as defined in Appendix B? Yes
es a community revitalization plan exist? No
ll the project use steel and concrete construction and have at least 4 stories? No
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (1 of 21)4/8/2009 3:42:28 PM
27612
27601
(919)890-3050
35.8312
-78.6845
-
8/6/2019 Laurel Spring - A Congregate Care Community
2/21
rint - APP09-0086
ll the project include a Community Service Facility under IRS Revenue Ruling 2003-77?o
If yes, please describe:
rget Population:Elderly (55)
ll the project be receiving project based federal rental assistance? No
If yes, provide the subsidy source: and number of units:
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (2 of 21)4/8/2009 3:42:28 PM
-
8/6/2019 Laurel Spring - A Congregate Care Community
3/21
rint - APP09-0086
pplicant Information
icate below an individual or a validly existing entity (a corporation, nonprofit, limited partnership or LLC) as the official applicant. UAP Section III(C)(5) only this individual or entity will be able to make decisions with regard to this application. If awarded the applica
st become part of the ownership entity. The applicant will execute the signature page for this application.
pplicant Name: Evergreen Construction Company
ddress: 7706 Six Forks Road
ty: Raleigh State: NC Zip:
ontact: First: Tim Last:Morgan Title:Vice President
elephone:
t Phone:
ax:
mail Address:
OTE: Email Address above will be used for communication between NCHFA and Applicant.
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (3 of 21)4/8/2009 3:42:28 PM
27615
(919)848-2041
(919)630-3383
(919)848-0455
-
8/6/2019 Laurel Spring - A Congregate Care Community
4/21
rint - APP09-0086
te Description
tal Site Acreage: Total Buildable Acreage:
If buildable acreage is less than total acreage, please explain:
ntify utilities and services currently available (and with adequate capacity) for this site:
Storm Sewer Water Sanitary Sewer Electric
he demolition of any buildings required or planned? Yes
If yes, please describe:
There is a single family home on the site that will need to be removed.
e existing buildings on the site currently occupied? Yes
If yes:(a) Briefly describe the situation:
The home is occupied by a renter on a month to month lease.
(b) Will tenant displacement be temporary? No(c) Will tenant displacement be permanent? Yes
he site directly accessed by an existing, paved, publicly maintained road? Yes
If no, please explain:
any portion of the site located inside the 100 year floodplain? No
If yes:(a) Describe placement of project buildings in relation to this area:
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (4 of 21)4/8/2009 3:42:28 PM
4.27 4.27
-
8/6/2019 Laurel Spring - A Congregate Care Community
5/21
rint - APP09-0086
(b) Describe flood mitigation if the project will have improvements within the 100 year floodplain:
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (5 of 21)4/8/2009 3:42:28 PM
-
8/6/2019 Laurel Spring - A Congregate Care Community
6/21
rint - APP09-0086
te Control
es the owner have fee simple ownership of the property (site/buildings)?No
If yes provide:
Purchase Date: Purchase Price:
If no:
(a) Does the owner/principal or ownership entity have valid option/contract to purchase the property?Yes
(b) Does an identity of interest (direct or indirect) exist between the owner/principal or ownership entity with the option/contractpurchase of the property and the seller of the property?NoIf yes, specify the relationship:
(c) Enter the current expiration date of the option/contract to purchase:
(D) Enter Purchase Price:
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (6 of 21)4/8/2009 3:42:28 PM
08/30/2009
1,295,000
-
8/6/2019 Laurel Spring - A Congregate Care Community
7/21
rint - APP09-0086
oning
esent zoning classification of the site:R-6
multifamily use permitted?Yes
e variances, special or conditional use permits or any other item requiring a public hearing needed to develop this proposal?No
If yes, have the hearings been completed and permits been obtained?
If yes, specify permit or variance required and date obtained. If no, describe permits/variances required and schedule forobtaining them:
e there any existing conditions of historical significance located on the project site that will require State Historic Preservation officeiew?No
If yes, describe below:
e there any existing conditions of environmental significance located on the project site?No
If yes, describe below:
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55s...38CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (7 of 21)4/8/2009 3:42:28 PM
-
8/6/2019 Laurel Spring - A Congregate Care Community
8/21
-
8/6/2019 Laurel Spring - A Congregate Care Community
9/21
-
8/6/2019 Laurel Spring - A Congregate Care Community
10/21
rint - APP09-0086
Community space within residential bulding(s) - Sq. Ft. (Floor Area):
Elevators - Number of Elevators:
quare Footage Information
oss Floor Square Footage:
otal Net Sq. Ft. (All Heated Areas):
icate below any additional targeting for special populations proposed for this project:
Mobility impaired handicapped: 5% of units comply with QAP Section IV(F)(3) (in addition to the units required by other federal state codes.)
Number of Units:
Number of Units Required:
Persons with disabilities or homeless populations.
Number of Units:
tes
Please refer to the Income Limits and Maximum Housing Expense Table to ensure that Total Monthly Tenant Expenses for low
income units are within established thresholds.
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (10 of 21)4/8/2009 3:42:28 PM
17,597
1
61,283
59,223
6
6
5
http://www.nchfa.com/Rental/Mincomelimits.aspxhttp://www.nchfa.com/Rental/Mincomelimits.aspx -
8/6/2019 Laurel Spring - A Congregate Care Community
11/21
rint - APP09-0086
argeting
ecify Low Income Unit Targeting in table below. List each applicable targeting combination in a separate row below. Click [Add] ate another row. Click "X" (at the left of each row) to delete a row. Add as many rows as needed.
BRs Units %
targeted at percent of median income affordable to/occupied by
targeted at percent of median income affordable to/occupied by
targeted at percent of median income affordable to/occupied by
targeted at percent of median income affordable to/occupied by
targeted at percent of median income affordable to
targeted at percent of median income affordable to
tal Low Income Units:
te: This number should match the total number of low income units in the Unit Mix section.
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (11 of 21)4/8/2009 3:42:28 PM
6 30
6 30
4 50
4 50
14 60
14 60
48
-
8/6/2019 Laurel Spring - A Congregate Care Community
12/21
rint - APP09-0086
unding Sources
Source AmountNon-
Amortizing*Rate(%)
Term(Years)
Amort.Period(Years)
AnnualDebt
Service
Bank Loan
RPP Loan
Local Gov. Loan - Specify:WCHS
RD 515 Loan
RD 538 Loan - Specify:
AHP Loan
Other Loan 1 - Specify:City of Raleigh
Other Loan 2 - Specify:
Other Loan 3 - Specify:
Tax Exempt Bonds
State Tax Credit(Loan)
State Tax Credit(Direct Refund)
Equity: Federal LIHTC
Non-Repayable Grant
Equity: Historic Tax Credits
Deferred Developer Fees
Owner Investment
Other - Specify:
Total Sources**
"Non-amortizing" indicates that the loan does not have a fixed annual debt service. For these items, you must fill in 20-year debtservice below.
Total Sources must equal total replacement cost in Project Development Cost (PDC) section.
stimated pricing on sale of Federal Tax Credits: $0.
emarks concerning project funding sources:ease be sure to include the name of the funding source(s))
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (12 of 21)4/8/2009 3:42:28 PM
510,000 6.50 30 40 35,830
435,000 2.00 20 20
160,000 2.00 30 30
800,000 2.00 30 30
543,910 0 30 30 0
4,645,071
100
7,094,081
73
-
8/6/2019 Laurel Spring - A Congregate Care Community
13/21
-
8/6/2019 Laurel Spring - A Congregate Care Community
14/21
rint - APP09-0086
evelopment Costs
Item Cost Element TOTAL COSTEligible Basis
30% PV 70% PV
1 Purchase of Building(s) (Rehab / Adaptive Reuse only)
2 Demolition (Rehab / Adaptive Reuse only)
3 On-site Improvements
4 Rehabilitation
5 Construction of New Building(s)
6 Accessory Building(s)
7 General Requirements (max 6% lines 2-6)
8 Contractor Overhead (max 2% lines 2-7)
9 Contractor Profit (max 8% lines 2-7; 6% if Identity of Interest)
10 Construction Contingency (max 5% lines 2-9, Rehabs 10%)
11 Architect's Fee - Design (11 + 12 = max 3% lines 2-10)
12 Architect's Fee - Inspection
13 Engineering Costs
SUBTOTAL (lines 1 through 13)
14 Construction Insurance (prorate)
15 Construction Loan Orig. Fee (prorate)
16 Construction Loan Interest (prorate)
17 Construction Loan Credit Enhancement (prorate)
18 Construction Period Taxes (prorate)
19 Water, Sewer and Impact Fees
20 Survey
21 Property Appraisal
22 Environmental Report
23 Market Study
24 Bond Costs
25 Bond Issuance Costs
26 Placement Fee
27 Permanent Loan Origination Fee
28 Permanent Loan Credit Enhancement
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (14 of 21)4/8/2009 3:42:28 PM
700,000 700,000
3,050,000 3,050,000
225,000 225,000
79,500 79,500
238,500 238,500
214,650 214,650
77,500 77,500
11,250 11,250
62,000 62,000
4,658,400
8,900 8,900
145,000 95,000
3,500 3,500
48,000 48,000
10,000 10,000
5,000 5,000
3,000 3,000
4,300 4,300
18,900
-
8/6/2019 Laurel Spring - A Congregate Care Community
15/21
rint - APP09-0086
29 Title and Recording
SUBTOTAL (lines 14 through 29)
30 Real Estate Attorney
31 Other Attorney's Fees
32 Tax Credit Application Fees (Preliminary and Full)
33 Tax Credit Allocation Fee (0.62% of line 60, minimum $7,500)
34 Cost Certification / Accounting Fees
35 Tax Opinion
36 Organizational (Partnership)
37 Tax Credit Monitoring Fee
SUBTOTAL (lines 30 through 37)
38 Furnishings and Equipment
39 Relocation Expense
40 Developer's Fee
41 Additional Contigency (greater of $500/unit or $30,000)
42
43
44 Rent-up Expense
45
46
SUBTOTAL (lines 38 through 45)
47 Rent up Reserve
48 Operating Reserve
49
50
51 DEVELOPMENT COST (lines 1-49)
52 Less Federally Funded Grant
53 Less Disproportionate Standard
54 Less Nonqualified Nonrecourse Financing
55 Less Historic Tax Credit
56 TOTAL ELIGIBLE BASIS
57 Applicable Fraction (percentage of LI Units)
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (15 of 21)4/8/2009 3:42:28 PM
6,000
252,600
9,000 9,000
5,000 5,000
2,300
43,839
5,000 5,000
5,000
33,600
103,739
50,000 50,000
534,000 534,000
Other Basis Expense (s
Other Basis Expense (s
20,942
Costs associated with l 20,000
Other Non-basis Expen
624,942
14,400
145,000
Other Reserve (specify)
Other Reserve (specify)
5,799,081 0 5,439,100
0
5,439,100 0 5,439,100
100.00% 100% 100%
-
8/6/2019 Laurel Spring - A Congregate Care Community
16/21
rint - APP09-0086
58 Basis Before Boost
59 Basis Boost of up to 130%
60 TOTAL QUALIFIED BASIS
61 Tax Credit Rate
62 Federal Tax Credits (maximum $1,300,000)
63 Federal Tax Credits Requested (if less than line 62)
64 Land Cost
65 TOTAL REPLACEMENT COST
FEDERAL TAX CREDITS IF AWARDED
Comments:
Project Development Cost per unit63,542
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (16 of 21)4/8/2009 3:42:28 PM
5,439,100 0 5,439,100
100.00% 130.00%
7,070,830 0 7,070,830
3.50 9.00
636,375 0 636,375
636,375 636,375
1,295,000
7,094,081
636,375
-
8/6/2019 Laurel Spring - A Congregate Care Community
17/21
rint - APP09-0086
arket Study Information
ease provide a detailed description of the proposed project:
e are proposing to construct a forty-eight (48) unit rental community on Blue Ridge Road. The project willnsist of (24) one bedroom, one bath units and (24) two bedroom, one bath units for persons 55 years ofe and older. The design of the building is such that all units are fully accessible. The building is served bye elevator and the entrances are secured with a call panel entry system. All exterior doors are self lockingth all residential units opening into an interior hallway. There will be multiple common areas for the
sidents use including a computer center, exercise room and more. We will have units set aside forrsons at 30%, 50% and 60% of the area median income. In addition, 10% of the units will be targeted tosabled persons.
nstruction (check all that apply):
Brick Vinyl Wood HardiPlank Balconies/Patios Sunrooms Front Porches
Front Gables or Dormers Wide Banding or Vertical/Horizontal Siding
Other:
30 Year Dimensional Shingles
ve you built other tax credit developments that use the same building design as this project?No
If yes, please provide name and address:
e Amenities:
esident computer center, covered drive thru, lobby and sitting areas, community room with full kitchen, TV/unge, exercise room and additional storage for each unit.
site Activities:
nsite activities will consist of resident association sponsored bingo, Bible studies, monthly birthdaylebrations and holiday gatherings. Residents will have access to computer and exercise equipment.
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (17 of 21)4/8/2009 3:42:28 PM
-
8/6/2019 Laurel Spring - A Congregate Care Community
18/21
rint - APP09-0086
ndscaping Plans:
e building will have landscaped beds around the perimeter. Trees will also be planted and dispersedound the property.
erior Apartment Amenities:
ange, range hood, frost free refrigerator, washer/dryer connections, pantry, walk-in closets, wall to wallrpet, VCT in kitchen and bath areas, central air and heat pump, mini-blinds, cable and phone ready.
you plan to submit additional market data (market study, etc.) that you want considered? No
If yes, please make sure to include the additional information in your pre-application packet.
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (18 of 21)4/8/2009 3:42:28 PM
-
8/6/2019 Laurel Spring - A Congregate Care Community
19/21
rint - APP09-0086
pplicant's Site Evaluation
efly describe your site in each of the following categories:
EIGHBORHOOD CHARACTERISTICS
end and direction of real estate development and area economic health. Physical condition of buildings andprovements in the immediate vicinity. Concentration of affordable housing.
he trend for real estate development along Blue Ridge Road is positive. It has experienced alot of new
evelopment to include all types of residential use, office/commerical use, medical use and retail. There areo affordable housing developments in the area.
URROUNDING LAND USES AND AMENITIES
nd use pattern is residential in character (single and multifamily housing). Extent that the location isolated. Effect of industrial, large-scale institutional or other incompatible uses, including but not limited to:astewater treatment facilities, high traffic corridors, junkyards, prisons, landfills, large swamps, distribution
cilities, frequently used railroad tracks, power transmission lines and towers, factories or similar operations,urces of excessive noise, and sites with environmental concerns (such as odors or pollution). Amount andaracter of vacant, undeveloped land. The surrounding land uses include all types of residential use, from
ngle family to townhouse to multi-family. Other uses include medical, office and retail. There are noensive uses in the area.
TE SUITABILITY
dequate traffic safety controls (i.e. stop lights, speed limits, turn lanes). Burden on public facilitiesarticularly roads). Access to mass transit (if applicable). Visibility of buildings and/or location of project sign in relation to traffic corridors. Blue Ridge Road has several stop lights, a speed limit of 35 miles per hourd access to mass transit with a bus stop very close to the site. NCDOT will require us to widen our portionBlue Ridge Road along our property to allow for greater ingress and egress.
egree of on-site negative features and physical barriers that will impede project construction or adversely
ect future tenants; for example: power transmission lines and towers, flood hazards, steep slopes, largeulders, ravines, year-round streams, wetlands, and other similar features (for adaptive re-use projects-itability for residential use and difficulties posed by the building(s), such as limited parking, environmentaloblems or the need for excessive demolition).
he existing topographic conditions of this site are an 11% slope down from west (Blue Ridge Road) to theast, or front to back of site. To accommodate the steep topography, a building was designed to minimizerading. The building will be a 2/4 floor split providing a 21 foot drop from the ground floor entry on the front the building to the ground floor entry on the rear of the building. This building design will allow for
equired parking to be distributed in the front and rear of the building with slopes to meet accessibilityequirements.
milarity of scale and aesthetics/architecture between project and surroundings.
here are a variety of architectural designs along Blue Ridge Road due to the varied residential andommercial uses so I feel our design will fit fine with the surroundings.
r each applicable neighborhood feature, enter distance from project in miles.
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (19 of 21)4/8/2009 3:42:28 PM
-
8/6/2019 Laurel Spring - A Congregate Care Community
20/21
rint - APP09-0086
Grocery Store Community/Senior Center
Mall/Strip Center Hospital
Outdoor Athletic
eldsPharmacy
Day Care/After
choolBasic Health Care
SchoolsPublic Transportation
Stop
Convenience Store Public Parks
Gas Station Library
her facilities or services:
ttps://www.nchfa.org/Rental/RTCApp/(S(bhptgn55...8CB97F839&SNID=A2DFDAA213FC4333933F20323FD0AD4D (20 of 21)4/8/2009 3:42:28 PM
.5 1.0
.0 1.5
.01.5
1.5
.0.5
.0 .1
.0 2.5
-
8/6/2019 Laurel Spring - A Congregate Care Community
21/21
rint - APP09-0086
reliminary App Checklist
e following enclosures must be submitted along with your signed preliminary application. Some enclosures are required only undetain conditions. Please check each applicable item to indicate that you understand the enclosure requirements and will enclose threct supporting documentation with your application.
Fee PaymentCheck in the amount of $5,450.00 made payable to North Carolina Housing Finance Agency.
Tab A - Preliminary ApplicationPrinted, signed copy of preliminary application generated from online system.
B - Map/Driving InstructionsA local map clearly identifying the location of the Site and detailed directions to the Site. Current City or County maps are prefe
internet maps and directions are not acceptable. Applicant must also provide a map identifying the amenities listed in section(A)(1)(b)(ii) of the QAP and their proximity to the site.
Applicant must provide a sign and boundary markers to clearly identify the road frontage of the site. The sign identifying the sitshould read SITE with a minimum size of 11x17.
C - Community Revitalization Plan
Applicant should provide a map identifying the subject site within the Plan area (if applicable).D - Evidence of Site ControlProvide valid option/contract or warranty deed and plot plan.
E - Site Plans/Scope of WorkPreliminary site plan, floor plans and elevations for all projects, interior and exterior photographs and detailed scope of work foAdaptive Reuse and Rehab projects. Site and floor plans should be no larger than 11x17 and must be produced by a licensedarchitect or engineer.
F - Information Package for Market AnalystsThis section must include copies of items required in Tabs A, B, E and G (site and floor plans should be no larger than 11x17) can include any additional market information such as preliminary market studies the applicant would like to provide to theAnalysts.
G - Rent Roll (Rehabs only)
Provide the current rent roll for the property and indicate which units (if any) are receiving rental assistance.H - Documentation for Basis BoostApplicant should provide an appraisal and/or standard geological survey to support a request for the basis boost (if applicable)