Page 1: Latent Vendor Selection Project

Latent Vendor Selection Project

Cost Competitiveness Improvement (CCI TFT)

Sivaramakrishnan.S

Page 2: Latent Vendor Selection Project

TABLE OF CONTENTS

1 Focus of the Project

Page 3: Latent Vendor Selection Project

FOCUS OF THE PROJECT

SOURCE potential suppliers for localization

Make vendor pool COMPETITIVE

Reduce FOREIGN EXCHANGE impact

Page 4: Latent Vendor Selection Project

STRATEGY

Vendor Selection

Vendor Selection

Vendor Evaluation

Vendor Evaluation

Cost Analysis

Cost Analysis

Vendor Audit

Vendor Audit

Source ApprovalSource

Approval

CCIVD

SQA

CCIVD

VDCCIVD

SQAVD

Page 5: Latent Vendor Selection Project

SOURCE IDENTIFICATION

BENCHMARK competitors of existing suppliers

IDENTIFY potential suppliers visiting Auto Expo

STUDY the list of vendors existing in Automotive Component Manufacturing Association

Page 6: Latent Vendor Selection Project

VENDOR EVALUATION CRITERIA

General

• Industry Experience• Financial Stability• Export & Dom Sales

Turnover• Stable Labor Force• Wide Product Portfolio• Customer List• Quality Certifications• PPM level

Technical

• Any Technical Assistance (TA) ?

• Number & Experience of R&D Engineers

• Investment in R&D• Solution providing

capability• Product & Design

Validation capability

Development

• Capacity Availability• Development Lead Time• Response Time• Testing Capabilities• RM (Local / KD)• Supplier Base• Tool design &

manufacturing capability

NoteNote Meeting Participants : CCI & Vendor Development (VD)Meeting Participants : CCI & Vendor Development (VD)

Page 7: Latent Vendor Selection Project

Initial SuccessTEAM NO OF VENDORS

Engine 15

Chassis 11

Electrical 3

Body 3

Trim 1

Total 33

Shortlisted 62 vendors and screened 33 vendors for localization. Reviewed 33 vendors within 21 days. Within 40 days, I selected 1 global vendor & arranged “TECH SHOW” to display his solution providing capability.

Outcome of Tech Show

Hyundai R&D keen to work on 19 suggestions made from Hyundai Line Walk.1

8 vendors attended the Tech Show. 2 vendors released quotation request (RFQ) the very next day.

2

Overall, vendors have identified 57 parts for localization.3

32 Hyundai import parts have been identified for localization.4