Latent Vendor Selection Project
Cost Competitiveness Improvement (CCI TFT)
Sivaramakrishnan.S
![Page 2: Latent Vendor Selection Project](https://reader036.vdocuments.site/reader036/viewer/2022080206/587873ab1a28ab497b8b6a95/html5/thumbnails/2.jpg)
TABLE OF CONTENTS
1 Focus of the Project
![Page 3: Latent Vendor Selection Project](https://reader036.vdocuments.site/reader036/viewer/2022080206/587873ab1a28ab497b8b6a95/html5/thumbnails/3.jpg)
FOCUS OF THE PROJECT
SOURCE potential suppliers for localization
Make vendor pool COMPETITIVE
Reduce FOREIGN EXCHANGE impact
![Page 4: Latent Vendor Selection Project](https://reader036.vdocuments.site/reader036/viewer/2022080206/587873ab1a28ab497b8b6a95/html5/thumbnails/4.jpg)
STRATEGY
Vendor Selection
Vendor Selection
Vendor Evaluation
Vendor Evaluation
Cost Analysis
Cost Analysis
Vendor Audit
Vendor Audit
Source ApprovalSource
Approval
CCIVD
SQA
CCIVD
VDCCIVD
SQAVD
![Page 5: Latent Vendor Selection Project](https://reader036.vdocuments.site/reader036/viewer/2022080206/587873ab1a28ab497b8b6a95/html5/thumbnails/5.jpg)
SOURCE IDENTIFICATION
BENCHMARK competitors of existing suppliers
IDENTIFY potential suppliers visiting Auto Expo
STUDY the list of vendors existing in Automotive Component Manufacturing Association
![Page 6: Latent Vendor Selection Project](https://reader036.vdocuments.site/reader036/viewer/2022080206/587873ab1a28ab497b8b6a95/html5/thumbnails/6.jpg)
VENDOR EVALUATION CRITERIA
General
• Industry Experience• Financial Stability• Export & Dom Sales
Turnover• Stable Labor Force• Wide Product Portfolio• Customer List• Quality Certifications• PPM level
Technical
• Any Technical Assistance (TA) ?
• Number & Experience of R&D Engineers
• Investment in R&D• Solution providing
capability• Product & Design
Validation capability
Development
• Capacity Availability• Development Lead Time• Response Time• Testing Capabilities• RM (Local / KD)• Supplier Base• Tool design &
manufacturing capability
NoteNote Meeting Participants : CCI & Vendor Development (VD)Meeting Participants : CCI & Vendor Development (VD)
![Page 7: Latent Vendor Selection Project](https://reader036.vdocuments.site/reader036/viewer/2022080206/587873ab1a28ab497b8b6a95/html5/thumbnails/7.jpg)
Initial SuccessTEAM NO OF VENDORS
Engine 15
Chassis 11
Electrical 3
Body 3
Trim 1
Total 33
Shortlisted 62 vendors and screened 33 vendors for localization. Reviewed 33 vendors within 21 days. Within 40 days, I selected 1 global vendor & arranged “TECH SHOW” to display his solution providing capability.
Outcome of Tech Show
Hyundai R&D keen to work on 19 suggestions made from Hyundai Line Walk.1
8 vendors attended the Tech Show. 2 vendors released quotation request (RFQ) the very next day.
2
Overall, vendors have identified 57 parts for localization.3
32 Hyundai import parts have been identified for localization.4