lake okeechobee status lake okeechobee wrac committee david unsell, pe march 28, 2007

15
Lake Okeechobee Lake Okeechobee Status Status Lake Okeechobee Lake Okeechobee WRAC Committee WRAC Committee David Unsell, PE David Unsell, PE March 28, 2007 March 28, 2007

Upload: evangeline-harper

Post on 01-Jan-2016

219 views

Category:

Documents


5 download

TRANSCRIPT

Lake Okeechobee Lake Okeechobee StatusStatus

Lake OkeechobeeLake OkeechobeeWRAC CommitteeWRAC Committee

Lake Okeechobee Lake Okeechobee StatusStatus

Lake OkeechobeeLake OkeechobeeWRAC CommitteeWRAC Committee

David Unsell, PEDavid Unsell, PE

March 28, 2007March 28, 2007

Water Quality – Total Suspended Water Quality – Total Suspended SolidsSolids

Lake Okeechobee Mean TSS

131

112

42

24

31

39

1913

7

22

3933 35

24

0

20

40

60

80

100

120

140

Jan

06

Feb

06

Mar

06

Ap

r 06

May 0

6

Ju

n 0

6

Ju

l 06

Au

g 0

6

Sep

06

Oct 06

No

v 0

6

Dec 0

6

Jan

07

Feb

07

month

mg

/L

Water Quality – Total PhosphorusWater Quality – Total PhosphorusLake Okeechobee Mean TPO4

305

292

207

170

188196

148

95102

140

165158 157

136

0

50

100

150

200

250

300

350Jan

06

Feb

06

Mar

06

Ap

r 06

May 0

6

Ju

n 0

6

Ju

l 06

Au

g 0

6

Sep

06

Oct 06

No

v 0

6

Dec 0

6

Jan

07

Feb

07

month

pp

b

Algal Blooms and ToxinsAlgal Blooms and Toxins

0

5

10

15

20

25

30M

ay

04

Ju

l 04

Se

p 0

4

No

v 0

4

Ja

n 0

5

Ma

r 0

5

Ma

y 0

5

Ju

l 05

Se

p 0

5

No

v 0

5

Ja

n 0

6

Ma

r 0

6

Ma

y 0

6

Ju

l 06

Se

p 0

6

No

v 0

6

Ja

n 0

7

Ma

r 0

7

Mic

roc

ys

tin

(u

g/L

)

0.0

10.0

20.0

30.0

40.0

50.0

60.0

Pre

vio

us m

on

ths C

hl a

(u

g/L

)

Hurricanes Frances and Jeanne

HurricaneWilma

Submerged Aquatic VegetationSubmerged Aquatic Vegetation

Monthly Submerged Aquatic Monthly Submerged Aquatic Vegetation Transect SamplingVegetation Transect Sampling

OBJECTIVES:OBJECTIVES:

To understand changes in To understand changes in SAV communities as they SAV communities as they relate to changes in water relate to changes in water level and transparencylevel and transparency

Submerged Aquatic VegetationSubmerged Aquatic VegetationTransect Sites

Number of Sites with Plants

6

1

0

1 1

0 0

1

13

15 15

3

10

7

4

0

2

4

6

8

10

12

14

16

Ja

n 0

6

Feb

06

Mar

06

Ap

r 06

May 0

6

Ju

n 0

6

Ju

l 06

Au

g 0

6

Se

p 0

6

Oct

06

No

v 0

6

Dec

06

Ja

n 0

7

Feb

07

Mar

07

Date

Nu

mb

er 5 Dry

Sites

3 Dry Sites

5 Dry Sites

Submerged Aquatic VegetationSubmerged Aquatic VegetationTransect Sites

Average Biomass

0

5

10

15

20

25

30

35

40Ja

n 0

4

Mar

04

May 0

4

Ju

l 04

Se

p 0

4

No

v 0

4

Ja

n 0

5

Mar

05

May 0

5

Ju

l 05

Se

p 0

5

No

v 0

5

Ja

n 0

6

Mar

06

May 0

6

Ju

l 06

Se

p 0

6

No

v 0

6

Ja

n 0

7

Mar0

7

Date

Bio

ma

ss

(g

dw

/m2

)

Hurricanes Francesand Jeanne

Hurricane Wilma

NS NSNS NS NSNSNS

< 0.02

Submerged Aquatic VegetationSubmerged Aquatic VegetationTransect Sites

SD:TD

0

00

00

10

13

27

32

12

18

14

2023

29

0

5

10

15

20

25

30

35

40

45

50

Jan

06

Feb

06

Mar

06

Ap

r 06

May 0

6

Ju

n 0

6

Ju

l 06

Au

g 0

6

Sep

06

Oct

06

No

v 0

6

Dec

06

Jan

07

Feb

07

Mar

07

Month

Nu

mb

er

of

SA

V S

ite

s V

isit

ed

SD:TD < 0.5 SD:TD > = 0.5

Dry Conditions Dry Conditions January 07

February 07

March 07

Exotic Vegetation Management Exotic Vegetation Management

In-Lake Restoration ProjectsIn-Lake Restoration Projects Provided cost share funds of $450,000 to the Provided cost share funds of $450,000 to the

City of Pahokee for Pahokee Harbor. City of Pahokee for Pahokee Harbor.  Selected sites in and around the Clewiston lock Selected sites in and around the Clewiston lock

to plant native pond apple and cypress along the to plant native pond apple and cypress along the pass and rim canal spoil islands while pass and rim canal spoil islands while water levels are low.  water levels are low.  

Developed a Cooperative Agreement with the Developed a Cooperative Agreement with the Florida Freshwater Fish and Game Commission Florida Freshwater Fish and Game Commission to conduct sediment removal in the Cody's Cove to conduct sediment removal in the Cody's Cove area of the remnant organic berm on the NW area of the remnant organic berm on the NW marsh shoreline. marsh shoreline.

In discussions with the City of Belle Glade In discussions with the City of Belle Glade for navigational dredging and boat ramp for navigational dredging and boat ramp extensions in the Belle Glade marina extensions in the Belle Glade marina

Temporary Forward PumpsTemporary Forward Pumps

Notice to Proceed with installation was Notice to Proceed with installation was issued to Lucas Marine Construction on issued to Lucas Marine Construction on March 21, 2007March 21, 2007

April 4 the S351 pumps are ready to April 4 the S351 pumps are ready to operateoperate

April 11 the S354 pumps are ready to April 11 the S354 pumps are ready to operate operate

April 18 the S352 pumps are ready to April 18 the S352 pumps are ready to operate operate

Temporary Forward PumpsTemporary Forward Pumps

Denise Arrieta, Construction Project Denise Arrieta, Construction Project Manager, 561-719-7572.Manager, 561-719-7572.

Tim Carter, Construction Division Director, Tim Carter, Construction Division Director, 561-951-2543. 561-951-2543.

Cled Weldon, Engineering Department Cled Weldon, Engineering Department Director, 561-719-7573Director, 561-719-7573