  • 7/31/2019 L-05 Critical Activities Anp-2

    1/11

  • 7/31/2019 L-05 Critical Activities Anp-2

    2/11

    1. CATENARY AND ALIGNMENTS

    Aim - to achieve proper alignment ofvarious rotors, Loading of rotor on Brg.

    Deviation lead to problem high shaftvibration, high brg. Vibration, high babbittmetal temperature of bearing.

    Stages of maintaining catenary- before &after pedestal grouting, during rotoralignment with brg on position.

  • 7/31/2019 L-05 Critical Activities Anp-2

    3/11

    2. ASSEMBLY OF BEARING AT SITE

    Measurement of bore dia of brg, journaldia of shaft,

    Measurement of contact surfaces- toruswith pedustal, brg bottom with torus,bearing with shaft journal. (0.03 mmtightness)

    Check for oil openings, cleaning ofpedustal,

  • 7/31/2019 L-05 Critical Activities Anp-2

    4/11

    3. COUPLINGS AND ALIGNMENTS OFROTORS

    Function- to connect two or more shafttogether to form a shaft assembly.

    Coupling- measurement of axial run out

    of coupling face, geometry of entirecoupling face i.e. concavity/convexity.

    Rotor align. follow continuous deflection

    curve as per drg of particular machine.Axial & Radial position of two coup. flange

    Casing alignment wrt rotor alignmnt.

  • 7/31/2019 L-05 Critical Activities Anp-2

    5/11

    3. COUPLINGS AND ALIGNMENTSOF ROTORS (cont)

    Measure before coupling- coup hole dia,coup bolt dia, spigot / recess of coupling,

    shaft journal diameter. - axial run out of coupling face.

    - radial run out of rotor.

    - Axial clearance (slip gauge), radialclearance (dial gauge) 0f two coupling.

  • 7/31/2019 L-05 Critical Activities Anp-2

    6/11

    4. SWING CHECK

    - Swing check is a measurement of radialthrow at the free end of the compltd rotor.

    Swing caused due to non parallelity ofcoup face.

    High swing value causes- high shaftvibration, high brg shell temperature.

    Swing depends upon axial run out ofcoup face, Dia of coup, length of rotor.

  • 7/31/2019 L-05 Critical Activities Anp-2

    7/11

    5. AXIAL CLEARANCE TEST (BUMPTEST)

    Movement of shaft in +ve or ve dirctionwhile casing is fixed and radially align.

    Based on bump test rading, axial positionof shaft wrt casing is to be fixed and NOTTO BE ALTERED. (i.e. Rotor Zero Position)

  • 7/31/2019 L-05 Critical Activities Anp-2

    8/11

    6. ROLL CHECK

    Measurement of minimum radial clearanceof HP, IP & LP casing by moving the

    casing radially while rotor is rotated byhand.

    Positioning of casing depends on top &

    bottom radial clearances.

  • 7/31/2019 L-05 Critical Activities Anp-2

    9/11

    7. HORN DROP TEST

    To determine the loading of the casing on eachcorner.

    Stages of horn drop test- without connecting the

    piping, without connection of breach nut ofHPCV, after completion of all piping connectionto turbine casing.

    This test indicat the quality of work during

    assembly / welding of pipe lines with casings. Problem may cause- high vibration, failure ofbarring gear in hot / cold condition, obstructionduring expansion of machine.

  • 7/31/2019 L-05 Critical Activities Anp-2

    10/11

    WELDING OF STEAM INLET ANDEXHAUST PIPE LINES WITH H P

    AND I P CASING

    Floating of piping.

    Adjustment of piping hangers.

    Making free joint at turbine connection.

  • 7/31/2019 L-05 Critical Activities Anp-2

    11/11

    THANKS

    THANKS