14 November 2007 SAME DC Post Industry Day Contracting Opportunities & Major Design / Construction Projects NAVFAC Washington Overview Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

Upload: cadee

Post on 02-Feb-2016

66 views

Category:

Documents


0 download

DESCRIPTION

SAME DC Post Industry Day Contracting Opportunities & Major Design / Construction Projects NAVFAC Washington Overview. Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator. NAVFAC Washington - Overview. AGENDA NAVFAC Washington’s AOR & Clients Acquisition - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

14 November 2007

SAME DC PostIndustry Day

Contracting Opportunities & Major Design / Construction Projects

NAVFAC Washington Overview

SAME DC PostIndustry Day

Contracting Opportunities & Major Design / Construction Projects

NAVFAC Washington Overview

Kurt W. Kuhn, R.A.Capital Improvements

Business Line Coordinator

Page 2: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

2 NAVFAC Washington 14 November 2007

AGENDA

NAVFAC Washington’s AOR & Clients

Acquisition

Projected Workload

Back-up Slides

AGENDA

NAVFAC Washington’s AOR & Clients

Acquisition

Projected Workload

Back-up Slides

NAVFAC Washington - Overview

Page 3: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

3 NAVFAC Washington 14 November 2007

NAVAC WASHINGTON – AOR and Clients

NAVFAC Washington Supports

• Naval District Washington• NSA Washington • NAS Patuxent • NSA North Potomac• NSA South Potomac• NSA Annapolis

• Two Air Force Bases

• Three USMC Sites

• Other DoD & Non-DoD Clients

Page 4: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

4 NAVFAC Washington 14 November 2007

NAVFAC’s Preferred Acquisition:• Design Build (DB) vs. Design Bid Build (DBB)

• Best Value Source Selection (BVSS) RFPs

NAVFAC Washington’s Acquisition Tools:• A-E IDQ Contracts

• Stand Alone A-E Contracts

• Multiple Award Construction Contacts (MACC)

• Job Order Contract (JOC)

• Stand Alone Competitive Source Selection for Unique & Larger Construction Contracts

NAVFAC Acquisition

Page 5: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

5 NAVFAC Washington 14 November 2007

• Architectural: 6 contracts (developing 2)

• MEP: 1 contract (developing 2)

• Civil/Struct: 3 contracts

• Cost Est. & Scheduling: 1 Contract

• Misc. Eng Services: (developing 1 - SDVOSB)

• Environ: 4 Compliance Contracts

1 Natural Resources Contract

2 NEPA Contracts

• Planning: 1 contract (developing 4)

• Other Support from NAVFAC Atlantic Components

NAVFAC Washington A-E IDQ Contracts

Page 6: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

6 NAVFAC Washington 14 November 2007

@ NAVFAC Washington• Large MACCs: 7 contracts, expires 05/09 • MID MACCs: 13 contracts, exp 06/09 (Incl Sm Bus)• 8a MACCs: 4 contracts, expires 09/11• JOC: 1 contract, Native Alaskan, expires 02/08• JOCs: 2 (developing)• Paving IDQ• Roofing IDQ (developing)

@ NAVFAC Atlantic:• Admin, Industrial & Other MACCs• Environmental MACCs, RACs, CLEANs

NAVFAC WashingtonConstruction Contract Tools

Page 7: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

7 NAVFAC Washington 14 November 2007

NAVFAC Projected Work

FY08• MILCON 10 Projects $167M PA

• CNIC, USNA & Other Special Projects > $500K

•Approx 35 projects totaling $40M+

•Renovate B-200, WNY

FY09 & Beyond• MILCON Typically $150-$250+M PA / Year

FY06- FY11•BRAC ‘05 13 Projects $1.4+B PA

FYI - Air Force Projects $125+M PA

FY08 & Beyond Projects < $500 K

Page 8: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

8 NAVFAC Washington 14 November 2007

NAVFAC Washington FY-08 MILCONand Defense Program

P No. Project Name ACTIVITYDesign Type

Contract Method

PA Amount

($Mil)

Issue RFP (Ph 2 If DB)

Current Award Goal

339A NMIC Additon (Inc 2 of 3) NSA Wash-Suitland DB MOD 52.07 15-Feb-07 Dec-07

977 Aircraft Navigation Equipment Laboratory NAS Patuxent River DB MMACC 6.72 9-Aug-07 Jan-08

110 Reserve Center Addition MCB-Quantico DB 8aMACC 2.41 7-Sep-07 Jan-08

156 E-2 Advanced Hawkeye RDT&E Facility NAS Patuxent River DB LMACC 13.65 6-Nov-07 Jan-08

558 Aircraft Prototype Facility NAS Patuxent River DB LMACC 17.99 17-Jan-08 Apr-08

668 Warfare Programs Support Center MCB-Quantico DB MMACC 5.00 14-Feb-08 May-08

546 Student Officer Quarters, TBS Phase 2 MCB-Quantico DB 2 Ph Open 26.68 22-Sep-08 Jan-09

545 MSGBN Headquarters and BEQ Phase 1 MCB-Quantico DB LMACC 18.84 TBD TBD

1072 Communication Frame Facility BAFB DB MMACC 2.50 On hold On hold

5003 Construct Temporary Lodging Facility AAFB DBB AFCEE 21.00 AFCEE AFCEE

FY-08 MILCON TOTALS = $167

Page 9: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

9 NAVFAC Washington 14 November 2007

NAVFAC Washington FY-09 MILCONand Defense Program

P No. Project Name ACTIVITYDesign Type

Contract Method

PA Amount

($Mil)

Issue RFP (Ph 2 If DB)

Current Award Goal

339B NMIC Addition (Inc 3 of 3) NSA Wash - Suitland DB Mod 4.90 15-Feb-07 Dec-08

619 Instruction Facility Addition, TBS MCB-Quantico DB LMACC 6.35 16-Jul-08 Dec-08

443 OCS Mess Hall MCB-Quantico DB LMACC 13.75 27-Jun-08 Dec-08

495A Aircraft Parking Apron - Green Side MCB-Quantico DBB Stand Alone 36.28 28-Jul-08 Dec-08

547 Student Quarters, TBS Phase 3 MCB-Quantico DB Stand Alone 27.53 1-Jul-08 Dec-08

010 Autonomous Systems Research Lab NSA Wash - NRL DB Stand Alone 24.22 7-Jul-08 Dec-08

555 Instruction Facility, TBS MCB-Quantico DB Stand Alone 25.20 30-Jul-08 Jan-09

306 Electromagnetic Launch RDT&E FAC NSA SP-Dahlgren DB LMACC 10.21 12-Aug-08 Jan-09

517 Greenside Hanagr Complex Phase 2 MCB-Quantico DB Stand Alone 27.75 26-Aug-08 Feb-09200 Sewage Treatment Plant Upgrades NSA SP-Indian Head DB Stand Alone 13.93 22-Oct-08 Feb-09

FY-09 MILCON TOTALS = $190

Page 10: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

10 NAVFAC Washington 14 November 2007

NAVFAC Washington BRAC ‘05 Program

FY P # Project Name ActivityDesign Type

Contract Method

PA Amount ($Mil)

Issue RFP (Ph 2 If DB)

Award Goal

06 P-009V Aircraft Research Support Facility NAS - Patuxent River DB 2 Ph - Open 22.52 5/311/06 Sep-0608 P-011V R,D&A, & T&E Consolidation Facility NSA SP - Dahlgren DB 2 Ph - Open 28.93 20-Aug-07 Jan-08

08 P-005V Walter Reed National Mil Medical Ctr Addition Bethesda DB 2 Ph - Open 700.00 21-Aug-07 Jan-08

08 P-002V Explosive Development Facility NSA SP - Indian Head DB 2 Ph - Open 28.79 12-Mar-08 Jun-08

08 P-012V Collocate MILDEP Investigative Agencies MCB - Quantico DB 2 Ph - Open 360.00 20-Feb-08 Jun-08

08 P-015V WRNMMC Support Facilities Bethesda DB 2 Ph - Open 74.40 1-May-08 Oct-08

09 P-TBD WRNMMC Support Facilities Bethesda DB 2 Ph - Open 130.00 1-May-08 Oct-08

09 P-013V Pre-Trial Detainee Facility (BRAC) MCB - Quantico DB MMACC 5.57 TBD TBD

09 P-006V NSMA - New Warehouse NSA Wash - Anacostia TBD TBD 7.61 TBD TBD

09 P-003V Navy Sys Mgt. Activity (NSMA) Relocation NSA Wash - Anacostia TBD TBD 31.36 TBD TBD

09 P-014V Joint Medical Command HQ Facilities NSA NP (NGA Site?) DB 2 Ph - Open TBD TBD TBD

10 P-117V Renovate 3rd Floor of Building 176, WNY NSA Wash - WNY TBD 8aMACC 0.81 TBD TBD

10 P-001V Crystal Park 5 to Arlington Service Center NSA NP - Arl Svc Ctr DB 2 Ph - Open 27.40 TBD TBD

NAVY/MC BRAC Sub-Total = 1,417.39

09 TBD Admin Facility Andrews AFB TBD TBD $95.00 AFCEE AFCEE

09 TBD BRAC Related Facility Work Andrews AFB TBD TBD $30.00 AFCEE AFCEE

AIR FORCE BRAC Sub-Total = $125

Page 11: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

11 NAVFAC Washington 14 November 2007

BACKUP SLIDES

• Summary Scopes of Work Based Upon 1391s

• Projects Included Herein are Shown in Previous Spreadsheets

Page 12: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

12 NAVFAC Washington 14 November 2007

Questions

Page 13: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

13 NAVFAC Washington 14 November 2007

MILCON SCOPES OF WORK

The Following Scopes of Work are as Generally Described in Project 1391s

P-5003 Construct TLF @ Andrews AFB: (Const to be admin by AFCEE)

Design Bid Build - Construct a new 2-story, 50 unit Temporary Lodging Facility (TLF) to include central bulk storage room/admin office and 25 single family units with a 2-bedroom configuration, full bathroom and kitchens.

P-339 National Maritime Intel Center (NMIC) @ NSA Wash – Suitland:

Design Build - Construct an 15K+ GSM (150K+ GSF) addition to the existing NMIC to house additional personnel in support of the increased mission of the Office of the Naval Intelligence and its sub-tenants. Renovate/upgrade some existing administrative offices.

Page 14: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

14 NAVFAC Washington 14 November 2007

MILCON SCOPES OF WORK (cont.)

P-306 Electro Magnetic Launch RDT&E Facility @ NSA SP – Dahlgren:

Design Build – Construct a 1,276 SM (13,742 SF) single-story pre-engineered building addition to existing building 1410.The project includes a 9600 SF high-bay area and 4000 SF technical support area.

P-156 E-2 Advanced Hawkeye RDT&E Facility @ NAS Patuxent River:

Design Build a 3,017 SM (32,473 SF) multi-story secure facility including engineering workspace, secure aircraft data laboratory, engineering analysis workstations, etc. Also, this project will include the demolition of small buildings and the disposal of MILVAN units.

Page 15: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

15 NAVFAC Washington 14 November 2007

MILCON SCOPES OF WORK (cont.)

P-558 Aircraft Prototype Facility, Phase 1 of 3 @ NAS Patuxent River:

Design Build - This project provides a 3,730 SM (40,149 SF) secure multi-story Aircraft Prototype Facility. Phase 1 will include type II hangers with parking apron and taxi way, a secured video teleconference center, a test control center and a SCIF laboratory, shop and other support spaces.

P-977 Aircraft Navigation Equipment Laboratory @ NAS Patuxent River:

Design Build - Construct a 1,902 GSM (20,472 GSF) single-story addition to existing buildings 2110 and 2122 to provide space to support new mission requirements for the Joint Precision Approach and Landing System (JPALS) testing, development and fleet support activities.

Page 16: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

16 NAVFAC Washington 14 November 2007

MILCON SCOPES OF WORK (cont.)

P-110 General Warehouse and ISB Facility @ MCB-Quantico:

Design Build a 325 GSM (3,498 GSF) new warehouse facility at Camp Upshur and provide tactical parking for 41 combat vehicles.

P-545 Bachelor Enlisted Quarters (BEQ), MSGBN @ MCB- Quantico:

Design Build – Construct a 6,004 GSM (64,627 GSF) secure multi-story BEQ to house 280 Marines. Building will include 140 rooms in the standard 2+0 room configuration (70 Module) with semi-private bathrooms and walk-in closets and support spaces.

Page 17: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

17 NAVFAC Washington 14 November 2007

P-010 Autonomous Systems Research Lab @ NSA Wash - NRL:

Design Build – Construct a 4,607 GSM (49,585 GSF) Autonomous Systems Research Lab. Project includes some demolition.

P-200 Sewage Treatment Plant Upgrade @ NSA SP - Indian Head:

Upgrade NSF-IH’s existing sewage treatment plant to comply with Maryland Dept of Environment (MDE) water quality standards for nitrogen and phosphorus level and the “Chesapeake Bay Restoration” Memorandum of Understanding (MOU) between DoD and the State of Maryland.

MILCON SCOPES OF WORK (cont.)

Page 18: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

18 NAVFAC Washington 14 November 2007

P-306 Electromagnetic Launch (EML) RDT&T @ NSA SP- Dahlgren

Design Build – Construct a 1,277 GSM (13,742 GSF) building to include an 892 SM (9,600 SF) high bay area with a 13.11M (43 ft) eave height and a 372 SM (4,000 SF) technical support facility . The project includes some demolition.

P-443 Mess Hall, OCS @ MCB - Quantico:

Design Build – Construct a 2,750 GSM (29,600 GSF) Mess Hall to match existing architectural plan. The project includes some demolition.

MILCON SCOPES OF WORK (cont.)

Page 19: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

19 NAVFAC Washington 14 November 2007

P-517 Green Side Hangar, Phase 2 @ MCAF - Quantico:

Design Build – Construct a 5,626 GSM (60,558 GSF) Air Craft Maintenance Hangar. Provide 1 module of standard type II hangar space with adjacent multi-story maintenance shop, administrative, medical, storage and other support areas.

P-547 Student Barracks, The Basic School, Ph 3 @ MBC- Quantico:

Design Build – Construct an 8,866 GSM (95,433 GSF) multi-story building. Building provides for 410 rooms in 1x1 room configuration (205 modules) with semi-private bathrooms and walk-in closets.

MILCON SCOPES OF WORK (cont.)

Page 20: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

20 NAVFAC Washington 14 November 2007

P-555 Instruction Facility, The Basic School (TBS), Ph 1 @ MCB - Quantico:

Design Build – Construct a 5,724 GSM (61,613 GSF) multi-story Academic Instruction Facility for The Basic School. This facility will be designed to include classrooms, offices, lounges, locker rooms, video viewing rooms, storage rooms and other support spaces.

P-619 Instruction Facility Addition, TBS @ MCB - Quantico:

Design Build – Construct a 1,397 GSM (15,037 GSF) addition to the Academic Instruction Facility for The Basic School.

MILCON SCOPES OF WORK (cont.)

Page 21: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

21 NAVFAC Washington 14 November 2007

MILCON/BRACON SCOPES OF WORK

P-546 Student Officer Quarters, TBS Phase 2 @ MCB – Quantico:

Design Build – Construct an 8,661 GSM (93,226 GSF) multi-story facility to provide housing for 250 officers undergoing initial training at The Basic School. Building provides 250 rooms in the 1+1 E room configuration (125 modules) with semi-private bathrooms and walk-in closets and support spaces. Project includes some demolition.

P-001V Crystal Park 5 to Arlington Service Center @ NSA NP – ASC:Design Build - Renovate Buildings 1, 2 and 12 at the Arlington Service Center totaling 18,976 GSM (204,264 GSF) to provide offices for over 1,000 personnel and related support spaces.

P-002V Explosive Development Facility @ NSA SP - Indian Head:

Design Build - Construct 8 facilities totaling 5,285 GSM (56,894 GSF) to include new explosive pressing facility, explosives hogout facility, category 2 magazine, change house and office space, and renovates facilities for melt casting, explosives machining facility, and laboratory space to support to relocation of the Explosive Engineering Detachment.

Page 22: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

22 NAVFAC Washington 14 November 2007

BRACON SCOPES OF WORK

P-005V Walter Reed National Military Medical Center (WRNMMC) Addition @ Bethesda:

Design Build – Construct 50K+ GSM (540K+ GSF) additions and 17K+ GSM (185K+ GSF) alterations at the Medical Center. Also, construct 6.7K+ GSM (73,000 GSF) alterations for administration space, parking facilities for 2,500 vehicles, and associated site work.

P-006V NSMA - New Warehouse @ NSA Washington – Anacostia:

Design Build – Construct a 2,139 GSM (20,000 GSF) climate-controlled, SCIF warehouse and associated 1,858 GSM (3,000 GSF) administrative open storage SCIF.

Page 23: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

23 NAVFAC Washington 14 November 2007

BRACON SCOPES OF WORK (cont..)

P-011V R,D&A, & T&E Consolidation Facility @ NSA SP – Dahlgren:

Design Build – Construct a 6,094 GSM (65,595 GSF) multi-story technical support/research facility, with raised access floor in computer rooms and laboratories, sensitive compartmented information facility (SCIF), and associated site work.

P-012V Collocate MILDEP Investigative Agencies @ MCB – Quantico:

Design Build - Construct 68K+ GSM (700K+ GSF) secure multi-story office facilities with Classrooms, Cafeteria, Visitor Center/Gatehouse, Warehouse, Utility Facility, and Technical Service spaces to house Military Investigative Agencies. These facilities will include SCIF areas, TV studios and control rooms, and video viewing rooms. Site improvements include parking spaces for 3,900 vehicles, and other site work.

Page 24: Kurt W. Kuhn, R.A. Capital Improvements Business Line Coordinator

24 NAVFAC Washington 14 November 2007

P-013V Pre-Trial Detainee Facility (BRAC) @ MCB – Quantico:

Design Build - 457 GSM (4,925 GSF) Pre-Trail Detainee Facility.

P-015V WRNMMC Support Facility @ Bethesda:

Design Build - Support Facilities to include will include a 565 vehicle Parking Garage, a 64,000 GSF Physical Fitness Center, a 21,000 SF Messing Facility, a 204,000 GSF new Billeting Facility and the renovation of a 27 GSF facility for billeting. The project will include some demolition.

P-TBD WRNMMC Support Facility @ Bethesda:

Design Build - Support Facilities to include new 41,000 SF and 114,000 GSF administrative facilities.

BRACON SCOPES OF WORK (cont..)