kps engineering company profile for plumbing and sanitary works

18
KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Upload: jacquelyn-bales

Post on 11-Dec-2015

249 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

KPS ENGINEERING

Company profile for

PLUMBING AND SANITARY WORKS

Page 2: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

OFFICE ADDRESS

No:73/31, Saravana Perumal Koil Street,

Purasawalkam,

Chennai - 600 084,

Tamil Nadu, INDIA.

Phone No : 044-26400062,

Mobile No : +91 9841389378,

URL : www.kpsengineering.in

E-mail : [email protected]

Page 3: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

BUSINESS PROFILEKPS ENGINEERING

( Plumbing Contractors)

We take pleasure in introducing ourselves as PLUMBING AND SANITARY CONTRACTOR, capable of taking Jobs on Contract / Turnkey basis.

Recently we have completed the Plumbing & Sanitary installation at an factory project,

(namely FAURECIA EMMISSION COTROL SYSTEM) Chennai. Sriperembadur,Salient detail of this project is explained in. Annexure I. The Annexure II enclosed herewith would highlight one of the jobs executed by the undersigned in India.

We would be happy to be associated in taking up of Plumbing and Sanitary installations on turkey basis / on contract basis for your forthcoming projects.

 

Regards,

Managing DirectorKPS ENGINEERING

Page 4: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

ANNEXURE I

Brief explanation FAURECIA project designed and executed by us.

Name of Project: “FAURECIA”,

Sriperumbudur.

No. Of Floors : 1 Basement + 1st Floors.

Our scope of design and execution starts from designing of underground

sumps to final disposal of Sewage after treatment.

Page 5: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

The design and execution includes,

* Water treatment system.

* Water softening plant.

* Automatic Hydro pneumatic water pumping system.

* Hot & cold water piping system.

* Soil & waste water disposal system.

* Rainwater installation.

* Automatic sewage transfer pumps.

* Automatic storm water transfer pumps.

* Installation of sanitary wares.

The building is served with direct water supply to fixtures through Hydro pneumatic pumping system.

Addl. Roof tank is also incorporated to take care at the power failures

Our expert team of dedicated technicians carried out the entire installation and Commissioned

the whole System by our Engineers.

Page 6: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

ANNEXURE II

Brief Description of works done (not limited to..)While working:-

TOWNSHIP FOR PETROLIUM DEVELOPMENT OMAN AT SULTANATE OF OMAN:

The arihant foundation residential apartment ….etc The services works includes: - • Installation of sanitary wares • Installation and commissioning of hot and cold water system including automatic Pumping system. • Installation and commissioning of soil, waste and drainage system. • Installation and commissioning of Solar water heaters • Installation and commissioning of Irrigation system (water re-circulated from sewage Treatment tank) • Installation and commissioning of swimming pool • Installation and commissioning of Sewage treatment plant (5: 5 purity) • Installation and commissioning of domestic gas piping • Installation and commissioning of compressed air system • Installation and commissioning of kitchen equipments

Page 7: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

CURRICULAM VITAE

KISHORE KUMAR

# 73/31, SARAVANA PERUMAL KOIL STREET,

PURASAWALKAM,

CHENNAI-600084,

TAMILNADU,

INDIA.------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

--------------------

OBJECTIVE:

To achieve set goals and to be innovative in all works. I would like to strive

as a key member in every success of the organization.

Educational Qualification:

B.E

Specialization:

Plumbing and Sanitary works.

PERSONAL DETAILS

NAME - KISHORE KUMAR

FATHER’S NAME - GH.KUNAR

D.O.B - OCT 5TH 1978

LANGUAGES KNOWN - TAMIL,HINDI AND ENGLISH.

SEX - MALE

MARITAL STATUS - MARRIED

BLOOD GROUP - AB +VE

Page 8: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

TECHNICAL TEAM(ONLY KEY PERSONNELS FURNISHED)

SL NO NAME QUALIFICATION POSITION EXPERIENCE

1 Mr. KISHORE KUMAR  B.E Director

 15 Years

 

2 Mr. SEMANBALU D.M.E Project Manager 11 Years

3 Mr. SUSANTH D.M.E Project Engineer 13 Years

4 MR. PRASANTH D.M.E 

Project Engineer

10 YEARS

5 MANOJ KUMAR DPTSITE

ENGINEER8 YEARS

Page 9: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Project :Grandeur Chetpetclient :Life Style Housingplumbing contractor :KPS ENGINEERING

Page 10: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Project :Pacifica Arum

client :Pacifica companies group(Chennai)plumbing contractor :KPS ENGINEERING

Page 11: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Project :Avvai homes girls Hostel(adiyar)client :Avaai homes girls high schoolplumbing contractor : KPS ENGINEERING

Page 12: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Architects: - KSM Consultants - Chennai

Project : ETA TECHNOPARKcleint :ETAplumbing sub contractor :KPS ENGINEERING

Page 13: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Project :GURUSANTHI VELLAcleint :GURUSANTHI DEVELOPERSplumbing contractor :KPS ENGINEERING

Page 14: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

Project : FAUROCIAcleint :SUGAL GROUPplumbing contractor :KPS ENGINEERING

Page 16: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

LIST OF PLUMBING WORKS UNDER TAKEN-(Partial list) Contd…

Sl.No. PROJECT NAME SHORT DESCRIPTION OF WORK ARCHITECT/ CLIENTMAIN/SUB

CONTRACTORREMARKS

1SIYAT PROJECT LLP

AT MARAMALAI NAGER

Complete Plumbing and Sanitary installation

PRAKASH CONSALTENT

2LIFE STYLE HOUSING

(ON GOING)

Complete Plumbing and Sanitary installation

NAVEEN AGARWAL & ARCHITECT / Life style &

infra,Egmore.

3.

GURUSANTHI VELLA

(ON GOING)

Complete Plumbing and Sanitary installation

SHANKER ASSOCIATE AT

SAWKARPET NAGER CHENNAI

4ETA TECHNO PARK AT NAVALLUR

CHENNAI

Complete Plumbing and Sanitary installation

ESSKAY DESIEN AT TEYNAMPET

CHENNAI 18/ETA TECHNO PARK AT

NAVALLUR CHENNAI

MADRAS ENGNEERIN

G CONCEARN

Page 17: KPS ENGINEERING Company profile for PLUMBING AND SANITARY WORKS

LIST OF PLUMBING WORKS UNDER TAKEN-(Partial list) Contd…

Sl.No. PROJECT NAME SHORT DESCRIPTION OF WORK ARCHITECT/ CLIENTMAIN/SUB

CONTRACTORREMARKS

5 ARIHANT VAIKUNTSComplete Plumbing and

Sanitary installation DTS CONSALTENT5+11

FLOORS

6SINGHVI LAND

DEVELOPERS PVT LTD

Complete Plumbing and Sanitary installation

FAURECIAL atSriperumbudur

7

AVAAI HOMESHOSTEL

(ON GOING)Complete Plumbing and

Sanitary installationTECHNICALLYA CONSULTANT

8

AURUM- Chennai Township(Pacifica

Companies)(ON GOING)

Complete Plumbing and Sanitary installation

Stantec Consulting Pvt. Ltd.(Formerly known as Burt Hill Design Pvt. Ltd.)

G+15 FLOORS