Page 1: Kimberley Township Assessment Report

41P15SE2004 2.18916 KIMBERLY 010

Kimberley Township Assessment Report

October 23,1998

Prepared forMines Recorder Office

byThe Hunt Engineering Group Inc.

i. a A

Page 2: Kimberley Township Assessment Report

Table of Contents 41P15SE2004 2.18916 KIMBERLY 010C

Introduction ............................................................................ l

Fieldwork .............................................................................. l

Subsoil And Ground water Conditions ....................................................... 2

Geological Sampling ....... ... ... ........... ... ... ... .................... .............. .. 2

Development Planning ................................................................... 3

Page 3: Kimberley Township Assessment Report

Kimberley Township Assessment Report

Introduction

Fieldwork

The Kimberley Township claims No. 1206318 and 1206317 are part of the claim holdings formerly held by the Windsor family and recently transferred to Greg Hunt (client number 146779). A site plan has been prepared and is attached, Dwg l. This drawing will be further developed as the project continues. These claim blocks are being explored for their quartz potential both for silica and as decorative stone. At this stage, exploration is at a preliminary level and the assessment work being reported concerns the surface geotechnical considerations and conceptual hydrogeological components.

The fieldwork for this assessment was undertaken between September 4 to October 23, 1998. During this period, the property was re-surveyed by chaining and flagging methods to establish property boundaries and approximate locations of relevant surface features. A series of five test pit trenches were excavated using hand methods to characterize the subsoil conditions and ground water state. In addition to the test pits, five assay samples were collected and sent to the Placer Dome, Dome Mine for gold assaying. This was done in order to confirm the general absence of precious metals as known in this specific area.

Page l

Page 4: Kimberley Township Assessment Report

Kimberley Township Assessment Report

Subsoil And Ground water Conditions

At the five locations tested, the subsoil consists of sand and silt size particles (till) overlying bedrock, consisting of granodiorite and granitic type host rocks. Test locations are provided on the attached field drawing, Dwg 2. The depth of subsoil did not exceed l .4 metres at all locations tested indicating that overburden stripping operations in this area will be relatively straightforward. Applications for work permits for advanced site stripping and bedrock trenching are currently being prepared for submission to the Ministry of Natural Resources.Ground water in the test holes was found at bedrock contact with minimal flow conditions. Excavations in this area will not effect the ground water regime which is controlled by bedrock contouring, flowing in the low lying areas only.

Geological Sampling

A series of grab samples were obtained and forwarded to the Dome Mine for assay purposes. The area is not actively being explored for its gold potential; however, it is considered prudent to randomly test for metals at this preliminary stage. The locations of the grab samples are shown on Dwg. Z and the test results are provided on the attached table. Gold grades were generally not high enough to warrant immediate attention, although follow up testing will likely be considered.

Page!

Page 5: Kimberley Township Assessment Report

Kimberley Township Assessment Report

Development Planning

The property, which also consists of claims no 1200469 and 1211565, is being assessed for its silica potential for possible markets in mining and foundries. It is expected that assessment work will be ongoing throughout 1999 with possible production plans in mid summer next year under an Aggregate License. Depending development plans a quarry may result with up to a five year mine plan.

Page 3

Page 6: Kimberley Township Assessment Report

l) Drawing taken from Ministry Natural Resources. Canada, 41 P/1 S, Edition 3, for lUtachewan. timiskaming District. Ontario.

r.c

c o

cc"-1't

c c

(C(t

Po;

c c l-

Page 7: Kimberley Township Assessment Report

av o .A TV-

a T?S

1X0 Co'.M

leiV ^,\ W t.ACo^ f circ-X, Sc^-^-pl

F^eU ^^.,,,

k lin U xU -. "ToL.. . , L

o, r (z X~.z

Page 8: Kimberley Township Assessment Report

PLACER DOME NORTH AMERICA ^T7H0 PORCUPINE , ONTARIORON l HODOME MINE

PH. (705)235-6525 FAX (705) 235-6526

ANALYTICAL AND ENVIRONMENTAL SERVICES

CERTIFICATE OF ANALYSIS

Customer No 1 Contact Person Andre Dionne

PDCDomeA&E Date ree

Job Order 410 ^ . . . . Date Complete

Assayed for: Au P.O./ 0

Description Sample/ Value Unit Comment

Sep/15/98

Sep/23/98

Q014501 R1 0.077 PPM

Q014502 R2 0.051 PPM

QQ14503 R3 > 0.03 PPM

Q014504 R4 > 0.03 PPM

Q014505 R5 > 0.03 PPM

SO. 00

SO.OO

to.oo

SO.OO

10.00

Total "

Certified by: Ron M. Connell . CAB.C.

Superintendent of Analytical and Environmental Services

JO 00

Return to j

Accredited byCAEAL for specific tests registered with the Association

P i

Page 9: Kimberley Township Assessment Report

Ontario nd k***Declaration of Assessment Work Performed on Mining Land

Mining Act, Subsection M{2) and M(3), R.I.O. IN*

Traneacta) Numbar (office UM)

Aaaaaamant FM* Riaaarch Imaging

6S(2)itM 66(3) ottoe correepoocl Wtty feepooc

. 3riFtoOr,

Mng Act Undw MCflon e c( Vw Mining Ad, this tt* mining land holder. Question* about tt* cotecttonRt maay Lato Road. Sudbury. Ontario. P3E 685.

41P15SE2004 2.18916 KIMBERLY 900

Instructions: - For work performed on Crown Lands befi - Please type or print in ink.

1. Recorded holders) (Attach a list if necessary)

2 C ^3

H.lalm, useFforr ^

.nmSmSlS0240.

2.189 l 6N"n" Grtu, ^U 4AddreM *J

^Ov^ -^t^JOName

Addraaa

Clant NumbarJK771

Telephone Numbar 704T ?fo7

Fax Numbar7Cb~ 2.63

st 2. T00,'?

CBent Number

Teteph0n* NUmbW

Fax Numbar

2. Type of work performed: Check (*0 and report on only ONE of the following groups for this declaration.

Geotechnical: prospecting, surveys, assays and work under section 1 8 (regs)

n "

Physical: drilling stripping, trenching and associated assays

n u

Rehabilitation

Work Type

fDtfwWork From To

Pwfomed f* O** 1 Monti 1 \ YMT ^0 2, "i D*y j/CVtonVt | Vtv ?#

Global Portioning Syttem Data (V aveitabto) TowrahipMrae i, . i

Mor O-PtonNumbw ^i

fKotWJvec^i^ f-i^X/S"

Office Use

Commodity |Total S Value ofWork Claimed 3 1 "5 k

NTS Reference

Mining Division tvrtrc)^ r L/ik*

Resident Geologist i/ (Jr k1 la^tt.dL^LgL-^ ^^ District T^U/t-lTT

Please remember to: - obtain a work permit from the Ministry of Natural Resources as req- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for- include two copies of your technical report.

3. Pereon or companies who prepared the technical report (Attach a list if necessary)

"^ -rl^ IL -f F ' f~ -rf "Xe- r-rtaAi 1 ^"*^fi In e-es~i ii~ *^ru u.yj -trie.

Wdr"** ^ t r* Name

Addraaa

Same

Xddraaa

Telephone Number7ox~-z^g 00/6

Fax Numbar

Telephone Number

Fax Numbar

Telephone Number

Fax Number

i. Certification by Recorded Holder or Agent, _____Ores, of^ M*~ 4______, do hereby certify that l have personal knowledge of the facts set forth in

3 ^ t Name)

his Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its x)mpletion and, to the best of my knowledge, the annexed report is true.Signature of Recorded Holder or Agent y*/ //f L

^/d^U td*- QRent's Address d Telephone Number

7cr 2.6 e &0 f t

Date ^ , C/cf Z6 . /*y*

Fax Number 70 *~ ^(3 ci oo/f

241 (BM7)

Page 10: Kimberley Township Assessment Report

Sand where work was performed, at the time work was penormeo. A map snuwniv me?0fTn 'Mining Claim Number. Or Kwork was done on other eligible mining tend, thaw in this

column (he location number indicated on the claim map.

9

9

eg

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

TB 7827

1234567

1234568

/2-Okaifc

11662 h

Column Totals

Number of Claim Units. For other mining land, M hectare*.

16 ha

12

2

4-

1

Value of workperformed on (his daim or othermWngland.

126,825

0

S 8,892

^n4> -/OOb "

Value of work applied to this

~2 li*w * A 'N/A

S24.000

S 4,000

y 4oo4-oa

Value of work assigned to other

HH. 6124,000

0

0

- 7-r -f "*^Eoc^ -v.

-s

nr.T 2 s ':-0c C icwr.F ASSESSMENT

OfFlCE^^

Bank. Value of work to be distributed at a future date

S2.82S

0

K892

^34

^06

\1

I.. , do hereby certify that the above work credits are eligible under(Pnnt Full N*nw)

subsection 7 (J) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to the claim

where the work was done.Signature of Recorded Holder or Agent ^^ Date -U

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check (X) in the boxes below to show how you wish to prioritize the deletion of credits:

O 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.

D 2. Credits are to be cut back starting with the claims listed last, working backwards; or

O 3. Credits are to be cut back equally over all claims listed in this declaration; or

D 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

For Office Use Only____________________Received Stamp

0041(03/67)

Deemed Approved Date

Date Approved

D&t* Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 11: Kimberley Township Assessment Report

Ontario e r,, Development and Mines

staiement ot costs for Assessment Credit

Transact.cn Number (oftee uee)

Personal Information collected on this form tt obtained under the authority of subsection 0(1) of the Assessment WonX Regulation 6/96 Under section 8 of the Mining Act, the information is a public record. This information win be used to review the assessment work and correspond wtth the mining land holder. Questions about (his collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines. 6th Floor, 933 Ramsay Lake Road. Sudbury. Ontario. P3E 665. 4 .^

~ l 8 9 l 6Work Type

Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.

Cost Per Unit of work

Total Cost

sJLL-

Associated Costs (e.g. supplies, mobilization and demobilization).

Transportation Costs

Food and Lodging Costs Stt-Oo

Total Value of Assessment Work 3/3^.

Calculations of Filing Discounts:

1. Work filed within two years of performance is claimed at KXW of the above Total Value of Assessment Work. Z. If work is filed after two years and up to five years after performance, it can only be claimed at S&Ht of the Total

Value of Assessment Work. If this situation applies to your claims, use the calculation below:

TOTAL VALUE OF ASSESSMENT WORK x 0.50 Total S value of worked claimed.

Not*:- Work older than S years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.

Certification verifying costs:

, do hereby certify, that the amounts shown are as accurate as mayi print full ntme)

reasonably be determined and the costs were incurred while conducting assessment work on the lands indicated on

the accompanying Declaration of Work form as

to make this certification.

(recorded holder, agent, or Mate company position with signing authority)l am authorized

0212 (0246)

Date

Page 12: Kimberley Township Assessment Report

Ministry of Ministere duNorthern Development Developpement du Nordand Mines et des Mines Ontario

Geoscience Assessment Office 933 Ramsey Lake Road

March 9, 1999 6th FloorSudbury, Ontario

GREG HUNT P3E6B5RR#1 LOT 7 CON 3ST-CHARLES, Ontario Telephone: (888)415-9846POM-2WO Fax: (877)670-1555

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Dear Sir or Madam: Submission Number: 2.18916

Status Subject: Transaction Number(s): W9880.00676 Approval After Notice

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the - response date on the summary.

If you have any questions regarding this correspondence, please contact Steve Beneteau by e-mail at [email protected] or by telephone at (705) 670-5855.

Yours sincerely,

ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 13450

Copy for: Assessment Library

Page 13: Kimberley Township Assessment Report

Work Report Assessment Results

Submission Number: 2.18916

Date Correspondence Sent: March 09, 1999_______________________Assessor:Steve Beneteau^^^^^^^ - ^^^^^^^^

Transaction First ClaimNumber Number Township(s)/Area(s) Status Approval Date

W9880.00676 1206318 KIMBERLEY Approval After Notice March 05, 1999

Section:10 Physical PITS

The revisions outlined in the Notice dated January 19, 1999, have been corrected. Accordingly, assessment work credit has been approved as outlined on the attached Declaration of Assessment Work form.

Correspondence to: Recorded Holder(s) and/or Agent(s):

Resident Geologist G REG HUNTKirkland Lake, ON ST-CHARLES, Ontario

Assessment Files Library Sudbury, ON

Page: 1

Correspondence ID: 13450

Page 14: Kimberley Township Assessment Report

Distribution of Assessment Work Credit

The following credit distribution reflects the value of assessment work performed on the mining land(s).

Date: March 09, 1999

Submission Number: 2.18916

Transaction Number: W9880.00676

Claim Number Value Of Work Performed

1206317 613.00

1206318 1,308.00

Total:* 1,921.00

Page: l

Correspondence ID: 13450

Page 15: Kimberley Township Assessment Report

j 530000mE^

SYMBOLS Ministry of Ministry ofNatural Northern DevelopmentResources and Mines

CAIRO TOWNSHIP3M

Boundary

Township. Meridian. Baseline.

Road allowance; surveyed

shoreline. . .. . . .

INDEX TO LAND DISPOSITIONLot/Concession; surveyed, . .

unsurveyed .

Parcel: surveyed

unsurveyed . . . .. . .

Right-of-way; road

railway

utility

Reservation

Cliff. Pit. Pile ... ,

Contour . ..

Interpolated

Approximate

Depression.

Control point (horizontal)

Flooded land

Mine head frame

Pipeline (above ground)

M.N.R. ADMINISTRATIVE DISTRICT

KIRKLAND LAKEMINING DIVISION

LARDER LAKELAND TITLES/REGISTRY DIVISION

TIMISKAMING

PLAN

G-3660TOWNSHIP

KIMBERLEY

DATE OF ISSUE

APR O 11999

,- r ~

PRQVINCIAL RECCjg^L^gL^ -^ OFFICE -924397

Railway, single track. .

double Irack

abandoned. Contour Interval 10 Metres

Road; highway, county, township

access

trail, bush

Shoreline (original)

Transmission line

Wooded area

Map base and land disposition drafting by Surveys and Mapping Branch, Ministry of Natural Resources.

The disposition of land, location of lot fabric and parcel boundaries on this index was compiled for administrative purposes only.

AREAS WITHDRAWN FROM DISPOSITIONDISPOSITION OF CROWN LANDSMRO- Mining Rights Only

SRO - Surface Rights Only

M + S - Mining and Surface Rights

Patent

Surfaces Mining Rights

Surface Rights Only . .

Mining Rights Only

Lease

Surface S Mining Rights

Surface Rights Only . . ,

Mining Rights Only

Licence of Occupation

Order-in-CounciL .

Cancelled

Reservation.

Sand S Gravel ...

Description Order No. Date Disposition File

R i) LONG RfiaiDs - MONTREAL RIVE V;.".TLP FO',,ER RESERVE

/ining S 5 L .-f ace Rignts Reopcied to prospecting, sale or case. Order C-L-iO/35, previouiiv \wi1harawn under Ordrr W-S5/8B

BOUNDARY O? KlMBERLEr TOWNSHIP FOLLOWS THE ORIGINAL SOUTH SHORELINE OF THE VC^TREAL RIVER.

THE INFORMATION THAT. APPEARS ON THIS MAP HAS BEEN COMPILED

VARIOUS SOURCES, ACCURACY IS NOT

UARANTEED. THOSE WISHING TO STAKE MIN ING CLAIMS SHOULD CON SULT WITH THE MINING RECORDER. MINISTRY NORTHERN DEVELOP MENT AND MINES, FOR AD DITIONAL INFORMATlQt^

ROTICE OF FORESTRY ACTIVITYTHS TOWNSHP l AREA FALLS WITHIN THE ELK LAKE MANAGEMENT UNIT

AND MAY BE SUBJECT TO FORESTRY OPERATIONS. THE MNR UNIT FORESTER FOR THIS AREA CAN BE CONTACTED AT: P.O. BOX I29

SWASTIKA. ONT.POK ITO705-642-322212 (1-565

CIRCULATED AUG. 18, 1992 B.R.B. ON THE STATUS OFLANDS SHOWN HEREON

.- ___. ^.^ ^d

1206318'205527

1205424X -'205537

TOWWSH l P

SHILLINGTON TOWNSHIP SMYTH TOWNSHIPFARRv TOWNSHIP

o

O)O

DOm

m

H^TD

Ol

OJen enO

41P15SB2004 2.13916 KIMBERLY 200

Page 16: Kimberley Township Assessment Report

,- t

5302000

5301000-

LEGEND

Trail

Clain Boundary

Forest Access Road

Trenching in Overburden (Bedrock Contact)

Exposed Bedrock (Quartz Showing)

Bulk Sampling

Clain Post (G. Windsor)

•5305000

lmO

om

ona*"my,

mmO)

m—1

s:TO

1 on

tCr-.JCO CJ

*"nmOmmo

5301COO

2 . j 8 9 l 6

NOTES:

1) Drawing taken from Ministry Natural Resources, Canada, 41P/15, Edition 3, for Matachewan, Timiskaming District, Ontario.

SCALE (METRIC)

100 100 200 300 400 500

41P15SE2004 2.18916 KIMBERLY 210

A

AA

DOE

HUflTcn&m oroup

DKf

Hunt Engineering Group P.O. Box 129, 524 King Street Porcupine, ON PON ICO Tel: 705 335 2135

CBECKKD BT

DRHK

WJJ.R

D.T.T. W/OZ/17

MW# CLAIMS (120631*. 1206317,1200469 A1211565)

Oattrio

PROJECT: HE121

Site DrawingSCilZ tem s 4500 em (B Slza)

CAD Fttf: HK121

SBAHQTC KTWHER

HE121 DwgJ

REVISION

Page 17: Kimberley Township Assessment Report